CN109032022B - Intelligent seamless connection operation method for alarm second connection program of test box - Google Patents

Intelligent seamless connection operation method for alarm second connection program of test box Download PDF

Info

Publication number
CN109032022B
CN109032022B CN201810894625.5A CN201810894625A CN109032022B CN 109032022 B CN109032022 B CN 109032022B CN 201810894625 A CN201810894625 A CN 201810894625A CN 109032022 B CN109032022 B CN 109032022B
Authority
CN
China
Prior art keywords
humidity
temperature
alarm
control
input
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810894625.5A
Other languages
Chinese (zh)
Other versions
CN109032022A (en
Inventor
张艳军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Tuomiluo High End Equipment Co ltd
Original Assignee
Jiangsu Tomilo Environmental Testing Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Tomilo Environmental Testing Equipment Co Ltd filed Critical Jiangsu Tomilo Environmental Testing Equipment Co Ltd
Priority to CN201810894625.5A priority Critical patent/CN109032022B/en
Publication of CN109032022A publication Critical patent/CN109032022A/en
Application granted granted Critical
Publication of CN109032022B publication Critical patent/CN109032022B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/042Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
    • G05B19/0423Input/output
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/25Pc structure of the system
    • G05B2219/25257Microcontroller

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The invention discloses an intelligent seamless connection operation method for an alarm second connection program of a test box, which comprises the following steps: determining a curve required to control the temperature and the humidity by a user, and sending the determined curve to a central control system as an input parameter; the temperature and humidity control system is used for controlling the temperature and humidity according to a temperature and humidity movement track route map input by a user; the time timer calculates the number of the current program, and after time recording emergency alarm is carried out for various emergency conditions through real-time calculation with the running time, the input control processor analyzes the input signal; when the physical alarm factor is removed, a continuation button is manually started; the equipment continues to operate, whether the sensor is recovered or not is detected, and after manual confirmation, the time arithmetic unit detects the DI input point; and performing second continuation in a preset mode of the user system after the equipment is restarted by detecting the multiprocessor and a circulation strategy in the controller.

Description

Intelligent seamless connection operation method for alarm second connection program of test box
Technical Field
The invention relates to test equipment and a control method of the test equipment, in particular to an intelligent seamless connection operation method of a test box alarm second continuing program.
Background
At present, in the environmental test industry, particularly a temperature and humidity test box is used, fault alarm is generated, fault removal needs to be restarted, after the test box is restarted, the current program needs to be operated again, the operation cannot be continued in the moment of stopping, so that serious repeated tests waste time of customers, electric power and low efficiency are caused, the test time of products exceeds the original required test, and the bearing capacity of the test products under the temperature curve cannot be truly simulated.
Therefore, it is necessary to provide an intelligent seamless operation method for the second-to-alarm continuing program of the test chamber to solve the above problems.
Disclosure of Invention
The invention aims to provide an intelligent seamless connection operation method for an alarm second continuing program of a test box.
The technical scheme is as follows:
an intelligent seamless connection operation method for a test box alarm second connection program,
the method comprises the following steps:
1) before the temperature and humidity work, determining a curve required to be controlled by the temperature and humidity by a user, and sending the determined curve to a central control system as an input parameter;
2) the temperature and humidity control system decomposes the curves according to a temperature and humidity movement track route diagram input by a user, determines logic actions and analog quantity output of each control output point according to a temperature and humidity movement track path, calculates a difference value between the current state of the starting point and a temperature and humidity target point by taking a first temperature and humidity curve control task as the starting point, and calculates the control requirement of the current temperature and humidity point;
3) the time timer calculates the number of the current program, and time records are made for various emergency conditions through real-time calculation with the running time;
4) after the emergency condition is alarmed, analyzing the input signal through the input control processor, and resetting to be invalid when the alarm physical factor is not released;
5) when the physical alarm factor is removed, a continuation button is manually started;
5-1) calculating a point when stopping by combining a time controller, and sampling the current state;
5-2) acquiring input information by an input sensor in the sampling process;
5-3) the main control processor calculates the control state of the current output action according to the acquired input signal;
5-4) simultaneously reading initial temperature and humidity control information from a temperature and humidity curve planned in advance by a temperature and humidity control processor;
6) the equipment continues to operate, whether the sensor is recovered or not is detected, and after manual confirmation, the time arithmetic unit detects the DI input point;
7) and performing second continuation in a preset mode of the user system after the equipment is restarted by detecting the multiprocessor and a circulation strategy in the controller.
Furthermore, the control is carried out through an alarm second continuous accurate control system, and the alarm second continuous accurate control system comprises a sensor, an output controller, an external input detection controller, an internal abnormal input detection controller, a time timer and a temperature and humidity PID controller.
Further, sensors are arranged on each safety loop for input detection, and are used for acquiring the current control state; the output controller sends out control signals to each output joint point to prompt the temperature and humidity of the equipment to be controlled according to a preset mode.
Furthermore, the temperature and humidity PID controller realizes temperature and humidity control so as to ensure that the temperature and humidity control process according to a curve in advance and realize a rapid and stable control effect.
Furthermore, when the physical alarm is released, the output control processor calculates the current action state of each input point, the DI control information and the client curve requirement are transmitted to the output controller through the PID controller, the output controller directly controls the switching action of each output port and the high-frequency pulse control, and the output control processor comprises a multi-processor action cooperative controller which coordinates the logic action and the action controller task execution on each output point; the time timer accurately calculates each instant action, ensures that the equipment can quickly recover the time and control action of the state before the alarm after the alarm is reset, and realizes the function of continuing the second after the alarm is reset.
Compared with the prior art, when the physical alarm is released, the output control processor calculates the current action state of each input point, DI control information and a client curve requirement are transmitted to the output controller through the PID controller, the output controller directly controls the switching action of each output port and the high-frequency pulse control, and the output control processor comprises a multi-processor action cooperative controller and coordinates the execution of logic action and action controller tasks on each output point; the time timer accurately calculates each instant action, ensures that the equipment can quickly recover the time and control action of the state before the alarm after the alarm is reset, and realizes the function of continuing the second after the alarm is reset.
Drawings
FIG. 1 is one of the flow diagrams of the present invention.
FIG. 2 is a second schematic flow chart of the present invention.
Detailed Description
Example (b):
referring to fig. 1 to 2, the present embodiment shows an intelligent seamless connection operation method for the second alarm continuing procedure of a test chamber,
the method comprises the following steps:
1) before the temperature and humidity work, determining a curve required to be controlled by the temperature and humidity by a user, and sending the determined curve to a central control system as an input parameter;
2) the temperature and humidity control system decomposes the curves according to a temperature and humidity movement track route diagram input by a user, determines logic actions and analog quantity output of each control output point according to a temperature and humidity movement track path, calculates a difference value between the current state of the starting point and a temperature and humidity target point by taking a first temperature and humidity curve control task as the starting point, and calculates the control requirement of the current temperature and humidity point;
3) the time timer calculates the number of the current program, and time records are made for various emergency conditions through real-time calculation with the running time;
4) after the emergency condition is alarmed, analyzing the input signal through the input control processor, and resetting to be invalid when the alarm physical factor is not released;
5) when the physical alarm factor is removed, a continuation button is manually started;
5-1) calculating a point when stopping by combining a time controller, and sampling the current state;
5-2) acquiring input information by an input sensor in the sampling process;
5-3) the main control processor calculates the control state of the current output action according to the acquired input signal;
5-4) simultaneously reading initial temperature and humidity control information from a temperature and humidity curve planned in advance by a temperature and humidity control processor;
6) the equipment continues to operate, whether the sensor is recovered or not is detected, and after manual confirmation, the time arithmetic unit detects the DI input point;
7) and performing second continuation in a preset mode of the user system after the equipment is restarted by detecting the multiprocessor and a circulation strategy in the controller.
The alarm second continuous accurate control system is used for controlling and comprises a sensor, an output controller, an external input detection controller, an internal abnormal input detection controller, a time timer and a temperature and humidity PID controller.
The sensors are arranged on each security loop for input detection and are used for acquiring the current control state; the output controller sends out control signals to each output joint point to prompt the temperature and humidity of the equipment to be controlled according to a preset mode.
The temperature and humidity PID controller realizes temperature and humidity control to ensure that the temperature and humidity are controlled according to a curve in advance, and a quick and stable control effect can be realized.
When the physical alarm is relieved, the output control processor calculates the current action state of each input point, DI control information and a client curve requirement are transmitted to the output controller through a PID controller, the output controller directly controls the switching action of each output port and the high-frequency pulse control, and the output control processor comprises a multi-processor action cooperative controller and coordinates the execution of logic action and action controller tasks on each output point; the time timer accurately calculates each instant action, ensures that the equipment can quickly recover the time and control action of the state before the alarm after the alarm is reset, and realizes the function of continuing the second after the alarm is reset.
Compared with the prior art, in the embodiment, when the physical alarm is released, the output control processor calculates the current action state of each input point, the DI control information and the client curve requirement are transmitted to the output controller through the PID controller, the output controller directly controls the switching action of each output port and the high-frequency pulse control, and the output control processor comprises a multi-processor action cooperative controller which coordinates the logic action and the action controller task execution on each output point; the time timer accurately calculates each instant action, ensures that the equipment can quickly recover the time and control action of the state before the alarm after the alarm is reset, and realizes the function of continuing the second after the alarm is reset.
What has been described above are merely some embodiments of the present invention. It will be apparent to those skilled in the art that various changes and modifications can be made without departing from the inventive concept thereof, and these changes and modifications can be made without departing from the spirit and scope of the invention.

Claims (5)

1. An intelligent seamless connection operation method for a test box alarm second connection program is characterized in that:
the method comprises the following steps:
1) before the temperature and humidity work, determining a curve required to be controlled by the temperature and humidity by a user, and sending the determined curve to a central control system as an input parameter;
2) the temperature and humidity control system decomposes the curves according to a temperature and humidity movement track route diagram input by a user, determines logic actions and analog quantity output of each control output point according to a temperature and humidity movement track path, calculates a difference value between the current state of the starting point and a temperature and humidity target point by taking a first temperature and humidity curve control task as the starting point, and calculates the control requirement of the current temperature and humidity point;
3) the time timer calculates the number of the current program, and time records are made for various emergency conditions through real-time calculation with the running time;
4) after the emergency condition is alarmed, analyzing the input signal through the input control processor, and resetting to be invalid when the alarm physical factor is not released;
5) when the physical alarm factor is removed, a continuation button is manually started;
5-1) calculating a point when stopping by combining a time controller, and sampling the current state;
5-2) acquiring input information by an input sensor in the sampling process;
5-3) the main control processor calculates the control state of the current output action according to the acquired input signal;
5-4) simultaneously reading initial temperature and humidity control information from a temperature and humidity curve planned in advance by a temperature and humidity control processor;
6) the equipment continues to operate, whether the sensor is recovered or not is detected, and after manual confirmation, the time arithmetic unit detects the DI input point;
7) and performing second continuation in a preset mode of the user system after the equipment is restarted by detecting the multiprocessor and a circulation strategy in the controller.
2. The intelligent seamless connection operation method for the alarm second continuing program of the test chamber according to claim 1, characterized in that: the alarm second continuous accurate control system is used for controlling and comprises a sensor, an output controller, an external input detection controller, an internal abnormal input detection controller, a time timer and a temperature and humidity PID controller.
3. The intelligent seamless connection operation method for the alarm second continuing program of the test chamber according to claim 2, characterized in that: the sensors are arranged on each security loop for input detection and are used for acquiring the current control state; the output controller sends out control signals to each output joint point to prompt the temperature and humidity of the equipment to be controlled according to a preset mode.
4. The intelligent seamless connection operation method for the alarm second continuing program of the test chamber according to claim 3, characterized in that: the temperature and humidity PID controller realizes temperature and humidity control to ensure that the temperature and humidity are controlled according to a curve in advance, and a quick and stable control effect can be realized.
5. The intelligent seamless connection operation method for the alarm second continuing program of the test chamber according to claim 4, characterized in that: when the physical alarm is relieved, the output control processor calculates the current action state of each input point, DI control information and a client curve requirement are transmitted to the output controller through a PID controller, the output controller directly controls the switching action of each output port and the high-frequency pulse control, and the output control processor comprises a multi-processor action cooperative controller and coordinates the execution of logic action and action controller tasks on each output point; the time timer accurately calculates each instant action, ensures that the equipment can quickly recover the time and control action of the state before the alarm after the alarm is reset, and realizes the function of continuing the second after the alarm is reset.
CN201810894625.5A 2018-08-08 2018-08-08 Intelligent seamless connection operation method for alarm second connection program of test box Active CN109032022B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810894625.5A CN109032022B (en) 2018-08-08 2018-08-08 Intelligent seamless connection operation method for alarm second connection program of test box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810894625.5A CN109032022B (en) 2018-08-08 2018-08-08 Intelligent seamless connection operation method for alarm second connection program of test box

Publications (2)

Publication Number Publication Date
CN109032022A CN109032022A (en) 2018-12-18
CN109032022B true CN109032022B (en) 2021-01-15

Family

ID=64649330

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810894625.5A Active CN109032022B (en) 2018-08-08 2018-08-08 Intelligent seamless connection operation method for alarm second connection program of test box

Country Status (1)

Country Link
CN (1) CN109032022B (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3072048B2 (en) * 1996-03-19 2000-07-31 株式会社東芝 Computer system and software failure recovery method for computer system
CN103337837B (en) * 2009-05-18 2015-09-30 许昌永新电气股份有限公司 A kind of supply line protecting control method
CN103150173B (en) * 2011-12-06 2016-06-01 亚旭电子科技(江苏)有限公司 Intelligent energy-saving program starting method
CN103454004B (en) * 2013-09-10 2015-07-29 中环天仪股份有限公司 A kind of digital multi-drop temp measuring system and implementation method
US9471491B2 (en) * 2013-11-06 2016-10-18 International Business Machines Corporation Cache configured to log addresses of high-availability data

Also Published As

Publication number Publication date
CN109032022A (en) 2018-12-18

Similar Documents

Publication Publication Date Title
WO2021112256A3 (en) Systems and methods for automatic anomaly detection in mixed human-robot manufacturing processes
EP3703250A1 (en) Servo driver and state change detecting method
CN110134077A (en) Data processing method, data processing equipment and recording medium
CN109032022B (en) Intelligent seamless connection operation method for alarm second connection program of test box
US10416646B2 (en) Systems, methods, and articles of manufacture for operation of an industrial machine
CN110794237A (en) Fault auxiliary positioning method, device and equipment for elevator
CN113818514B (en) Method, controller and device for judging flameout of excavator and excavator
US20210157298A1 (en) Program restart assisting apparatus
CN112415946B (en) Method and device for monitoring communication state of PLC (programmable logic controller) lower computer
JPS623464B2 (en)
CN114962631A (en) Retarder electromagnetic valve control method, device, equipment and medium
JP2008097285A (en) Plant monitor and control system
CN115061415B (en) Automatic process monitoring method and device and computer readable storage medium
JP2007286707A (en) Equipment diagnostic system
CN110793546B (en) Optimization method and system for inertial equipment adjustment and storage medium
JP2013161380A (en) Control logic management device
JP2002186281A (en) Motor controller
JP2932507B2 (en) Anomaly detection device
JP2006235890A (en) Operation support system and operation support method
JP2715589B2 (en) Sensor switching device
KR20080029455A (en) The system and method for monitoring the overcurrent of direct current motor
JP2006058983A (en) Process data collector
JP2004226114A (en) Sensor device
JPH027199A (en) Fault diagnostic device for control computer for construction equipment
JP2000112506A (en) Sequence controller and method for monitoring the same

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 215300 plants A6, a7, a8 and B10, No. 8, Huacheng Road, Lujia Town, Kunshan City, Suzhou City, Jiangsu Province

Patentee after: Jiangsu Tuomiluo High-end Equipment Co.,Ltd.

Address before: 215300 No.427 Sanxiang Road, Kunshan Economic and Technological Development Zone, Suzhou City, Jiangsu Province

Patentee before: JIANGSU TOLIMO ENVIRONMENT TESTING EQUIPMENT Co.,Ltd.