- CN109028380A CN109028380A CN201810790017.XA CN201810790017A CN109028380A CN 109028380 A CN109028380 A CN 109028380A CN 201810790017 A CN201810790017 A CN 201810790017A CN 109028380 A CN109028380 A CN 109028380A
- Authority
- CN
- China
- Prior art keywords
- chute
- air
- high pressure
- pack assembly
- output terminal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F3/00—Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems
- F24F3/12—Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems characterised by the treatment of the air otherwise than by heating and cooling
- F24F3/16—Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems characterised by the treatment of the air otherwise than by heating and cooling by purification, e.g. by filtering; by sterilisation; by ozonisation
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F13/00—Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
- F24F13/28—Arrangement or mounting of filters
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F8/00—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying
- F24F8/10—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F8/00—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying
- F24F8/30—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by ionisation
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Disinfection, Sterilisation Or Deodorisation Of Air (AREA)
Abstract
The invention discloses a kind of high pressure pack assembly and air processors.The high pressure pack assembly is mainly used for air processor, wherein high pressure pack assembly includes shell, high voltage package ontology, output terminal and ion generating device, and shell includes chute;High voltage package ontology is connect with chute;Output terminal is connect with chute, and output terminal is electrically connected with the output end of high voltage package ontology, and output terminal is used for output HIGH voltage or no-voltage;Ion generating device is connect with chute, and ion generating device is electrically connected with the output end of high voltage package ontology.Present invention improves over the structures of high pressure pack assembly, make the easier for installation of high pressure pack assembly.
Description
Technical field
The present invention relates to field of home appliance technology more particularly to a kind of high pressure pack assemblies and air processor.
Background technique
The air processors such as air conditioner, air purifier usually have the clean air package purified to air,
The clean air package includes high voltage package, and, the output terminal and ion generating device being electrically connected with the output end of high voltage package.
During assembling air processor, it will usually high voltage package, output terminal and ion generating device are installed to sky respectively
On Flash Gas Compression Skid System, installation is very inconvenient, influences the assembly efficiency of air processor.
Summary of the invention
The main purpose of the present invention is to provide a kind of high pressure pack assemblies, it is intended to simplify the circuit structure of high pressure pack assembly,
The cost of high pressure pack assembly is reduced, and makes the easier for installation of high pressure pack assembly.
To achieve the above object, the present invention proposes a kind of high pressure pack assembly, is used for air processor, the high pressure package
Part includes:
Shell, the shell include chute;
High voltage package ontology is connect with the chute;
Output terminal is connect with the chute, and the output terminal is electrically connected with the output end of the high voltage package ontology,
The output terminal is used for output HIGH voltage or no-voltage;
Ion generating device is connect with the chute, the output of the ion generating device and the high voltage package ontology
End electrical connection.
Preferably, the elongated setting of the chute, the high voltage package ontology are connect with one end of the chute.
Preferably, the quantity of the chute is two, and two chutes are arranged along the length direction of the shell;Institute
State output terminal quantity be it is multiple, multiple output terminals are distributed on two chutes, described this position of high voltage package
It is connect between two chutes, and with the end of two chutes.
Preferably, the chute surface offers locating slot and the first cabling channel, and first cabling channel is walked described in
The length direction of coil holder extends, and the locating slot and first cabling channel are arranged in a crossed manner;The ion generating device includes supplying
First mounting shell of its electrode installation, at least partly described first mounting shell are inserted into first cabling channel and the locating slot
It is interior, the ion generating device and the chute are positioned.
Preferably, the air processor includes air inlet bracket, and first cabling channel is opened in the chute face
To the side of the air inlet bracket, the chute connect with the air inlet bracket, so that the air inlet bracket covers described the
One cabling channel.
Preferably, the air processor includes air cleaner modules, which is mounted on the air inlet
On bracket, the air cleaner modules and the air inlet bracket all have windward side and leeward side;The shell be set to it is described into
The leeward side of wind bracket, the electrode of the ion generating device are located at the windward side of the air cleaner modules.
Preferably, the quantity of the output terminal is multiple, and multiple output terminals are along far from the high voltage package ontology
Direction be arranged successively, the second cabling channel separated with first cabling channel is offered on the chute, close to the height
The output terminal of briquetting ontology is set in second cabling channel, and the output terminal far from the high voltage package ontology is led by connection
Line is electrically connected with the high voltage package ontology, and the connecting wire is set in first cabling channel.
Preferably, the air processor includes multiple air cleaner modules being set side by side, and the ion fills
Setting between the adjacent two sides of two air cleaner modules, the ion generating device includes multiple electrodes, multiple
The distribution of electrodes is in the ion generating device close to the two sides of the air cleaner modules.
Preferably, the ion generating device further includes the pcb board for multiple electrode installations, the pcb board and institute
State the output end electrical connection of high voltage package ontology.
Preferably, the air processor includes multiple air cleaner modules being set side by side, the output terminal position
Between the adjacent two sides of two air cleaner modules, the output terminal includes spaced two sub- terminals,
The two sub- terminals are electrically connected with the output end of the high voltage package ontology respectively, and the two sub- terminals are used for and the output terminal
The corresponding electrical connection of the air cleaner modules of two sides.
Preferably, for exporting high-voltage electricity, the ion generating device is electrically connected the output terminal with the output terminal
It connects.
The present invention also proposes a kind of air processor, which includes air inlet bracket and height as described above
Briquetting component, the high pressure pack assembly are connect with the air inlet bracket, wherein the high pressure pack assembly includes:
Shell, the shell include chute;
High voltage package ontology is connect with the chute;
Output terminal is connect with the chute, and the output terminal is electrically connected with the output end of the high voltage package ontology,
The output terminal is used for output HIGH voltage or no-voltage;
Ion generating device is connect with the chute, the output of the ion generating device and the high voltage package ontology
End electrical connection.
The present invention by by high voltage package ontology, output terminal and the ion generating device of high pressure pack assembly simultaneously and chute
Connection can make high pressure pack assembly carry out modularization, can will be high when high pressure pack assembly to be installed on air processor
Briquetting component is connect with the ontology of air processor as a whole, easier for installation, can be improved air-treatment dress
The assembly efficiency set.Moreover, by making high voltage package ontology simultaneously to other portions of ion generating device and air processor
Part is powered, and can reduce the quantity of high voltage package ontology, reduces the cost of high pressure pack assembly.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with
The structure shown according to these attached drawings obtains other attached drawings.
Fig. 1 is the decomposition texture schematic diagram of one embodiment of high pressure pack assembly of the present invention;
Fig. 2 is another angular views after the assembly of Fig. 1 mesohigh pack assembly;
Fig. 3 is the decomposition texture schematic diagram of one embodiment of ion generating device of the present invention;
Fig. 4 is the decomposition texture schematic diagram of one embodiment of chute of the present invention;
Fig. 5 is the structural schematic diagram of high pressure pack assembly and air cleaner modules of the present invention;
Fig. 6 is the decomposition texture schematic diagram of shell of the present invention and air processor;
Fig. 7 is the assembling structure schematic diagram of present invention air inlet bracket and high pressure pack assembly.
Drawing reference numeral explanation:
Label | Title | Label | Title |
10 | Shell | 111 | Second cabling channel |
11 | Chute | 112 | Card hole |
12 | First cover board | 113 | First cabling channel |
13 | Second mounting shell | 114 | Locating slot |
14 | Installation lid | 115 | Location hole |
20 | High pressure pack assembly | 121 | Clamping protrusion |
21 | High voltage package ontology | 131 | Second installation cavity |
22 | Output terminal | 221 | Sub- terminal |
23 | First mounting shell | 231 | First positioning region |
24 | Electrode | 232 | Second positioning region |
25 | Ion generating device | 301 | Mounting groove |
26 | Pcb board | 302 | Skeleton |
30 | Enter the wind bracket | 303 | Accommodation groove |
27 | Second cover board | 304 | Installing port |
31 | Air cleaner modules | 401 | Air inlet |
40 | Shell |
The embodiments will be further described with reference to the accompanying drawings for the realization, the function and the advantages of the object of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiment is only a part of the embodiments of the present invention, instead of all the embodiments.Base
Embodiment in the present invention, those of ordinary skill in the art under that premise of not paying creative labor it is obtained it is all its
His embodiment, shall fall within the protection scope of the present invention.
It is to be appreciated that the directional instruction (such as up, down, left, right, before and after ...) of institute is only used in the embodiment of the present invention
In explaining in relative positional relationship, the motion conditions etc. under a certain particular pose (as shown in the picture) between each component, if should
When particular pose changes, then directionality instruction also correspondingly changes correspondingly.
In addition, the description for being related to " first ", " second " etc. in the present invention is used for description purposes only, and should not be understood as referring to
Show or imply its relative importance or implicitly indicates the quantity of indicated technical characteristic." first ", " are defined as a result,
Two " feature can explicitly or implicitly include at least one of the features.In addition, the technical solution between each embodiment can
It to be combined with each other, but must be based on can be realized by those of ordinary skill in the art, when the combination of technical solution occurs
Conflicting or cannot achieve when, will be understood that the combination of this technical solution is not present, also not the present invention claims protection model
Within enclosing.
The present invention proposes a kind of high pressure pack assembly, which is mainly used for air processor.
Referring to FIG. 1 and FIG. 2, high pressure pack assembly 20 includes shell 10, and the high voltage package connecting with shell 10, the high voltage package
Including high voltage package ontology 21 and output terminal 22, high voltage package ontology 21 is mainly used for accessing power supply, and carries out to the voltage of power supply
Boosting processing;Output terminal 22 is electrically connected with the output end of high voltage package ontology 21, is used for output voltage, which can be high electricity
Pressure, can also no-voltage, specifically can be depending on the structure being connect with output terminal 22.Such as: at output terminal 22 and air
When managing the electrical connection of air cleaner modules 31 of device, 22 output HIGH voltage of output terminal can be made, make air purge module
31 formation electrostatic fields achieve the effect that air cleaning to adsorb the dust with ion.In addition, the quantity when output terminal 22 is
When multiple, a part of output HIGH voltage can be made, and another part exports no-voltage, air cleaner modules 31 is grounded to facilitate.
It should be noted that air cleaner modules 31 can also include the strainer being filtered to the bulky grain in room air, towards room
One or more in the air processors such as the humidifier of interior release steam or the washing module cleaned to air.
It is possible to further make high pressure pack assembly 20 further include ion generating device 25, which is used for
Cation or anion are generated, the dust in air is charged, to make in air more dust by air cleaner modules 31
Absorption, improves the clean-up effect of cleaning module.Wherein it is possible to connect the ion generating device 25 with shell 10, and make ion
Generating device 25 is electrically connected with the output end of high voltage package ontology 21.Thereby, it is possible to fill a high voltage package to ion simultaneously
25 and the power supply of air cleaner modules 31 are set, reduces the quantity of high voltage package ontology 21, reduces the cost of high pressure pack assembly 20.And
And the quantity by reducing high voltage package ontology 21, additionally it is possible to keep the circuit structure of high pressure pack assembly 20 simpler, reduce high pressure
The security risk of pack assembly 20.In addition, since high voltage package ontology 21, output terminal 22 and ion generating device 25 are installed in together
On one shell 10, high pressure pack assembly 20 can be enable to be mounted directly to as a whole 20 modularization of high pressure pack assembly
It is easier for installation on air processor, improve the assembly efficiency of air processor.
In one embodiment, above-mentioned output terminal 22 can be made for output HIGH voltage, and by ion generating device 25 with
The output terminal 22 electrical connection, thereby, it is possible to shorten the conductor length of connection ion generating device 25 and high voltage package ontology 21, and
The output end quantity of high voltage package ontology 21 is reduced, thus simplify the route of high pressure pack assembly 20, and, simplify high voltage package ontology 21
Structure.Wherein, ion generating device 25 can be connect by conducting wire with output terminal 22, can also pass through sheet metal, metal
The structures such as block are electrically connected with output terminal 22, specifically can be depending on the position of ion generating device 25 and output terminal 22.When
So, ion generating device 25 can also be individually electrically connected with the output end of high voltage package ontology 21, specifically can be according to high pressure pack assembly
20, depending on the relative position of ion generating device 25 and output terminal 22.
It is alternatively possible to make ion generating device 25 for generating anion, and keep the quantity of output terminal 22 multiple,
A portion output terminal 22 exports negative high voltage to air cleaner modules 31, and another part output terminal 22 is to air cleaning mould
31 output no-voltage of group, so that air processor has better air purification effect.
In the present embodiment, as shown in Figure 1, shell 10 can be made to include chute 11, and by high voltage package ontology 21, output end
Son 22 and ion generating device 25 are connect with chute 11.It is understood that output terminal 22 and/or ion generating device 25
It is usually electrically connected with the output end of high voltage package ontology 21 by conducting wire, by by high voltage package ontology 21, output terminal 22 and ion
Generating device 25 is connect with chute 11, can facilitate the cabling of conducting wire, improves the assembly efficiency of high pressure pack assembly 20.
It is possible to further make the elongated setting of chute 11, so that the structure of chute 11 is more reasonable, reduction is walked
The width of coil holder 11 reduces the occupied installation space of chute 11.Wherein, high voltage package ontology 21 can in chute 11
Portion's connection, can also connect with the end of chute 11, can when high voltage package ontology 21 to be connect with the end of chute 11
Cooperate high pressure pack assembly 20 with air cleaner modules 31 more compact, is conducive to the overall volume for reducing air processor.
When especially air processor includes multiple air cleaner modules 31 being set side by side, as shown in Figures 5 and 6, it can make to walk
Coil holder 11 is located between the adjacent two edges of two air cleaner modules 31, and high voltage package ontology 21 is made to be located at two air cleaner modules
The end in the gap between 31 adjacent two edges, so that the output terminal 22 and ion generating device 25 on chute 11 can
It is corresponding with multiple air cleaner modules 31, achieve the purpose that the remaining space for making full use of air processor.
It should be noted that high voltage package ontology 21 can be directly mounted on to the end of chute 11, can also such as Fig. 1 and
Shown in Fig. 2, making shell 10 includes the second mounting shell 13 installed for high voltage package ontology 21, second mounting shell 13 and chute 11
End connection so that high voltage package ontology 21 is connect with the end of chute 11.It is possible to further make 13 He of the second mounting shell
11 split settings of chute, so that the second mounting shell 13 and chute 11 can be produced individually, to simplify for making
The mould structure of shell 10 reduces the processing cost of mold.Wherein it is possible to will by modes such as screw, buckle, welding, stickups
Chute 11 and the connection of the second mounting shell 13, the present embodiment is with no restriction.Furthermore it is possible to make the second mounting shell 13 and chute 11
End be detachably connected, the non-dismountable connection in end of the second mounting shell 13 and chute 11, certainly, Qian Zheneng can also be made
Enough make maintenance and the replacement of high pressure pack assembly 20 more convenient.
In one optionally embodiment, as shown in Figure 1, can make the second mounting shell 13 that there is the second installation cavity 131, high pressure
Packet ontology 21 is mounted in the second installation cavity 131, and installation lid 14 is covered second installation cavity 131, to high voltage package sheet
Body 21 forms protection.Wherein it is possible to be detachably connected installation lid 14 and the second mounting shell 13, to facilitate to high pressure pack assembly 20
It repairs.The connection type of installation lid 14 and the second mounting shell 13 is referred to the peace of following first cover boards 12 and chute 11
Dress mode, details are not described herein again.Furthermore it is possible to the second installation cavity 131 be opened in the leeward side of the second mounting shell 13, to prevent
Water, dust etc. are brought into the second installation cavity 131 by air-flow from the opening of the second installation cavity 131.
In the present embodiment, the quantity of chute 11 can be one or more, specifically can according to the quantity of purge module and
It is fixed.Such as shown in Fig. 1 and Fig. 2,11 quantity of chute two of elongated setting can be made, and be distributed in high voltage package ontology
21 two sides, and two chutes 11 extend along the length direction of shell, when high pressure pack assembly 20 is installed to air processor
When upper, each chute 11 can correspond to one or more air cleaner modules 31.Thereby, it is possible to the chute grown is divided into two
A short chute 11, simplifies the mould structure for making chute 11, reduces the processing cost of mold.Moreover, passing through
High pressure pack assembly 20 is set between two chutes 11, can be improved and shorten connection output terminal 22 and ion generating device 25
Conducting wire total length.In addition, as shown in Figures 5 and 6, when multiple air cleaner modules 31 are divided to for two groups of left and right, and the sky in every group
When gas purge module 31 is arranged along the vertical direction, can by a chute 11 be set to top two air cleaner modules 31 it
Between, another chute 11 is set between two air cleaner modules 31 of lower part, the output of high pressure pack assembly 20 can be made
Terminal 22 is electrically connected with all realizations of air cleaner modules 31, and installation is very convenient, meanwhile, make high pressure pack assembly 20 and air
Purge module 31 cooperates more compact.
It should be noted that the quantity of output terminal 22 is multiple and multiple defeated when the quantity of chute 11 is two
Terminal 22 is distributed on two chutes 11 out, so that output terminal 22 is corresponding with air cleaner modules 31.
In addition, multiple ion generating devices 25 can be made to be distributed in two when the quantity of ion generating device 25 is multiple
On chute 11, so that ion generating device 25 is corresponding with air cleaner modules 31.
In the present embodiment, as shown in Fig. 2, 113 He of the first cabling channel arranged in a crossed manner can be opened up on 11 surface of chute
Locating slot 114, the first cabling channel 113 are used to carry out cabling, the extending direction of the first cabling channel 113 for the conducting wire on chute 11
Setting is a certain included angle with the extending direction of locating slot 114;Ion generating device 25 includes the electricity for ion generating device 25
The first mounting shell 23 that pole 24 is installed, at least partly the first mounting shell 23 are inserted into the first cabling channel 113 and locating slot 114, from
And position ion generating device 25 and chute 11, the first mounting shell 23 of limitation is along the first cabling channel 113 and locating slot 114
The movement of extending direction keeps the installation of ion generating device 25 and chute 11 more stable.
Specifically, as shown in Figures 2 and 3, can make the first mounting shell 23 includes the first positioning region 231 and the second positioning region
232, the extending direction of first positioning region 231 is consistent with the extending direction of the first cabling channel 113, and the second positioning region 232 is prolonged
It is consistent with the extending direction of locating slot 114 to stretch direction, by making the first positioning region 231 be inserted into the first cabling channel 113, makes second
Positioning region 232 is inserted into locating slot 114, so that chute 11 and the first mounting shell 23 be positioned.
Wherein, when 11 elongated setting of chute, the first cabling channel 113 can be made along the length direction of chute 11
Extend, to make full use of the structure of chute 11, the extending direction of locating slot 114 can be vertical with the length direction of chute 11
Or setting at an acute angle, herein with no restriction.
Furthermore it is possible to be interference fitted the first mounting shell 23 and the first cabling channel 113 or locating slot 114, to prevent first
Mounting shell 23 is separated with chute 11, can also be further fixed by the first mounting shell 23 and chute 11 by fixing piece, this
Embodiment is with no restriction.
Certainly, can be connected by modes such as buckle, screw, welding, stickups between ion generating device 25 and chute 11
It is connected together, it specifically can be depending on the structure of chute 11 and ion generating device 25.
In the present embodiment, as shown in Figure 1, Figure 2 and shown in Fig. 4, the second cabling channel 111 can be opened up on chute 11, second
Cabling channel 111 is used to carry out cabling for the conducting wire on chute 11, to position to conducting wire, while protecting conducting wire.Work as cabling
Multiple output terminals 22 are provided on frame 11, and multiple output terminals 22 are arranged successively along the direction far from high voltage package ontology 21
When, the output terminal 22 far from high voltage package ontology 21 is electrically connected by connecting wire (not shown) with high voltage package ontology 21, can be with
Make the first cabling channel 113 and the mutually separated setting of the second cabling channel 111, the output terminal 22 that will be close to high voltage package ontology 21 is set to
In second cabling channel 111, and connecting wire is set in the first cabling channel 113.Thereby, it is possible to prevent close to high voltage package ontology 21
Output terminal 22 and above-mentioned connecting wire contact and cut connecting wire.It should be noted that the first cabling channel 113 and second
Wire casing 111 can be opened in the ipsilateral of chute 11, can also be opened in the adjacent or opposite two sides of chute 11, specifically can root
Depending on structure according to chute 11, it need to only meet the first cabling channel 113 and the second wire casing 111 separates setting.In addition, connection
Conducting wire can partially be located in the first cabling channel 113, can also be entirely located in the first cabling channel 113, the present embodiment does not limit
System.
In the present embodiment, can make shell 10 includes the first cover board 12, which connect with chute 11, to cover
The second cabling channel of lid 111, so that the conducting wire in the second cabling channel 111 is positioned and be protected.Wherein, it the first cover board 12 and walks
Coil holder 11 can be fixedly connected, and can also be detachably connected, and certainly, the latter can make the maintenance of high pressure pack assembly 20 more square
Just.
In one optionally embodiment, as shown in Fig. 1 and Fig. 4, the first cover board 12 and chute 11 can be made to pass through clamping
Protrusion 121 and card hole 112 are detachably connected.Specifically, card hole 112 can be opened up on the inner sidewall of the second cabling channel 111,
Card sets clamping protrusion 121 in the edge surface of first cover board 12, by the way that the first cover board 12 to be installed in the second cabling channel 111, makes
Clamping protrusion 121 is inserted into card hole 112, and the first cover board 12 and chute 11 are connected.Wherein it is possible to keep clamping raised
121 quantity is multiple, and extends multiple clamping protrusions 121 along the length direction of the second cabling channel 111, to improve the first lid
Bonding strength between plate 12 and chute 11 keeps the connection between the first cover board 12 and chute 11 more stable.
It is of course also possible to clamping protrusion 121 is set on the inner sidewall of the second cabling channel 111, and in the corresponding position of cover board
It sets and opens up card hole 112, details are not described herein again.
It should be noted that shell 10 can also be made to include third cover board (not shown), the third cover board and chute 11
Connection, to cover the first cabling channel 113, the connection type of third cover board and chute 11 is referred to the first cover board 12 and cabling
The connection type of frame 11, details are not described herein again.
In the present embodiment, as shown in fig. 7, the first cabling channel 113 can be made to be opened in chute 11 towards air inlet bracket 30
Side, when making 30 connection between chute 11 and air inlet, the first cabling channel 113 on chute 11 is covered by air inlet bracket 30
Lid, the conducting wire in the first cabling channel 113 is positioned and be protected.Alternatively, can also make the second cabling channel 111 be opened in
Side of the chute 11 towards air inlet bracket 30, when making 30 connection between chute 11 and air inlet, second on chute 11 is walked
Wire casing 111 is covered by air inlet bracket 30, and details are not described herein again.
In one optionally embodiment, as shown in FIG. 6 and 7, it can make to enter the wind bracket 30 with elongated setting
Skeleton 302, the elongated setting of chute 11, and it is mounted on the inlet side or air side of skeleton 302, so that skeleton 302 covers
First wire casing 113 or the second wire casing 111.Chute 11 will not occupy the incoming air area of air inlet bracket 30 as a result,.
Such as Fig. 6 and with shown in 7, air processor includes air inlet bracket 30, and high pressure pack assembly 20 is mounted on air inlet bracket
On 30, wherein air inlet bracket 30 has windward side and leeward side, and the shell 10 of high pressure pack assembly 20 can be set to air inlet bracket
30 leeward side prevents air-flow by bands such as dust, water thereby, it is possible to block air inlet bracket 30 to the formation of high pressure pack assembly 20
Enter into the shell 10 of high pressure pack assembly 20.Moreover, because air cleaner modules 31 are set on air inlet bracket 30, it is located at air inlet branch
The air of 30 inlet side of frame is purified by air cleaner modules 31, and the content of dust in air is lower, high pressure package
The phenomenon that being less prone to dust on part 20.In addition, when being set in the entrance or air duct in air duct between air inlet, additionally it is possible to prevent hand
Encounter high pressure pack assembly 20 and causes safety accident.
It should be noted that air inlet bracket 30 for installation into the devices such as air conditioner or air purifier tunnel inlet,
Any position in ducting outlet and air duct, herein with no restriction.
In the present embodiment, as shown in FIG. 6 and 7, can make the air cleaner modules 31 of air processor be mounted on into
Wind bracket 30, the air cleaner modules 31 have windward side and leeward side, can make the shell 10 and air inlet of high voltage package component 20
When bracket 30 connects, the electrode 24 of ion generating device 25 is located at the inlet side of air cleaner modules 31.Ion fills as a result,
After setting 25 electrode 24 and charging dust by discharging ion, can rapidly it be brought into air cleaner modules 31 by air-flow,
And captured by air cleaner modules 31, to achieve the purpose that quickly and effectively to purify air.
Further, as shown in fig. 7, mounting groove 301 can also be set in the leeward side of air inlet bracket 30, and shell 10 is pacified
In the mounting groove 301, so that the cooperation of shell 10 and air inlet bracket 30 is more stable, and further air-flow is stopped to carry ash
Dirt enters in the first cabling channel 113.
In one optionally embodiment, shell 10 can be made to be located at the leeward side of air inlet bracket 30, make ion generating device
25 are located at chute 11 towards between air inlet 30 side, and the electrode 24 of ion generating device 25 is made to be located at air cleaner modules
31 inlet side.Make air processor that not only there is said effect as a result, but also the whole of ion generating device 25 can be made
Body small volume structure is more compact.
In the present embodiment, air cleaner modules 31 can be made to be detachably connected with air inlet bracket 30, to be convenient for changing or clearly
Wash air cleaner modules 31.Specifically, as shown in FIG. 6 and 7, it can make to enter the wind on bracket 30 and be formed with accommodation groove 303, the appearance
It sets slot 303 and is formed with installing port 304 in the side of air inlet bracket 30, air cleaner modules 31 are inserted by the mounting hole 304
In accommodation groove 303.Accommodation groove 303 can be one or more, specifically can be depending on the quantity of air cleaner modules 31.Separately
Outside, accommodation groove 303 can be located at the windward side of air inlet bracket 30, can also be located at the leeward side of air inlet bracket 30, certainly, the latter
Air inlet bracket 30 can be made to protect air cleaner modules 31, prevent hand from encountering air cleaner modules 31, especially enter the wind
When being provided with grid on bracket 30, protecting effect is more preferable.
In one optionally embodiment, installing port 304 can be made to be exposed to the outer surface of shell 40, in order to which user is to sky
Gas purge module 31 is operated.It is possible to further make chute 11 be located at side of the accommodation groove 303 far from installing port 304
Edge can make the defeated of air cleaner modules 31 and high pressure pack assembly when air cleaner modules 31 are inserted into accommodation groove 303
Terminal 22 is electrically connected out, so that the assembly of air cleaner modules 31 is more convenient.
In the present embodiment, the specific structure of air inlet bracket 30 can be depending on air processor type.Such as: work as air
When processing unit includes vertical air conditioner, vertical air conditioner is set to such as Fig. 6 and with bracket 30 shown in 7, can will be entered the wind
At air inlet 401, make to enter the wind the arc-shaped setting of bracket 30, and extend along the length direction of vertical air conditioner;High pressure pack assembly
20 are mounted on the leeward side of air inlet bracket 30, and ion generating device 25, which is located at, enters the wind the middle part of bracket 30 in left-right direction, and from
The electrode 24 of sub- generating device 25 is located at the windward side of air cleaner modules 31.
In the present embodiment, when the electrode 24 of ion generating device 25 is located at the inlet side of air cleaner modules 31, may be used also
So that air inlet bracket 30 has occlusion part (not shown), which deviates from the side of air cleaner modules 31 in electrode 24,
And barrier electrode 24, it is protected with being formed to electrode 24, and prevent manpower from encountering electrode 24 and causing safety accident.
In the present embodiment, as shown in Figures 3 to 5,24 quantity of electrode of ion generating device 25 is multiple, and sends out ion
Generating apparatus 25 further includes the pcb board 26 installed for multiple electrodes 24, and the pcb board 26 and the output end of high voltage package ontology 21 are electrically connected
It connects, so that ion generating device 25 can be corresponding with multiple air cleaner modules 31, and makes ion generating device 25 and high pressure
The connection of the output end of packet ontology 21 is more convenient.Wherein, the multiple electrodes 24 of ion generating device 25 can be according to following sides
Formula is arranged, and can also be arranged otherwise, specifically can according to the quantity and position of air cleaner modules 31 and
It is fixed.
It should be noted that pcb board 26 can be directly installed on chute 11, the first mounting shell 23 also may be mounted at
It is interior, when pcb board 26 is mounted in the first mounting shell 23, as shown in figure 3, can make the first mounting shell 23 that there is the first installation cavity
(not shown), pcb board 26 and multiple electrodes 24 are mounted in the first installation cavity, and pass through the first installation of the second cover board 27 covering
Chamber, pcb board 26 is positioned and be protected.
Certainly, in further embodiments, can also directly by after 24 parallel connection of multiple electrodes of ion generating device 25, with
The output end of high voltage package ontology 21 is electrically connected.
In the present embodiment, when the quantity of air cleaner modules 31 is multiple, as shown in figure 5, can be by high pressure package
After part 20 is installed on air processor, make ion generating device 25 be located at the adjacent two sides of two air cleaner modules 31 it
Between, and the multiple electrodes 24 of ion generating device 25 is made to be distributed in ion generating device 25 close to the two of air cleaner modules 31
Side.Make the multiple electrodes 24 of an ion generating device 25 corresponding with two air cleaner modules 31 as a result, to reduce ion
The quantity of generating device 25 reduces the cost of high pressure pack assembly 20.
Specifically, it can make chute 11 between adjacent two air cleaner modules 31, so that ion on chute 11
Generating device 25 is located between the adjacent two sides of two air cleaner modules 31.Wherein, chute 11 can prolong in a downwardly direction
It stretches, can also extend in left-right direction, it specifically can be depending on the arrangement mode of air cleaner modules 31.Such as: when can make
Chute 11 vertically extends, and be located at the adjacent two sides of two air cleaner modules 31 arranging in left-right direction it
Between, alternatively, extending chute 11 in left-right direction, and it is adjacent to be located at two air cleaner modules 31 arranged along the vertical direction
Two sides between so that chute 11 and the structure of air cleaner modules 31 are more compact.
It is equally possible that being located at output terminal 22 between the adjacent two sides of two air cleaner modules 31, and make defeated
Terminal 22 has multiple interfaces out, and multiple interfaces are distributed in output terminal 22 close to the two sides of air cleaner modules 31, so that one
A output terminal 22 can be electrically connected with the air cleaner modules 31 of two sides.Further, as shown in figure 4, output end can be made
Son 22 includes spaced two sub- terminals 221, and two sub- terminals 221 are electrically connected with the output end of high voltage package ontology 21 respectively,
And two sub- terminal 221 for it is corresponding with the air cleaner modules 31 of 22 two sides of output terminal electrical connection so that output terminal 22 and
The connection of air cleaner modules 31 is more flexible.Such as: it can according to need, two sub- terminals 221 is made to export different voltage,
Improve the performance of air cleaner modules 21;In addition, when output terminal 22 is not between adjacent two air cleaner modules 31, it can
Only to install a sub- terminal 221, to reduce the cost of output terminal 22.
In order to make to be steadily contacted between output terminal 22 and air cleaner modules 31,31 He of air cleaner modules can also be made
It is positioned between the shell 10 of high pressure pack assembly 20 by location structure.Specifically, as shown in figure 4, location structure can be made
Including positioning protrusion and location hole, which is opened on shell 10, and it is net that positioning protrusion (not shown) is correspondingly arranged at air
Change in mould group 31, when by air cleaner modules 31 with the connection of air inlet bracket 30, positioning protrusion is inserted into location hole 115,
To position air cleaner modules 31 and chute 11, to make the output terminal 22 being mounted on chute 11 and air
Purge module 31 stablizes electrical connection.
It should be noted that the air processor in the present invention includes air conditioner, air purifier etc., wherein air-conditioning
Implement body can be air conditioner indoor unit (such as wall-hanger), floor air conditioner, mobile air conditioner, four sides air-out ceiling machine or window machine etc.,
Floor air conditioner can be the types such as rectangular cabinet-type air conditioner or round cabinet-type air conditioner again.
When air processor includes air conditioner, which has heat exchanging air duct, and high pressure pack assembly reliably closely exchanges heat
The inlet side in air duct or air side setting, certainly, high pressure pack assembly may be alternatively located at the middle part of heat exchanging air duct.
As shown in fig. 6, air processor includes the shell 40 for offering air inlet 401, can make to enter the wind bracket 30 with
The shell 40 connection, and be set at the air inlet 401 of shell 40, and the installation of air inlet bracket 30 is very convenient.Wherein, shell
40 shape can be depending on the type of air processor.Such as in round cabinet-type air conditioner, shell 40 is in arc-shaped.Implement one
In example, can make shell 40 includes the air inlet faceplate for offering air inlet 401, and, offer the wind outlet panel of air outlet (not
Show), air inlet faceplate and wind outlet panel are enclosed the space for installations such as the blower of air processor or heat exchangers.The reality
It applies in example, the connection of air inlet faceplate and wind outlet panel is preferably detachably connected, and is connected for example, by using modes such as buckle or screws
It connects, in order to open the shell of air processor.
The present invention also proposes a kind of air processor, which includes high pressure pack assembly, the high pressure package
The specific structure of part is referring to above-described embodiment, since air processor proposed by the present invention includes the institute of above-mentioned high pressure pack assembly
There are all schemes of embodiment, therefore, at least there is technical effect identical with the high pressure pack assembly, do not explain one by one herein
It states.
The above description is only a preferred embodiment of the present invention, is not intended to limit the scope of the invention, all at this
Under the inventive concept of invention, using equivalent structure transformation made by description of the invention and accompanying drawing content, or directly/use indirectly
It is included in other related technical areas in scope of patent protection of the invention.
Claims (12)
1. a kind of high pressure pack assembly, it to be used for air processor, which is characterized in that the high pressure pack assembly includes:
Shell, the shell include chute;
High voltage package ontology is connect with the chute;
Output terminal is connect with the chute, and the output terminal is electrically connected with the output end of the high voltage package ontology, described
Output terminal is used for output HIGH voltage or no-voltage;
Ion generating device is connect with the chute, the output end electricity of the ion generating device and the high voltage package ontology
Connection.
2. high pressure pack assembly as described in claim 1, which is characterized in that the elongated setting of chute, the high pressure
Packet ontology is connect with one end of the chute.
3. high pressure pack assembly as claimed in claim 2, which is characterized in that the quantity of the chute is two, is walked described in two
Coil holder is arranged along the length direction of the shell;The quantity of the output terminal be it is multiple, multiple output terminals are distributed in
On two chutes, the high voltage package ontology is connect between two chutes, and with the end of two chutes.
4. the high pressure pack assembly as described in any one of claims 1 to 3, which is characterized in that the chute surface opens up
There are locating slot and the first cabling channel, first cabling channel extends along the length direction of the chute, the locating slot and institute
It is arranged in a crossed manner to state the first cabling channel;The ion generating device includes the first mounting shell for the installation of its electrode, at least partly institute
It states the first mounting shell to be inserted into first cabling channel and the locating slot, by the ion generating device and the chute
Positioning.
5. high pressure pack assembly as claimed in claim 4, which is characterized in that the air processor includes air inlet bracket, institute
It states the first cabling channel and is opened in side of the chute towards the air inlet bracket, the chute and the air inlet bracket connect
It connects, so that the air inlet bracket covers first cabling channel.
6. high pressure pack assembly as claimed in claim 5, which is characterized in that the air processor includes air cleaning mould
Group, the air cleaner modules are mounted on the air inlet bracket, and the air cleaner modules and the air inlet bracket all have and meet
Wind side and leeward side;The shell is set to the leeward side of the air inlet bracket, and the electrode of the ion generating device is located at described
The windward side of air cleaner modules.
7. high pressure pack assembly as claimed in claim 4, which is characterized in that the quantity of the output terminal is multiple, Duo Gesuo
It states output terminal to be arranged successively along the direction far from the high voltage package ontology, be offered on the chute and first cabling
The second cabling channel that slot separates, the output terminal close to the high voltage package ontology is set in second cabling channel, far from described
The output terminal of high voltage package ontology is electrically connected by connecting wire with the high voltage package ontology, and the connecting wire is set on described the
In one cabling channel.
8. the high pressure pack assembly as described in any one of claims 1 to 3, which is characterized in that the air processor packet
Multiple air cleaner modules being set side by side are included, the ion generating device is located at adjacent two of two air cleaner modules
Between side, the ion generating device includes multiple electrodes, and multiple distribution of electrodes are close in the ion generating device
The two sides of the air cleaner modules.
9. high pressure pack assembly as claimed in claim 8, which is characterized in that the ion generating device further includes for multiple described
The pcb board of electrode installation, the pcb board are electrically connected with the output end of the high voltage package ontology.
10. the high pressure pack assembly as described in any one of claims 1 to 3, which is characterized in that the air processor packet
Multiple air cleaner modules being set side by side are included, the output terminal is located at the adjacent two sides of two air cleaner modules
Between, the output terminal includes spaced two sub- terminals, the two sub- terminals respectively with the high voltage package ontology
Output end electrical connection, the two sub- terminals are for electrical connection corresponding with the air cleaner modules of the output terminal two sides.
11. the high pressure pack assembly as described in any one of claims 1 to 3, which is characterized in that the output terminal is for defeated
High-voltage electricity out, the ion generating device are electrically connected with the output terminal.
12. a kind of air processor, which is characterized in that the air processor includes air inlet bracket, and such as claim 1
To high pressure pack assembly described in any one of 11, the high pressure pack assembly is connect with the air inlet bracket.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810790017.XA CN109028380B (en) | 2018-07-17 | 2018-07-17 | High-pressure bag subassembly and air treatment device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810790017.XA CN109028380B (en) | 2018-07-17 | 2018-07-17 | High-pressure bag subassembly and air treatment device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109028380A true CN109028380A (en) | 2018-12-18 |
CN109028380B CN109028380B (en) | 2020-12-11 |
Family
ID=64643304
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810790017.XA Active CN109028380B (en) | 2018-07-17 | 2018-07-17 | High-pressure bag subassembly and air treatment device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109028380B (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201037674Y (en) * | 2007-05-15 | 2008-03-19 | 王洪亮 | Anion air-cleaning facility for air conditioner |
CN101737935A (en) * | 2008-11-17 | 2010-06-16 | Lg电子株式会社 | Purication unit assembly |
CN203147909U (en) * | 2013-01-10 | 2013-08-21 | 浙江欧伦电气有限公司 | High-efficient and environment-friendly multi-functional dehumidifier |
CN203298419U (en) * | 2013-05-20 | 2013-11-20 | 聂振杰 | Air sterilization and dust-collection device |
CN205957440U (en) * | 2016-08-10 | 2017-02-15 | 青岛海尔空调器有限总公司 | A dust removal subassembly and air conditioner for air conditioner |
CN107062458A (en) * | 2017-05-10 | 2017-08-18 | 宋晓明 | A kind of air purifier for being placed on domestic air conditioning indoor set air inlet |
CN107388530A (en) * | 2017-08-02 | 2017-11-24 | 青岛海尔空调器有限总公司 | A kind of chute, cleaning module, air intake grid, purge module and air-conditioning device |
-
2018
- 2018-07-17 CN CN201810790017.XA patent/CN109028380B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201037674Y (en) * | 2007-05-15 | 2008-03-19 | 王洪亮 | Anion air-cleaning facility for air conditioner |
CN101737935A (en) * | 2008-11-17 | 2010-06-16 | Lg电子株式会社 | Purication unit assembly |
CN203147909U (en) * | 2013-01-10 | 2013-08-21 | 浙江欧伦电气有限公司 | High-efficient and environment-friendly multi-functional dehumidifier |
CN203298419U (en) * | 2013-05-20 | 2013-11-20 | 聂振杰 | Air sterilization and dust-collection device |
CN205957440U (en) * | 2016-08-10 | 2017-02-15 | 青岛海尔空调器有限总公司 | A dust removal subassembly and air conditioner for air conditioner |
CN107062458A (en) * | 2017-05-10 | 2017-08-18 | 宋晓明 | A kind of air purifier for being placed on domestic air conditioning indoor set air inlet |
CN107388530A (en) * | 2017-08-02 | 2017-11-24 | 青岛海尔空调器有限总公司 | A kind of chute, cleaning module, air intake grid, purge module and air-conditioning device |
Also Published As
Publication number | Publication date |
---|---|
CN109028380B (en) | 2020-12-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA1224727A (en) | Air-purifying apparatus | |
CN105264298B (en) | Ion generator and the air-conditioning with ion generator | |
KR20180008063A (en) | Indoor unit for air condition | |
CN109028378B (en) | Air purification device and air conditioner | |
KR20180065711A (en) | air conditioner | |
CN109028531A (en) | Framework and air processor afterwards | |
CN109028380A (en) | High pressure pack assembly and air processor | |
CN202470239U (en) | Air register with air cleaning device | |
CN103307659B (en) | Air conditioner with air cleaner | |
CN205957440U (en) | A dust removal subassembly and air conditioner for air conditioner | |
CN113428092A (en) | Electronic wire harness gathering and battery heat dissipation storage structure of electric vehicle | |
CN109028383A (en) | High pressure pack assembly and air processor | |
CN207756285U (en) | Electrostatic precipitator, air conditioner indoor unit and air conditioner | |
CN109028305B (en) | Air treatment device | |
CN109028384B (en) | Air treatment device | |
CN208567080U (en) | Air processor | |
CN202521746U (en) | Cabinet type air conditioner with air filtering system | |
CN208936350U (en) | Conditioner | |
CN215681471U (en) | Dustproof block terminal of heat dissipation | |
JP2003074888A (en) | Indoor unit of air conditioner | |
CN220321551U (en) | Air flow generating structure for air curtain machine | |
CN217469174U (en) | Low-voltage switch cabinet with good heat dissipation performance | |
CN219998750U (en) | Energy storage system and energy storage power station | |
CN109028379B (en) | Air treatment device | |
CN215343398U (en) | Waterproof outdoor distribution box |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |