CN108999622A - A kind of ditch cable trench constructing device and its construction method - Google Patents

A kind of ditch cable trench constructing device and its construction method Download PDF

Info

Publication number
CN108999622A
CN108999622A CN201811003606.5A CN201811003606A CN108999622A CN 108999622 A CN108999622 A CN 108999622A CN 201811003606 A CN201811003606 A CN 201811003606A CN 108999622 A CN108999622 A CN 108999622A
Authority
CN
China
Prior art keywords
screw rod
chute
template
sleeve
cable trench
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811003606.5A
Other languages
Chinese (zh)
Other versions
CN108999622B (en
Inventor
赵国余
黄太富
刘放
王晨晨
梅普松
张红亮
刘欢
李臣刚
周鼎淇
孙天宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd MBEC filed Critical China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority to CN201811003606.5A priority Critical patent/CN108999622B/en
Publication of CN108999622A publication Critical patent/CN108999622A/en
Application granted granted Critical
Publication of CN108999622B publication Critical patent/CN108999622B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a kind of ditch cable trench constructing device and its construction methods, wherein ditch cable trench constructing device includes plate device and pours device, plate device includes template, the first bracing means and the second bracing means, first bracing means includes first sleeve, the first screw rod and the second screw rod, and the second bracing means includes and the second sleeve of the second screw rod connection and the third screw rod being arranged between two second sleeves;Pouring device includes chute, and chute includes section in the frame of triangular shape and the chute plate completely spread on frame is arranged in, and the chute channel circulated for concrete is formed between chute plate and two edges of a wing of frame.The present invention, pass through the size of the first bracing means adjusting template, the distance between ditch cable trench two sides wall is adjusted by the second bracing means, effectively control the problem of template runs mould, faulting of slab ends, special chute is used simultaneously, speed of perfusion is effectively improved, solves the problems, such as to fall concrete very well.

Description

A kind of ditch cable trench constructing device and its construction method
Technical field
The present invention relates to the technical field of construction of ditch cable trench, and in particular to a kind of ditch cable trench constructing device and its Construction method.
Background technique
With the speed-raising again and enlarging of China railways, all standing of high-speed rail is gradually formed, this is not only to railway main line It builds and proposes high request, while requirements at the higher level also are proposed to the efficiency of building of the accessory building facility of Along Railway.
Positioned at the ditch of rail on both sides and cable trough as the embedded slot drained in railway tunnel with cable in railway tunnel Very important effect is played to the normal operation of railway, due to the scrambling of its construction, causes the slow of real construction efficiency Slowly, the form of construction work of existing railway tunnel ditch cable trench is roughly divided into two classes according to the difference of construction technology:
The advantages of first kind is to be spliced using pre-processed trench cell, this mode is construction technology content It is low, high-efficient, short construction period, but since the tunnel in practical construction is often all located in mountain area, the groove list of installation forming Member needs to cause transportation cost high, fortune in the good concrete groove shipped of factory process to construction tunnel project site The excessive problem of throughput rate, simultaneously as the design of the ditch of railway tunnel and cable trough is usually to be integrally designed, it is desirable that there is height Intensity, high life, the groove of splicing will appear crackle at splicing gap, cause to seal it is bad, the problems such as leak, so now Substantially this kind of construction method is seldom used.
Second class is cast-in-place method, i.e., is fixed using template, concreting is formed in template, this to apply Work technique has good airproof performance, and intensity is high, service life long advantage, for existing railway tunnel ditch cable trench generally use apply Work method.
But because works is relatively narrow when due to current railway, the construction of highway ditch cable trench, formwork reinforcement and its difficulty are existing Have generally using the seamless steel pipe of fixed length come support shuttering in technology, according to strong mould situation, using manually by steel pipe cutting or use The modes such as flitch feet are controlled, are reinforced.It is used again after template position confirmation and manually carries out hammering into shape the methods of striking steel, tapping Pipe is closely connect with template and ground, final fixed-type, then by chute placing concrete, completes to construct, but this There is also following defects for kind method:
(1) fixed form of steel pipe and feet, poor accuracy are used, and operating process is difficult to control, template is easy to appear The phenomenon that running mould, faulting of slab ends, reduces the accuracy of template;
(2) during placing concrete, chute concrete at shift position is easy to be scattered, it cannot be guaranteed that construction site Cleannes.
In view of this, being badly in need of improving existing ditch cable trench formwork reinforcement and casting method, race is avoided the occurrence of The phenomenon that mould, faulting of slab ends, increases the accuracy of template, while during placing concrete, keeps construction site cleaning.
Summary of the invention
The technical problem to be solved by the present invention is to existing ditch cable trench formwork reinforcement and casting method, there are templates It is easy to appear the phenomenon that running mould, faulting of slab ends, reduces the accuracy of template, while not can guarantee construction during placing concrete The problem of cleaned in situ.
In order to solve the above-mentioned technical problem, the technical scheme adopted by the invention is that providing a kind of ditch cable trench construction dress It sets, comprising:
Plate device including two templates and the first bracing means that the die head is arranged in, and is arranged two The second bracing means between the side wall of a template, first bracing means include first sleeve and are rotatably arranged on it First screw rod, second screw rod at both ends, first screw rod, the second screw rod one end pass through connecting plate respectively and be fixed on the mould In the two side walls of plate, one end of second screw rod is arranged across the connecting plate, and second bracing means includes two It is rotatably arranged on the second sleeve of the extension end of two second screw rods respectively, rotates and is equipped between two second sleeves Third screw rod;
Device is poured, including for the chute towards placing concrete in the template, the chute includes section in three The chute plate that the frame of horn shape and setting are completely spread on said frame, the two sides of the frame are equipped with the edge of a wing, the edge of a wing The chute plate setting is stretched out, forms the chute channel circulated for concrete between the chute plate and two edges of a wing.
In the above scheme, first screw rod, the second screw rod, third screw rod periphery be equipped with the first screw thread, described the One sleeve, second sleeve inner wall be equipped with the second screw thread compatible with first screw thread, pass through the rotation first set Cylinder changes first screw rod, the second screw rod protrudes into the length of the first sleeve, changes the by rotating the second sleeve Two screw rods, third screw rod protrude into the length of the second sleeve.
In the above scheme, the first sleeve, be respectively equipped with multiple first hand holes, the second hand hole in second sleeve.
In the above scheme, the connecting plate be angle steel, first screw rod, the second screw rod one end be separately positioned on institute It states on the side plate of angle steel, the bottom plate of the angle steel is equipped with the pin for fixing the template.
In the above scheme, the pin there are two being all provided on the bottom plate of each angle steel, and two pin edges The length direction of the angle steel be set side by side.
In the above scheme, the chute further includes the baffle taken for manpower, is kept off in two chute channels Top, for limiting the circulating direction and velocity of liquid assets of concrete, the frame, chute plate and the baffle are all made of bamboo glue Plate production.
In the above scheme, the both ends on the edge of a wing are equipped with chute handle, are set at the top of the baffle there are two baffle Handle.
In the above scheme, the middle part of the frame is equipped with pillar, the inner wall of the pillar and the frame be equipped with plus Strengthening tendons, the reinforcing rib use reinforcing bar material.
In the above scheme, the bottom of the template is fixed by Steel-bar Pile.
The present invention also provides a kind of construction methods of ditch cable trench, comprising the following steps:
Step 1 clears up substrate, and after survey engineer setting-out, installation template, the lower mouth of template sets Steel-bar Pile reinforcing, and Adjust formwork elevation measuring;
The first bracing means is arranged in the top of step 2, template, and the pin of the first bracing means is inserted into the pre- of template It boxes out, rotates first sleeve, template size is made to meet the requirements;
The second bracing means is arranged between two side templates for step 3, rotates second sleeve, makes ditch cable trench two sides wall Spacing meet the requirements;
Step 4, chute place the position for needing to pour, utilize the baffle controls progressive die concrete being equipped in casting process Quantity and speed, pour completion one section after, be moved to next section;
Construction is completed in step 5, form removal and health.
Compared with prior art, the present invention passes through the size of the first bracing means adjusting template, passes through the second bracing means The distance between ditch cable trench two sides wall is adjusted, effectively controls the problem of template runs mould, faulting of slab ends, while using special Chute effectively improves speed of perfusion, solves the problems, such as to fall concrete very well.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of plate device of the invention;
Fig. 2 is the side view of Fig. 1;
Fig. 3 is the structural schematic diagram of chute of the invention;
Fig. 4 is the sectional view of chute of the present invention;
Fig. 5 is the side view of chute of the present invention;
Fig. 6 is the structural schematic diagram of baffle of the present invention.
Specific embodiment
The present invention provides a kind of ditch cable trench constructing device and its construction method, can autonomous adjusting template size with And the distance between ditch cable trench two sides wall, the problem of template runs mould, faulting of slab ends is effectively controlled, while slipping using special Slot effectively improves speed of perfusion, solves the problems, such as to fall concrete very well.With reference to the accompanying drawings of the specification and it is embodied Mode is described in detail the present invention.
As shown in Fig. 1~Fig. 6, a kind of ditch cable trench constructing device provided by the invention, including plate device and pour Device.
As depicted in figs. 1 and 2, plate device includes two templates and the first bracing means that die head is arranged in, with And the second bracing means between the side wall of two templates is set, wherein the bottom of template is fixed by Steel-bar Pile, increases mould The stability of plate.
First bracing means includes first sleeve 4 and the first screw rod 3, the second screw rod 6 for being rotatably arranged on its both ends, and first Screw rod 3, the second screw rod 6 one end pass through connecting plate 1 respectively and be fixed in the two side walls of template, one end of the second screw rod 6 is worn The setting of connecting plate 1 is crossed, the second bracing means includes two second sets for being rotatably arranged on the extension end of two the second screw rods 6 respectively Cylinder 7, rotation is equipped with third screw rod 9 between two second sleeves 7.
Specifically, the periphery of the first screw rod 3, the second screw rod 6, third screw rod 9 is equipped with the first screw thread, first sleeve 4, second The inner wall of sleeve 7 is equipped with the second screw thread compatible with the first screw thread, changes the first screw rod 3, the by rotation first sleeve 4 Two screw rods 6 protrude into the length of first sleeve 4, by the way that rotation second sleeve 7 changes the second screw rod 6, third screw rod 9 protrudes into second set The length of cylinder 7.
The present invention passes through the size of the first bracing means adjusting template, effectively control template line style, reinforces and fills by second It sets and adjusts the distance between ditch cable trench two sides wall, effectively control the problem of template runs mould, faulting of slab ends, structure is simple, behaviour Facilitate, increases working efficiency.
Ground is advanced optimized, is respectively equipped with multiple first hand holes 5, the second hand hole 8 in first sleeve 4, second sleeve 7, just In rotation first sleeve 4 and second sleeve 7, increase the convenience used.
Wherein connecting plate 1 of the invention be angle steel, the first screw rod 3, the second screw rod 6 one end be separately positioned on the side of angle steel On plate, the bottom plate of angle steel is equipped with the pin 2 for fixed form, advanced optimizes ground, is equipped with two on the bottom plate of each angle steel A pin 2, and two pins 2 are set side by side along the length direction of angle steel, keep connection more stable.
As shown in Fig. 3~Fig. 6, the device that pours of the invention includes slipping for the chute towards placing concrete in template Slot includes section in the frame 10 of triangular shape and the chute plate 20 completely spread on frame 10 is arranged in, and the middle part of frame 10 is equipped with branch The inner wall of column 60, pillar 60 and frame 10 is equipped with reinforcing rib 70, increases the stability of frame 10, it is ensured that safe construction.
The two sides of frame 10 are equipped with the edge of a wing 40, and the edge of a wing 40 is stretched out chute plate 20 and is arranged, and the two of chute plate 20 and frame 10 The chute channel 30 circulated for concrete, frame 10 and 20 both ends of chute plate are formed between a edge of a wing 40 to connect by the edge of a wing 40 It connects, advanced optimizes ground, the edge of a wing 40 is obliquely installed towards outside, effectively prevent concrete to scatter, the both ends on the edge of a wing 40 are equipped with Chute handle 50 is convenient for manual handling, increases the convenience used.
It is set on baffle 80 there are two baffle handle 81, manpower is taken baffle 80 when use, and selective gear is in two chutes The top in channel 30, for limiting the circulating direction and velocity of liquid assets of concrete, structure is simple, operates conveniently.
Ground is advanced optimized, the width of 10 bottom of frame of the present invention is slightly larger than the interior clear span of cable trough two sides wall, is less than The outermost width of cable trough wall;Ensure concrete by chute channel 30 and enters in cable channel formwork.
Preferably, reinforcing rib 70 of the invention uses reinforcing bar material, and hardness is big, provides enough support forces.Frame 10 slips Frid 20 and baffle 80 are all made of bamboo slab rubber production, and the hardness of bamboo slab rubber is high, has the advantages that anti-folding, resistance to compression, increase chute Service life.
The application method that device is poured in the present invention is as follows
When construction, after plate device, which installs, has casting concrete condition, the chute made is placed on electricity Above cable slot template, tail end is carried chute pair after concrete tank is in place by the bottom alignment in chute channel 30 position to be poured Concreting is carried out among the chute that standard places, baffle 80 is placed on the top of chute, and control two sides groove body pours speed Degree and quantity.
Worker is ready at all times to carry out the adjustment of concrete using baffle 80 in casting process, i.e., when sending out abutment wall existing The concrete of certain altitude has been poured, has timely used baffle 80 to coagulation when the height that another road abutment wall pours is relatively low Soil pours too fast closing over there, and concrete is allowed to flow to the low side of absolute altitude, and so on finished until concrete uniformly pours.
The present invention can effectively control ditch cable trench two sides concreting speed by baffle, big using this chute Reduce greatly because of concrete delivery truck deviation in place, works is partially narrow, traditional chute is mobile falls concrete problem, operation letter It is single.
Work progress of the invention specifically includes the following steps:
Step 1 clears up substrate, and after survey engineer setting-out, installation template, the lower mouth of template sets Steel-bar Pile reinforcing, and Adjust formwork elevation measuring;
The first bracing means is arranged in the top of step 2, template, and the pin of the first bracing means is inserted into the pre- of template It boxes out, rotates first sleeve, template size is made to meet the requirements;
The second bracing means is arranged between two side templates for step 3, rotates second sleeve, makes ditch cable trench two sides wall Spacing meet the requirements;
Step 4, chute place the position for needing to pour, utilize the baffle controls progressive die concrete being equipped in casting process Quantity and speed, pour completion one section after, be moved to next section;
Construction is completed in step 5, form removal and health.
The present invention adjusts ditch cable trench by the second bracing means by the size of the first bracing means adjusting template The distance between two sides wall effectively controls the problem of template runs mould, faulting of slab ends, while using special chute, is effectively promoted Speed of perfusion, solves the problems, such as to fall concrete very well.
The invention is not limited to above-mentioned preferred forms, and anyone should learn that is made under the inspiration of the present invention Structure change, the technical schemes that are same or similar to the present invention are fallen within the scope of protection of the present invention.

Claims (10)

1. a kind of ditch cable trench constructing device characterized by comprising
Plate device including two templates and the first bracing means that the die head is arranged in, and is arranged in two institutes The second bracing means between the side wall of template is stated, first bracing means includes first sleeve and is rotatably arranged on its both ends The first screw rod, the second screw rod, first screw rod, the second screw rod one end pass through connecting plate respectively and be fixed on the template In two side walls, one end of second screw rod is arranged across the connecting plate, and second bracing means includes two difference It is rotatably arranged on the second sleeve of the extension end of two second screw rods, rotation is equipped with third between two second sleeves Screw rod;
Device is poured, including for the chute towards placing concrete in the template, the chute includes section in triangular shape Frame and the chute plate that completely spreads on said frame of setting, the two sides of the frame are equipped with the edge of a wing, and the edge of a wing is stretched out The chute plate setting, forms the chute channel circulated for concrete between the chute plate and two edges of a wing.
2. a kind of ditch cable trench constructing device according to claim 1, which is characterized in that first screw rod, second Screw rod, third screw rod periphery be equipped with the first screw thread, the first sleeve, second sleeve inner wall be equipped with and first spiral shell Compatible second screw thread of line, by rotating, the first sleeve changes first screw rod, the second screw rod protrudes into described first The length of sleeve protrudes into the length of the second sleeve by the second screw rod of the rotation second sleeve change, third screw rod.
3. a kind of ditch cable trench constructing device according to claim 1, which is characterized in that the first sleeve, second Multiple first hand holes, the second hand hole are respectively equipped on sleeve.
4. a kind of ditch cable trench constructing device according to claim 1, which is characterized in that the connecting plate is angle steel, First screw rod, the second screw rod one end be separately positioned on the side plate of the angle steel, the bottom plate of the angle steel is equipped with and is used for The pin of the fixed template.
5. a kind of ditch cable trench constructing device according to claim 4, which is characterized in that the bottom plate of each angle steel On be all provided with there are two the pin, and two pins are set side by side along the length direction of the angle steel.
6. a kind of ditch cable trench constructing device according to claim 1, which is characterized in that the chute further include for The baffle that manpower is taken is kept off at the top in two chute channels, for limiting the circulating direction and velocity of liquid assets of concrete, The frame, chute plate and the baffle are all made of bamboo slab rubber production.
7. according to claim, a kind of ditch cable trench constructing device described in 6, which is characterized in that the both ends on the edge of a wing are equal Equipped with chute handle, set at the top of the baffle there are two baffle handle.
8. a kind of ditch cable trench constructing device according to claim 1, which is characterized in that the middle part of the frame is equipped with The inner wall of pillar, the pillar and the frame is equipped with reinforcing rib, and the reinforcing rib uses reinforcing bar material.
9. a kind of ditch cable trench constructing device according to claim 1, which is characterized in that the bottom of the template passes through Steel-bar Pile is fixed.
10. a kind of construction method of ditch cable trench, which comprises the following steps:
Step 1 clears up substrate, and after survey engineer setting-out, installation template, the lower mouth of template sets Steel-bar Pile reinforcing, and adjusts Good formwork elevation measuring;
The first bracing means is arranged in the top of step 2, template, and the pin of the first bracing means is inserted into the preformed hole of template, First sleeve is rotated, template size is made to meet the requirements;
The second bracing means is arranged between two side templates for step 3, rotates second sleeve, makes between the wall of ditch cable trench two sides Away from meeting the requirements;
Step 4, chute place the position for needing to pour, the number for the baffle controls progressive die concrete being equipped with are utilized in casting process Amount and speed are moved to next section after pouring one section of completion;
Construction is completed in step 5, form removal and health.
CN201811003606.5A 2018-08-30 2018-08-30 Ditch cable duct construction device and construction method thereof Active CN108999622B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811003606.5A CN108999622B (en) 2018-08-30 2018-08-30 Ditch cable duct construction device and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811003606.5A CN108999622B (en) 2018-08-30 2018-08-30 Ditch cable duct construction device and construction method thereof

Publications (2)

Publication Number Publication Date
CN108999622A true CN108999622A (en) 2018-12-14
CN108999622B CN108999622B (en) 2023-10-20

Family

ID=64593677

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811003606.5A Active CN108999622B (en) 2018-08-30 2018-08-30 Ditch cable duct construction device and construction method thereof

Country Status (1)

Country Link
CN (1) CN108999622B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111139834A (en) * 2019-12-20 2020-05-12 中冶天工集团有限公司 One-time pouring forming device for two side walls of high-side wave ditch and construction method thereof
CN111155488A (en) * 2020-02-16 2020-05-15 中国十七冶集团有限公司 Device is pour simultaneously to two lateral walls concrete of ground inlet channel
CN111980338A (en) * 2020-08-20 2020-11-24 中建八局第二建设有限公司 Mounting structure of Z-shaped corner protector of pipe trench and construction method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003232196A (en) * 2002-02-06 2003-08-22 Kajima Corp Tunnel invert construction method and device for the same
JP2007211514A (en) * 2006-02-10 2007-08-23 Shoji Matsuzawa Method and device for constructing foundation, and anchor bolt support device for construction
JP2011058314A (en) * 2009-09-11 2011-03-24 Daiei Koki Kk Portal frame and center truck
CN103266900A (en) * 2013-03-25 2013-08-28 中交路桥建设有限公司 Integrated quick moving formwork for tunnel multi-longitudinal cable trough construction
CN205777549U (en) * 2016-05-13 2016-12-07 中铁三局集团有限公司 Portable Y type concrete chute
CN205876345U (en) * 2016-07-08 2017-01-11 中铁十九局集团第三工程有限公司 Platform truck system that transports of template is pour to tunnel lateral sulcus cable duct
CN206109997U (en) * 2016-08-31 2017-04-19 中建八局第二建设有限公司 Two -sided sliding chute device
CN208778017U (en) * 2018-08-30 2019-04-23 中铁大桥局集团有限公司 A kind of ditch cable trench constructing device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003232196A (en) * 2002-02-06 2003-08-22 Kajima Corp Tunnel invert construction method and device for the same
JP2007211514A (en) * 2006-02-10 2007-08-23 Shoji Matsuzawa Method and device for constructing foundation, and anchor bolt support device for construction
JP2011058314A (en) * 2009-09-11 2011-03-24 Daiei Koki Kk Portal frame and center truck
CN103266900A (en) * 2013-03-25 2013-08-28 中交路桥建设有限公司 Integrated quick moving formwork for tunnel multi-longitudinal cable trough construction
CN205777549U (en) * 2016-05-13 2016-12-07 中铁三局集团有限公司 Portable Y type concrete chute
CN205876345U (en) * 2016-07-08 2017-01-11 中铁十九局集团第三工程有限公司 Platform truck system that transports of template is pour to tunnel lateral sulcus cable duct
CN206109997U (en) * 2016-08-31 2017-04-19 中建八局第二建设有限公司 Two -sided sliding chute device
CN208778017U (en) * 2018-08-30 2019-04-23 中铁大桥局集团有限公司 A kind of ditch cable trench constructing device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111139834A (en) * 2019-12-20 2020-05-12 中冶天工集团有限公司 One-time pouring forming device for two side walls of high-side wave ditch and construction method thereof
CN111139834B (en) * 2019-12-20 2024-05-14 中冶天工集团有限公司 Disposable pouring forming device for two side walls of high side wave ditch and construction method thereof
CN111155488A (en) * 2020-02-16 2020-05-15 中国十七冶集团有限公司 Device is pour simultaneously to two lateral walls concrete of ground inlet channel
CN111980338A (en) * 2020-08-20 2020-11-24 中建八局第二建设有限公司 Mounting structure of Z-shaped corner protector of pipe trench and construction method thereof
CN111980338B (en) * 2020-08-20 2021-09-21 中建八局第二建设有限公司 Mounting structure of Z-shaped corner protector of pipe trench and construction method thereof

Also Published As

Publication number Publication date
CN108999622B (en) 2023-10-20

Similar Documents

Publication Publication Date Title
CN108999622A (en) A kind of ditch cable trench constructing device and its construction method
CN106592440B (en) A kind of construction method of prefabricated subsection type bridge pier
CN107974891A (en) A kind of town road assembled rigid unit and its construction method
CN103470272B (en) A kind of chassis for the multiple section concrete construction of Mining Method and construction method thereof
CN108086113A (en) A kind of road surface precast assembly fast repairing method for being suitable for southern damp-heat area
CN103726589B (en) I-shaped steel and steel and steel pipe framework interface drum projection diagonal reinforcement assembling shear wall and the practice
CN105908585A (en) Road foundation or base and building soft foundation grouting reinforcement method
CN110230394A (en) The construction method of constructional column
CN106894587A (en) Precast stair connection method
CN109973117A (en) A kind of structure structure fracture plugging reinforcement means
CN106593468B (en) Tunnel inverted arch concrete lining sliding formwork and construction method
CN107989049A (en) A kind of construction method of frame bank protection
CN207998860U (en) A kind of assembled pipe gallery
CN113389169A (en) Slope concrete crack repairing device and construction method
CN208778017U (en) A kind of ditch cable trench constructing device
CN206328954U (en) Node pouring structure between prefabricated assembled post and post
CN109972543B (en) Prefabricated assembly type culvert and construction method
CN209687505U (en) Reinforced concrete frame tunnel, which pours, uses hydraulic template trolley
CN109750832A (en) A kind of construction method of constructional column concrete self-compaction
CN114809029A (en) High cutting slope anchor rod frame beam coupling construction method
CN106049665B (en) The construction method of the cast-in-place core of light block wall
CN209854569U (en) Automatic pouring device for bridge deck concrete
CN207905825U (en) A kind of circular cross section tunnel lining construction device three times
CN104453235B (en) Current conversion station fire wall construction technology
CN106703291A (en) Joint pouring structure between prefabricated columns and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant