CN109030213A - Nut guarantees load test tooling - Google Patents

Nut guarantees load test tooling Download PDF

Info

Publication number
CN109030213A
CN109030213A CN201810903461.8A CN201810903461A CN109030213A CN 109030213 A CN109030213 A CN 109030213A CN 201810903461 A CN201810903461 A CN 201810903461A CN 109030213 A CN109030213 A CN 109030213A
Authority
CN
China
Prior art keywords
split type
transition sleeve
type transition
nut
plug
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810903461.8A
Other languages
Chinese (zh)
Inventor
雷钧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Mechanical Product Quality Supervision And Inspection Station
Shanxi Institute of Mechanical and Electrical Engineering
Original Assignee
Shanxi Mechanical Product Quality Supervision And Inspection Station
Shanxi Institute of Mechanical and Electrical Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Mechanical Product Quality Supervision And Inspection Station, Shanxi Institute of Mechanical and Electrical Engineering filed Critical Shanxi Mechanical Product Quality Supervision And Inspection Station
Priority to CN201810903461.8A priority Critical patent/CN109030213A/en
Publication of CN109030213A publication Critical patent/CN109030213A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/08Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M13/00Testing of machine parts

Abstract

Nut provided by the invention guarantees load test tooling, belongs to nut machinery performance technologies field, mainly solves the problems, such as to thread off when nut test and stuck is difficult to separate on plug.Including split type transition sleeve and plug, the split type transition sleeve, it is made of at least three parts, its each section is altogether in a tubular form, its main feature is that: split type transition sleeve external cylindrical surface is provided with screw thread, it can be matched with subject nut, inner cylinder face is machined with T-type screw thread, can match with the T-type end of thread of plug;Split type transition sleeve includes split type transition sleeve one, split type transition sleeve two and split type transition sleeve three;When test, encounter subject nut tripping and stuck in the case where split type transition sleeve, first screw out the plug with the cooperation of split type transition sleeve, split type transition sleeve one is taken out out of subject nut afterwards, split type transition sleeve two and split type transition sleeve three are further taken out, to realize the separation of subject nut and tooling.

Description

Nut guarantees load test tooling
Technical field
The invention belongs to nut machinery performance technologies fields, and in particular to nut guarantees load test tooling.
Background technique
Existing nut guarantees that load test is to apply axial tension to bolt using plug.When nut is met the requirements of the standard When, the nut after test can be screwed out from plug with hand.When nut does not meet standard requirements, nut will thread off and it is stuck On plug.There is defects for this method by plug application axial tension, i.e., since nut does not meet standard requirements, cause Nut is stuck on plug, needs to cut off the rod head containing nut or destroys nut.Repeatedly excision plug will lead to Plug is scrapped, and is destroyed nut and is needed to buy special equipment, can all generate waste using both methods.
Summary of the invention
The present invention is to solve when nut does not meet standard requirements, and nut will thread off and the stuck problem on plug, is mentioned Guarantee load test tooling for a kind of nut using split type transition sleeve.
The present invention in order to solve the problems existing in the prior art, is adopted the technical scheme that:
Nut guarantees load test tooling, including split type transition sleeve and plug, the split type transition sleeve, by least Three parts are constituted, each section altogether in a tubular form, its main feature is that: split type transition sleeve external cylindrical surface is provided with screw thread, can be with It is matched with subject nut, inner cylinder face is machined with T-type screw thread, can match with the T-type end of thread of plug;Split type transition Set includes split type transition sleeve one, split type transition sleeve two and split type transition sleeve three;Before test, split type transition sleeve is mounted in Then the T-type end of thread of plug will be tested nut rotation set on the split type transition sleeve, be tested;The plug is fixed, Fixture applies pulling force to subject nut, when encountering subject nut tripping and stuck in the case where split type transition sleeve, first screws out With split type transition sleeve cooperation plug 4, after by split type transition sleeve one from subject nut in take out, further take out split type transition Set two and split type transition sleeve three, to realize the separation of subject nut and tooling.
Compared with the prior art, the present invention has the following beneficial effects:
The present invention utilizes split type transition sleeve and plug, avoids due to nut tripping and stuck needs to cut off on plug Rod head destroys nut and leads to the case where scrapping and purchase the special equipment for destroying nut of plug.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is cross-sectional view of the present invention;
Fig. 3 is the split type transition engaging body schematic diagram of the present invention;
Fig. 4 is plug schematic diagram of the invention.
In figure: 1-fixture;2-subject nuts;3-split type transition sleeves;The split type transition sleeve one of 3-1-;3-2-points Body formula transition sleeve two;The split type transition sleeve three of 3-3-;4-plugs.
Specific embodiment
As shown in Figure 1, Figure 2, shown in Fig. 3 and Fig. 4, nut guarantees load test tooling, including split type transition sleeve 3 and plug 4, the split type transition sleeve 3 is made of at least three parts, each section altogether in a tubular form, its main feature is that: split type transition It covers 3 external cylindrical surfaces and is provided with screw thread, can be matched with subject nut 2, inner cylinder face is machined with T-type screw thread, can be with plug 4 The T-type end of thread match;Split type transition sleeve 3 includes split type one 3-1 of transition sleeve, two 3-2 of split type transition sleeve and fission Three 3-3 of formula transition sleeve;Before test, split type transition sleeve 3 is mounted in the T-type end of thread of plug 4, then will be tested 2 rotation set of nut On the split type transition sleeve 3, tested;The plug 4 is fixed, and fixture 1 applies pulling force to subject nut 2, when encountering It is tested the tripping of nut 2 and stuck in the case where split type transition sleeve 3, the plug 4 of first back-out and the cooperation of split type transition sleeve 3, Split type one 3-1 of transition sleeve is taken out out of subject nut 2 afterwards, further takes out split type two 3-2 of transition sleeve and split type transition sleeve Three 3-3, to realize the separation of subject nut 2 and tooling.
Use process:
It is tested according to standard requirements according to Fig. 1 arrangement tooling.When encounter subject nut 2 tripping and it is stuck split type When the case where transition sleeve 3, screw out with split type transition sleeve 3 cooperation plug 4, after by split type one 3-1 of transition sleeve from subject spiral shell It is taken out in mother 2, further takes out three 3-3 of split type two 3-2 of transition sleeve and split type transition sleeve, to realize subject nut 2 and work The separation of dress.

Claims (1)

1. nut guarantees load test tooling, including split type transition sleeve (3) and plug (4), the split type transition sleeve (3), be made of at least three parts, each section altogether in a tubular form, it is characterized in that: split type transition sleeve (3) external cylindrical surface is set It is equipped with screw thread, can be matched with subject nut (2), inner cylinder face is machined with T-type screw thread, can be with the T-type screw thread of plug (4) End matches;Split type transition sleeve (3) includes split type transition sleeve one (3-1), split type transition sleeve two (3-2) and split type mistake Cross set three (3-3);Before test, split type transition sleeve (3) are mounted in the T-type end of thread of plug (4), then will be tested nut (2) Rotation set is tested on the split type transition sleeve (3);The plug (4) is fixed, and fixture (1) applies to subject nut (2) Pulling force is tested nut (2) tripping and stuck in the case where split type transition sleeve (3), first back-out and split type transition when encountering Cover (3) cooperation plug (4), after by split type transition sleeve one (3-1) from subject nut (2) in take out, further take out split type mistake Set two (3-2) and split type transition sleeve three (3-3) are crossed, to realize the separation of subject nut (2) and tooling.
CN201810903461.8A 2018-08-09 2018-08-09 Nut guarantees load test tooling Pending CN109030213A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810903461.8A CN109030213A (en) 2018-08-09 2018-08-09 Nut guarantees load test tooling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810903461.8A CN109030213A (en) 2018-08-09 2018-08-09 Nut guarantees load test tooling

Publications (1)

Publication Number Publication Date
CN109030213A true CN109030213A (en) 2018-12-18

Family

ID=64633408

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810903461.8A Pending CN109030213A (en) 2018-08-09 2018-08-09 Nut guarantees load test tooling

Country Status (1)

Country Link
CN (1) CN109030213A (en)

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1213776A (en) * 1997-07-01 1999-04-14 株式会社理光 Tensile strength tester
CN2604312Y (en) * 2003-03-10 2004-02-25 岳国民 Oil press mould fixing device
CN201152840Y (en) * 2007-12-19 2008-11-19 奇瑞汽车股份有限公司 General bolt/nut test clamp
CN201470409U (en) * 2009-08-27 2010-05-19 芜湖金安世腾汽车安全系统有限公司 Novel bolt clamp for lab
CN101886961A (en) * 2010-07-26 2010-11-17 西安理工大学 Full-load static characteristic test device and test method of bolt joint surface unit
CN201810619U (en) * 2010-07-07 2011-04-27 张钧迪 Bidirectional locking connecting device
CN102507325A (en) * 2011-11-28 2012-06-20 芜湖市中兴机械技术开发有限公司 Thread testing process device and testing method
CN202649039U (en) * 2012-06-06 2013-01-02 奇瑞汽车股份有限公司 Stretching load-holding test fixture
CN203929501U (en) * 2014-06-12 2014-11-05 陕西法士特齿轮有限责任公司 A kind of nut tensile test fixture
CN204882242U (en) * 2015-07-31 2015-12-16 河南理工大学 Experimental quick detachable ground tackle device is drawn to laboratory stock
CN205504750U (en) * 2016-03-14 2016-08-24 杭州金锄市政园林工程有限公司 Municipal administration street lamp
CN205562281U (en) * 2016-04-27 2016-09-07 上汽大众汽车有限公司 Tensile test anchor clamps
CN107664607A (en) * 2017-09-21 2018-02-06 贵州航天新力铸锻有限责任公司 Round metal pin shearing test simple frock
CN209707249U (en) * 2018-08-09 2019-11-29 山西省机电设计研究院 Nut guarantees load test tooling

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1213776A (en) * 1997-07-01 1999-04-14 株式会社理光 Tensile strength tester
CN2604312Y (en) * 2003-03-10 2004-02-25 岳国民 Oil press mould fixing device
CN201152840Y (en) * 2007-12-19 2008-11-19 奇瑞汽车股份有限公司 General bolt/nut test clamp
CN201470409U (en) * 2009-08-27 2010-05-19 芜湖金安世腾汽车安全系统有限公司 Novel bolt clamp for lab
CN201810619U (en) * 2010-07-07 2011-04-27 张钧迪 Bidirectional locking connecting device
CN101886961A (en) * 2010-07-26 2010-11-17 西安理工大学 Full-load static characteristic test device and test method of bolt joint surface unit
CN102507325A (en) * 2011-11-28 2012-06-20 芜湖市中兴机械技术开发有限公司 Thread testing process device and testing method
CN202649039U (en) * 2012-06-06 2013-01-02 奇瑞汽车股份有限公司 Stretching load-holding test fixture
CN203929501U (en) * 2014-06-12 2014-11-05 陕西法士特齿轮有限责任公司 A kind of nut tensile test fixture
CN204882242U (en) * 2015-07-31 2015-12-16 河南理工大学 Experimental quick detachable ground tackle device is drawn to laboratory stock
CN205504750U (en) * 2016-03-14 2016-08-24 杭州金锄市政园林工程有限公司 Municipal administration street lamp
CN205562281U (en) * 2016-04-27 2016-09-07 上汽大众汽车有限公司 Tensile test anchor clamps
CN107664607A (en) * 2017-09-21 2018-02-06 贵州航天新力铸锻有限责任公司 Round metal pin shearing test simple frock
CN209707249U (en) * 2018-08-09 2019-11-29 山西省机电设计研究院 Nut guarantees load test tooling

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张亚军;: "螺栓拉伸试验夹具快换装置研究", 《制造业自动化》, vol. 35, no. 09, pages 152 - 154 *

Similar Documents

Publication Publication Date Title
CN103949847B (en) Utilize the method for the long thin walled cylinder body of bracing or strutting arrangement processing vapor turbine control valve
CN104959844A (en) Clamp device for machining long-cylinder thin-wall part
CN209707249U (en) Nut guarantees load test tooling
CN104142203B (en) Tight locking nut loose moment testing method and this test frock of unloading axial force
CN109030213A (en) Nut guarantees load test tooling
CN203936612U (en) Anti-turn bolt device for screwing up
CN103949679B (en) For processing thin-walled sleeve bracing or strutting arrangement and dismantle the instrument of this thin walled cylinder body
CN203696544U (en) Taper shank converting sleeve for machine tool spindle
CN209707250U (en) Tooling is used in bolt tension force test
CN201552546U (en) Decapitated bolt extractor
CN207901037U (en) A kind of valve seat dismounting puller
CN203711985U (en) Motorized spindle broach mechanism easy to detach
CN105014399A (en) Fixing device used for machining long-cylinder thin-walled parts
CN203993201U (en) A kind of frock clamp of anti-machining deformation
CN204277895U (en) A kind of studs quick despatch instrument
CN209830932U (en) Quick-mounting positioning and tensioning device with tripping function
CN209510885U (en) A kind of loose-proof self-lock bolt of convenient disassembly
CN208895754U (en) A kind of bellmouth elastic grinding mechanism
CN109060533A (en) Tooling is used in bolt tension force test
CN207044092U (en) Corrosion nut removes device in a kind of hydroelectric project
CN206972713U (en) A kind of fuel jettison stud
CN201714782U (en) Dodecagonal quincunx full-thread bolt device with washers
CN204976041U (en) Bolt anchor clamps
CN205298213U (en) Stop nut
CN203843771U (en) Novel extraction tool for pressure-bearing disc of downhole logging instrument

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination