CN109004659A - A kind of distribution transforming active load imbalance judgment method based on metering centralized meter reading terminal data - Google Patents

A kind of distribution transforming active load imbalance judgment method based on metering centralized meter reading terminal data Download PDF

Info

Publication number
CN109004659A
CN109004659A CN201710425638.3A CN201710425638A CN109004659A CN 109004659 A CN109004659 A CN 109004659A CN 201710425638 A CN201710425638 A CN 201710425638A CN 109004659 A CN109004659 A CN 109004659A
Authority
CN
China
Prior art keywords
active load
distribution transforming
threshold values
phase
minutes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710425638.3A
Other languages
Chinese (zh)
Inventor
朱延廷
黄红远
黄小耘
欧阳卫年
黎皓彬
姚若昊
张文骏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Power Supply Bureau of Guangdong Power Grid Corp
Original Assignee
Foshan Power Supply Bureau of Guangdong Power Grid Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Power Supply Bureau of Guangdong Power Grid Corp filed Critical Foshan Power Supply Bureau of Guangdong Power Grid Corp
Priority to CN201710425638.3A priority Critical patent/CN109004659A/en
Publication of CN109004659A publication Critical patent/CN109004659A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/26Arrangements for eliminating or reducing asymmetry in polyphase networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/50Arrangements for eliminating or reducing asymmetry in polyphase networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The present invention provides a kind of distribution transforming active load imbalance judgment method based on metering centralized meter reading terminal data, this method calculates the three-phase active load degree of unbalancedness of each data break of the distribution transforming according to the calculation method of three-phase active load degree of unbalancedness in certain time length;Judge whether each phase active load situation of each data break has reached the threshold values of judgement;When each phase active load situation has reached the threshold values of judgement, judge whether the three-phase active load degree of unbalancedness of each data break has reached the threshold values of judgement;When each phase active load situation has reached the threshold values of judgement and three-phase active load degree of unbalancedness has reached the threshold values of judgement, which is denoted as active load imbalance;The unbalanced number of active load in the time span is counted, then divided by the data break sum in the time span, obtains the unbalanced duration accounting of active load, if the duration accounting is greater than decision threshold, which is judged as active load imbalance.

Description

A kind of distribution transforming active load imbalance judgment method based on metering centralized meter reading terminal data
Technical field
The present invention relates to field of power systems, have more particularly, to a kind of distribution transforming based on metering centralized meter reading terminal data Function laod unbalance judgment method.
Background technique
The intelligent centralized meter reading terminal of metering automation system has been realized substantially acquires three distant data of distribution transformer, former The balance movement situation for capableing of three-phase active load to distribution transformer in reason is analyzed.But it is copied currently based on metering collection The example that terminal data analyzes the operating status of distribution transformer three-phase active load is few, and reason mainly has following:
1) the case where sending data to rely on wireless network in terminal, loss of data had due to signal problem;
2) terminal itself quality problems cause to lack data or data inaccuracy;
3) data memory gap is not short enough, and most of only 15 minutes finenesses cannot achieve real time monitoring.
Summary of the invention
The present invention provides a kind of distribution transforming active load imbalance judgment method based on metering centralized meter reading terminal data, this method Can the three-phase active load situation to distribution transformer assess, judge its unbalanced state and degree.
In order to reach above-mentioned technical effect, technical scheme is as follows:
A kind of distribution transforming active load imbalance judgment method based on metering centralized meter reading terminal data, comprising the following steps:
S1: calculating distribution transforming every 15 minutes three-phase active load degree of unbalancedness S, and calculation formula is as follows:
S2: judging whether every 15 minutes S are greater than threshold values Ss, if more than then judging that the distribution transforming threephase load in 15 minutes is uneven Weighing apparatus, otherwise it is assumed that its three-phase active load is uneven;
S3: judge every 15 minutes it is each it is mutually active whether be greater than Ps, any mutually active Ps that is greater than is according to condition 3. to judge, no Then think this 15 minutes distribution transforming three-phase active load balances;
S4: counting the Sc in this month, by formula:
Computational load three-phase imbalance time accounting T;
S5: judging whether T is greater than Ts, if more than this month active load imbalance of the distribution transforming then being judged, otherwise it is assumed that should This month active load balance of distribution transforming;
Wherein, Ps is the active threshold values of individual event, and Ss is degree of unbalancedness threshold values, and Ts is duration accounting threshold values, and T is duration accounting, Sc is uneven number, and St is 15 minutes numbers in statistical time length.
Compared with prior art, the beneficial effect of technical solution of the present invention is:
The method of the present invention calculates this according to the calculation method of three-phase active load degree of unbalancedness and matches in certain time length Become the three-phase active load degree of unbalancedness of each data break;Judge each data break each phase active load situation whether Have reached the threshold values of judgement;When each phase active load situation has reached the threshold values of judgement, the three-phase of each data break is judged Whether active load degree of unbalancedness has reached the threshold values of judgement;When each phase active load situation has reached the threshold values and three-phase of judgement When active load degree of unbalancedness has reached the threshold values of judgement, which is denoted as active load imbalance;Count the time The unbalanced number of active load in length, then divided by the data break sum in the time span, obtain active load injustice The distribution transforming is judged as active load imbalance if the duration accounting is greater than decision threshold by the duration accounting of weighing apparatus.This method energy Enough utilize the data of the general measuring terminal of quality;Using the data of regular period, the interference of data fluctuations can be removed from;Using The data of long-term can be derived that statistical law, not engrave when single and go into seriously accuracy.
Detailed description of the invention
Fig. 1 is the method for the present invention flow chart.
Specific embodiment
The attached figures are only used for illustrative purposes and cannot be understood as limitating the patent;
In order to better illustrate this embodiment, the certain components of attached drawing have omission, zoom in or out, and do not represent actual product Size;
To those skilled in the art, it is to be understood that certain known features and its explanation, which may be omitted, in attached drawing 's.
The following further describes the technical solution of the present invention with reference to the accompanying drawings and examples.
Embodiment 1
As shown in Figure 1, a kind of distribution transforming active load imbalance judgment method based on metering centralized meter reading terminal data, including with Lower step:
S1: calculating distribution transforming every 15 minutes three-phase active load degree of unbalancedness S, and calculation formula is as follows:
S2: judging whether every 15 minutes S are greater than threshold values Ss, if more than then judging that the distribution transforming threephase load in 15 minutes is uneven Weighing apparatus, otherwise it is assumed that its three-phase active load is uneven;
S3: judge every 15 minutes it is each it is mutually active whether be greater than Ps, any mutually active Ps that is greater than is according to condition 3. to judge, no Then think this 15 minutes distribution transforming three-phase active load balances;
S4: counting the Sc in this month, by formula:
Computational load three-phase imbalance time accounting T;
S5: judging whether T is greater than Ts, if more than this month active load imbalance of the distribution transforming then being judged, otherwise it is assumed that should This month active load balance of distribution transforming;
Wherein, Ps is the active threshold values of individual event, and Ss is degree of unbalancedness threshold values, and Ts is duration accounting threshold values, and T is duration accounting, Sc is uneven number, and St is 15 minutes numbers in statistical time length.
It is every that this method calculates the distribution transforming in certain time length, according to the calculation method of three-phase active load degree of unbalancedness The three-phase active load degree of unbalancedness of one data break;Judge whether each phase active load situation of each data break has reached To the threshold values of judgement;When each phase active load situation has reached the threshold values of judgement, judge that the three-phase of each data break is active Whether laod unbalance degree has reached the threshold values of judgement;When each phase active load situation has reached the threshold values of judgement and three-phase is active When laod unbalance degree has reached the threshold values of judgement, which is denoted as active load imbalance;Count the time span The interior unbalanced number of active load, then divided by the data break sum in the time span, show that active load is unbalanced The distribution transforming is judged as active load imbalance if the duration accounting is greater than decision threshold by duration accounting.This method being capable of benefit With the data of the general measuring terminal of quality;Using the data of regular period, the interference of data fluctuations can be removed from;Using it is long when The data of phase can be derived that statistical law, not engrave when single and go into seriously accuracy.
The same or similar label correspond to the same or similar components;
Described in attached drawing positional relationship for only for illustration, should not be understood as the limitation to this patent;
Obviously, the above embodiment of the present invention be only to clearly illustrate example of the present invention, and not be pair The restriction of embodiments of the present invention.For those of ordinary skill in the art, may be used also on the basis of the above description To make other variations or changes in different ways.There is no necessity and possibility to exhaust all the enbodiments.It is all this Made any modifications, equivalent replacements, and improvements etc., should be included in the claims in the present invention within the spirit and principle of invention Protection scope within.

Claims (1)

1. it is a kind of based on metering centralized meter reading terminal data distribution transforming active load imbalance judgment method, which is characterized in that including with Lower step:
S1: calculating distribution transforming every 15 minutes three-phase active load degree of unbalancedness S, and calculation formula is as follows:
S2: judging whether every 15 minutes S are greater than threshold values Ss, if more than then judging that the distribution transforming threephase load in 15 minutes is uneven, Otherwise it is assumed that its three-phase active load is uneven;
S3: judge every 15 minutes it is each it is mutually active whether be greater than Ps, any mutually active Ps that is greater than is according to condition 3. to judge, is otherwise recognized For this 15 minutes, the distribution transforming three-phase active load was balanced;
S4: counting the Sc in this month, by formula:
Computational load three-phase imbalance time accounting T;
S5: judging whether T is greater than Ts, if more than this month active load imbalance of the distribution transforming then being judged, otherwise it is assumed that the distribution transforming This month active load balance;
Wherein, Ps is the active threshold values of individual event, and Ss is degree of unbalancedness threshold values, and Ts is duration accounting threshold values, and T is duration accounting, and Sc is Uneven number, St are 15 minutes numbers in statistical time length.
CN201710425638.3A 2017-06-07 2017-06-07 A kind of distribution transforming active load imbalance judgment method based on metering centralized meter reading terminal data Pending CN109004659A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710425638.3A CN109004659A (en) 2017-06-07 2017-06-07 A kind of distribution transforming active load imbalance judgment method based on metering centralized meter reading terminal data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710425638.3A CN109004659A (en) 2017-06-07 2017-06-07 A kind of distribution transforming active load imbalance judgment method based on metering centralized meter reading terminal data

Publications (1)

Publication Number Publication Date
CN109004659A true CN109004659A (en) 2018-12-14

Family

ID=64574006

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710425638.3A Pending CN109004659A (en) 2017-06-07 2017-06-07 A kind of distribution transforming active load imbalance judgment method based on metering centralized meter reading terminal data

Country Status (1)

Country Link
CN (1) CN109004659A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112436530A (en) * 2020-12-01 2021-03-02 广东电网有限责任公司佛山供电局 Method for judging three-phase imbalance of feeder load at tail end of power distribution network
CN112467763A (en) * 2020-12-01 2021-03-09 广东电网有限责任公司佛山供电局 Evaluation method for three-phase unbalance state of distribution transformer load

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102208807A (en) * 2011-01-25 2011-10-05 中国电力科学研究院 Medium and low voltage distribution network energy efficiency evaluation method based on accurate load measurement data
CN103364723A (en) * 2012-04-05 2013-10-23 北京光耀能源技术股份有限公司 Running state analysis method for aerogenerator based on voltage and current balance
CN104407268A (en) * 2014-11-27 2015-03-11 国家电网公司 Abnormal electricity utilization judgment method based on abnormal analysis of electric quantity, voltage and current
CN105160445A (en) * 2015-01-19 2015-12-16 国家电网公司 Evaluation system and method for power supply reliability for important user
CN105846453A (en) * 2016-05-10 2016-08-10 北京泰豪电力科技有限公司 Method for treating three-phase load imbalance of low-voltage distribution network
CN106556777A (en) * 2017-02-10 2017-04-05 云南电网有限责任公司电力科学研究院 Based on the wind-electricity integration operational monitoring method and system that the quality of power supply is monitored on-line
CN106597349A (en) * 2017-01-25 2017-04-26 云南电网有限责任公司电力科学研究院 CVT measurement error on-line monitoring method and CVT measurement error on-line monitoring system based on secondary voltage
CN106684895A (en) * 2017-01-11 2017-05-17 南京工程学院 Three-phase unbalance management method and commutation system based on active power unbalanced automatic phase change control strategy

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102208807A (en) * 2011-01-25 2011-10-05 中国电力科学研究院 Medium and low voltage distribution network energy efficiency evaluation method based on accurate load measurement data
CN103364723A (en) * 2012-04-05 2013-10-23 北京光耀能源技术股份有限公司 Running state analysis method for aerogenerator based on voltage and current balance
CN104407268A (en) * 2014-11-27 2015-03-11 国家电网公司 Abnormal electricity utilization judgment method based on abnormal analysis of electric quantity, voltage and current
CN105160445A (en) * 2015-01-19 2015-12-16 国家电网公司 Evaluation system and method for power supply reliability for important user
CN105846453A (en) * 2016-05-10 2016-08-10 北京泰豪电力科技有限公司 Method for treating three-phase load imbalance of low-voltage distribution network
CN106684895A (en) * 2017-01-11 2017-05-17 南京工程学院 Three-phase unbalance management method and commutation system based on active power unbalanced automatic phase change control strategy
CN106597349A (en) * 2017-01-25 2017-04-26 云南电网有限责任公司电力科学研究院 CVT measurement error on-line monitoring method and CVT measurement error on-line monitoring system based on secondary voltage
CN106556777A (en) * 2017-02-10 2017-04-05 云南电网有限责任公司电力科学研究院 Based on the wind-electricity integration operational monitoring method and system that the quality of power supply is monitored on-line

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
叶润潮 等: "基于牵引负荷的三相不平衡度计算方法比较", 《电力系统及其自动化学报》 *
方恒福 等: "配电台区三相负荷不平衡实时在线治理方法研究", 《中国电机工程学报》 *
柳丹: "牵引系统中三相电压允许不平衡度测量与计算的研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112436530A (en) * 2020-12-01 2021-03-02 广东电网有限责任公司佛山供电局 Method for judging three-phase imbalance of feeder load at tail end of power distribution network
CN112467763A (en) * 2020-12-01 2021-03-09 广东电网有限责任公司佛山供电局 Evaluation method for three-phase unbalance state of distribution transformer load
CN112467763B (en) * 2020-12-01 2023-01-17 广东电网有限责任公司佛山供电局 Evaluation method for three-phase unbalanced state of distribution transformer load

Similar Documents

Publication Publication Date Title
CN107039970B (en) Public affairs become taiwan area line loss per unit abnormal cause detection method and system
CN106569164B (en) A kind of synchronous detecting method and system of twin-core electric energy meter electricity
CN106338705B (en) A kind of method and apparatus of the verification error for three-phase electric energy metering device
CN102223264B (en) Alarm processing method and alarm processing system for monitoring system
CN111198764A (en) SDN-based load balancing implementation system and method
CN102692615B (en) System capable of automatically acquiring electric quantity data
CN114744734B (en) Battery operation control-based battery charging and discharging protection method and management system
CN110046076A (en) Intelligence system facility environment inspection method, system, equipment and can storage medium
CN104281510A (en) Method and system for obtaining power consumption degree of application program and energy-saving method and system
CN110276511A (en) A kind of line change relationship anomalous discrimination method based on electricity and line loss relevance
CN103837777B (en) Electric power system electricity quality evaluation method and system
CN109004659A (en) A kind of distribution transforming active load imbalance judgment method based on metering centralized meter reading terminal data
AU2015257863A1 (en) Detecting the operational management of a battery store
CN102902879A (en) Synchronous phasor calculation method based on discrete Fourier transform (DFT) recursion of field programmable gate array (FPGA) hardware
CN112684400B (en) Electric energy meter operation error data monitoring method and system for small electric quantity station area
CN109408452A (en) Mimicry industry control processor and data processing method
CN109001548A (en) A kind of distribution transforming current imbalance judgment method based on metering centralized meter reading terminal data
CN104300532A (en) Voltage sag evaluation process based on matrix factor
CN114095194A (en) Abnormal flow detection method and device
CN109525036B (en) Method, device and system for monitoring mains supply state of communication equipment
RU2012148411A (en) ORGANIZATIONAL SYSTEM SUPPORT TECHNOLOGY
CN103682486A (en) Multi-module cascading balancing method for cells
CN109001547A (en) A kind of power distribution voltage imbalance judgment method based on metering centralized meter reading terminal data
CN103631900A (en) Data comparing method based on main gateway and standby gateway comparison
CN109407039A (en) Intelligent electric meter and its system, self-diagnosing method and fault detection method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181214