CN109002582A - A kind of one key drawing methods of rail traffic escalator construction drawing of data-driven - Google Patents

A kind of one key drawing methods of rail traffic escalator construction drawing of data-driven Download PDF

Info

Publication number
CN109002582A
CN109002582A CN201810644559.6A CN201810644559A CN109002582A CN 109002582 A CN109002582 A CN 109002582A CN 201810644559 A CN201810644559 A CN 201810644559A CN 109002582 A CN109002582 A CN 109002582A
Authority
CN
China
Prior art keywords
data
staircase
driven
entrance
countersign
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810644559.6A
Other languages
Chinese (zh)
Inventor
李成洋
朱丹
张琨
张�浩
罗小华
史明红
周明翔
刘辉
郭文浩
游鹏辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201810644559.6A priority Critical patent/CN109002582A/en
Publication of CN109002582A publication Critical patent/CN109002582A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of one key drawing methods of rail traffic escalator construction drawing of data-driven, it is characterised in that the following steps are included: the parametrization for going out figure element of S1, escalator construction drawing;S2, it is drawn by VB.NET programming language data-driven CAD diagram shape;The mapping with parameters of S3, drawing of binding into book form;It wherein, include countersign information in formed figure.Realize integrality, relevance, the correctness verification of high-speed railway and rail traffic escalator manufacture drawings parameter, the data-driven quick mapping of Structure in Complex Structure escalator, " key is at figure " that profession countersign parameter list is docked with one key of construction drawing.

Description

A kind of one key drawing methods of rail traffic escalator construction drawing of data-driven
Technical field
The invention belongs to high-speed railway and field of track traffic, and in particular to a kind of rail traffic of data-driven is helped automatically Terraced one key drawing methods of construction drawing.
Background technique
With the fast development of China's economy, more and more cities start to build high-speed railway, urban track traffic, from Dynamic staircase is a pith of high-speed railway and rail transit station equipment.Every subway line has 200 to 300 substantially The escalator of platform needs to design.In the construction drawing stage, every escalator will draw corresponding construction drawing mounting arrangements work Skill drawing, limited designer, which needs to take a substantial amount of time, completes technological design, and domestic high-speed rail, rail traffic with energy The project construction period is short, need to carry out the inclusive design based on different geographical, multiple equipment producer, need to solve duration anxiety, packet Capacitive requires the problems such as high, standard is unified.
Previous high-speed railway and rail traffic escalator construction drawing need to carry out mounting arrangements technique on the basis of architectural drawing The drafting of drawing all needs Man Graphics, low efficiency, and human error easily occurs in drawing quality, and can not solve the duration it is nervous, Inclusiveness requires the problems such as high, standard is unified.
For countersign problem (countersign refer to other profession, unit whether strict implement escalator design content, data Verification process), existing countersign mode is that each designer directly sees the drawing of interface profession, file, by wanting to proposing money The impression and design experiences asked are confirmed that this countersign mode human factor is more, and quality is difficult to control.
Summary of the invention
For at least one of prior art the above defects or improvement requirements, the present invention provides a kind of data-drivens One key drawing methods of rail traffic escalator construction drawing realize high-speed railway and rail traffic escalator manufacture drawings ginseng Several integrality, relevance, correctness verification, the data-driven quick mapping of Structure in Complex Structure escalator, profession countersign " key is at figure " that parameter list is docked with one key of construction drawing.
To achieve the above object, according to one aspect of the present invention, the rail traffic for providing a kind of data-driven is automatic One key drawing methods of staircase construction drawing, the one key drawing methods of escalator construction drawing the following steps are included:
The parametrization for going out figure element of S1, escalator construction drawing;
S2, it is drawn by VB.NET programming language data-driven CAD diagram shape;
The mapping with parameters of S3, drawing of binding into book form;It wherein, include countersign information in formed figure.
Preferably, in step S3, the step of mapping with parameters for drawing of binding into book form, includes:
(1) enter manufacture drawings sub-interface;
(2) judge that interface selects;
(3) if the first interface of selection, diagram parameter is inputted, including selects staircase structure size itself, fill in work up and down Make point an absolute altitude, calculate fill in related Containing size, selection intermediate supports quantity and pattern, selection suspension hook quantity and arrangement, Selection staircase arrangement form, selection architecture structure form, modification this project are different from the size of sundry item, then add single width For graph parameter into summary sheet, circulation input can add cover, catalogue, specification after graph parameter;
If selecting second contact surface, the profession countersign parameter list mixed up in advance is imported, cover, catalogue, specification are added;
(4) editor's title bar and countersign column;
(5) start to draw.
Preferably, bind into book form drawing mapping with parameters the step of (3) in, when selecting second contact surface, profession countersign parameter Table import the step of include:
(a) Excel book is defined;
(b) Excel program is called;
(c) staircase data in station are first judged whether there is, interior staircase data of standing if it exists then activate staircase work in station Book reads the DataGridView control of staircase draw data in recording station with row record circulation, and being then further continued for judgement is It is no that there are entrance staircase data;Staircase data in standing if it does not exist, then directly judge whether there is entrance staircase data; Entrance staircase data if it exists then activate entrance staircase work book, read record entrance staircase with row record circulation The DataGridView control of draw data;Then entrance staircase data if it does not exist directly execute step (d);
Or entrance staircase data are first judged whether there is, entrance staircase data, then activate entrance to help if it exists Terraced book, with row record circulation read record entrance staircase draw data DataGridView control, then followed by It is continuous to judge whether there is staircase data in station;Then entrance staircase data if it does not exist are directly judged whether there is and are helped in station Terraced data;Staircase data in standing if it exists then activate staircase work book in station, read staircase in recording station with row record circulation The DataGridView control of draw data;Staircase data in standing if it does not exist, then directly execute the step of docking (d);
(d) it imports to read and complete.
Preferably, in step S2, include: by the process that VB.NET programming language data-driven CAD diagram shape is drawn
S2.1, addition CAD program reference;
CAD program and newly-built drawing are opened in S2.2, reading;
S2.3, it creates layer;
S2.4, graph pararneterization are drawn;
S2.5, edit substance;
S2.6, size marking;
S2.7, other unilateral pel elements are drawn, including insertion countersign column;
S2.8, circulation draw drawing of binding into book form.
Above-mentioned preferred feature can be combined with each other as long as they do not conflict with each other.
In general, through the invention it is contemplated above technical scheme is compared with the prior art, have below beneficial to effect Fruit:
1, the one key drawing methods of rail traffic escalator construction drawing of data-driven of the invention, realize high-speed railway and The integrality of rail traffic escalator manufacture drawings parameter, relevance, correctness verification, Structure in Complex Structure escalator Data-driven quick mapping, " key at scheme " that profession countersign parameter list is docked with one key of construction drawing.
2, creatively profession countersign parameter list to be docked with one key of construction drawing, it will label data import " key is at figure ", Rapid response engineering variation, drawing complete rail traffic escalator construction drawing only needs 60s, has reformed rail traffic certainly Dynamic staircase design cycle, the figure time rises to original 10 times or more to construction drawing out, greatly shortens the design cycle, it is high to adapt to China Fast railway and the construction demand of urban track traffic.
3, it is directed to staircase in the station of station, station entrance-exit staircase respectively using the secondary exploitation technology of AutoCAD, summarizes and draws Graph parameter extracts the graphic feature of Structure in Complex Structure by an information association rule, graphic feature clustering rule, establishes ginseng The adaptive unit figure library of number, realizes the high-speed railway and rail traffic escalator construction drawing quick mapping of data-driven; And the Parameter Function Unit of cover, catalogue, explanation is provided, realize the breakthrough of engineering design field " getting rid of CAD ".
Detailed description of the invention
Fig. 1 is the flow chart that the embodiment of the present invention passes through that VB.NET programming language data-driven CAD diagram shape is drawn;
Fig. 2 is the high-speed railway and rail traffic escalator construction drawing mapping with parameters of data-driven of the embodiment of the present invention Flow chart;
Fig. 3 is the flow chart that profession of embodiment of the present invention countersign parameter list imports.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.As long as in addition, technical characteristic involved in the various embodiments of the present invention described below Not constituting a conflict with each other can be combined with each other.The present invention is described in more detail With reference to embodiment.
As a kind of better embodiment of the invention, as shown in Figure 1-3, the present invention provides a kind of track of data-driven One key drawing methods of traffic escalator construction drawing, the one key drawing methods of escalator construction drawing the following steps are included:
The parametrization for going out figure element of S1, escalator construction drawing.
The element to be expressed can be divided into building structure size, staircase in high-speed railway and rail traffic escalator construction drawing 2 part of size itself.According to the difference of staircase foundation of civil work, mounting condition, conventional staircase construction drawing can be divided into station station Interior staircase, station entrance-exit staircase.
The parameters of a size, position, stress etc. more than 80 are expressed on every drawing, and (graph parameter is by design experiences and to help out What terraced drawing type summary came out), the parameter of all expression is arranged at interface, is initially set to default empirical value.
To provide convenient and fast design parameter input interface, input interface is classified by escalator arrangement form, and passes through ginseng The modes that summarize of number bind into book form the drafting of drawing.
The present invention summarizes the arrangement form of high-speed railway and rail traffic escalator, extracts and draws escalator construction drawing Go out figure element, guarantee figure inclusiveness, the standard uniformity of figure element out.
S2, it is drawn by VB.NET programming language data-driven CAD diagram shape.
It is quoted with the COM (Component Object Model, The Component Object Model) based on VB.NET programming language, It directly utilizes GetObject or CreateObject to open the AutoCAD for corresponding to version in computer when running drawing command, leads to Some information association rules, graphic feature clustering rule are crossed, carries out sub-unit processing in different drawing nodes, with a coordinate driving The drafting of each figure segment establishes the unit figure library of parameter adaptive to adapt to the graphic feature of Structure in Complex Structure, The high-speed railway and rail traffic escalator manufacture drawings completed are formed by the combination of pel.
AutoCAD is referred in programmed environment, addition Autodest.AutoCAD, Autodest.AutoCAD.Interop, Autodest.AutoCAD.Interop.Common class utilize a variety of objects and its side Method, attribute are completed an artwork and are drawn, such as Layers (figure layer), AcadLine (line), AcadLWPolyline (multistage Line), AcadCircle (circle), AcadArc (arc), AcadHatch (filling), AcadDimAligned (linear dimension), AcadMText (multline text), AcadBlock (block) etc..Go out the coordinate that figure element is converted into AutoCAD object for more than 80, The drafting that each pel is completed using coordinate takes the whole situation into account and plan accordingly figure distribution using the constraint between coordinate, and utilizes AutoCAD Constant amplification segment is directly inserted into figure by block editing, to realize the integrality of avatars.
Fig. 1 is the flow chart for passing through the drafting of VB.NET programming language data-driven CAD diagram shape.Specifically, in step S2, Include: by the process that VB.NET programming language data-driven CAD diagram shape is drawn
S2.1, addition CAD program reference;
CAD program and newly-built drawing are opened in S2.2, reading;
S2.3, it creates layer;
S2.4, graph pararneterization are drawn;
S2.5, edit substance;
S2.6, size marking;
S2.7, other unilateral pel elements are drawn, including insertion countersign column;
S2.8, circulation draw drawing of binding into book form.
The mapping with parameters of S3, drawing of binding into book form;It wherein, include countersign information in formed figure.
After realizing that data-driven CAD diagram shape is drawn by computer language, the point on the basis of operating point under staircase in drawing Information, combination interface input paramete information calculate graphical dots coordinate information in each view from left to right, from bottom to up, then draw Staircase shape processed draws building structure, standard technology size, writes specification, finally with whole coordinate circulation offset Mode realizes the mapping with parameters for drawing of binding into book form.
Fig. 2 is the high-speed railway of data-driven and the flow chart of rail traffic escalator construction drawing mapping with parameters. Specifically, in step S3, the step of mapping with parameters for drawing of binding into book form, includes:
(1) enter manufacture drawings sub-interface;
(2) judge that interface selects;
(3) if selection traditional interface, diagram parameter is inputted, including selects staircase structure size itself, fill in work up and down Make point an absolute altitude, calculate fill in related Containing size, selection intermediate supports quantity and pattern, selection suspension hook quantity and arrangement, Selection staircase arrangement form, selection architecture structure form, modification this project are different from the size of sundry item, then add single width For graph parameter into summary sheet, circulation input can add cover, catalogue, specification after graph parameter;
If selecting simple interface, the profession countersign parameter list (countersign information) mixed up in advance is imported, cover, mesh are added Record, specification;By obtaining countersign parameter list, conutersigning parameter list one to each profession, the countersign process of constituent parts result of design Key imports, and is directly entered addition cover, catalogue, specification stage.
(4) editor's title bar and countersign column (countersign information);Because each city, each designing unit, projects have oneself The title bar of drawing outputting standard, the requirement of countersign column, therefore, exploitation editor title bar, the function of conutersigning column, by the function, Personalized title bar, countersign column can be adapted to according to primary import of different requirements, and recorded in the database, to guarantee that drawing adapts to The characteristics of without city, disparity items.
(5) start to draw.
With the Excel secondary development based on VB.NET programming language, by the database being preset inside program, directly Circulation reads the Excel multirow data information imported, is then converted to the coordinate data that driving is drawn, and realizes profession countersign parameter list Dock with a key of escalator construction graph parameter, can simplify circulate operation process, realize that data-driven designs " key at Figure ".
Fig. 3 is the flow chart that profession countersign parameter list imports.Specifically, bind into book form drawing mapping with parameters the step of (3) in, when selecting simple interface, the process step that profession countersign parameter list imports includes:
(a) Excel book is defined;
(b) Excel program is called;
(c) staircase data in station are first judged whether there is, interior staircase data of standing if it exists then activate staircase work in station Book reads the DataGridView control of staircase draw data in recording station with row record circulation, and being then further continued for judgement is It is no that there are entrance staircase data;Staircase data in standing if it does not exist, then directly judge whether there is entrance staircase data; Entrance staircase data if it exists then activate entrance staircase work book, read record entrance staircase with row record circulation The DataGridView control of draw data;Then entrance staircase data if it does not exist directly execute step (d);
" judge whether there is stand in staircase data " and " judging whether there is entrance staircase data " is suitable in step (c) Sequence can be interchanged, and a selection scheme arranged side by side is provided below:
Or entrance staircase data are first judged whether there is, entrance staircase data, then activate entrance to help if it exists Terraced book, with row record circulation read record entrance staircase draw data DataGridView control, then followed by It is continuous to judge whether there is staircase data in station;Then entrance staircase data if it does not exist are directly judged whether there is and are helped in station Terraced data;Staircase data in standing if it exists then activate staircase work book in station, read staircase in recording station with row record circulation The DataGridView control of draw data;Staircase data in standing if it does not exist, then directly execute the step of docking (d);
(d) it imports to read and complete.
The one key drawing methods of rail traffic escalator construction drawing of data-driven of the invention realize high-speed railway and rail The integrality of road traffic escalator manufacture drawings parameter, relevance, correctness verification, Structure in Complex Structure escalator Data-driven quick mapping, " key is at figure " that profession countersign parameter list is docked with one key of construction drawing.
The present invention creatively by conutersign the stage formed profession countersign parameter list (profession countersign parameter list refer to: with build It builds, in structure discipline Process in Cooperative Design, confirmation and record for building, the information parameter correctness of structure discipline drawing) It is docked with one key of construction drawing, it will label data import " key is at figure ", skip intermediate data input and selection course, i.e., professional After interface conutersigns data record, construction drawing drawing directly can be generated, a complete track is drawn in rapid response engineering variation Traffic escalator construction drawing (containing covering+interior envelope+catalogue+specification+title bar+countersign column) only needs 60s, has reformed track Traffic escalator design process, the figure time rises to original 10 times or more to construction drawing out, greatly shortens the design cycle, solves Duration is nervous, drawing efficiency is low, the problem of human error easily occurs, adapts to building for China express railway and urban track traffic If demand.
The present invention is directed to staircase in the station of station, station entrance-exit staircase using the secondary exploitation technology of AutoCAD respectively, converges Total diagram parameter is extracted the graphic feature of Structure in Complex Structure, is built by an information association rule, graphic feature clustering rule The unit figure library of vertical parameter adaptive, so that the escalator mounting arrangements of construction drawing stage script complexity and larger workload Artwork can be realized the high-speed railway and rail traffic escalator construction drawing quick mapping of data-driven;And provide cover, The Parameter Function Unit of catalogue, explanation realizes the breakthrough of engineering design field " getting rid of CAD ", shortens the design cycle, improves high-speed iron Road and rail traffic escalator manufacture drawings efficiency and standardization level solve domestic high-speed rail, rail transportation projects duration Nervous, inclusiveness requires the problems such as high, standard is unified.
As it will be easily appreciated by one skilled in the art that the foregoing is merely illustrative of the preferred embodiments of the present invention, not to The limitation present invention, any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should all include Within protection scope of the present invention.

Claims (4)

1. a kind of one key drawing methods of rail traffic escalator construction drawing of data-driven, which is characterized in that the escalator One key drawing methods of construction drawing the following steps are included:
The parametrization for going out figure element of S1, escalator construction drawing;
S2, it is drawn by VB.NET programming language data-driven CAD diagram shape;
The mapping with parameters of S3, drawing of binding into book form;It wherein, include countersign information in formed figure.
2. the one key drawing methods of rail traffic escalator construction drawing of data-driven as described in claim 1, feature exist In: in step S3, the step of mapping with parameters for drawing of binding into book form, includes:
(1) enter manufacture drawings sub-interface;
(2) judge that interface selects;
(3) if the first interface of selection, diagram parameter is inputted, including selects staircase structure size itself, fill in operating point up and down Absolute altitude, calculating fill in related Containing size, selection intermediate supports quantity and pattern, selection suspension hook quantity and arrangement, selection Staircase arrangement form, selection architecture structure form, modification this project are different from the size of sundry item, then add single width figure ginseng It counts in summary sheet, circulation input can add cover, catalogue, specification after graph parameter;
If selecting second contact surface, the profession countersign parameter list mixed up in advance is imported, cover, catalogue, specification are added;
(4) editor's title bar and countersign column;
(5) start to draw.
3. the one key drawing methods of rail traffic escalator construction drawing of data-driven as claimed in claim 2, feature exist In the mapping with parameters of: drawing of binding into book form the step of in (3), when selecting second contact surface, the step of profession countersign parameter list imports Include:
(a) Excel book is defined;
(b) Excel program is called;
(c) staircase data in station are first judged whether there is, interior staircase data of standing if it exists then activate staircase work book in station, with Row record circulation reads the DataGridView control of staircase draw data in recording station, is then further continued for judging whether there is Entrance staircase data;Staircase data in standing if it does not exist, then directly judge whether there is entrance staircase data;If it exists Entrance staircase data then activate entrance staircase work book, read record entrance staircase drawing number with row record circulation According to DataGridView control;Then entrance staircase data if it does not exist directly execute step (d);
Or entrance staircase data are first judged whether there is, entrance staircase data, then activate entrance staircase work if it exists Make book, the DataGridView control of record entrance staircase draw data is read with row record circulation, is then further continued for sentencing It is disconnected to whether there is interior staircase data of standing;Then entrance staircase data if it does not exist directly judge whether there is staircase number in station According to;Staircase data in standing if it exists then activate staircase work book in station, read staircase in recording station with row record circulation and draw The DataGridView control of data;Staircase data in standing if it does not exist, then directly execute the step of docking (d);
(d) it imports to read and complete.
4. the one key drawing methods of rail traffic escalator construction drawing of data-driven as described in any one of claims 1-3, It is characterized by: including: by the process that VB.NET programming language data-driven CAD diagram shape is drawn in step S2
S2.1, addition CAD program reference;
CAD program and newly-built drawing are opened in S2.2, reading;
S2.3, it creates layer;
S2.4, graph pararneterization are drawn;
S2.5, edit substance;
S2.6, size marking;
S2.7, other unilateral pel elements are drawn, including insertion countersign column;
S2.8, circulation draw drawing of binding into book form.
CN201810644559.6A 2018-06-21 2018-06-21 A kind of one key drawing methods of rail traffic escalator construction drawing of data-driven Pending CN109002582A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810644559.6A CN109002582A (en) 2018-06-21 2018-06-21 A kind of one key drawing methods of rail traffic escalator construction drawing of data-driven

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810644559.6A CN109002582A (en) 2018-06-21 2018-06-21 A kind of one key drawing methods of rail traffic escalator construction drawing of data-driven

Publications (1)

Publication Number Publication Date
CN109002582A true CN109002582A (en) 2018-12-14

Family

ID=64601656

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810644559.6A Pending CN109002582A (en) 2018-06-21 2018-06-21 A kind of one key drawing methods of rail traffic escalator construction drawing of data-driven

Country Status (1)

Country Link
CN (1) CN109002582A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110083881A (en) * 2019-04-02 2019-08-02 河北万达轮胎有限公司 A kind of tire tread based on Excel and CAD platform goes out type die panel method for drafting
CN111079218A (en) * 2019-12-18 2020-04-28 卢娅 AutoCAD-based design drawing rapid countersigning method
CN112182686A (en) * 2019-07-04 2021-01-05 广东省重工建筑设计院有限公司 Method, device, equipment and storage medium for generating channel model
CN116450277A (en) * 2023-06-12 2023-07-18 湖南中车时代通信信号有限公司 Graphic configuration management method and system for rail transit equipment

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李成洋: "《基于VBA的轨道交通电扶梯智能辅助设计技术》", 《2016中国(深圳)城市轨道交通关键技术论坛暨第25届地铁学术交流会论文集》 *
李成洋: "《自动扶梯安装工艺及其智能成图软件开发与应用》", 《现代城市轨道交通》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110083881A (en) * 2019-04-02 2019-08-02 河北万达轮胎有限公司 A kind of tire tread based on Excel and CAD platform goes out type die panel method for drafting
CN112182686A (en) * 2019-07-04 2021-01-05 广东省重工建筑设计院有限公司 Method, device, equipment and storage medium for generating channel model
CN112182686B (en) * 2019-07-04 2023-11-07 广东省重工建筑设计院有限公司 Method, device, equipment and storage medium for generating channel model
CN111079218A (en) * 2019-12-18 2020-04-28 卢娅 AutoCAD-based design drawing rapid countersigning method
CN116450277A (en) * 2023-06-12 2023-07-18 湖南中车时代通信信号有限公司 Graphic configuration management method and system for rail transit equipment
CN116450277B (en) * 2023-06-12 2023-08-11 湖南中车时代通信信号有限公司 Graphic configuration management method and system for rail transit equipment

Similar Documents

Publication Publication Date Title
CN109002582A (en) A kind of one key drawing methods of rail traffic escalator construction drawing of data-driven
CN107832541B (en) Intelligent conversion method and system for parameterized two-dimensional drawing/three-dimensional model
CN1873648B (en) Casting design optimization system for shape castings and optimization method
CN107423518B (en) Comprehensive pipe gallery full-line BIM collaborative design method combining Civil3D and Revit
CN107992651A (en) The two-dimentional drawing methods of one kind parametrization and system
CN110222445A (en) Based on BIM and the integrated of design information, collaborative design and delivery method and system
CN109491735B (en) Integrated data generation and verification integrated monitoring human-computer interface configuration implementation method
CN103578137A (en) Three-dimensional modeling system and method for prefabricated parts
CN110362887A (en) A kind of fast modeling method based on Revit
CN108255489A (en) Front-end interface code generating method, device, electronic equipment and storage medium
CN106844885B (en) BIM technology-based drawing frame and drawing label design method
CN102509511A (en) Rapid map making system based on GIS (Geographic Information System) data
CN106445900A (en) Table style processing method and device
CN111309313A (en) Method for quickly generating HTML (hypertext markup language) and storing form data
CN105045583B (en) A kind of IETM failure classes data module composition apparatus and its creative method based on visible process
CN109710357A (en) A kind of method and system based on Unity3D engine implementation server operation
CN101894386A (en) Method and system for intuitively displaying interlayer relation of graphic element in multi-level model
CN108845942A (en) Product feature management method, device, system and storage medium
CN104298705A (en) Converting method of relational data and unstructured data
CN106682816A (en) Feature-basedthree-dimensional machiningtechnology layout system and method
CN108170855A (en) A kind of CityGML and IFC data unified query and data pick-up method
CN107862151A (en) A kind of gate intelligence aided design system
CN105320802B (en) A method of it is designed based on AutoCAD general graphical object implementatio8 auxiliary programmings
US20040215586A1 (en) Automatic knowledge creating method, program therefor, automatic designing method and its system
CN109828806A (en) A kind of optimization method based on the customized diversified control combing of UI

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181214