CN109000223A - A kind of material return device for circulating fluidized bed boiler part thermal insulation layer lining restorative procedure - Google Patents

A kind of material return device for circulating fluidized bed boiler part thermal insulation layer lining restorative procedure Download PDF

Info

Publication number
CN109000223A
CN109000223A CN201810610502.4A CN201810610502A CN109000223A CN 109000223 A CN109000223 A CN 109000223A CN 201810610502 A CN201810610502 A CN 201810610502A CN 109000223 A CN109000223 A CN 109000223A
Authority
CN
China
Prior art keywords
thermal insulation
insulation layer
pressing machine
hole
heat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810610502.4A
Other languages
Chinese (zh)
Inventor
苏彦彬
宋现玺
王红令
田飞
宋毅
何宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jade And Construction Co Ltd
Original Assignee
Jade And Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jade And Construction Co Ltd filed Critical Jade And Construction Co Ltd
Priority to CN201810610502.4A priority Critical patent/CN109000223A/en
Publication of CN109000223A publication Critical patent/CN109000223A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23CMETHODS OR APPARATUS FOR COMBUSTION USING FLUID FUEL OR SOLID FUEL SUSPENDED IN  A CARRIER GAS OR AIR 
    • F23C10/00Fluidised bed combustion apparatus
    • F23C10/18Details; Accessories
    • F23C10/24Devices for removal of material from the bed
    • F23C10/26Devices for removal of material from the bed combined with devices for partial reintroduction of material into the bed, e.g. after separation of agglomerated parts
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23MCASINGS, LININGS, WALLS OR DOORS SPECIALLY ADAPTED FOR COMBUSTION CHAMBERS, e.g. FIREBRIDGES; DEVICES FOR DEFLECTING AIR, FLAMES OR COMBUSTION PRODUCTS IN COMBUSTION CHAMBERS; SAFETY ARRANGEMENTS SPECIALLY ADAPTED FOR COMBUSTION APPARATUS; DETAILS OF COMBUSTION CHAMBERS, NOT OTHERWISE PROVIDED FOR
    • F23M5/00Casings; Linings; Walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

The invention discloses a kind of material return device for circulating fluidized bed boiler part thermal insulation layer lining restorative procedures, comprising the following steps: and one, it determines thermal insulation layer cavity: determining thermal insulation layer damaged condition and thermal insulation layer cavity range;Two, it opens up and repairs hole: opening up several in the surrounding corner of thermal insulation layer cavity and repair hole;Three, connect pressing machine: selection grout hole, the welding metal short tube at grout hole, short metal pipe connect pressing machine pipeline;Four, grouting indentation: the heat-insulated press-in material being stirred being packed into the hopper of pressing machine, starts pressing machine, and heat-insulated press-in material is pressed into thermal insulation layer cavity;Pressing machine is closed when having heat-insulated press-in material spilling from peep hole;Five, 5-10 days excision short metal pipes after furnace lifting will repair hole closing with iron plate.Reparation of the present invention completing material return device for circulating fluidized bed boiler cylinder part thermal insulation layer lining in such a way that material returning device wall outer wall aperture is pressed into heat-insulated press-in material can shorten the lining building time, reduce furnace lining price for repairing.

Description

A kind of material return device for circulating fluidized bed boiler part thermal insulation layer lining restorative procedure
Technical field
The present invention relates to recirculating fluidized bed material returning device insulating and wearing-resistant lining field more particularly to a kind of circulating fluidized bed boiler Material returning device part thermal insulation layer lining restorative procedure.
Background technique
Circulating fluidized bed boiler (CFBB) material returning device is important component part.900 DEG C of operation temperature or so, media particle 1600 kg/Nm3 of concentration (accumulation volume) left and right, 0.2 m/s of grey speed or so.Generally use multilayer insulation wear resistance lining structure.Every Thermosphere is using small heat-barrier materials of thermal coefficients such as heat insulating casting material, refractory fibre product or calcium silicate boards, and wearing layer is using resistance to The high wear-resistant castable of mill property.The thermal expansion coefficient of wearing layer and thermal insulation layer differs greatly, and long-time service is easy to produce interlayer seam Gap.Wearing layer is used for a long time more with crackle after multiple start and stop.And thermal insulation layer is low using temperature, intensity is low, once it is big with hardness High-temperature medium particle contact, thermal insulation layer is worn out quickly, wearing layer outwardly sound often occurs and material returning device wall overheat shows As not only increasing heat dissipation capacity, and there are serious security risks.Need to be thermally shielded repairing for wear resistance lining in the case It mends.General method for repairing and mending is that the insulating and wearing-resistant lining of cylinder body outer wall superheat section is removed the method for remaking lining again to repair It is multiple.
Traditional CFBB material returning device cylinder refractory liner restorative procedure has the following problems: 1, material returning device barrel diameter is small, Working face is small, and operation difficulty is big;2, maintenance engineering amount is big, waste is big, and the wearing layer castable for needing not damage is also simultaneously It removes, repair;3, wearing layer thickness is big, body is close big, and risk is big when dismounting;4, more wearing layer linings are caused to connect simultaneously Seam, furnace lining globality are deteriorated;5, it needs baker that could use after lining reparation, increases maintenance time and baker expense.
The presence of problem above, make the maintenance time of material return device for circulating fluidized bed boiler refractory liner it is long, it is costly, maintenance It is of low quality.
Summary of the invention
The present invention provides a kind of material return device for circulating fluidized bed boiler part to solve shortcoming in the prior art Thermal insulation layer lining restorative procedure, completing recirculating fluidized bed in such a way that material returning device wall outer wall aperture is pressed into heat-insulated press-in material The reparation of boiler return feeder cylinder part thermal insulation layer lining can shorten the lining building time, reduce the furnace lining cost of repairs.
In order to solve the above technical problems, the present invention adopts the following technical scheme: a kind of material return device for circulating fluidized bed boiler office Portion's thermal insulation layer lining restorative procedure, comprising the following steps:
Step 1 determines thermal insulation layer cavity: tentatively true according to overtemperature situation of the material returning device cylinder wall in day-to-day operation first Determine thermal insulation layer damaged condition, taps overtemperature site boundary with hammer, listening determines thermal insulation layer cavity range;
Step 2 opens up and repairs hole: opening up several in the surrounding corner of thermal insulation layer cavity and repairs hole;
Step 3 connects pressing machine: selecting one as grout hole in wherein one reparation hole, weld and have at grout hole The short metal pipe of screw thread or flange, remaining repairs hole as peep hole, and short metal pipe connects pressing machine pipeline;
Step 4, grouting indentation: the heat-insulated press-in material being stirred being packed into the hopper of pressing machine, starts pressing machine, will be heat-insulated Press-in material is pressed into thermal insulation layer cavity by pressing machine pipeline and short metal pipe;There is heat-insulated press-in material to overflow from peep hole When, it closes pressing machine and stops being pressed into heat-insulated press-in material, block short metal pipe;
Step 5,5-10 days excision short metal pipes after furnace lifting fill out cellucotton at hole repairing, will repair hole closing with iron plate.
Preferably, in step 2, when opening up reparation hole, metal anchorage need to be avoided, the material returning device at thermal insulation layer cavity On cylinder wall respectively circumferentially opened up with 500 ± 50mm of axially spaced-apart, repair hole size be φ 30- φ 50mm, one every Two reparation holes are at least opened up at thermosphere cavity, one of them is as grout hole, another is as peep hole.
Preferably, in step 3, the reparation hole for selecting the top positioned at thermal insulation layer cavity to locate between two parties is as grout hole.
Preferably, in step 4, when thermal insulation layer cavity has different height position that is multiple and being located at material returning device cylinder, first It is in the milk since the thermal insulation layer cavity for being located at material returning device cylinder lower part, from material returning device inside, if at thermal insulation layer cavity Wearing layer has dilatation joint, then is in the milk and needs when being pressed into while observing the case where heat-insulated press-in material oozes out from dilatation joint, to heat-insulated Press-in material oozes out from dilatation joint, while when the pressure reduction of pressing machine, clogs dilatation joint with pottery fiber cotton, removes pressing machine pipe Road, blocks the grout hole at the thermal insulation layer cavity and replaces a grout hole of more top and carry out grouting push operation;In same The peep hole of one horizontal plane, which has to rise with the horizontal line of heat-insulated press-in material when the exudation of heat-insulated press-in material, block until completely It blocks;Aforesaid operations are repeated until whole thermal insulation layer cavity groutings is completed.
Preferably, in step 3, the internal diameter of the outer diameter and pressing machine pipeline of short metal pipe matches, the internal diameter of short metal pipe Match with the diameter of grout hole, one end of short metal pipe is connect by welding manner with material returning device cylinder wall, short metal pipe The other end connect with the discharge port of pressing machine pipeline by fastener.
Preferably, the feed inlet of pressing machine pipeline is connect by fastener with pressing machine, and pressing machine selection for pipeline is high-intensitive Sebific duct.
Preferably, pressing machine selects piston type or squash type mortar pump, when completing operation or longer intermediate idle hours and Heat-insulated press-in material in Shi Qingli hopper and pressing machine pipeline.
Preferably, heat-insulated press-in material is mainly made of the raw material of following weight percent: light-weight refractory aggregate 40-60%, resistance to Fiery powder 8-20%, bonding agent 15-40%, Ultramicro-powder 0.5-10%, plasticizer 0.1-10% and cellucotton 0.5-10%, it is additional above-mentioned The compound additive of total mass of raw material 0.1-3%.
According to above-mentioned heat-insulated press-in material, it is mainly made of the raw material of following weight percent: light-weight refractory aggregate 42%, refractory powder 20%, bonding agent 30%, Ultramicro-powder 3%, plasticizer 4.5 and cellucotton 0.5%, additional above-mentioned raw materials gross mass 0.3% compound additive.
According to above-mentioned heat-insulated press-in material, the light-weight refractory aggregate is haydite, expanded vermiculite, expanded perlite, lightweight Brick sand, light-weight mullite or alumina hollow ball, the partial size of light-weight refractory aggregate are 0.1-8mm.
According to above-mentioned heat-insulated press-in material, the refractory powder is clay, alumina, floating bead, flyash or slag fine powder, resistance to Partial size≤0.074mm of fiery powder.
According to above-mentioned heat-insulated press-in material, the bonding agent is solid binder or liquid binder, and solid binder is Portland cement, aluminate cement, sulphate aluminium cement combine clay;Liquid binder is that waterglass, silica solution or aluminium are molten Glue.
According to above-mentioned heat-insulated press-in material, the Ultramicro-powder is alumina powder, silicon powder, chromium oxide powder or zirconia powder.
According to above-mentioned heat-insulated press-in material, the plasticizer is organic plasticizers or inorganic plasticizer.
According to above-mentioned heat-insulated press-in material, the cellucotton is ceramic fiber cotton, rock wool or organic fiber cotton.
According to above-mentioned heat-insulated press-in material, the compound additive is organo-silicon coupling agent.
According to the specifically used method of above-mentioned heat-insulated press-in material, it is by light-weight refractory aggregate, refractory powder, combination It is packed after the metering such as agent, Ultramicro-powder, plasticizer, cellucotton, compound additive.For two-component packet when using liquid binder Dress.Adding water or bonding agent to stir evenly when use according to a certain percentage can be installed by the modes such as being pressed into, pumping, Gu Change, come into operation after baking.The heat-insulated press-in material has good mobility, fillibility and thermal insulation, bulk density 800- 1500kg/m3, it is suitable for mechanization indentation construction.
Light-weight refractory aggregate is generally partial size 0.1mm or more, natural or artificial synthesized with higher refractoriness and hardness Light material.Its kind includes but is not limited to: haydite, expanded vermiculite, expanded perlite, light-weight brick sand, light-weight mullite, oxidation Aluminium hollow sphere etc..Partial size is general maximum no more than 8mm, and too big particle can not carry out indentation construction, according to the thickness of refractory lining Degree determines.
Refractory powder can be by light-weight refractory aggregate further it is levigate form, be also possible to clay, alumina, floating bead, powder Coal ash, ground slag etc..
Bonding agent can be portland cement, aluminate cement, sulphate aluminium cement, in conjunction with solid binders such as clays, It is also possible to the liquid binders such as waterglass, silica solution, Aluminum sol.
Ultramicro-powder is the very big refractory material fine powder of fineness, and material includes but is not limited to alumina powder, silicon powder, chromium oxide Powder, zirconia powder etc..It commonly include alumina powder, silicon powder etc..
Plasticizer is the material that is layered after increasing heat-insulated press-in material plasticity, mixture being avoided to add water, be can be organically, It is also possible to inorganic.
Cellucotton is used to improve the material of the cracking resistance of the furnace lining after mixture adds water to install, including but not limited to ceramic Cellucotton, rock wool, organic fiber cotton etc.;Cellucotton can also generally improve the plasticity of mixture.
Compound additive is based on organic surface active agent.
By adopting the above technical scheme, the invention has the following advantages that
The present invention mainly uses the spaced openings on material returning device metal wall, using pressing machine by heat-insulated press-in material from grout hole The method of indentation thermal insulation layer cavity is repaired, and is replaced and is removed the insulating and wearing-resistant lining of material returning device cylinder body outer wall superheat section again The restorative procedure for remaking lining no longer needs to the wearing layer castable that will do not damage also while removing, repairing, avoids and tear open Issuable danger when except wearing layer, while more wearing layer lining seams are avoided, ensure furnace lining globality, more Importantly, due to which the heat-insulated press-in material that the present invention uses when repairing has been subjected to quick baking, therefore after repairing lining, it is not necessarily to Furnace lining Decrepitation Phenomena will not occur for baker, save plenty of time of baker consuming and artificial etc., shorten maintenance time, reduce Baker expense can save great amount of cost for enterprise.
The present invention repairs hole on material returning device cylinder wall at thermal insulation layer cavity respectively circumferentially between axial direction opening up Multiple reparation holes are opened up every 500 ± 50mm, select one of them as grout hole, remaining is repaired hole and is all used as peep hole, with Existing grouting method (opening two reparation holes, one of them is for being in the milk, another is for the slurry that overflows) has significant difference, multiple Peep hole can help service worker to ensure the reparation situation of thermal insulation layer in repair process, because only opening up two reparation Kong Xiu It cannot determine whether heat-insulated damage layer situation has completely been not present well after multiple, since centre is there may be isolated island part, There may be the abrasion of thickness direction, multiple peep holes are observed during being easily repaired, and are avoided omitting, are also reduced and only open Two holes cause the risks such as grouting pressure is excessive, filling is discontented.
The present invention selects light-weight refractory aggregate and refractory powder, using based on bonding agent and the compound additive of auxiliary, adds Add Ultramicro-powder and plasticizer, the heat-insulated press-in material of low cost is produced by simply puddling, which is a kind of bulk density For 800-1500kg/m3Heat-insulated press-in material, be suitable for mechanization indentation construction.
Detailed description of the invention
Fig. 1 is using reparation schematic diagram of the invention;
In figure: 1, material returning device cylinder wall, 2, short metal pipe, 3, hopper, 4, heat-insulated press-in material, 5, pressing machine, 6, pressing machine pipe Road, 7, fastener, 8, residual thermal insulation layer, 9, wearing layer, 10, metal anchorage, 11, thermal insulation layer cavity, 12, reparation hole.
Specific embodiment
As shown in Figure 1, a kind of material return device for circulating fluidized bed boiler part thermal insulation layer lining restorative procedure of the invention includes Following steps:
Step 1 determines thermal insulation layer cavity 11: preliminary according to overtemperature situation of the material returning device cylinder wall 1 in day-to-day operation first It determines thermal insulation layer damaged condition, taps overtemperature site boundary with hammer, listening determines 11 range of thermal insulation layer cavity;
Step 2 opens up and repairs hole 12: opening up several in the surrounding corner of thermal insulation layer cavity 11 and repairs hole 12;
When opening up reparation hole 12, metal anchorage 10 need to be avoided, on the material returning device cylinder wall 1 at thermal insulation layer cavity 11 respectively It is circumferentially opened up with axially spaced-apart 500mm, the size for repairing hole 12 is φ 40mm, at least opens up two at a thermal insulation layer cavity 11 A reparation hole 12, one of them is as grout hole, another is as peep hole.
Step 3 connects pressing machine 5: the reparation hole 12 for selecting the top positioned at thermal insulation layer cavity 11 to locate between two parties is as grouting Hole, short metal pipe 2 of the welding with screw thread or flange at grout hole, remaining is repaired hole 12 and is used as peep hole, peep hole Have the function of that 11 inner air of thermal insulation layer cavity is discharged simultaneously in filling process, short metal pipe 2 connects pressing machine pipeline 6;
Step 4, grouting indentation: the heat-insulated press-in material 4 being stirred being packed into the hopper 3 of pressing machine 5, starts pressing machine 5, is filled The pressure and speed for starching indentation need to determine according to field condition, break thermal insulation layer to avoid the pressure of grouting indentation excessive Bad, the pressure for indentation of being in the milk is generally 3-4Mpa;Heat-insulated press-in material 4 is pressed by pressing machine pipeline 6 and short metal pipe 2 heat-insulated In layer cavity 11;When having heat-insulated press-in material 4 spilling from peep hole, closes pressing machine 5 and stops being pressed into heat-insulated press-in material 4, Block short metal pipe 2;
When thermal insulation layer cavity 11 has different height position that is multiple and being located at material returning device cylinder, first under material returning device cylinder The thermal insulation layer cavity 11 in portion starts to be in the milk, from material returning device inside, if the wearing layer 9 at thermal insulation layer cavity 11 has expansion Seam is then in the milk and needs when being pressed into while observing the case where heat-insulated press-in material 4 oozes out from dilatation joint, to heat-insulated press-in material 4 from swollen It is oozed out at expansion joint (E.J.), while when the pressure reduction of pressing machine 5, clogs dilatation joint with pottery fiber cotton, remove pressing machine pipeline 6, block this Grout hole at a thermal insulation layer cavity 11 and grout hole for replacing more top carries out grouting push operation;In same level Peep hole have to rise with the horizontal line of heat-insulated press-in material 4 when the exudation of heat-insulated press-in material 4 and block until completely blocking;Weight Multiple aforesaid operations are until whole thermal insulation layer cavitys 11 is in the milk and completes.
Step 57 days after furnace lifting, cuts off short metal pipe 2, fills out cellucotton at hole 12 repairing, will repair hole with iron plate 12 closings.
The residual thermal insulation layer 8 of breakage may be adjacent to material returning device cylinder wall 1 or wearing layer on material returning device cylinder wall 1 9, it is also possible between material returning device cylinder wall 1 and wearing layer 9.Remaining thermal insulation layer 8 can be thicker, can also be very thin, even All disappear.For the different situations of above-mentioned residual thermal insulation layer 8, using above-mentioned restorative procedure, by pressing machine 5 by heat-insulated indentation In 4 indentation thermal insulation layer cavity 11 of material, the gap between filling material returning device cylinder wall 1, residual thermal insulation layer 8 and wearing layer 9, equal energy The reparation for completing material returning device lining, forms furnace lining very close to each other.
The outer diameter of short metal pipe 2 and the internal diameter of pressing machine pipeline 6 match, the internal diameter of short metal pipe 2 and grout hole it is straight Diameter matches, and one end of short metal pipe 2 is connect by welding manner with material returning device cylinder wall 1, and the other end of short metal pipe 2 is logical Fastener 7 is crossed to connect with the discharge port of pressing machine pipeline 6.The length of short metal pipe 2 is generally 100 ~ 200mm, is also possible to more Long length.Short metal pipe 2 will have enough intensity, be able to bear the pressure of 10MPa.
The feed inlet of pressing machine pipeline 6 is connect by fastener 7 with pressing machine 5, and pressing machine pipeline 6 selects high-intensitive glue Pipe.Pressing machine pipeline 6 is able to bear at least pressure of 10MPa, can also partially use steel pipe, and pressing machine pipeline 6 will contract as far as possible It is short, avoid overlong time of the heat-insulated press-in material 4 in pressing machine pipeline 6.The section of pressing machine pipeline 6 is generally circular in cross section, size It is adapted with other component interconnected.Fastener 7 and the connection of other component can be that buckle-type is connect, flange form connects It connects, the modes such as screw-type connection or welding.Fastener 7 answer it is light, connection want quick, secured, closed, can bear at least The pressure of 10MPa is without revealing.
Pressing machine 5 selects piston type or squash type mortar pump, completes to clear up in time when operation or longer intermediate idle hours Heat-insulated press-in material 4 in hopper 3 and pressing machine pipeline 6 places solidification blocking pipeline to prevent heat-insulated press-in material 4 for a long time.
Heat-insulated press-in material 4 is mainly made of the raw material of following weight percent: light-weight refractory aggregate 42%, refractory powder 20%, bonding agent 30%, Ultramicro-powder 3%, plasticizer 4.5 and cellucotton 0.5%, the compound addition of additional above-mentioned raw materials gross mass 0.3% Agent.
The light-weight refractory aggregate is haydite, expanded vermiculite, expanded perlite, light-weight brick sand, light-weight mullite or oxidation Aluminium hollow sphere, the partial size of light-weight refractory aggregate are 0.1-8mm.
The refractory powder is clay, alumina, floating bead, flyash or slag fine powder, the partial size of refractory powder≤ 0.074mm。
The bonding agent be solid binder or liquid binder, solid binder be portland cement, aluminate cement, Sulphate aluminium cement combines clay;Liquid binder is waterglass, silica solution or Aluminum sol.
The Ultramicro-powder is alumina powder, silicon powder, chromium oxide powder or zirconia powder.
The plasticizer is organic plasticizers or inorganic plasticizer.
The cellucotton is ceramic fiber cotton, rock wool or organic fiber cotton.
The compound additive is organo-silicon coupling agent.
According to the specifically used method of above-mentioned heat-insulated press-in material, it is by light-weight refractory aggregate, refractory powder, combination It is packed after the metering such as agent, Ultramicro-powder, plasticizer, cellucotton, compound additive.For two-component packet when using liquid binder Dress.Adding water or bonding agent to stir evenly when use according to a certain percentage can be installed by the modes such as being pressed into, pumping, Gu Change, come into operation after baking.The heat-insulated press-in material has good mobility, fillibility and thermal insulation, bulk density 800- 1500kg/m3, it is suitable for mechanization indentation construction.
Light-weight refractory aggregate is generally partial size 0.1mm or more, natural or artificial synthesized with higher refractoriness and hardness Light material.Its kind includes but is not limited to: haydite, expanded vermiculite, expanded perlite, light-weight brick sand, light-weight mullite, oxidation Aluminium hollow sphere etc..Partial size is general maximum no more than 8mm, and too big particle can not carry out indentation construction, according to the thickness of refractory lining Degree determines.
Refractory powder can be by light-weight refractory aggregate further it is levigate form, be also possible to clay, alumina, floating bead, powder Coal ash, ground slag etc..
Bonding agent can be portland cement, aluminate cement, sulphate aluminium cement, in conjunction with solid binders such as clays, It is also possible to the liquid binders such as waterglass, silica solution, Aluminum sol.
Ultramicro-powder is the very big refractory material fine powder of fineness, and material includes but is not limited to alumina powder, silicon powder, chromium oxide Powder, zirconia powder etc..It commonly include alumina powder, silicon powder etc..
Plasticizer is the material that is layered after increasing heat-insulated press-in material plasticity, mixture being avoided to add water, be can be organically, It is also possible to inorganic.
Cellucotton is used to improve the material of the cracking resistance of the furnace lining after mixture adds water to install, including but not limited to ceramic Cellucotton, rock wool, organic fiber cotton etc.;Cellucotton can also generally improve the plasticity of mixture.
Compound additive is based on organic surface active agent.
Carrying out material return device for circulating fluidized bed boiler in such a way that material returning device wall outer wall aperture is pressed into heat-insulated press-in material 4 The reparation of cylinder part thermal insulation layer lining can shorten the lining building time, reduce the furnace lining cost of repairs.By certain improvement Can also carry out the online hot repair of local thermal insulation layer lining, change at present can only cold repair status.
The present embodiment not makes any form of restriction shape of the invention, material, structure etc., all according to this hair Bright technical spirit any simple modification, equivalent change and modification to the above embodiments, belong to the technology of the present invention side The protection scope of case.

Claims (8)

1. a kind of material return device for circulating fluidized bed boiler part thermal insulation layer lining restorative procedure, it is characterised in that: the following steps are included:
Step 1 determines thermal insulation layer cavity: tentatively true according to overtemperature situation of the material returning device cylinder wall in day-to-day operation first Determine thermal insulation layer damaged condition, taps overtemperature site boundary with hammer, listening determines thermal insulation layer cavity range;
Step 2 opens up and repairs hole: opening up several in the surrounding corner of thermal insulation layer cavity and repairs hole;
Step 3 connects pressing machine: selecting one as grout hole in wherein one reparation hole, weld and have at grout hole The short metal pipe of screw thread or flange, remaining repairs hole as peep hole, and short metal pipe connects pressing machine pipeline;
Step 4, grouting indentation: the heat-insulated press-in material being stirred being packed into the hopper of pressing machine, starts pressing machine, will be heat-insulated Press-in material is pressed into thermal insulation layer cavity by pressing machine pipeline and short metal pipe;There is heat-insulated press-in material to overflow from peep hole When, it closes pressing machine and stops being pressed into heat-insulated press-in material, block short metal pipe;
Step 5,5-10 days excision short metal pipes after furnace lifting fill out cellucotton at hole repairing, will repair hole closing with iron plate.
2. a kind of material return device for circulating fluidized bed boiler part thermal insulation layer lining restorative procedure according to claim 1, special Sign is: in step 2, when opening up reparation hole, need to avoid metal anchorage, the material returning device cylinder wall at thermal insulation layer cavity Upper difference is circumferentially opened up with 500 ± 50mm of axially spaced-apart, and the size for repairing hole is φ 30- φ 50mm, a thermal insulation layer cavity Place at least opens up two reparation holes, one of them is as grout hole, another is as peep hole.
3. a kind of material return device for circulating fluidized bed boiler part thermal insulation layer lining restorative procedure according to claim 1, special Sign is: in step 3, the reparation hole for selecting the top positioned at thermal insulation layer cavity to locate between two parties is as grout hole.
4. a kind of material return device for circulating fluidized bed boiler part thermal insulation layer lining restorative procedure according to claim 1, special Sign is: in step 4, thermal insulation layer cavity have it is multiple and be located at material returning device cylinder different height positions when, first from be located at return The thermal insulation layer cavity of glassware cylinder lower part starts to be in the milk, from material returning device inside, if the wearing layer at thermal insulation layer cavity has Dilatation joint is then in the milk and needs when being pressed into while observing the case where heat-insulated press-in material oozes out from dilatation joint, to heat-insulated press-in material from It is oozed out at dilatation joint, while when the pressure reduction of pressing machine, clogs dilatation joint with pottery fiber cotton, remove pressing machine pipeline, block this Grout hole at a thermal insulation layer cavity and grout hole for replacing more top carries out grouting push operation;In same level Peep hole, which has to rise with the horizontal line of heat-insulated press-in material when the exudation of heat-insulated press-in material, block until blocking completely;In repetition Operation is stated until whole thermal insulation layer cavity groutings is completed.
5. a kind of material return device for circulating fluidized bed boiler part thermal insulation layer lining restorative procedure according to claim 1, special Sign is: in step 3, the internal diameter of the outer diameter and pressing machine pipeline of short metal pipe matches, the internal diameter and grout hole of short metal pipe Diameter match, one end of short metal pipe is connect by welding manner with material returning device cylinder wall, the other end of short metal pipe It is connect by fastener with the discharge port of pressing machine pipeline.
6. a kind of material return device for circulating fluidized bed boiler part thermal insulation layer lining restorative procedure according to claim 5, special Sign is: the feed inlet of pressing machine pipeline is connect by fastener with pressing machine, pressing machine selection for pipeline high intensity sebific duct.
7. a kind of material return device for circulating fluidized bed boiler part thermal insulation layer lining restorative procedure according to claim 1, special Sign is: pressing machine selects piston type or squash type mortar pump, completes to clear up material in time when operation or longer intermediate idle hours Heat-insulated press-in material in bucket and pressing machine pipeline.
8. a kind of material return device for circulating fluidized bed boiler part thermal insulation layer lining restorative procedure according to claim 1, special Sign is: the heat-insulated press-in material is mainly made of the raw material of following weight percent: light-weight refractory aggregate 40-60%, fire resisting Powder 8-20%, bonding agent 15-40%, Ultramicro-powder 0.5-10%, plasticizer 0.1-10% and cellucotton 0.5-10%, additional above-mentioned original Expect the compound additive of gross mass 0.1-3%.
CN201810610502.4A 2018-06-14 2018-06-14 A kind of material return device for circulating fluidized bed boiler part thermal insulation layer lining restorative procedure Pending CN109000223A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810610502.4A CN109000223A (en) 2018-06-14 2018-06-14 A kind of material return device for circulating fluidized bed boiler part thermal insulation layer lining restorative procedure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810610502.4A CN109000223A (en) 2018-06-14 2018-06-14 A kind of material return device for circulating fluidized bed boiler part thermal insulation layer lining restorative procedure

Publications (1)

Publication Number Publication Date
CN109000223A true CN109000223A (en) 2018-12-14

Family

ID=64600705

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810610502.4A Pending CN109000223A (en) 2018-06-14 2018-06-14 A kind of material return device for circulating fluidized bed boiler part thermal insulation layer lining restorative procedure

Country Status (1)

Country Link
CN (1) CN109000223A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109681863A (en) * 2019-01-03 2019-04-26 青海盐湖工业股份有限公司 A kind of feed back pipeline repair technology of circulating fluidized bed boiler
CN110529843A (en) * 2019-09-04 2019-12-03 张选 A kind of restorative procedure of material returner of fluidized-bed boiler heat preservation heat insulation layer failure
CN116293653A (en) * 2023-03-27 2023-06-23 新疆华电米东热电有限公司 Method for repairing internal defect of boiler material returning device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3202732A (en) * 1962-05-14 1965-08-24 Shell Oil Co Repairing refractory lined vessels
US4279845A (en) * 1978-10-19 1981-07-21 Union Siderurgique Du Nord Et De L'est De La France (Usinor) Process for coating the inner wall of a furnace or like apparatus
US5916500A (en) * 1997-11-20 1999-06-29 Magneco/Metrel, Inc. Method of lining a blast furnace
JP2005047735A (en) * 2003-07-31 2005-02-24 Kurosaki Harima Corp Method for wet-spraying monolithic refractory
CN1993594A (en) * 2004-06-07 2007-07-04 黑崎播磨株式会社 Spray application method of amorphous refractory material, spray material and application device for the same
CN102674851A (en) * 2012-04-25 2012-09-19 大连金州金鞍耐火材料有限公司 Quick-drying and repairing refractory material

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3202732A (en) * 1962-05-14 1965-08-24 Shell Oil Co Repairing refractory lined vessels
US4279845A (en) * 1978-10-19 1981-07-21 Union Siderurgique Du Nord Et De L'est De La France (Usinor) Process for coating the inner wall of a furnace or like apparatus
US5916500A (en) * 1997-11-20 1999-06-29 Magneco/Metrel, Inc. Method of lining a blast furnace
JP2005047735A (en) * 2003-07-31 2005-02-24 Kurosaki Harima Corp Method for wet-spraying monolithic refractory
CN1993594A (en) * 2004-06-07 2007-07-04 黑崎播磨株式会社 Spray application method of amorphous refractory material, spray material and application device for the same
CN102674851A (en) * 2012-04-25 2012-09-19 大连金州金鞍耐火材料有限公司 Quick-drying and repairing refractory material

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
刘银等: "《无机非金属材料工艺学》", 30 September 2015, 中国科学技术大学出版社 *
武汉威林炉衬材料有限责任公司: "《高炉砌筑技术手册》", 30 June 2006, 冶金工业出版社 *
薛正良等: "《钢铁冶金概论》", 30 April 2016, 冶金工业出版社 *
郑毅等: "《土木工程材料》", 30 June 2014, 武汉大学出版社 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109681863A (en) * 2019-01-03 2019-04-26 青海盐湖工业股份有限公司 A kind of feed back pipeline repair technology of circulating fluidized bed boiler
CN110529843A (en) * 2019-09-04 2019-12-03 张选 A kind of restorative procedure of material returner of fluidized-bed boiler heat preservation heat insulation layer failure
CN116293653A (en) * 2023-03-27 2023-06-23 新疆华电米东热电有限公司 Method for repairing internal defect of boiler material returning device

Similar Documents

Publication Publication Date Title
US9751804B2 (en) Refractory castables with hydrophobic aggregates
CN101585710B (en) Refractory material for coal loading port of coke oven
CN104326758B (en) A kind of high temperature resistant anti-thermal shock pipeline of iron-making heat wind furnace and preparation method thereof
CN109000223A (en) A kind of material return device for circulating fluidized bed boiler part thermal insulation layer lining restorative procedure
JP4856772B2 (en) Blast furnace cast iron
CN102249698B (en) Blast furnace cooling wall laying brick
CN102251066B (en) Cooling wall with pre-coated slag crust
CN112123544B (en) Construction method of integrated full-cast refractory structure applied to blast furnace lining
CN103288460A (en) Casting material for prefabricating burner block of annular heating furnace
JP4308288B2 (en) Outlet structure of melting furnace and repair method
CN104829242A (en) Preparation method of tertiary air duct curve prefabricated component used for cement kiln
CN104829244A (en) Tertiary air duct curve prefabricated component for cement kiln
CN107151134A (en) A kind of industrial kiln high-strength high-alumina fire-resistant slurry
CN107010965A (en) Fast gravity die blast furnace crucibe repairing material and preparation method thereof
CN202182612U (en) Lining structure of vertical lime pit
CN108342534A (en) A method of avoid blast furnace taphole from burning
CN104844229A (en) High-aluminum strong adhesion-resistant castable
CN112898993A (en) Method for repairing small flue of coke oven
CN105884379A (en) Non-cement content high-strength wear-resistant material used for cement kiln
CN105861771A (en) Three-fork stove lining structure of ironmaking hot-blast stove
Standard Refractory Installation Quality Control–Inspection and Testing Monolithic Refractory Linings and Materials
Sengupta et al. Manufacturing and properties of refractories
Montgomery Heat-resisting and refractory concretes
CN201809363U (en) Cooling wall for pre-hanging slag crust
CN107339707A (en) A kind of heating furnace hot-air duct lining construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181214