CN109024318A - A kind of beam section support construction and its construction method reducing construction area - Google Patents

A kind of beam section support construction and its construction method reducing construction area Download PDF

Info

Publication number
CN109024318A
CN109024318A CN201811099959.XA CN201811099959A CN109024318A CN 109024318 A CN109024318 A CN 109024318A CN 201811099959 A CN201811099959 A CN 201811099959A CN 109024318 A CN109024318 A CN 109024318A
Authority
CN
China
Prior art keywords
tubing string
beam section
construction
cushion cap
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811099959.XA
Other languages
Chinese (zh)
Inventor
王金安
黄福云
罗文艺
严宇
李磊
崔玉龙
李雅杰
张胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCFEB Civil Engineering Co Ltd
Original Assignee
CCFEB Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCFEB Civil Engineering Co Ltd filed Critical CCFEB Civil Engineering Co Ltd
Priority to CN201811099959.XA priority Critical patent/CN109024318A/en
Publication of CN109024318A publication Critical patent/CN109024318A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Abstract

The present invention provides a kind of beam section support construction and its construction method for reducing construction area, including the cushion cap for Auxiliary support bent cap and it is fixed on the tubing string of cushion cap week side-lower, the tubing string is from top to bottom gradually to offset in the middle part of supporting beam center, the tubing string has four or more, with the reduction of height, the area in each surrounded section of tubing string is smaller and smaller.The present invention assists pier stud with the composite structure of the steel pipe column of oblique inner support and steel plate cushion cap to support the part gravity of beam section, plays the role of small land occupation temporary support, reusable, intensity is big, it takes up little area, is a kind of good temporary supporting system for modern society.

Description

A kind of beam section support construction and its construction method reducing construction area
Technical field
The present invention relates to a kind of beam section support constructions and its construction method for reducing construction area.
Background technique
With the development of economy, city is increasingly flourishing, and building is more and more, and distribution is more and more intensive, many unfavorable Under space enrironment, the temporary support of beam section is difficult smoothly to carry out, because many buildings etc. exist, the place of construction be will receive centainly Limitation.And as the volume of traffic is increasing, requirement at this stage is not achieved in the bearing capacity of many old bridges, and many bridges can select The mode widened cannot influence the traffic of former bridge in the work progress widened, this just needs occupied area few as far as possible.It is small to account for The temporary support on ground also can provide convenience for other work progress.Therefore the temporary support land occupation problem of beam section is increasingly by weight Depending in this background, the temporary support of small land occupation increasingly receives an acclaim.The present invention is exactly the one kind provided in this context Reduce the beam section support construction and its construction method of construction area.
Summary of the invention
The present invention improves the above problem, i.e., the technical problem to be solved by the present invention is to the interim of existing beam section Support land occupation is excessive and influences road traffic.
Specific embodiments of the present invention are: a kind of beam section support construction reducing construction area, including for assisting branch It supports the cushion cap of bent cap and is fixed on the tubing string of cushion cap week side-lower, the tubing string is gradually inclined to supporting beam center middle part from top to bottom It moves, the tubing string has four or more, and with the reduction of height, the area in each surrounded section of tubing string is increasingly It is small.
A kind of beam section support construction reducing construction area according to claim 1, which is characterized in that adjacent described It is fixedly connected with connecting tube between in the middle part of tubing string, the bent cap lower part is fixed with vertical pier stud, between the pier stud and tubing string Also it is fixedly connected with connecting tube.
Further, contour in the middle part of each tubing string and pier stud to be fixedly connected with anchor ear, there is lug on the anchor ear, The connection tube end is fixedly connected with a pair of of otic placode, and the lug is inserted between otic placode, and the lug and otic placode have and can join Logical fixation hole, the connecting tube is with anchor ear through being fixedly connected through the fixation hole of otic placode and lug.
Further, the cushion cap includes steel plate and the frame that is fixedly connected along steel plate edge with steel plate edge.
Further, below the lower part insertion earth's surface of the tubing string, the structure is deep using the certain soil of pillar embedment And diagonal brace triangular in shape bears the part gravity on cushion cap in soil.
Further, there are four the tubing string tools.
The invention also includes a kind of construction method of beam section support construction for reducing construction area as described above, feature exists In, comprising the following steps: (1) it is corresponding on ground according to design drawing in the quantity and tilt angle of bent cap envisaged underneath tubing string Get inclination foundation pit in the position of tubing string;(2) tubing string oblique cutting is entered in foundation pit and is tamped using loop wheel machine;(3) in the middle part of the tubing string It is fixedly connected with anchor ear, the anchor ear between adjacent tubing string is connected through connecting tube, is surrounded rectangular;(4) with company between tubing string and pier stud Adapter tube connection, increases the overall stability of temporary support using these connecting tubes, prevents lifting eccentric;(5) on tubing string top Cushion cap and fixation are set up, beam section is lifted on to the top of cushion cap and bent cap, beam section is supported by bent cap and cushion cap jointly;(6) to institute Some beam sections are unloaded this temporary support structure by cushion cap all in place and after the completion of splicing to tubing string, from top to bottom.
Compared with prior art, the invention has the following advantages: the tubing string and cushion cap of the oblique inner support of the present invention Composite structure auxiliary pier stud support the part gravity of beam section, play the role of small land occupation temporary support, it is reusable, by force Degree is big, takes up little area, is a kind of good temporary supporting system for modern society.
Detailed description of the invention
Fig. 1 planar configuration schematic diagram;
Fig. 2 facade organigram;
Fig. 3 overlooks organigram;
Fig. 4 anchor ear organigram;
The organigram of Fig. 5 round steel pipe connection;
Label declaration: 1-beam section, 2-steel plate cushion caps, 3-steel pipe columns, 4-ground, 5-bent caps, 6-pier studs, 7-anchor ears, 8-round steel pipes, 71- lug, 81- otic placode.
Specific embodiment
The present invention will be further described in detail with reference to the accompanying drawings and detailed description.
As shown in Fig. 1~5, it is a kind of reduce construction area beam section support construction, including 5 lower part of the bent cap be fixed with it is perpendicular Straight pier stud 6 including the cushion cap for Auxiliary support bent cap 5 and is fixed on the tubing string of cushion cap week side-lower, and the tubing string is by upper Under gradually to offset in the middle part of supporting beam center, the tubing string has four or more, with the reduction of height, Ge Geguan The area in the surrounded section of column is smaller and smaller.
In the present embodiment, the cushion cap is steel plate cushion cap 2, and tubing string is steel pipe column 3, adjacent 3 middle part of steel pipe column Between be fixedly connected with round steel pipe 8(i.e. connecting tube), be also fixedly connected with connecting tube between the pier stud and tubing string.
It is contour in the middle part of each steel pipe column and pier stud to be fixedly connected with anchor ear, there is lug 71 on the anchor ear 7, it is described 8 end of round steel pipe is fixedly connected with a pair of of otic placode 81, and the lug 71 is inserted between otic placode 81, and the lug and otic placode have The fixation hole of energy connection, the round steel pipe 8 is with anchor ear through being fixedly connected through the fixation hole of lug 71 and otic placode 81.
In the present embodiment, 71 quantity of lug and angle of the anchor ear 7 are carried out according to 8 position of round steel pipe to be connected It is welded and fixed.
In the present embodiment, the cushion cap includes steel plate and the frame that is fixedly connected along steel plate edge with steel plate edge, is used for Bent cap is assisted to carry beam section.
In the present embodiment, there are four the tubing string tools, and below the lower part insertion earth's surface of the tubing string, the structure is utilized The certain native diagonal brace deep and triangular in shape of pillar embedment bears the part gravity on cushion cap in soil.
This concrete construction method is as follows, after 6 pouring molding of pier stud 5 and bent cap of beam section, starts setting up for temporary support. The inclination foundation pit for first getting four specified sizes on the ground 4 of selected temporary support position with drilling machine, using loop wheel machine by steel pipe Column 3 hangs in place to designated position, four 3 oblique cuttings of steel pipe column is entered in the foundation pit accomplished fluently fixed compacting, and maintained with loop wheel machine The stabilization of steel pipe column 3, the anchor ear 7 of pier stud, circular steel tubing string is close in setting at whole intermediate altitude, and with round steel pipe 8 Anchor ear 7 on anchor ear 7 and steel pipe column 3 on pier stud is linked together and (utilizes the otic placode of lug and round steel pipe on anchor ear It is stitched together, blending bolt is fixed), collectively form stable structure.Frame steel plate cushion cap 2 is ridden upon into steel pipe column 3 again Top and fixation can remove loop wheel machine after fixing-stable, beam section be lifted on to the top of steel plate cushion cap 2 and bent cap 6, by bent cap 6 Beam section is supported jointly with steel plate cushion cap 2.It is all in place etc. all beam sections and after the completion of splicing, so that it may by steel plate cushion cap 2 to Round steel pipe 8 and anchor ear 7 arrive steel pipe column 3(from top to bottom again) uninstall this temporary support structure.
The embodiment of the present invention uses steel plate and steel pipe column, is steel construction, intensity is big, and the steel pipe column on ground is entered using diagonal brace The square frame steel plate cushion cap temporary support beam section surrounded with bar steel plate, as height reduces, the face that four steel pipe columns surround Product is smaller and smaller.Adjacent steel pipe column is connected with round steel pipe at whole intermediate altitude, there are also pier studs and steel pipe column, are used to Enhance the stability of temporary support.Steel pipe column is by transmitting the part gravity of beam section and steel plate cushion cap in deep soil come supporting beam Section, it is ensured that meet and minimize occupied area in the case of supporting.This handstand gusseted can substantially reduce occupied area, Construction suitable for many small land occupations.
Any technical solution disclosed in aforementioned present invention unless otherwise stated, if it discloses numberical range, Disclosed numberical range is preferred numberical range, and any it should be appreciated by those skilled in the art preferred numberical ranges The only obvious or representative numerical value of technical effect in many enforceable numerical value.It, can not since numerical value is more Exhaustion, so the present invention just discloses technical solution of the component values to illustrate the present invention, also, the above-mentioned numerical value enumerated is not The limitation to the invention protection scope should be constituted.
If the present invention is open or relates to the components or structural member of connection fastened to each other, unless otherwise stated, It is fixedly connected it is to be understood that connection (such as connecting using bolt or screw) can be removedly fixed, it is understood that are as follows: It is non-removable to be fixedly connected with (such as riveting, welding), certainly, connection fastened to each other or integral structure (such as make Manufactured with casting technique is integrally formed) replaced (obviously can not be using except integrally formed technique).
In addition, for indicating the art of positional relationship or shape applied in any technical solution disclosed in aforementioned present invention Its meaning includes approximate with its, similar or close state or shape to language unless otherwise stated.
Either component provided by the invention by multiple individual component parts either assembled, or one The separate part that forming technology manufactures.
Finally it should be noted that: the above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof;To the greatest extent The present invention is described in detail with reference to preferred embodiments for pipe, it should be understood by those ordinary skilled in the art that: still It can modify to a specific embodiment of the invention or some technical features can be equivalently replaced;Without departing from this hair The spirit of bright technical solution should all cover within the scope of the technical scheme claimed by the invention.

Claims (7)

1. it is a kind of reduce construction area beam section support construction, which is characterized in that including for Auxiliary support bent cap cushion cap and It is fixed on the tubing string of cushion cap week side-lower, the tubing string is from top to bottom gradually to offset in the middle part of supporting beam center, the tubing string tool There are four or four or more, with the reduction of height, the area in each surrounded section of tubing string is smaller and smaller.
2. a kind of beam section support construction for reducing construction area according to claim 1, which is characterized in that the adjacent pipe It is fixedly connected with connecting tube between in the middle part of column, the bent cap lower part is fixed with vertical pier stud, between the pier stud and tubing string It is fixedly connected with connecting tube.
3. a kind of beam section support construction for reducing construction area according to claim 2, which is characterized in that each pipe It is contour in the middle part of column and pier stud to be fixedly connected with anchor ear, there is lug on the anchor ear, the connection tube end is fixedly connected with one To otic placode, the lug is inserted between otic placode, the fixation hole of the lug and otic placode with energy connection, the connecting tube and anchor ear Through being fixedly connected through the fixation hole of otic placode and lug.
4. a kind of beam section support construction for reducing construction area according to claim 2 or 3, which is characterized in that described to hold Platform includes steel plate and the frame that is fixedly connected along steel plate edge with steel plate edge.
5. a kind of beam section support construction for reducing construction area according to claim 2 or 3, which is characterized in that the pipe Below the lower part insertion earth's surface of column, the structure is embedded to certain native diagonal brace deep and triangular in shape using pillar and holds in Tu Zhonglai By the part gravity on cushion cap.
6. a kind of beam section support construction for reducing construction area according to claim 2 or 3, which is characterized in that the pipe There are four column tools.
7. a kind of construction method for the beam section support construction for reducing construction area as described in claim 1, which is characterized in that including Following steps: (1) in the quantity and tilt angle of bent cap envisaged underneath tubing string, the position of tubing string is corresponded on ground according to design drawing It sets and gets inclination foundation pit;(2) tubing string oblique cutting is entered in foundation pit and is tamped using loop wheel machine;(3) it is fixedly connected in the middle part of the tubing string There is anchor ear, the anchor ear between adjacent tubing string is connected through connecting tube, is surrounded rectangular;(4) it is connected between tubing string and pier stud with connecting tube, The overall stability for increasing temporary support using these connecting tubes prevents lifting eccentric;(5) cushion cap is set up simultaneously on tubing string top It is fixed, beam section is lifted on to the top of cushion cap and bent cap, beam section is supported by bent cap and cushion cap jointly;(6) all to all beam sections After the completion of in place and splicing, this temporary support structure is unloaded to tubing string, from top to bottom by cushion cap.
CN201811099959.XA 2018-09-20 2018-09-20 A kind of beam section support construction and its construction method reducing construction area Pending CN109024318A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811099959.XA CN109024318A (en) 2018-09-20 2018-09-20 A kind of beam section support construction and its construction method reducing construction area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811099959.XA CN109024318A (en) 2018-09-20 2018-09-20 A kind of beam section support construction and its construction method reducing construction area

Publications (1)

Publication Number Publication Date
CN109024318A true CN109024318A (en) 2018-12-18

Family

ID=64617187

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811099959.XA Pending CN109024318A (en) 2018-09-20 2018-09-20 A kind of beam section support construction and its construction method reducing construction area

Country Status (1)

Country Link
CN (1) CN109024318A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000096517A (en) * 1998-09-17 2000-04-04 Nkk Corp Pier structure
EP1881111A2 (en) * 2006-07-17 2008-01-23 Spæncom A/S A bridge and a method for the construction of a bridge
CN202064288U (en) * 2011-05-10 2011-12-07 中铁九局集团有限公司 Hoop and A-frame combining construction supporting device for single-column capping beam
CN203923914U (en) * 2014-05-20 2014-11-05 中交四公局第三工程有限公司 Solely stub bent cap support
CN108149577A (en) * 2017-12-05 2018-06-12 上海建工七建集团有限公司 A kind of steel bracket system and its installation method
CN209114339U (en) * 2018-09-20 2019-07-16 中建五局土木工程有限公司 A kind of beam section support construction reducing construction area

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000096517A (en) * 1998-09-17 2000-04-04 Nkk Corp Pier structure
EP1881111A2 (en) * 2006-07-17 2008-01-23 Spæncom A/S A bridge and a method for the construction of a bridge
CN202064288U (en) * 2011-05-10 2011-12-07 中铁九局集团有限公司 Hoop and A-frame combining construction supporting device for single-column capping beam
CN203923914U (en) * 2014-05-20 2014-11-05 中交四公局第三工程有限公司 Solely stub bent cap support
CN108149577A (en) * 2017-12-05 2018-06-12 上海建工七建集团有限公司 A kind of steel bracket system and its installation method
CN209114339U (en) * 2018-09-20 2019-07-16 中建五局土木工程有限公司 A kind of beam section support construction reducing construction area

Similar Documents

Publication Publication Date Title
CN103741604B (en) Totally-prefabricated assembling type reinforced concrete bridge splicing structure and attaching method thereof
CN108755388A (en) Unit construction bridge girder construction and its construction method
CN201053123Y (en) Deep foundation ditch tower crane platform base frame
CN108005401A (en) A kind of support and change method of the column of existing frame structure base isolation reinforcement
CN106988303B (en) A kind of pile foundation and its construction method
CN106012851A (en) Synchronous construction method of steel box girder and concrete pier studs
CN107355008A (en) A kind of prefabricated attachment structure and method of newly-increased steel core concrete column and existing structure
CN209114339U (en) A kind of beam section support construction reducing construction area
CN109837924B (en) Construction method for intersection part of lattice column and main body structure of foundation pit support
CN109024318A (en) A kind of beam section support construction and its construction method reducing construction area
CN112323639A (en) Construction method for three-column accurate positioning
EP1561874A1 (en) Connecting device and node for buildings with prefabricated elements
CN216194062U (en) Temporary support structure
CN213978605U (en) Assembled pier stud connection structure
CN211228571U (en) Viaduct and cover-excavation top-down construction method subway station co-construction structure and co-construction bearing platform thereof
CN108343162A (en) A kind of mounting structure and installation method of assembling-type precast hybrid beam and stiffened column
CN104404967B (en) Rigid frame posture internal support of foundation pit structure and construction method
CN204401462U (en) For the support of pier prestressed cap beam with extra length Construction Supporting System in water
CN208346973U (en) Concrete-filled steel tubular hollow steel structure technique and steel construction
CN209620610U (en) Steel platform for the construction of subway entrance upper cover
CN206554273U (en) A kind of pre-assembled Anchor Bolts in Steel Column Bases structure
CN208649839U (en) Pavement with top cover
CN208251112U (en) A kind of detachable structural steel combination crown beam
CN208072458U (en) A kind of pier sheet-pile engaging portion structure
CN206655062U (en) Concrete support column and overhead rail system for overhead rail system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination