CN109024248A - Automatic embedded type segment prefabricated pier column structure and connecting method - Google Patents

Automatic embedded type segment prefabricated pier column structure and connecting method Download PDF

Info

Publication number
CN109024248A
CN109024248A CN201810911588.4A CN201810911588A CN109024248A CN 109024248 A CN109024248 A CN 109024248A CN 201810911588 A CN201810911588 A CN 201810911588A CN 109024248 A CN109024248 A CN 109024248A
Authority
CN
China
Prior art keywords
clip slot
bridge pier
slot device
segment
pillarwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810911588.4A
Other languages
Chinese (zh)
Inventor
张建东
刘朵
宋祖鹤
姚凯
周彬
徐亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Tech University
JSTI Group Co Ltd
Original Assignee
Nanjing Tech University
JSTI Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Tech University, JSTI Group Co Ltd filed Critical Nanjing Tech University
Priority to CN201810911588.4A priority Critical patent/CN109024248A/en
Publication of CN109024248A publication Critical patent/CN109024248A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides an automatic embedded segment prefabricated pier stud structure, which comprises: the top of lower section of pier is provided with the slot hole, and the slot hole is the shoulder hole, is provided with first reinforcing bar in the upper section of pier, and the one end that upper section of pier was kept away from to first reinforcing bar is fixed with and presss from both sides the slot device, presss from both sides the slot device and includes the steel jacket body, flank steel sheet, and the flank steel sheet sets up two, lies in steel jacket body both sides respectively, flank steel sheet and steel jacket body rotatable coupling. Compared with the prior art, the automatic embedded type segment prefabricated pier stud structure and the connection method provided by the invention can complete connection only by aligning the groove clamping device with the groove hole, are simple, convenient and quick, and greatly improve the construction speed.

Description

Automatically insert formula precast segment pillarwork and connection method
Technical field
The present invention relates to bridge construction technical field, in particular to automatically insert formula precast segment pillarwork and Connection method.
Background technique
In recent years, under the guidance that national policy and technology develop, bridge fabricated construction is got in all kinds of engineerings To be more widely applied.But the prefabricated application of substructure is seldom, and the joining method between existing prefabricated subsection bridge pier is applied to existing Process is complicated when the construction of field, and the used time is longer.
Summary of the invention
In consideration of it, the invention proposes automatically insert formula precast segment pillarwork and connection method, it is intended to solve existing The bridge assembly technical problem that difficulty of construction is big, construction efficiency is low.
On the one hand, the invention proposes automatically insert formula precast segment pillarwork, comprising: upper segment bridge pier, lower segment Bridge pier, clip slot device;
Slot hole is provided at the top of the lower segment bridge pier, the slot hole is stepped hole;
The first reinforcing bar is provided in the upper segment bridge pier, first reinforcing bar is fixed with far from one end of the upper segment bridge pier Clip slot device, the clip slot device include steel bushing body, flank steel plate, and the flank steel plate is arranged two, is located at the steel Body two sides, the flank steel plate are rotatably connected with the steel bushing body.
Further, the flank steel plate is rotatably connected with the steel bushing body by hinge.
Further, spring is provided between the flank steel plate and the steel bushing body.
Further, first reinforcing bar is spiral.
Further, it is provided with screw thread mouth at the top of the steel bushing body, is based on the spiral and the upper screw thread Mouth alignment, first reinforcing bar and the steel bushing body are threadedly coupled.
Further, the slot hole includes the first notch, the second notch, and the bore of first notch is less than described second The bore of notch.
Further, the notch length of first notch is greater than the length when clip slot device is closed, and is less than institute State total length when clip slot device opens;The length of second notch is greater than the total length when clip slot device opens, institute The depth for stating the second notch is greater than the height of the clip slot device.
Further, the bottom of the steel bushing body is provided with lower hole, is provided with the second reinforcing bar below the lower hole.
On the other hand, the invention proposes automatically insert formula precast segment pillarwork connection method, comprising the following steps:
Step S1: clip slot device is fixed on the first reinforcing bar bottom end;
Step S2: slow cohesion resin is injected in slot hole;
Step S3: compression clip slot device is aligned based on clip slot device and slot hole, by upper segment bridge pier be placed in lower segment bridge pier just on Side;
Step S4: clip slot device opens, and slow cohesion resin overflows, segment bridge pier and lower segment bridge pier in sealing.
Compared with prior art, the beneficial effects of the present invention are provided by the invention to automatically insert formula precast segment pier Rod structure and connection method only need for clip slot device and slot hole to be aligned, and connection can be completed, simple and efficient, and construction is greatly improved Speed.
Further, it is provided with slow cohesion resin in slot hole of the present invention to overflow, after clip slot device enters slot hole, can to delay Binding resin overflows, time saving and energy saving without doing encapsulation process again.
Detailed description of the invention
By reading the following detailed description of the preferred embodiment, various other advantages and benefits are common for this field Technical staff will become clear.The drawings are only for the purpose of illustrating a preferred embodiment, and is not considered as to the present invention Limitation.And throughout the drawings, the same reference numbers will be used to refer to the same parts.In the accompanying drawings:
Fig. 1 is the structural schematic diagram provided in an embodiment of the present invention for automatically inserting formula precast segment pillarwork;
Fig. 2 is the left view provided in an embodiment of the present invention for automatically inserting formula precast segment pillarwork;
Fig. 3 is the top view provided in an embodiment of the present invention for automatically inserting formula precast segment pillarwork;
Fig. 4 is the structural schematic diagram of clip slot device provided in an embodiment of the present invention;
Fig. 5 is the structural schematic diagram of flank steel plate provided in an embodiment of the present invention;
Fig. 6 is the structural schematic diagram provided in an embodiment of the present invention automatically inserted after the connection of formula precast segment pillarwork.
Specific embodiment
Exemplary embodiments of the present disclosure are described in more detail below with reference to accompanying drawings.Although showing the disclosure in attached drawing Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here It is limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure It is fully disclosed to those skilled in the art.It should be noted that in the absence of conflict, embodiment in the present invention and Feature in embodiment can be combined with each other.The present invention will be described in detail below with reference to the accompanying drawings and embodiments.
Refering to fig. 1, formula precast segment pillarwork is automatically inserted to be provided in an embodiment of the present invention, as seen from the figure, packet It includes: upper segment bridge pier 1, lower segment bridge pier 2, clip slot device 3, wherein the top of lower segment bridge pier 2 is provided with slot hole 4, slot hole 4 For stepped hole, it is provided with the first reinforcing bar 11 in upper segment bridge pier 1, the first reinforcing bar 11 is fixed with far from one end of upper segment bridge pier 1 Clip slot device 3, the clip slot device 3 include steel bushing body 31, flank steel plate 32, and the flank steel plate 32 is arranged two, respectively position In 31 two sides of steel bushing body, flank steel plate 32 is rotatably connected with steel bushing body 31, in the present embodiment, when clip slot device 3 enters slot Behind hole 4, since slot hole 4 is stepped hole, two flank steel plates 32 of clip slot device 3 can be opened, thus by upper segment bridge pier 1 under Segment bridge pier 2 connects into an entirety.
In the present embodiment, upper segment bridge pier 1 is cylindric, and the first reinforcing bar 11, the first steel are provided on upper segment bridge pier 1 Muscle 11 is vertically arranged, and when specific implementation can be spiral.
In the present embodiment, clip slot device 3 includes steel bushing body 31, flank steel plate 32, spring 33, hinge 34, upper screw thread mouth 35, lower hole 36, upper screw thread mouth 35 and the first reinforcing bar 11 are threadedly coupled, and flank steel plate 32 is arranged two, and flank steel plate 32 is not Regular body, the angle β that 32 bottom surface of flank steel plate and vertical plane are formed under vertical state are 30 degree, 32 top surface of flank steel plate and The angle α that vertical plane is formed is 60 degree.Flank steel plate 32 is hinged by hinge with steel bushing body 31, flank steel plate 32 and steel bushing body 31 Between be additionally provided with spring 33, it will be appreciated by persons skilled in the art that can be between flank steel plate 32 and steel bushing body 31 By shaft connection, can also be connected by folding.
In the present embodiment, slot hole 4 is provided on lower segment bridge pier 2, slot hole 4 is arranged four, and slot hole 4 is stepped hole, packet Include the first notch 41, the second notch 42, bore of the bore less than the second notch 42 of the first notch 41, the notch of the first notch 41 Length is greater than length when clip slot device 3 is closed, and is less than total length when clip slot device 3 opens;The length of second notch 42 Total length when opening greater than clip slot device 3, the depth of second notch 42 are greater than the height of clip slot device 3, steel bushing body 31 Bottom be provided with lower hole 36, be provided with the second reinforcing bar 21 below lower hole 36, the second reinforcing bar 21 is higher than lower segment bridge pier 2 Lower end surface has one section to be arranged in lower hole 36.
The invention also provides automatically insert formula precast segment pillarwork connection method, comprising the following steps:
Step S1: clip slot device 3 is fixed on 11 bottom end of the first reinforcing bar;
Step S2: slow cohesion resin 5 is injected in slot hole 4;
Step S3: compression clip slot device 3 is aligned based on clip slot device 3 and slot hole 4, upper segment bridge pier 1 is placed in lower segment bridge pier Right above 2;
Step S4: clip slot device 3 opens, and slow cohesion resin 5 overflows, segment bridge pier 1 and lower segment bridge pier 2 in sealing.
In the present embodiment, it is overflow by being provided with slow cohesion resin in slot hole, after clip slot device 3 enters slot hole 4, meeting So that slow cohesion resin overflows, it is time saving and energy saving without doing encapsulation process again.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art Mind and range.In this way, if these modifications and changes of the present invention belongs to the range of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to include these modifications and variations.

Claims (9)

1. automatically inserting formula precast segment pillarwork characterized by comprising upper segment bridge pier (1), lower segment bridge pier (2), Clip slot device (3);
It is provided with slot hole (4) at the top of the lower segment bridge pier (2), the slot hole (4) is stepped hole;
It is provided with the first reinforcing bar (11) in the upper segment bridge pier (1), first reinforcing bar (11) is far from the upper segment bridge pier (1) one end is fixed with clip slot device (3), and the clip slot device (3) includes steel bushing body (31), flank steel plate (32), the side Wing steel plate (32) is arranged two, is located at steel bushing body (31) two sides, the flank steel plate (32) and the steel bushing body (31) it is rotatably connected.
2. according to claim 1 automatically insert formula precast segment pillarwork, which is characterized in that the flank steel plate (32) it is rotatably connected with the steel bushing body (31) by hinge (34).
3. -2 described in any item automatically inserting formula precast segment pillarwork according to claim 1, which is characterized in that the side Spring (33) are provided between wing steel plate (32) and the steel bushing body (31).
4. according to claim 3 automatically insert formula precast segment pillarwork, which is characterized in that first reinforcing bar It (11) is spiral.
5. according to claim 4 automatically insert formula precast segment pillarwork, which is characterized in that the steel bushing body (31) Top be provided with screw thread mouth (35), be aligned based on the spiral and the upper screw thread mouth (35), first reinforcing bar (11) it is threadedly coupled with the steel bushing body (31).
6. according to claim 1 automatically insert formula precast segment pillarwork, which is characterized in that slot hole (4) packet The first notch (41), the second notch (42) are included, the bore of first notch (41) is less than the bore of second notch (42).
7. according to claim 6 automatically insert formula precast segment pillarwork, which is characterized in that first notch (41) notch length is greater than the length when clip slot device (3) is closed, and is less than total when the clip slot device (3) is opened Length;The length of second notch (42) is greater than the total length when clip slot device (3) is opened, second notch (42) Depth be greater than the clip slot device (3) height.
8. according to claim 5 automatically insert formula precast segment pillarwork, which is characterized in that the steel bushing body (31) Bottom be provided with lower hole (36), be provided with the second reinforcing bar (21) below the lower hole (36).
9. automatically inserting formula precast segment pillarwork connection method, which comprises the following steps:
Step S1: clip slot device (3) is fixed on the first reinforcing bar (11) bottom end;
Step S2: slow cohesion resin (5) are injected in slot hole (4);
Step S3: compression clip slot device (3) is aligned based on clip slot device (3) and slot hole (4), upper segment bridge pier (1) is placed in down Right above segment bridge pier (2);
Step S4: clip slot device (3) opens, and slow cohesion resin (5) overflows, segment bridge pier (1) and lower segment bridge pier in sealing (2).
CN201810911588.4A 2018-08-10 2018-08-10 Automatic embedded type segment prefabricated pier column structure and connecting method Pending CN109024248A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810911588.4A CN109024248A (en) 2018-08-10 2018-08-10 Automatic embedded type segment prefabricated pier column structure and connecting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810911588.4A CN109024248A (en) 2018-08-10 2018-08-10 Automatic embedded type segment prefabricated pier column structure and connecting method

Publications (1)

Publication Number Publication Date
CN109024248A true CN109024248A (en) 2018-12-18

Family

ID=64633681

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810911588.4A Pending CN109024248A (en) 2018-08-10 2018-08-10 Automatic embedded type segment prefabricated pier column structure and connecting method

Country Status (1)

Country Link
CN (1) CN109024248A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113430931A (en) * 2021-07-30 2021-09-24 贵州路桥集团有限公司 Steel-concrete composite beam panel structure
CN113565005A (en) * 2021-07-16 2021-10-29 苏交科集团股份有限公司 Prefabricated assembled bridge structure with assembled corrugated steel web cantilever and construction method

Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08337293A (en) * 1995-06-13 1996-12-24 Kyoritsu Concrete:Kk Concrete storage tank
US20020170245A1 (en) * 2001-05-18 2002-11-21 Yi-Lung Mo Joint for prefabricated concrete blocks in non-plastic hinge zone of earthquake-resistant pier
RU2231608C1 (en) * 2002-12-15 2004-06-27 Общество с ограниченной ответственностью "Биттехника" Device for mounting of deflector wedge in well shaft
CN2795291Y (en) * 2005-05-17 2006-07-12 周兆弟 Double head insert type spring engaged body pile extension buckle and prefabricated member
US20120255158A1 (en) * 2011-04-07 2012-10-11 Empire Technology Development Llc Joint type prefab assembly
CN105179398A (en) * 2015-10-09 2015-12-23 周兆弟 Elastic clamping type connecting piece
EP3009575A1 (en) * 2014-10-15 2016-04-20 Kappa Filter Systems GmbH Connecting device for mechanically coupling concrete slabs, and concrete wall constructed with same
CN105525689A (en) * 2016-01-28 2016-04-27 中铁第四勘察设计院集团有限公司 Prefabricated and spliced socket-and-spigot joint
CN105908776A (en) * 2016-04-22 2016-08-31 苏交科集团股份有限公司 Segmented connection structure of precast concrete culvert and construction method thereof
US20160265212A1 (en) * 2015-03-13 2016-09-15 National Applied Research Laboratories Precast segment, stacking structure and energy dissipation column thereof
CN106223483A (en) * 2016-07-29 2016-12-14 初明进 A kind of precast reinforced concrete structure method of attachment
WO2016197597A1 (en) * 2015-06-09 2016-12-15 周兆弟 Connecting piece for connecting two objects and prefabricated member connected using connecting piece
US20170183861A1 (en) * 2014-07-07 2017-06-29 Fundacion Tecnalia Research & Innovation Joining device for precast reinforced concrete columns with a dry joint
CN106930180A (en) * 2017-03-10 2017-07-07 中国市政工程中南设计研究总院有限公司 A kind of damping anti-fall girder apparatus for preventing prefabricated beam bridge from longitudinally coming off
CN107328353A (en) * 2017-06-19 2017-11-07 中交二航局第四工程有限公司安徽分公司 Beam tube road inspection hole device and its application method in prefabricated case beam body
CN107605052A (en) * 2017-11-16 2018-01-19 华北理工大学 Prefabricated assembled concrete-filled steel square tubular column member connecting structure and its construction method
CN207079461U (en) * 2017-05-08 2018-03-09 广东工业大学 Assembled pier column nested encryptions structure
CN207392042U (en) * 2017-10-24 2018-05-22 青岛理工大学 Pier connecting device is assembled to prefabricated segment of buckle formula
CN108086140A (en) * 2018-01-31 2018-05-29 福建工程学院 A kind of assembled bridge pier structure of steel pipe socket
CN207469648U (en) * 2018-03-12 2018-06-08 湖北沛函建设有限公司 A kind of connector of the prefabricated plug-in wall of assembled architecture
CN108149585A (en) * 2018-01-31 2018-06-12 福建工程学院 A kind of splicing construction and joining method of the pier stud segment of precast assembly bridge pier
CN108222003A (en) * 2017-12-26 2018-06-29 中国十七冶集团有限公司 A kind of telescopic PHC pipe piles core borehole cleaning lever apparatus
CN108266212A (en) * 2018-02-24 2018-07-10 山东科技大学 A kind of back anchorage cable anchoring agent erecting device

Patent Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08337293A (en) * 1995-06-13 1996-12-24 Kyoritsu Concrete:Kk Concrete storage tank
US20020170245A1 (en) * 2001-05-18 2002-11-21 Yi-Lung Mo Joint for prefabricated concrete blocks in non-plastic hinge zone of earthquake-resistant pier
RU2231608C1 (en) * 2002-12-15 2004-06-27 Общество с ограниченной ответственностью "Биттехника" Device for mounting of deflector wedge in well shaft
CN2795291Y (en) * 2005-05-17 2006-07-12 周兆弟 Double head insert type spring engaged body pile extension buckle and prefabricated member
US20120255158A1 (en) * 2011-04-07 2012-10-11 Empire Technology Development Llc Joint type prefab assembly
US20170183861A1 (en) * 2014-07-07 2017-06-29 Fundacion Tecnalia Research & Innovation Joining device for precast reinforced concrete columns with a dry joint
EP3009575A1 (en) * 2014-10-15 2016-04-20 Kappa Filter Systems GmbH Connecting device for mechanically coupling concrete slabs, and concrete wall constructed with same
US20160265212A1 (en) * 2015-03-13 2016-09-15 National Applied Research Laboratories Precast segment, stacking structure and energy dissipation column thereof
WO2016197597A1 (en) * 2015-06-09 2016-12-15 周兆弟 Connecting piece for connecting two objects and prefabricated member connected using connecting piece
CN105179398A (en) * 2015-10-09 2015-12-23 周兆弟 Elastic clamping type connecting piece
CN105525689A (en) * 2016-01-28 2016-04-27 中铁第四勘察设计院集团有限公司 Prefabricated and spliced socket-and-spigot joint
CN105908776A (en) * 2016-04-22 2016-08-31 苏交科集团股份有限公司 Segmented connection structure of precast concrete culvert and construction method thereof
CN106223483A (en) * 2016-07-29 2016-12-14 初明进 A kind of precast reinforced concrete structure method of attachment
CN106930180A (en) * 2017-03-10 2017-07-07 中国市政工程中南设计研究总院有限公司 A kind of damping anti-fall girder apparatus for preventing prefabricated beam bridge from longitudinally coming off
CN207079461U (en) * 2017-05-08 2018-03-09 广东工业大学 Assembled pier column nested encryptions structure
CN107328353A (en) * 2017-06-19 2017-11-07 中交二航局第四工程有限公司安徽分公司 Beam tube road inspection hole device and its application method in prefabricated case beam body
CN207392042U (en) * 2017-10-24 2018-05-22 青岛理工大学 Pier connecting device is assembled to prefabricated segment of buckle formula
CN107605052A (en) * 2017-11-16 2018-01-19 华北理工大学 Prefabricated assembled concrete-filled steel square tubular column member connecting structure and its construction method
CN108222003A (en) * 2017-12-26 2018-06-29 中国十七冶集团有限公司 A kind of telescopic PHC pipe piles core borehole cleaning lever apparatus
CN108086140A (en) * 2018-01-31 2018-05-29 福建工程学院 A kind of assembled bridge pier structure of steel pipe socket
CN108149585A (en) * 2018-01-31 2018-06-12 福建工程学院 A kind of splicing construction and joining method of the pier stud segment of precast assembly bridge pier
CN108266212A (en) * 2018-02-24 2018-07-10 山东科技大学 A kind of back anchorage cable anchoring agent erecting device
CN207469648U (en) * 2018-03-12 2018-06-08 湖北沛函建设有限公司 A kind of connector of the prefabricated plug-in wall of assembled architecture

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113565005A (en) * 2021-07-16 2021-10-29 苏交科集团股份有限公司 Prefabricated assembled bridge structure with assembled corrugated steel web cantilever and construction method
CN113430931A (en) * 2021-07-30 2021-09-24 贵州路桥集团有限公司 Steel-concrete composite beam panel structure

Similar Documents

Publication Publication Date Title
CN109024248A (en) Automatic embedded type segment prefabricated pier column structure and connecting method
CN108951404A (en) Cross connection structure and connection method for segment prefabricated pier stud
CN108951952A (en) Concrete filled steel tube precast shear wall plate perps connecting node and assembly method
CN109339238A (en) A kind of prefabricated assembled profile steel concrete column splicing node structure and its construction method
CN208777154U (en) Connection structure between prefabricated pier sections
CN201121471Y (en) Dual-purpose group corner angle code
CN206722680U (en) A kind of corner brace and door and window
CN203961571U (en) The closer of door
CN201488452U (en) Handle component fixing structure
CN103615049B (en) The node of newly-increased framework reinforcing bar and original structure anchoring and construction method thereof
CN208777155U (en) Rotatory prefabricated segment pier of assembling
CN206256831U (en) One kind assembling aluminum alloy doors and windows corner brace mechanism
CN208702010U (en) Concrete reinforcement cushion block
CN106111779A (en) A kind of stretcher jaw clamping device
CN206538875U (en) A kind of connector for assembled architecture
CN205636777U (en) Basis is consolidated to assembled cement pole protection mound stock
CN209457322U (en) A kind of connector of fixed wall panel
CN209799669U (en) Door hinge for opening cabinet door
CN106368724A (en) Mechanical constant-resistance single prop pre-tightening device and method
CN210828423U (en) Steel-coated glue-pouring reinforcing structure
CN206681625U (en) The frame fan group mount structure of aluminum wood composite door and window
CN206428953U (en) Scaffold
CN206694372U (en) A kind of setscrew
CN206397865U (en) One kind is located by connecting external member
CN206722396U (en) Fiberglass in Round Column Formwork system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination