CN109002034A - The pilot system and test method of city rail vehicle frame control autocontrol system - Google Patents

The pilot system and test method of city rail vehicle frame control autocontrol system Download PDF

Info

Publication number
CN109002034A
CN109002034A CN201811221553.4A CN201811221553A CN109002034A CN 109002034 A CN109002034 A CN 109002034A CN 201811221553 A CN201811221553 A CN 201811221553A CN 109002034 A CN109002034 A CN 109002034A
Authority
CN
China
Prior art keywords
braking
signal
vehicle frame
rail vehicle
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811221553.4A
Other languages
Chinese (zh)
Other versions
CN109002034B (en
Inventor
王纪刚
王玉波
吴向宁
石喆文
安震
李润华
李莉
张乾乾
赵庆刚
古龙瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Qingdao Sifang Rolling Stock Research Institute Co Ltd
Original Assignee
CRRC Qingdao Sifang Rolling Stock Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRRC Qingdao Sifang Rolling Stock Research Institute Co Ltd filed Critical CRRC Qingdao Sifang Rolling Stock Research Institute Co Ltd
Priority to CN201811221553.4A priority Critical patent/CN109002034B/en
Publication of CN109002034A publication Critical patent/CN109002034A/en
Application granted granted Critical
Publication of CN109002034B publication Critical patent/CN109002034B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M17/00Testing of vehicles
    • G01M17/08Railway vehicles
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B23/00Testing or monitoring of control systems or parts thereof
    • G05B23/02Electric testing or monitoring
    • G05B23/0205Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The present invention proposes the pilot system and test method of a kind of city rail vehicle frame control autocontrol system, pilot system including the city rail vehicle frame control braking system includes that tested city rail vehicle frame controls autocontrol system, further includes that driver simulates console, the testing stand for installing the tested brak control unit, test measure and control device, Train Control and management system TCMS and traction control unit simulation device for monitoring the tested city rail vehicle frame control autocontrol system operating status;The pilot system and test method of city rail vehicle frame control autocontrol system of the invention, the city rail vehicle frame, which controls the pilot system of autocontrol system and test method, to control the simulation test and attribute testing that autocontrol system carries out 1:1 to city rail vehicle frame, carry out ground validation for the entrucking that city rail vehicle frame controls autocontrol system and provide hardware supported.

Description

The pilot system and test method of city rail vehicle frame control autocontrol system
Technical field
The present invention relates to vehicle braking control fields, more specifically to a kind of city rail vehicle frame control control for brake system The pilot system and test method of system
Background technique
Urban track traffic is with advantages such as high efficiency, large conveying quantity, low pollutions, it has also become many big cities solve traffic problems Primary selection.Since the new century, urban rail transit in China developing state is rapid, wherein railway and urban track traffic Project is the opera involving much singing and action of construction, and national emphasis promotes 103 urban rail traffic project previous works, creates urban track traffic 2000 kilometers or more, gross investment is up to 1.6 trillion yuans.In a foreseeable future city rail is handed over even in 20 years within 10 years It is logical to be in the high-speed developing period always.
Urban rail traffic vehicle braking system is one of critical component of city rail vehicle, and the performance of braking system is fine or not, It is related to vehicle comprehensive technical level and running quality.Braking system is directly related with the safe operation of train, so it is reliable Property require it is particularly important.Motor vehicle braking system is one of the key points and difficulties of urban rail transit equipment production domesticization.It was verified that Test method and means have all played great effect in the research, exploitation and technological progress of braking system, not advanced Technical equipment, autonomous innovation are difficult smoothly to realize.
The production domesticization research and development of city railway vehicle braking system are currently carried out, the research and development of braking system are necessarily required to Relevant experimental facilities.Domestic metro braking testing stand realizes having a single function, and can not carry out 1:1 to urban rail braking system Simulation test and city rail vehicle frame control autocontrol system attribute testing.
In consideration of it, it is necessary to provide the pilot system and test method of a kind of city rail vehicle frame control autocontrol system, it should City rail vehicle frame control autocontrol system pilot system and test method can to city rail vehicle frame control autocontrol system into The simulation test and attribute testing of row 1:1 carries out ground validation for the entrucking that city rail vehicle frame controls autocontrol system and provides firmly Part is supported.
Summary of the invention
It is directed to above-mentioned technical problem, the present invention provides a kind of pilot systems of city rail vehicle frame control autocontrol system And test method, the pilot system and test method of city rail vehicle frame control autocontrol system can control city rail vehicle frame Autocontrol system carries out the simulation test and attribute testing of 1:1, and the entrucking for controlling autocontrol system for city rail vehicle frame carries out ground Face verifying provides hardware supported.
In order to achieve the above object, the technical solution adopted by the present invention are as follows:
A kind of pilot system of city rail vehicle frame control autocontrol system, the test of the city rail vehicle frame control braking system System includes that tested city rail vehicle frame controls autocontrol system, and the tested city rail vehicle frame control autocontrol system includes eight groups Tested brak control unit;
The pilot system of the city rail vehicle frame control braking system further includes that driver simulates console, for installing the quilt It surveys the testing stand of brak control unit, control the test of autocontrol system operating status for monitoring the tested city rail vehicle frame Measure and control device, Train Control and management system TCMS and traction control unit simulation device;
It includes referring to for sending the braking traction level logic of brake signal and traction signal that the driver, which simulates console, Simulator and brake control signal is enabled to issue module;The system that the braking traction rank logical order simulator is sent Dynamic signal includes braking instruction and braking level signal;The brake control signal issues module, for issuing service braking letter Number, emergency brake signal, fast braking signal, urgent traction signal, release of brake signal, braking is kept to apply signal and holding Release of brake signal, braking traction rank logical order simulator and brake control signal issue module and are tested with described in eight groups Brak control unit connection, the braking draw rank logical order simulator, the traction control unit simulation device and The tested brak control unit is connected to the network by the Train Control and management system TCMS;
The testing stand is additionally provided with the car load simulator for simulated air spring pressure, for simulating axle The vehicle wheel of revolving speed carries running simulation device and foundation brake simulator, the tested brak control unit and the vehicle Lotus simulator connection, according to the different calculating for carrying out brake force of the car load simulator simulation load amount;Institute Tested brak control unit is stated respectively to connect running simulation device and the foundation brake simulator with the vehicle wheel, with The braking process of simulating vehicle;
The test measure and control device includes host computer and braking system maintenance terminal, the braking system maintenance terminal and institute Tested brak control unit network connection is stated, the host computer and the braking system maintenance terminal are connected to the network;The braking System maintenance terminal, the running state information issued for receiving tested city rail vehicle frame control autocontrol system;It is described upper Machine, for receiving the running state information of braking system maintenance terminal sending and with indicator light, data list and performance graph Form shows the operating status of tested braking control system.
A kind of city rail vehicle frame control autocontrol system test method, using city rail vehicle frame control control for brake above-mentioned system The pilot system of system, including braking system graduated application, graduated release performance test, the specific steps are as follows:
It is same by braking traction rank logical order simulator sending brake signal that the driver simulates console When module issued by the brake control signal be taken up in order of priority and issue service braking signal and release of brake signal, it is described tested City rail vehicle frame control autocontrol system receive braking instruction, braking level signal and service braking signal carry out braking apply Add, be followed by being carried out release of brake again by release of brake signal, testing crew obtains the quilt by the test measure and control device The operating status of city rail vehicle frame control autocontrol system is surveyed to judge whether the performance is normal.
Preferably, service braking performance test when further including different initial velocity, the specific steps are as follows: the vehicle wheel Different velocity amplitudes is exported to running simulation device, the driver simulates console and draws rank logical order by the braking Simulator exports brake signal, and the brake control signal issues module sending service braking signal, the tested urban rail simultaneously Vehicle frame control autocontrol system receive braking instruction, braking level signal and service braking signal after simulating vehicle it is normal With braking process, testing crew obtains the tested city rail vehicle frame by the test measure and control device and controls autocontrol system Operating status judges whether the performance is normal.
Preferably, emergency braking performance test when further including different initial velocity, the specific steps are as follows: the vehicle wheel Different velocity amplitudes is exported to running simulation device, the driver simulates console and draws rank logical order by the braking Simulator exports brake signal, and the brake control signal issues module sending emergency brake signal, the tested urban rail simultaneously Vehicle frame control autocontrol system receive braking instruction, braking level signal and emergency brake signal after simulating vehicle it is tight Anxious braking process, testing crew obtain the tested city rail vehicle frame by the test measure and control device and control autocontrol system Operating status judges whether the performance is normal.
Preferably, fast braking performance test when further including different initial velocity, the specific steps are as follows: the vehicle wheel Different velocity amplitudes is exported to running simulation device, the driver simulates console and draws rank logical order by the braking Simulator exports brake signal, and the brake control signal issues module sending fast braking signal, the tested urban rail simultaneously Vehicle frame control autocontrol system receive braking instruction, braking level signal and fast braking signal after simulating vehicle it is fast Fast braking process, testing crew obtain the tested city rail vehicle frame by the test measure and control device and control autocontrol system Operating status judges whether the performance is normal.
Preferably, further including electric empty composite braking performance test, the specific steps are as follows: the driver simulates console Braking traction rank logical order simulator and the traction control unit simulation device by the Train Control and Management system TCMS sends braking information and electric braking force parameter information to the tested city rail vehicle frame control autocontrol system, The tested city rail vehicle frame control autocontrol system obtains distribution and calculating that electric braking force parameter information carries out brake force, examination It tests personnel and the operating status of the tested city rail vehicle frame control autocontrol system is obtained to sentence by the test measure and control device Whether the performance of breaking is normal.
Preferably, further including the test of car load tuning performance, the specific steps are as follows: the car load simulator The different load informations of vehicle are exported, the tested city rail vehicle frame control autocontrol system described at this time acquires the load currently set Lotus information is receiving the braking instruction and braking level signal that the braking traction rank logical order simulator issues, And after the brake control signal issues the service braking signal that module issues, the tested city rail vehicle frame control control for brake System carries out the calculating of brake force, and testing crew obtains the tested city rail vehicle frame control by the test measure and control device and moves The operating status of control system judges whether the performance is normal.
Preferably, further including anti-sliding control performance test, the specific steps are as follows: the vehicle wheel is to running simulation device Different velocity amplitudes is exported, the speed that the tested city rail vehicle frame control autocontrol system acquisition acquisition is currently set is described Tested city rail vehicle frame control autocontrol system judges whether vehicle is in sliding state according to speed difference and deceleration, tests people Member obtains the operating status of the tested city rail vehicle frame control autocontrol system by the test measure and control device to judge this Whether performance is normal.
Preferably, further including the performance test for keeping braking to apply and alleviate, the specific steps are as follows: the control for brake Signal issues module and issues service braking signal, emergency brake signal, fast braking signal, urgent traction signal so that vehicle pair It should be at service braking mode, emergency brake modes, Rapid brake mode and urgent traction mode;In the different operation moulds of vehicle Under formula, the brake control signal issues module and issues holding braking application signal and the braking during stopping brake It draws rank logical order simulator and exports brake signal;The brake control signal is issued in starting operational process and is kept Release of brake signal, the tested city rail vehicle frame control autocontrol system are receiving brake signal and are keeping brake signal, And the holding braking of simulating vehicle and holding alleviation process, testing crew pass through the test observing and controlling after holding release of brake signal Device obtains the operating status of the tested city rail vehicle frame control autocontrol system to judge whether the performance is normal.
Preferably, further including the braking ability test under urgent traction mode, the specific steps are as follows: the control for brake Signal issues module and issues urgent traction signal so that vehicle is in urgent traction mode, and it is logical to simulate console by the driver at this time Crossing the braking traction rank logical order simulator output brake signal, the brake control signal issues module hair simultaneously Service braking signal out, the tested city rail vehicle frame control autocontrol system are receiving braking instruction, braking level signal And after service braking signal simulating vehicle braking process, testing crew passes through the test measure and control device acquisition tested city Rail vehicle frame controls the operating status of autocontrol system to judge whether the performance is normal.
Compared with prior art, the advantages and positive effects of the present invention are:
The pilot system and test method of city rail vehicle frame control autocontrol system of the invention, the city rail vehicle frame The pilot system and test method for controlling autocontrol system can control the simulation that autocontrol system carries out 1:1 to city rail vehicle frame Test and attribute testing carry out ground validation for the entrucking that city rail vehicle frame controls autocontrol system and provide hardware supported.
Detailed description of the invention
Fig. 1 is the structural schematic diagram for the pilot system that city rail vehicle frame controls autocontrol system
Fig. 2 is the structural schematic diagram of present invention test measure and control device
In above each figure: 1, driver simulates console;11, braking traction rank logical order simulator;12, braking control Signal processed issues module;2, testing stand;21, it is tested city rail vehicle frame and controls autocontrol system;211, it is tested brak control unit; 22, car load simulator;23, foundation brake simulator;24, vehicle wheel is to running simulation device;3, test observing and controlling dress It sets;31, host computer;32, maintenance terminal is braked;4, Train Control and management system TCMS;5, traction control unit simulation device.
Specific embodiment
In the following, the present invention is specifically described by illustrative embodiment.It should be appreciated, however, that not into one In the case where step narration, element, structure and features in an embodiment can also be advantageously incorporated into other embodiments In.
In order to achieve the above object, the technical solution adopted by the present invention are as follows:
As shown in Figure 1, a kind of pilot system of city rail vehicle frame control autocontrol system, the city rail vehicle frame control are dynamic The pilot system of system includes that tested city rail vehicle frame controls autocontrol system 21, the tested city rail vehicle frame control control for brake System 21 includes eight groups of tested brak control units 211;
The pilot system of the city rail vehicle frame control braking system further includes that driver simulates console 1, described for installing The testing stand 2 of tested brak control unit 211 runs shape for monitoring the tested city rail vehicle frame control autocontrol system 21 Test measure and control device 3, Train Control and the management system TCMS4 and traction control unit simulation device 5 of state;
It includes referring to for sending the braking traction level logic of brake signal and traction signal that the driver, which simulates console 1, Simulator 11 and brake control signal is enabled to issue module 12;What the braking traction rank logical order simulator 11 was sent The brake signal includes braking instruction and braking level signal;The brake control signal issues module 12, for issuing often With brake signal, emergency brake signal, fast braking signal, urgent traction signal, release of brake signal, braking is kept to apply letter Number and keep release of brake signal, braking traction rank logical order simulator 11 and brake control signal issue module 12 with It is tested brak control unit 211 described in eight groups to connect, the braking traction rank logical order simulator 11, traction control Unit simulation device 5 processed and the tested brak control unit 211 are connected by the Train Control and management system TCMS4 network It connects;
The testing stand 2 is additionally provided with the car load simulator 22 for simulated air spring pressure, for simulating The vehicle wheel of axle revolving speed is to running simulation device 24 and foundation brake simulator 23, the tested brak control unit 211 It is connect with the car load simulator 22, to be carried out according to the difference of the 22 simulation load amount of car load simulator The calculating of brake force;The tested brak control unit 211 is respectively with the vehicle wheel to running simulation device 24 and the base Plinth brake simulator 23 connects, with the braking process of simulating vehicle;
Wherein, the car load simulator 22 is mainly by electric Proportion valve, load signal generator and load simulated The composition such as control unit, control mode use automatic control mode, set each air spring by load simulated control unit Pressure value, electrical proportional dump valve is voluntarily adjusted according to the pressure value of setting, with simulated air spring pressure value;Institute Vehicle wheel is stated to running simulation device 24, is mainly made of servo motor, speed signal generator and speed analog controlling unit, Under speed analog controlling unit control, the change procedure of simulating vehicle axle revolving speed;The foundation brake simulator 23, by the output pressure air of the relay valve of each tested brak control unit 211 of 3L cylinder connection, with 3L cylinder pressure value Change modeling is tested the braking maneuver process of city rail vehicle frame control autocontrol system 21.
As shown in Fig. 2, the test measure and control device 3 includes host computer 31 and braking system maintenance terminal, the braking system Maintenance terminal of uniting is connected to the network with the tested brak control unit 211, and the host computer 31 is safeguarded eventually with the braking system End network connection;The braking system maintenance terminal, for receiving the tested city rail vehicle frame control sending of autocontrol system 21 Running state information;The host computer 31, for receiving the running state information of braking system maintenance terminal sending and with instruction The form of lamp, data list and performance graph shows the operating status of tested braking control system;Host computer 31 can also be passed through Response message is sent to the braking maintenance terminal 32 with Ethernet or USB, and forwarding is sent to the tested dynamic control of city rail vehicle frame control In the CAN bus of system 21 processed, the relevant parameter (such as: wheel footpath value) in each tested brak control unit 211 is modified.
A kind of city rail vehicle frame control autocontrol system test method, using city rail vehicle frame control control for brake above-mentioned system The pilot system of system, including braking system graduated application, graduated release performance test, the specific steps are as follows:
The driver simulates console 1 and draws the sending brake signal of rank logical order simulator 11 by the braking Module 12 is issued by the brake control signal simultaneously and is taken up in order of priority sending service braking signal and release of brake signal, it is described Tested city rail vehicle frame control autocontrol system 21 is receiving braking instruction, braking level signal and the progress of service braking signal Braking applies, and is followed by being carried out release of brake again by release of brake signal, and testing crew is obtained by the test measure and control device 3 The tested city rail vehicle frame controls the operating status of autocontrol system 21 to judge whether the performance is normal.
Further, service braking performance test when further including different initial velocity, the specific steps are as follows: the vehicle wheel Different velocity amplitudes is exported to running simulation device 24, the driver simulates console 1 and draws level logic by the braking Instruction simulation device 11 exports brake signal, and the brake control signal issues the sending service braking signal of module 12 simultaneously, described Tested city rail vehicle frame control autocontrol system 21 is receiving braking instruction, braking level signal and service braking signal rear mold The service braking process of quasi- vehicle, testing crew obtain the tested city rail vehicle frame control by the test measure and control device 3 The operating status of autocontrol system 21 judges whether the performance is normal.
Further, emergency braking performance test when further including different initial velocity, the specific steps are as follows: the vehicle wheel Different velocity amplitudes is exported to running simulation device 24, the driver simulates console 1 and draws level logic by the braking Instruction simulation device 11 exports brake signal, and the brake control signal issues the sending emergency brake signal of module 12 simultaneously, described Tested city rail vehicle frame control autocontrol system 21 is receiving braking instruction, braking level signal and emergency brake signal rear mold The emergency braking process of quasi- vehicle, testing crew obtain the tested city rail vehicle frame control by the test measure and control device 3 The operating status of autocontrol system 21 judges whether the performance is normal.
Further, fast braking performance test when further including different initial velocity, the specific steps are as follows: the vehicle wheel Different velocity amplitudes is exported to running simulation device 24, the driver simulates console 1 and draws level logic by the braking Instruction simulation device 11 exports brake signal, and the brake control signal issues the sending fast braking signal of module 12 simultaneously, described Tested city rail vehicle frame control autocontrol system 21 is receiving braking instruction, braking level signal and fast braking signal rear mold The fast braking process of quasi- vehicle, testing crew obtain the tested city rail vehicle frame control by the test measure and control device 3 The operating status of autocontrol system 21 judges whether the performance is normal.
It further, further include electric empty composite braking performance test, the specific steps are as follows: the driver simulates console 1 The braking traction rank logical order simulator 11 and the traction control unit simulation device 5 pass through the train control System sends braking information to the tested city rail vehicle frame control autocontrol system 21 with management system TCMS4 and electric braking force is joined Number information, the tested city rail vehicle frame control autocontrol system 21 obtain the distribution that electric braking force parameter information carries out brake force With calculating, testing crew obtains the tested city rail vehicle frame by the test measure and control device 3 and controls autocontrol system 21 Operating status judges whether the performance is normal.
It further, further include the test of car load tuning performance, the specific steps are as follows: the car load simulator The different load informations of 22 output vehicles, the tested city rail vehicle frame control autocontrol system 21 described at this time acquire current setting Load information, receiving it is described braking traction rank logical order simulator 11 issue braking instruction and braking rank After signal and the brake control signal issue the service braking signal that module 12 issues, the tested city rail vehicle frame control Braking control system 21 carries out the calculating of brake force, and testing crew obtains the tested urban rail by the test measure and control device 3 Vehicle frame controls the operating status of autocontrol system 21 to judge whether the performance is normal.
It further, further include anti-sliding control performance test, the specific steps are as follows: the vehicle wheel is to running simulation device The different velocity amplitude of 24 outputs, the speed that the tested city rail vehicle frame control autocontrol system 21 acquisition acquisition is currently set, The tested city rail vehicle frame control autocontrol system 21 judges whether vehicle is in sliding state according to speed difference and deceleration, Testing crew obtains the operating status that the tested city rail vehicle frame controls autocontrol system 21 by the test measure and control device 3 To judge whether the performance is normal.
It further, further include the performance test for keeping braking to apply and alleviate, the specific steps are as follows: the control for brake Signal issues module 12 and issues service braking signal, emergency brake signal, fast braking signal, urgent traction signal so that vehicle It is corresponding to be in service braking mode, emergency brake modes, Rapid brake mode and urgent traction mode;In the difference operation of vehicle Under mode, the brake control signal issues module 12 and issues holding braking application signal and described during stopping brake Braking traction rank logical order simulator 11 exports brake signal;The brake control signal is sent out in starting operational process Release of brake signal is kept out, and the tested city rail vehicle frame control autocontrol system 21 is receiving brake signal and keeping system The holding braking of simulating vehicle and holding alleviation process, testing crew pass through described after dynamic signal, and holding release of brake signal Test measure and control device 3 obtains the operating status of the tested city rail vehicle frame control autocontrol system 21 whether to judge the performance Normally.
Further, further include braking ability test under urgent traction mode, the specific steps are as follows: the control for brake Signal issues module 12 and issues urgent traction signal so that vehicle is in urgent traction mode, and the driver simulates console at this time 1, which draws rank logical order simulator 11 by the braking, exports the brake signal brake control signal sending mould simultaneously Block 12 issues service braking signal, and the tested city rail vehicle frame control autocontrol system 21 is receiving braking instruction, braking The braking process of simulating vehicle after level signal and service braking signal, testing crew are obtained by the test measure and control device 3 The tested city rail vehicle frame controls the operating status of autocontrol system 21 to judge whether the performance is normal.
Further, further include fault simulation performance test: passing through the artificial component to tested brak control unit 211 Failure (solenoid valve failure, pressure sensor failure etc.) simulates what tested city rail vehicle frame control autocontrol system 21 was likely to occur Failure is tested city rail vehicle frame control autocontrol system according to different fault type automatic guides, to guarantee city rail vehicle Frame controls the safety guiding of autocontrol system during train operation.Testing crew is obtained by the test measure and control device 3 The tested city rail vehicle frame controls the operating status of autocontrol system to judge whether the performance is normal.

Claims (10)

1. a kind of pilot system of city rail vehicle frame control autocontrol system, it is characterised in that: the city rail vehicle frame control is dynamic The pilot system of system includes that tested city rail vehicle frame controls autocontrol system, the tested city rail vehicle frame control control for brake system System includes eight groups of tested brak control units;
The pilot system of the city rail vehicle frame control braking system further includes that driver simulates console, for installing the tested system The testing stand of dynamic control unit, the test observing and controlling for monitoring the tested city rail vehicle frame control autocontrol system operating status Device, Train Control and management system TCMS and traction control unit simulation device;
It includes drawing rank logical order mould for sending the braking of brake signal and traction signal that the driver, which simulates console, Quasi- device and brake control signal issue module;The braking letter that the braking traction rank logical order simulator is sent Number include braking instruction and braking level signal;The brake control signal issues module, for issuing service braking signal, tight Anxious brake signal, urgent traction signal, release of brake signal, keeps braking to apply signal and keeps braking fast braking signal Mitigation signal, braking traction rank logical order simulator and brake control signal issue module and are tested braking described in eight groups Rank logical order simulator, the traction control unit simulation device and described are drawn in control unit connection, the braking Tested brak control unit is connected to the network by the Train Control and management system TCMS;
The testing stand is additionally provided with the car load simulator for simulated air spring pressure, for simulating axle revolving speed Vehicle wheel to running simulation device and foundation brake simulator, the tested brak control unit and the car load mould Quasi- device connection, according to the different calculating for carrying out brake force of the car load simulator simulation load amount;The quilt It surveys brak control unit respectively to connect running simulation device and the foundation brake simulator with the vehicle wheel, with simulation The braking process of vehicle;
The test measure and control device includes host computer and braking system maintenance terminal, the braking system maintenance terminal and the quilt Brak control unit network connection is surveyed, the host computer and the braking system maintenance terminal are connected to the network;The braking system Maintenance terminal, the running state information issued for receiving tested city rail vehicle frame control autocontrol system;The host computer is used It is shown in the running state information for receiving the sending of braking system maintenance terminal and in the form of indicator light, data list and performance graph Show the operating status of tested braking control system.
2. a kind of city rail vehicle frame controls autocontrol system test method, controlled using city rail vehicle frame described in claim 1 The pilot system of autocontrol system, it is characterised in that: specific to walk including braking system graduated application, graduated release performance test It is rapid as follows:
The driver simulates console is led to simultaneously by braking traction rank logical order simulator sending brake signal It crosses the brake control signal sending module and is taken up in order of priority sending service braking signal and release of brake signal, the tested urban rail Vehicle frame control autocontrol system receive braking instruction, braking level signal and service braking signal carry out braking application, It is followed by being carried out release of brake again by release of brake signal, testing crew obtains the tested city by the test measure and control device Rail vehicle frame controls the operating status of autocontrol system to judge whether the performance is normal.
3. city rail vehicle frame according to claim 2 controls autocontrol system test method, it is characterised in that: further include not With service braking performance test when initial velocity, the specific steps are as follows: the vehicle wheel exports running simulation device different Velocity amplitude, the driver simulate console and draw rank logical order simulator output brake signal simultaneously by the braking The brake control signal issues module and issues service braking signal, and the tested city rail vehicle frame control autocontrol system is connecing The service braking process for receiving braking instruction, braking simulating vehicle after level signal and service braking signal, testing crew pass through The test measure and control device obtains the operating status that the tested city rail vehicle frame controls autocontrol system It is no normal.
4. city rail vehicle frame according to claim 2 controls autocontrol system test method, it is characterised in that: further include not With emergency braking performance test when initial velocity, the specific steps are as follows: the vehicle wheel exports running simulation device different Velocity amplitude, the driver simulate console and draw rank logical order simulator output brake signal simultaneously by the braking The brake control signal issues module and issues emergency brake signal, and the tested city rail vehicle frame control autocontrol system is connecing The emergency braking process for receiving braking instruction, braking simulating vehicle after level signal and emergency brake signal, testing crew pass through The test measure and control device obtains the operating status that the tested city rail vehicle frame controls autocontrol system It is no normal.
5. city rail vehicle frame according to claim 2 controls autocontrol system test method, it is characterised in that: further include not With fast braking performance test when initial velocity, the specific steps are as follows: the vehicle wheel exports running simulation device different Velocity amplitude, the driver simulate console and draw rank logical order simulator output brake signal simultaneously by the braking The brake control signal issues module and issues fast braking signal, and the tested city rail vehicle frame control autocontrol system is connecing The fast braking process for receiving braking instruction, braking simulating vehicle after level signal and fast braking signal, testing crew pass through The test measure and control device obtains the operating status that the tested city rail vehicle frame controls autocontrol system It is no normal.
6. city rail vehicle frame according to claim 2 controls autocontrol system test method, it is characterised in that: further include electricity Empty composite braking performance test, the specific steps are as follows: rank logical order is drawn in the braking that the driver simulates console Simulator and the traction control unit simulation device are by the Train Control and management system TCMS to the tested city Rail vehicle frame controls autocontrol system and sends braking information and electric braking force parameter information, and the tested city rail vehicle frame control is dynamic Control system obtains the distribution and calculating that electric braking force parameter information carries out brake force, and testing crew is filled by the test observing and controlling The operating status of the acquisition tested city rail vehicle frame control autocontrol system is set to judge whether the performance is normal.
7. city rail vehicle frame according to claim 2 controls autocontrol system test method, it is characterised in that: further include vehicle The test of load tuning performance, the specific steps are as follows: the different load informations of the car load simulator output vehicle, The tested city rail vehicle frame control autocontrol system described at this time acquires the load information currently set, leads receiving the braking Draw the braking instruction of level logic instruction simulation device sending and brakes level signal and brake control signal sending mould After the service braking signal that block issues, the tested city rail vehicle frame control autocontrol system carries out the calculating of brake force, test Personnel obtain the operating status of the tested city rail vehicle frame control autocontrol system by the test measure and control device to judge Whether the performance is normal.
8. city rail vehicle frame according to claim 2 controls autocontrol system test method, it is characterised in that: further include preventing Slip control performance test, the specific steps are as follows: the vehicle wheel exports different velocity amplitudes to running simulation device, described tested The speed that the control autocontrol system acquisition acquisition of city rail vehicle frame is currently set, the tested city rail vehicle frame control control for brake system System judges whether vehicle is in sliding state according to speed difference and deceleration, and testing crew is obtained by the test measure and control device The tested city rail vehicle frame controls the operating status of autocontrol system to judge whether the performance is normal.
9. city rail vehicle frame according to claim 2 controls autocontrol system test method, it is characterised in that: further include protecting Hold the performance test that braking applies and alleviates, the specific steps are as follows: the brake control signal issues module and issues service braking Signal, emergency brake signal, fast braking signal, urgent traction signal are so that vehicle is corresponded in service braking mode, promptly Braking mode, Rapid brake mode and urgent traction mode;Under the different operational modes of vehicle, the brake control signal hair Module issues holding braking application signal and the braking traction rank logical order simulation dress during stopping brake out Set output brake signal;The brake control signal issues in starting operational process keeps release of brake signal, described tested City rail vehicle frame controls autocontrol system and is receiving brake signal and keeping brake signal, and keeps release of brake signal rear mold The holding braking of quasi- vehicle and holding alleviation process, testing crew obtain the tested urban rail car by the test measure and control device The operating status of frame control autocontrol system judges whether the performance is normal.
10. city rail vehicle frame according to claim 2 controls autocontrol system test method, it is characterised in that: further include Braking ability test under urgent traction mode, the specific steps are as follows: the brake control signal issues module sending and promptly leads Fuse number is so that vehicle is in urgent traction mode, and the driver simulates console and draws level logic by the braking at this time Instruction simulation device exports brake signal, and the brake control signal issues module sending service braking signal simultaneously, described tested City rail vehicle frame controls autocontrol system simulating vehicle after receiving braking instruction, braking level signal and service braking signal Braking process, testing crew obtains the tested city rail vehicle frame by the test measure and control device and controls autocontrol system Operating status judges whether the performance is normal.
CN201811221553.4A 2018-10-19 2018-10-19 Test system and test method for urban rail vehicle frame control system Active CN109002034B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811221553.4A CN109002034B (en) 2018-10-19 2018-10-19 Test system and test method for urban rail vehicle frame control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811221553.4A CN109002034B (en) 2018-10-19 2018-10-19 Test system and test method for urban rail vehicle frame control system

Publications (2)

Publication Number Publication Date
CN109002034A true CN109002034A (en) 2018-12-14
CN109002034B CN109002034B (en) 2019-12-27

Family

ID=64590234

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811221553.4A Active CN109002034B (en) 2018-10-19 2018-10-19 Test system and test method for urban rail vehicle frame control system

Country Status (1)

Country Link
CN (1) CN109002034B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110320891A (en) * 2019-07-09 2019-10-11 中车青岛四方车辆研究所有限公司 Rail vehicle braking system CAN bus message maintenance monitoring system and monitoring method
CN111006888A (en) * 2019-11-26 2020-04-14 中国铁道科学研究院集团有限公司铁道科学技术研究发展中心 Train air brake antiskid unit performance test method and test bench
CN111006887A (en) * 2019-11-21 2020-04-14 广州地铁集团有限公司 Urban rail train braking system test platform
CN112444416A (en) * 2020-09-25 2021-03-05 中车长春轨道客车股份有限公司 Motor train unit simulation speed method
CN112612234A (en) * 2020-12-23 2021-04-06 神华铁路装备有限责任公司 Train test system and method for electro-pneumatic brake control device, computer equipment and readable storage medium thereof
CN112874584A (en) * 2019-11-29 2021-06-01 株洲中车时代电气股份有限公司 Train test run test method, device and system
CN113359683A (en) * 2021-07-01 2021-09-07 青岛思锐科技有限公司 Test system and test method for vehicle control brake control system of urban rail vehicle
CN113640020A (en) * 2021-08-11 2021-11-12 中车青岛四方机车车辆股份有限公司 Test method and test device for rail vehicle brake system
CN116678649A (en) * 2023-06-07 2023-09-01 眉山中车制动科技股份有限公司 Air brake system of multi-system single-vehicle test platform of railway wagon

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205665019U (en) * 2016-06-07 2016-10-26 中车青岛四方车辆研究所有限公司 Pull brake test system
CN106444723A (en) * 2016-11-21 2017-02-22 中车青岛四方车辆研究所有限公司 Testing system and testing method for electronic brake control unit
US20180072296A1 (en) * 2016-09-12 2018-03-15 Klaus G. Buchberger System and method for wireless digital air brake testing
CN108008719A (en) * 2017-12-12 2018-05-08 同济大学 Municipal rail train electronic brake control unit closed-loop control experimental rig and test method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205665019U (en) * 2016-06-07 2016-10-26 中车青岛四方车辆研究所有限公司 Pull brake test system
US20180072296A1 (en) * 2016-09-12 2018-03-15 Klaus G. Buchberger System and method for wireless digital air brake testing
CN106444723A (en) * 2016-11-21 2017-02-22 中车青岛四方车辆研究所有限公司 Testing system and testing method for electronic brake control unit
CN108008719A (en) * 2017-12-12 2018-05-08 同济大学 Municipal rail train electronic brake control unit closed-loop control experimental rig and test method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王孝延: "制动系统可靠性试验方法研究", 《轨道机车车辆》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110320891A (en) * 2019-07-09 2019-10-11 中车青岛四方车辆研究所有限公司 Rail vehicle braking system CAN bus message maintenance monitoring system and monitoring method
CN110320891B (en) * 2019-07-09 2021-10-22 中车青岛四方车辆研究所有限公司 Railway vehicle braking system CAN bus message maintenance monitoring system and monitoring method
CN111006887A (en) * 2019-11-21 2020-04-14 广州地铁集团有限公司 Urban rail train braking system test platform
CN111006887B (en) * 2019-11-21 2024-04-26 广州地铁集团有限公司 Urban rail train braking system test platform
CN111006888A (en) * 2019-11-26 2020-04-14 中国铁道科学研究院集团有限公司铁道科学技术研究发展中心 Train air brake antiskid unit performance test method and test bench
CN112874584A (en) * 2019-11-29 2021-06-01 株洲中车时代电气股份有限公司 Train test run test method, device and system
CN112444416A (en) * 2020-09-25 2021-03-05 中车长春轨道客车股份有限公司 Motor train unit simulation speed method
CN112444416B (en) * 2020-09-25 2022-11-08 中车长春轨道客车股份有限公司 Motor train unit simulation speed method
CN112612234B (en) * 2020-12-23 2022-05-31 神华铁路装备有限责任公司 Train test system and method for electro-pneumatic brake control device, computer equipment and readable storage medium thereof
CN112612234A (en) * 2020-12-23 2021-04-06 神华铁路装备有限责任公司 Train test system and method for electro-pneumatic brake control device, computer equipment and readable storage medium thereof
CN113359683A (en) * 2021-07-01 2021-09-07 青岛思锐科技有限公司 Test system and test method for vehicle control brake control system of urban rail vehicle
CN113640020A (en) * 2021-08-11 2021-11-12 中车青岛四方机车车辆股份有限公司 Test method and test device for rail vehicle brake system
CN116678649A (en) * 2023-06-07 2023-09-01 眉山中车制动科技股份有限公司 Air brake system of multi-system single-vehicle test platform of railway wagon
CN116678649B (en) * 2023-06-07 2024-05-24 眉山中车制动科技股份有限公司 Air brake system of multi-system single-vehicle test platform of railway wagon

Also Published As

Publication number Publication date
CN109002034B (en) 2019-12-27

Similar Documents

Publication Publication Date Title
CN109002034A (en) The pilot system and test method of city rail vehicle frame control autocontrol system
CN106444421B (en) The vehicle-mounted traction braking controller system of urban track traffic and its working method
CN102328646B (en) Urban tram braking system
CN106774275B (en) Visualize the test macro and method of the control function of train operation monitoring device
CN104950878B (en) A kind of bullet train management information system cooperates with fault simulation system
CN102810267B (en) System and method for realizing train group running simulation by adopting object-oriented method
CN107240327A (en) A kind of railcar real time execution parameters simulation method based on virtual reality
CN110262286A (en) A kind of fully automatic operation system operation scene comprehensive verification system and method
CN109491267A (en) Hump automation semi-physical simulation experiment system and its algorithm based on data-driven
CN109883738A (en) High-speed train braking system Detecting data
CN101088822A (en) Analog control method of train running in fixed blocking condition
CN108153165B (en) Simulation test method and device for comprehensive automation system of marshalling station
CN104570761A (en) Visual simulation method for traction and braking of CRH train
CN107479402A (en) Electric braking simulation system, Simulation of Brake platform and electric braking analogy method
CN113359683B (en) Test system and test method for vehicle control brake control system of urban rail vehicle
CN110239590A (en) Block section length accordance checking method and platform
CN109677450A (en) The input/output test system of magnetic floating traffic vehicle-mounted running control
CN113997990B (en) Traction and motion simulation system and method for high-speed maglev train
CN205524319U (en) Braking state and warning playback device based on on --spot deposit data
CN109883598A (en) A kind of detection method of rail locomotive tractive force
CN207781054U (en) Air path system of braking practical training equipment of urban rail transit vehicle
CN110597087A (en) System and method for simulating operation of magnetic suspension train
Bin et al. CBTC (communication based train control): System and development
CN102956128A (en) Simulation operation trainer for operation monitoring and recording device of locomotive
Pugi et al. Hardware-in-the-loop testing of on-board subsystems: Some case studies and applications

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant