CN109024561A - A kind of flange form connection structure at steel-pipe pile top and I-shaped gooseneck - Google Patents

A kind of flange form connection structure at steel-pipe pile top and I-shaped gooseneck Download PDF

Info

Publication number
CN109024561A
CN109024561A CN201811164947.0A CN201811164947A CN109024561A CN 109024561 A CN109024561 A CN 109024561A CN 201811164947 A CN201811164947 A CN 201811164947A CN 109024561 A CN109024561 A CN 109024561A
Authority
CN
China
Prior art keywords
steel
flange
pipe pile
shaped gooseneck
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811164947.0A
Other languages
Chinese (zh)
Inventor
王安文
吴曼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Original Assignee
Road and Bridge International Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN201811164947.0A priority Critical patent/CN109024561A/en
Publication of CN109024561A publication Critical patent/CN109024561A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • E02D5/285Prefabricated piles made of steel or other metals tubular, e.g. prefabricated from sheet pile elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention provides the flange form connection structure at a kind of steel-pipe pile top and I-shaped gooseneck, sets up for steel-pipe pile bracket.Mounting flange is welded at the top of steel-pipe pile, mounting flange I-shaped gooseneck is disposed across on mounting flange, it is located at I-steel crossbeam two sides on mounting flange and one stop flange is installed respectively, each stop flange is one section of arc flange plate, the vertically arranged limit plate of two panels is welded on stop flange, the bottom wing listrium of I-shaped gooseneck is pushed down on the bottom edge of limit plate, and the side of limit plate pushes against the web of I-shaped gooseneck, I-shaped gooseneck is fixed at the top of steel-pipe pile.

Description

A kind of flange form connection structure at steel-pipe pile top and I-shaped gooseneck
Technical field
Flange the present invention relates to a kind of structure of steel-pipe pile bracket, at the top of especially a kind of steel-pipe pile with I-shaped gooseneck Formula connection structure.
Background technique
The brackets such as cast-in-place boom support, 0# block bracket, trestle, water drilling platform generally use steel-pipe pile as lower part branch Support, load bearing cross beam is set up at the top of steel-pipe pile, sets up distribution beam, lay panel in distribution beam on crossbeam again.Load bearing cross beam is general Using I-steel, to guarantee stability of the crossbeam on steel-pipe pile, bracket or circumferential plate are welded, at the top of steel-pipe pile with dispersion The load of fashioned iron at the top of steel-pipe pile, and bracket at the top of I-shaped gooseneck and steel-pipe pile or circumferential plate are welded, the method needs existing Field welding procedure, the supporting structure big for steel-pipe pile amount, site welding heavy workload, construction speed is slow, and support removing When need to cut welding position, keep steel-pipe pile and I-shaped gooseneck impaired, influence to reuse, cause waste of material.
Summary of the invention
It is an object of the invention to mention for defect existing for the welding structure at the top of current steel-pipe pile with I-shaped gooseneck For the flange form connection structure at the top of a kind of steel-pipe pile with I-shaped gooseneck, not needing welding can be realized steel-pipe pile and crossbeam It is stably connected with, improves construction efficiency, steel-pipe pile and crossbeam will not be damaged.
Technical scheme is as follows:
With the flange form connection structure of I-shaped gooseneck at the top of a kind of steel-pipe pile, including steel-pipe pile and it is horizontally set on steel pipe The I-shaped gooseneck in stake top portion, the I-shaped gooseneck use Two bors d's oeuveres i-beam structure, and Two bors d's oeuveres I-steel side flange plate is upward Other side flange plate is arranged downward, it is characterised in that: a horizontally disposed mounting flange is welded at the top of the steel-pipe pile, in fixation It is located at I-shaped gooseneck two sides on flange, a stop flange is installed respectively, each stop flange is one section of curved plate, if There are interior arc side and outer arc side, radian is equal with the periphery radian of mounting flange, and the interior arc side of two stop flanges is oppositely arranged, and It is connect by bolt with mounting flange;The two panels limit plate vertical with stop flange, every limit are welded on each stop flange Position plate is equipped with a horizontal bottom edge and one towards the vertical side of I-shaped gooseneck, bottom edge a part and limit of every limit plate The welding of flange top surface, another part extends to the direction of I-steel beam vertical, and is pressed in the I-shaped gooseneck edge of a wing directed downwardly On plate, the vertical side of every limit plate and the web of I-shaped gooseneck are pushed against.
Steel-pipe pile and top cross-bar are used flange form connection structure by the present invention, and in-site installation does not need welding procedure, are grasped Make simply, bracket is set up high-efficient;Bracket avoids the cutting to steel-pipe pile and crossbeam when dismantling, improve steel-pipe pile and I-shaped The reuse rate of gooseneck, improves economic benefit.
Detailed description of the invention
Fig. 1 is elevation of the present invention along I-shaped gooseneck longitudinal direction;
Fig. 2 is elevation of the present invention along I-shaped gooseneck transverse direction;
Fig. 3 is top structure plan view of the invention;
Fig. 4 is the mounting flange structural schematic diagram at the top of steel-pipe pile;
Fig. 5 is the plan view of two stop flanges;
Fig. 6 is the elevation of two stop flanges;
Fig. 7 is the plan view after mounting flange is in conjunction with two stop flanges at the top of steel-pipe pile.
Specific embodiment
As shown in Figure 1, Figure 2, Figure 3 shows, the present invention includes steel-pipe pile 1 and the I-shaped gooseneck that is horizontally set at the top of steel-pipe pile 2, the I-shaped gooseneck 2 uses Two bors d's oeuveres i-beam structure, and other side flange plate is downward upward for Two bors d's oeuveres I-steel side flange plate Setting;Horizontally disposed mounting flange 3 is welded at the top of the steel-pipe pile 1, the structure of mounting flange is as shown in figure 4, fixation Opposite two sides are preset with screw hole on orchid 3.Mounting flange 3 connects two stop flanges 5 by screw hole bolt 4.
As shown in Fig. 5, Fig. 6, Fig. 7, each stop flange 5 is one section of curved plate, and each stop flange 5 is equipped with interior arc side With outer arc side, radian is equal with the periphery radian of mounting flange 3, and the interior arc side of two limit methods 5 is oppositely arranged, two stop flanges It is equipped with screw hole corresponding with mounting flange, is bolted on mounting flange 3.Two panels is welded on each stop flange 5 The limit plate 6 vertical with stop flange, every limit plate 6 are equipped with a horizontal bottom edge 61 and erecting towards I-shaped gooseneck 2 61 a part of bottom edge of straight sided 62, every limit plate is welded with 5 top surface of stop flange, and another part hangs down along with I-shaped gooseneck Straight direction extends, and is pressed on the flange plate directed downwardly of I-shaped gooseneck 2, and the vertical side 62 of every limit plate and I-steel are horizontal The web of beam 2 pushes against.
I-shaped gooseneck 2 is not fixed on 1 top of steel-pipe pile by welding by above structure.
To keep I-shaped gooseneck more stable, can be arranged in the vertical side 62 of the limit plate and the intersection on bottom edge 61 The chamfering of chamfering 63, the chamfering and I-steel flange plate and web intersection is coincide, and is had a common boundary with I-steel flange plate and web The chamfering at place pushes against.
The present invention when bracket is set up, first erects steel-pipe pile when it is implemented, flange is welded and fixed in advance at the top of steel-pipe pile Vertical and lower end is fixed, and I-shaped gooseneck is placed across at the top of steel-pipe pile, then at the top of steel-pipe pile, I-shaped gooseneck two Side is installed by two stop flanges;Limit plate bottom edge outwardly extending portion on two stop flanges is pressed in the I-shaped gooseneck edge of a wing directed downwardly On plate, the vertical side of limit plate pushes against the web of I-shaped gooseneck, is then tightened stop flange and mounting flange with bolt It is fixed, that is, realize the connection of steel-pipe pile Yu I-shaped gooseneck.Reverse operating when disassembly.Installation and removal process do not have to welding and Cutting, will not damage material, convenient for recycling.

Claims (2)

1. including steel-pipe pile and being horizontally set on steel-pipe pile with the flange form connection structure of I-shaped gooseneck at the top of a kind of steel-pipe pile The I-shaped gooseneck at top, the I-shaped gooseneck use Two bors d's oeuveres i-beam structure, and Two bors d's oeuveres I-steel side flange plate is another upward Side flange plate is arranged downward, it is characterised in that: a horizontally disposed mounting flange is welded at the top of the steel-pipe pile, in fixation It is located at I-shaped gooseneck two sides on orchid, a stop flange is installed respectively, each stop flange is one section of curved plate, is equipped with Interior arc side and outer arc side, radian is equal with the periphery radian of mounting flange, and the interior arc side of two stop flanges is oppositely arranged, and is led to Bolt is crossed to connect with mounting flange;The two panels limit plate vertical with stop flange, every limit are welded on each stop flange Plate is equipped with a horizontal bottom edge and one towards the vertical side of I-shaped gooseneck, bottom edge a part and limit method of every limit plate Blue top surface welding, another part extends to the direction of I-steel beam vertical, and is pressed in I-shaped gooseneck flange plate directed downwardly On, the vertical side of every limit plate and the web of I-shaped gooseneck push against.
2. the flange form connection structure at steel-pipe pile top and I-shaped gooseneck according to claim 1, it is characterised in that: institute The intersection of the vertical edge and bottom edge of stating limit plate is equipped with chamfering, the chamfering and I-steel flange plate and the chamfering of web intersection is kissed It closes.
CN201811164947.0A 2018-10-07 2018-10-07 A kind of flange form connection structure at steel-pipe pile top and I-shaped gooseneck Pending CN109024561A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811164947.0A CN109024561A (en) 2018-10-07 2018-10-07 A kind of flange form connection structure at steel-pipe pile top and I-shaped gooseneck

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811164947.0A CN109024561A (en) 2018-10-07 2018-10-07 A kind of flange form connection structure at steel-pipe pile top and I-shaped gooseneck

Publications (1)

Publication Number Publication Date
CN109024561A true CN109024561A (en) 2018-12-18

Family

ID=64616042

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811164947.0A Pending CN109024561A (en) 2018-10-07 2018-10-07 A kind of flange form connection structure at steel-pipe pile top and I-shaped gooseneck

Country Status (1)

Country Link
CN (1) CN109024561A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914851A (en) * 2019-03-12 2019-06-21 中交路桥建设有限公司 A kind of assembled bracket for being mounted at the top of steel-pipe pile
CN110080207A (en) * 2019-04-29 2019-08-02 山东大学 A kind of assembled steel tubular pole connector and application method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1153854A (en) * 1995-07-20 1997-07-09 小野辰雄 Support
CN101818480A (en) * 2010-04-15 2010-09-01 中铁科工集团有限公司 Box girder transfer platform and girder transferring and girder loading working procedures thereof
CN207878458U (en) * 2018-01-03 2018-09-18 中交武汉港湾工程设计研究院有限公司 Interim steel trestle with resistance to plucking auxiliary pile
CN208899470U (en) * 2018-10-07 2019-05-24 中交路桥建设有限公司 A kind of flange form connection structure at steel-pipe pile top and I-shaped gooseneck

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1153854A (en) * 1995-07-20 1997-07-09 小野辰雄 Support
CN101818480A (en) * 2010-04-15 2010-09-01 中铁科工集团有限公司 Box girder transfer platform and girder transferring and girder loading working procedures thereof
CN207878458U (en) * 2018-01-03 2018-09-18 中交武汉港湾工程设计研究院有限公司 Interim steel trestle with resistance to plucking auxiliary pile
CN208899470U (en) * 2018-10-07 2019-05-24 中交路桥建设有限公司 A kind of flange form connection structure at steel-pipe pile top and I-shaped gooseneck

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914851A (en) * 2019-03-12 2019-06-21 中交路桥建设有限公司 A kind of assembled bracket for being mounted at the top of steel-pipe pile
CN109914851B (en) * 2019-03-12 2023-11-17 中交路桥建设有限公司 Assembled bracket for being mounted at top of steel pipe pile
CN110080207A (en) * 2019-04-29 2019-08-02 山东大学 A kind of assembled steel tubular pole connector and application method

Similar Documents

Publication Publication Date Title
CN109024561A (en) A kind of flange form connection structure at steel-pipe pile top and I-shaped gooseneck
CN102518300B (en) Embedded conical bearing joint type steel structural support and construction method thereof
CN106499201A (en) A kind of dismountable safety rope tool-type holding clamp and its using method
CN208899470U (en) A kind of flange form connection structure at steel-pipe pile top and I-shaped gooseneck
CN106703042B (en) A kind of bracket and the construction method of deep trench supporting
CN211772964U (en) Bridging suspension beam for box culvert first-aid repair
CN201865116U (en) Temporary construction platform of pile leg for self-climbing well drilling platform
CN113846641A (en) Telescopic and integrated pile-forming operation platform
CN210530358U (en) Device for hoisting and temporarily fixing H-shaped steel beam
CN204024084U (en) Easy unloading type triangular pipe truss just spells moulding bed
CN216446277U (en) Steel bar truss floor support plate with detachable bottom plate
CN214570413U (en) Special device for underground rapid lifting pipeline of mine
CN212078673U (en) Support type creeping formwork adhesion device
CN208668604U (en) A kind of pre-installation girder steel
CN204059589U (en) A kind of shaped steel combination formula supporting and the cantilevered structure of going along with sb. to guard him
CN208803382U (en) A kind of CFST Arch Bridge intermediate transverse girder promotion positioning apparatus
CN204002841U (en) A kind of outrigger formula mobile formwork for support of tunnel wall pouring construction
CN109457557B (en) Suspension type monorail traffic system and pier column structure thereof
CN208346630U (en) A kind of gap bridge pipeline K font door frame
CN206028597U (en) Processingequipment and system of processing of steel reinforcement cage
CN110005210A (en) The mounting device and its construction method of steel truss
CN205840308U (en) A kind of combined steel formwork panel assembly
CN206188262U (en) Novel fast -assembling railing structure
CN220060797U (en) Detachable pipeline supporting and hanging frame
CN217398221U (en) Auxiliary tool for hoisting large flue in limited space

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181218