CN108999143A - A kind of multi-port pond large size all-weather wharf structure and its method of construction - Google Patents

A kind of multi-port pond large size all-weather wharf structure and its method of construction Download PDF

Info

Publication number
CN108999143A
CN108999143A CN201811007175.XA CN201811007175A CN108999143A CN 108999143 A CN108999143 A CN 108999143A CN 201811007175 A CN201811007175 A CN 201811007175A CN 108999143 A CN108999143 A CN 108999143A
Authority
CN
China
Prior art keywords
wharf
awning
weather
column
clock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811007175.XA
Other languages
Chinese (zh)
Inventor
陈飞
凌益忠
徐俊
周枝荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Third Harbor Consultants
Original Assignee
CCCC Third Harbor Consultants
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Third Harbor Consultants filed Critical CCCC Third Harbor Consultants
Priority to CN201811007175.XA priority Critical patent/CN108999143A/en
Publication of CN108999143A publication Critical patent/CN108999143A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
    • E02B3/068Landing stages for vessels
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C5/00Base supporting structures with legs
    • B66C5/02Fixed or travelling bridges or gantries, i.e. elongated structures of inverted L or of inverted U shape or tripods
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/1205Small buildings erected in the open air

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of multi-port pond large size all-weather wharf structures, including convex dike formula dock structure and round-the-clock awning structure;Convex dike formula dock structure includes two sides quay wall structure and several interlude open wharf structures, waters forms two or more basins between two sides quay wall structure and interlude open wharf structure, and round-the-clock awning structure uses the corresponding multispan formula arrangement with basin quantity;Multi-port pond enlargement all-weather wharf structure of the present invention is more for open land-based area working space, operating system is relatively independent between each basin, round-the-clock handling operation can be carried out simultaneously, greatly improves operating efficiency, can greatly meet the job requirements of port enterprise;And the method for construction of enlargement all-weather wharf structure in multi-port pond of the present invention can be good at being applicable in different construction conditions, the assembly construction method of round-the-clock awning structure, all tool has great advantage in the economy, periodicity and safety of construction.

Description

A kind of multi-port pond large size all-weather wharf structure and its method of construction
Technical field
The present invention relates to port and pier technical field, especially a kind of multi-port pond large size all-weather wharf structure and its construction Method.
Background technique
All-weather wharf refers to that above basin, construction has and keeps out wind and rain and the water of the awning structure of handling operation function Work building, this structure can greatly improve stevedoring for the adaptability of natural conditions, significantly improve dock operation item Part, and greatly improve dock operation efficiency.Compared with conventional Wharf, all-weather wharf has operating environment comfortable, code The efficient and stable advantage of head operational efficiency, especially suitable for there is the port enterprise of particular/special requirement to product handling.
In recent years, all-weather wharf built at this stage according to incompletely statistics by the favor by more and more port enterprises At all-weather wharf be mostly single basin arrangement, berth grade is generally less than 5000 tonnes.And it is flourishing with water transport market Development and the handling of some special cargo types require to be continuously improved, use of the port enterprise for the all-weather wharf of enlargement Demand is more more and more urgent, so the enlargement construction of all-weather wharf is imperative.
Summary of the invention
To solve the above-mentioned problems, the purpose of the present invention is to provide a kind of multi-port pond large size all-weather wharf structure and its Method of construction.
The technical solution for realizing the aim of the invention is as follows:
A kind of multi-port pond large size all-weather wharf structure, which is characterized in that including convex dike formula dock structure and round-the-clock awning knot Structure;The convex dike formula dock structure includes two sides quay wall structure and several interlude open wharf structures, Ruo Ganzhong Between section open wharf structure be located between the quay wall structure of two sides, two sides quay wall structure and interlude exposed throughout type Waters forms two or more basins between dock structure, and each basin berth grade is up to 10,000 tons;The two sides wall type Dock structure rear forms land-based area, as all-weather wharf handling operation area and land transportation channel;The round-the-clock awning knot Structure uses the corresponding multispan formula arrangement with basin quantity, and the round-the-clock awning structure includes that side column cushion cap foundation, center pillar are held Stylobate plinth, lattice type steel column, trussed-beam steel beam, roofing steel grid structure, roof boarding, bridge crane, rises awning structure suspension column The outer gutter of heavy-duty machine track, ridge ventilator and roofing;It is provided with side column cushion cap foundation in the two sides quay wall structure, in Between be provided with center pillar cushion cap foundation in section open wharf structure, be respectively provided with rain on side column cushion cap foundation and center pillar cushion cap foundation Booth structure suspension column is provided with lattice type steel column on awning structure suspension column, is provided with truss-like between two neighboring lattice type steel column Girder steel is provided with roofing steel grid structure on trussed-beam steel beam, roof boarding is provided on roofing steel grid structure, is set on roof boarding It is equipped with ridge ventilator, the outer gutter of roofing is provided between two neighboring roof boarding;Between the two neighboring lattice type steel column It is provided with crane runway, is provided with bridge crane on crane runway.
Preferably, it is provided in the two sides quay wall structure and interlude open wharf structure by ship facility And draw boat system, wherein it is described by ship facility include bollard and rubber fender;The boat system that draws includes that ship rail is drawn in fixation Road draws ship trolley, capstan winch, winch, elevator and draws ship control system.
Preferably, the two sides quay wall structure uses sheet pile formula structure or Caisson type Structure, and the interlude is saturating Empty formula dock structure uses high-pile beam formula structure, and the roof boarding uses profiled sheet.
Preferably, the lattice type steel column includes load-bearing pillar and wind-resistant column, arranged for interval plane skylight on the profiled sheet.
Preferably, the all-weather wharf structure should also include powered lighting facility, communication equipment, fire water drainage facility.
A kind of method of construction of multi-port pond large size all-weather wharf structure, which comprises the following steps:
1) the proposed areas outside of all-weather wharf builds Temporary Cofferdam, and backfill forms convex dike formula land-based area within the scope of cofferdam;
2) quay wall forward position steel pipe sheet pile, rear anchoring two sides quay wall structure building: are set on convex dike formula land-based area Stake and round-the-clock awning side column foundation pile, ahead of the curve fitting-out quay reinforcing pull rod between steel pipe sheet pile and rear grouser, ahead of the curve steel Breastwork is poured in tube sheet stake, pours anchor wall on the grouser of rear, pours side column cushion cap on round-the-clock awning side column foundation pile Basis, and pre-buried bollard, fender, draw ship trolley track, Yin Chuan tensioning mechanism and awning structure suspension column built-in fitting, perform breastwork Inverted filter before inverted filter and anchor wall wall after wall performs winch, capstan winch basis and embedded built-in fitting, buries hydroelectric line, perform Terrace, gutter, installation rubber fender draw ship trolley track, Yin Chuan tensioning mechanism, draw ship trolley, capstan winch and winch;
3) interlude harbour is built: performing fully-sleeved filled pile on convex dike formula land-based area, center pillar is poured on fully-sleeved filled pile and is held Stylobate plinth, and embedded bollard, fender, to draw ship trolley track, Yin Chuan tensioning mechanism, capstan winch winch and awning structure suspension column pre-buried Part, performs Wharf Surface, and installation rubber fender draws ship trolley track, Yin Chuan tensioning mechanism, draws ship trolley, capstan winch and winch;
4) one main one auxiliary two enlarged loop wheel machines, ground round-the-clock awning structure building: must be used when the lattice type steel column lifts Face configures one group of work team, and lattice type steel column is assisted accurately to be located on cushion cap foundation;After lattice type steel column is installed, carry out Trussed-beam steel beam installation, forms round-the-clock awning upper brace;After trussed-beam steel beam is installed, bridge crane track is installed Beam and crane runway, and lift bridge crane;Platform is set up using the bridge crane being installed, which can be with bridge Formula crane is mobile;Elements of Space Grid Truss rod piece is hung on above-mentioned platform after ground carries out preassembling, carries out roofing steel grid structure Integral installation;Roof boarding is installed on roofing steel grid structure, ridge ventilator, two neighboring room are installed on roof boarding The outer gutter of roofing is provided between panel;
5) port basin: after above-mentioned all-weather wharf main structure is built up, the outer Temporary Cofferdam of basin is removed, is taken on the bank or waterborne Basin is excavated, dumped rocks protecting foundation is carried out to basin after excavation.
Preferably, round-the-clock awning side column foundation pile should be completed before sheet-pile wharf reinforcing pull rod is installed in step 2.
It preferably, must setting grounded screen in harbour building course in step 2 and step 3).
Preferably, lattice type steel column described in step 4) due to figure it is huge, need to be segmented it is prefabricated, it is assembled at the scene before lifting At complete cylinder, steel member used need to by preassembling before galvanizing, galvanizing, galvanizing post-processing, weld hot spray painted zinc and Steel member oil paint coating.
Preferably, in step 5) after the completion of port basin, two sides quay wall and interlude Pile Foundation of Wharf are prevented Corruption processing, processing mode select sacrificial anode block anti-corrosion.
Compared with prior art, the present invention its remarkable advantage:
The present invention provides a kind of multi-port pond enlargement all-weather wharf structure and its method of construction, the enlarged whole days in multi-port pond Harbour is waited more for open land-based area working space, operating system is relatively independent between each basin, can carry out round-the-clock dress simultaneously Operation is unloaded, operating efficiency is greatly improved, can greatly meet the job requirements of port enterprise.And it is provided by the invention A kind of multi-port pond enlargement all-weather wharf structure and its method of construction can be good at being applicable in different construction conditions, round-the-clock The assembly construction method of awning structure, all tool has great advantage in the economy, periodicity and safety of construction.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is required attached drawing in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only the present invention Some embodiments for those of ordinary skill in the art without creative efforts, can also basis These attached drawings obtain other attached drawings.
Fig. 1 is the structural schematic diagram of enlargement all-weather wharf structure in multi-port pond of the present invention.
Fig. 2 is the top view of enlargement all-weather wharf structure in multi-port pond of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Embodiment 1:
As depicted in figs. 1 and 2, a kind of multi-port pond large size all-weather wharf structure, including convex dike formula dock structure 1 and round-the-clock rain Booth structure;The convex dike formula dock structure 1 includes two sides quay wall structure 2 and interlude open wharf structure 3, centre Section open wharf structure 3 is between two sides quay wall structure 2, two sides quay wall structure 2 and interlude transmission Waters forms two basins 4 between formula dock structure 3, and each 4 berth grade of basin is up to 10,000 tons;The two sides wall type code Header structure 2 uses sheet pile formula structure or Caisson type Structure, and the interlude open wharf structure 3 uses high-pile beam formula knot Structure can also prove as the case may be and select structure type;2 rear of two sides quay wall structure forms land-based area 5, as All-weather wharf handling operation area and land transportation channel;The two sides quay wall structure 2 and interlude open wharf Be provided in structure 3 by ship facility and draw boat system, wherein it is described by ship facility include bollard and rubber fender 10;Institute State draw boat system include fixation draw ship track, draw ship trolley 11, capstan winch 7, winch 8, elevator 9 and draw ship control system;It is described All-weather wharf structure should also include powered lighting facility, communication equipment, fire water drainage facility;
The round-the-clock awning structure uses the corresponding multispan formula with basin quantity to arrange that the round-the-clock awning structure includes Side column cushion cap foundation 6, center pillar cushion cap foundation 30, awning structure suspension column 12, lattice type steel column 13, trussed-beam steel beam 14, roofing steel The outer gutter 21 of grid structure 15, roof boarding 16, bridge crane 18, crane runway 19, ridge ventilator 20 and roofing;It is described It is provided with side column cushion cap foundation 6 in two sides quay wall structure 2, is provided with center pillar in interlude open wharf structure 3 and holds Awning structure suspension column 12, awning structure suspension column 12 are provided on stylobate plinth 30, side column cushion cap foundation 6 and center pillar cushion cap foundation 30 On be provided with lattice type steel column 13, trussed-beam steel beam 14, trussed-beam steel beam 14 are provided between two neighboring lattice type steel column 13 On be provided with roofing steel grid structure 15, roof boarding 16 is provided on roofing steel grid structure 15, is provided with room on roof boarding 16 Ridge ventilator 20 is provided with the outer gutter 21 of roofing between two neighboring roof boarding 16;The two neighboring lattice type steel column 13 it Between be provided with crane runway 19, bridge crane 18 is provided on crane runway 19;Wherein, the roof boarding 16 is using pressure Shape steel plate, the lattice type steel column 13 include load-bearing pillar and wind-resistant column 17, arranged for interval plane skylight on the profiled sheet.
A kind of method of construction of multi-port pond large size all-weather wharf structure, comprising the following steps:
1) the proposed areas outside of all-weather wharf builds Temporary Cofferdam, and backfill forms convex dike formula land-based area within the scope of cofferdam;
2) quay wall forward position steel pipe sheet pile 22, rear anchor two sides quay wall structure building: are set on convex dike formula land-based area Determine stake 23 and round-the-clock awning side column foundation pile 24, ahead of the curve fitting-out quay reinforcing pull rod between steel pipe sheet pile 22 and rear grouser 23 25, breastwork 26 is poured on steel pipe sheet pile 22 ahead of the curve, anchor wall 27 is poured on rear grouser 23, in round-the-clock awning side column It pours side column cushion cap foundation 6 on foundation pile 24, and pre-buried bollard, fender, draws ship trolley track, Yin Chuan tensioning mechanism and awning knot 12 built-in fitting of bent performs after 26 wall of breastwork inverted filter before 27 wall of inverted filter and anchor wall, performs winch, capstan winch basis and bury If built-in fitting, hydroelectric line is buried, performs terrace 28, gutter, installation rubber fender 10 draws ship trolley track, draws ship tensioning Ship trolley 11, capstan winch 7 and winch 8 draw in mechanism;Wherein, round-the-clock awning side column foundation pile should be before the installation of sheet-pile wharf reinforcing pull rod It completes;
3) interlude harbour is built: on convex dike formula land-based area being performed fully-sleeved filled pile 29, is poured on fully-sleeved filled pile 29 Column cushion cap foundation 30, and bury bollard, fender, draw ship trolley track, Yin Chuan tensioning mechanism, capstan winch winch and awning structural column 12 built-in fitting of foot, performs Wharf Surface 33, and installation rubber fender 10 draws ship trolley track, Yin Chuan tensioning mechanism, draws ship trolley 11, capstan winch 7 and winch 8;
4) round-the-clock awning structure building: must use one main one auxiliary two enlarged loop wheel machines when the lattice type steel column 13 lifts, Ground configures one group of work team, and lattice type steel column 13 is assisted accurately to be located on cushion cap foundation;Lattice type steel column 13 is installed Afterwards, it carries out trussed-beam steel beam 14 to install, forms round-the-clock awning upper brace;After trussed-beam steel beam 14 is installed, mounting bridge Formula crane runway beam and crane runway 19, and lift bridge crane 18;It is set up using the bridge crane being installed Platform, the platform can be mobile with bridge crane;Elements of Space Grid Truss rod piece is hung on above-mentioned platform after ground carries out preassembling, into 15 integral installation of row roofing steel grid structure;Roof boarding 16 is installed on roofing steel grid structure 15, is pacified on roof boarding 16 Equipped with ridge ventilator 20, the outer gutter 21 of roofing is provided between two neighboring roof boarding 16;
5) port basin: after above-mentioned all-weather wharf main structure is built up, the outer Temporary Cofferdam of basin is removed, is taken on the bank or waterborne Basin 4 is excavated, dumped rocks protecting foundation 31 is carried out to basin 4 after excavation.
It must setting grounded screen in harbour building course in step 2 and step 3).
Lattice type steel column 13 described in step 4) since figure is huge, need to be segmented it is prefabricated, lifting before has been assembled at the scene Whole cylinder, steel member used need to be by preassembling, galvanizing, galvanizing post-processing, weld hot spray painted zinc and steel structures before galvanizing Part oil paint coating.
After the completion of basin 4 excavates in step 5), preservative treatment is carried out to two sides quay wall and interlude Pile Foundation of Wharf, Processing mode selects 35 anti-corrosion of sacrificial anode block.
In conclusion the present invention provides a kind of multi-port pond enlargement all-weather wharf structure and its method of construction, multi-port The enlarged all-weather wharf in pond is more for open land-based area working space, and operating system is relatively independent between each basin, Ke Yitong The round-the-clock handling operation of Shi Jinhang, greatly improves operating efficiency, can greatly meet the job requirements of port enterprise. And a kind of multi-port pond enlargement all-weather wharf structure provided by the invention and its method of construction can be good at being applicable in it is different Construction condition, the assembly construction method of round-the-clock awning structure all have in the economy, periodicity and safety of construction Very big advantage.
Particular embodiments described above, the technical issues of to solution of the invention, technical scheme and beneficial effects carry out It is further described, it should be understood that the above is only a specific embodiment of the present invention, is not limited to The present invention, all within the spirits and principles of the present invention, any modification, equivalent substitution, improvement and etc. done should be included in this Within the protection scope of invention.

Claims (10)

1. a kind of multi-port pond large size all-weather wharf structure, which is characterized in that including convex dike formula dock structure (1) and round-the-clock rain Booth structure;The convex dike formula dock structure (1) includes two sides quay wall structure (2) and several interlude open wharf knots Structure (3), several interlude open wharf structures (3) are located between two sides quay wall structure (2), two sides quay wall Waters is formed two or more basins (4) between structure (2) and interlude open wharf structure (3), each basin (4) berth Grade is up to 10,000 tons;The two sides quay wall structure (2) rear forms land-based area (5), loads and unloads and makees as all-weather wharf Industry area and land transportation channel;The round-the-clock awning structure uses the corresponding multispan formula arrangement with basin quantity, described complete Weather awning structure includes side column cushion cap foundation (6), center pillar cushion cap foundation (30), awning structure suspension column (12), lattice type steel column (13), trussed-beam steel beam (14), roofing steel grid structure (15), roof boarding (16), bridge crane (18), crane runway (19), ridge ventilator (20) and the outer gutter (21) of roofing;Side column cushion cap is provided on the two sides quay wall structure (2) Basic (6) are provided with center pillar cushion cap foundation (30) in interlude open wharf structure (3), side column cushion cap foundation (6) and center pillar It is provided with awning structure suspension column (12) on cushion cap foundation (30), is provided with lattice type steel column on awning structure suspension column (12) (13), it is provided with trussed-beam steel beam (14) between two neighboring lattice type steel column (13), trussed-beam steel beam is provided with room on (14) Face steel grid structure (15) is provided with roof boarding (16) on roofing steel grid structure (15), and roof boarding is provided with ridge on (16) Ventilator (20) is provided with the outer gutter (21) of roofing between two neighboring roof boarding (16);The two neighboring lattice type steel column (13) it is provided between crane runway (19), bridge crane (18) is provided on crane runway (19).
2. large size all-weather wharf structure in multi-port pond according to claim 1, which is characterized in that the two sides wall type code It is provided on header structure (2) and interlude open wharf structure (3) by ship facility and draws boat system, wherein is described to lean on ship Facility includes bollard and rubber fender (10);The boat system that draws includes that fixation draws ship track, draws ship trolley (11), capstan winch (7), winch (8), elevator (9) and draw ship control system.
3. large size all-weather wharf structure in multi-port pond according to claim 1, which is characterized in that the two sides wall type code Header structure (2) uses sheet pile formula structure or Caisson type Structure, and the interlude open wharf structure (3) uses high-pile beam formula Structure, the roof boarding (16) use profiled sheet.
4. large size all-weather wharf structure in multi-port pond according to claim 1, which is characterized in that the lattice type steel column It (13) include load-bearing pillar and wind-resistant column (17), arranged for interval plane skylight on the profiled sheet.
5. large size all-weather wharf structure in multi-port pond according to claim 1, which is characterized in that the all-weather wharf knot Structure should also include powered lighting facility, communication equipment, fire water drainage facility.
6. a kind of method of construction of large size all-weather wharf structure in multi-port pond according to claim 1, which is characterized in that packet Include following steps:
1) the proposed areas outside of all-weather wharf builds Temporary Cofferdam, and backfill forms convex dike formula land-based area within the scope of cofferdam;
2) quay wall forward position steel pipe sheet pile (22), rear two sides quay wall structure building: are set on convex dike formula land-based area Grouser (23) and round-the-clock awning side column foundation pile (24), install between steel pipe sheet pile (22) and rear grouser (23) ahead of the curve Harbour reinforcing pull rod (25) pours breastwork (26) on steel pipe sheet pile (22) ahead of the curve, pours anchor wall on rear grouser (23) (27), it is poured side column cushion cap foundation (6) on round-the-clock awning side column foundation pile (24), and pre-buried bollard, fender, draws ship trolley Track, Yin Chuan tensioning mechanism and awning structure suspension column (12) built-in fitting perform inverted filter and anchor wall (27) after breastwork (26) wall Inverted filter before wall performs winch, capstan winch basis and embedded built-in fitting, buries hydroelectric line, perform terrace (28), gutter, pacify Dress rubber fender (10) draws ship trolley track, Yin Chuan tensioning mechanism, draws ship trolley (11), capstan winch (7) and winch (8);
3) interlude harbour is built: being performed fully-sleeved filled pile (29) on convex dike formula land-based area, is poured on fully-sleeved filled pile (29) It builds center pillar cushion cap foundation (30), and buries bollard, fender, draws ship trolley track, Yin Chuan tensioning mechanism, capstan winch winch and awning Structure suspension column (12) built-in fitting, performs Wharf Surface (33), and installation rubber fender (10) draws ship trolley track, draws ship stretching machine Structure draws ship trolley (11), capstan winch (7) and winch (8);
4) round-the-clock awning structure building: main auxiliary two enlargements must be used to hang when the lattice type steel column (13) lifts Machine, ground configure one group of work team, and lattice type steel column (13) is assisted accurately to be located on cushion cap foundation;Lattice type steel column (13) peace After the completion of dress, trussed-beam steel beam (14) installation is carried out, round-the-clock awning upper brace is formed;Trussed-beam steel beam (14) is installed Afterwards, bridge crane track beam and crane runway (19) are installed, and lift bridge crane (18);Utilize the bridge being installed Formula crane sets up platform, which can be mobile with bridge crane;Elements of Space Grid Truss rod piece is hung after ground carries out preassembling On above-mentioned platform, roofing steel grid structure (15) integral installation is carried out;Roof boarding is installed on roofing steel grid structure (15) (16), it is equipped on roof boarding (16) ridge ventilator (20), the outer day of roofing is provided between two neighboring roof boarding (16) Ditch (21);
5) port basin: after above-mentioned all-weather wharf main structure is built up, the outer Temporary Cofferdam of basin is removed, is taken on the bank or waterborne It excavates basin (4), dumped rocks protecting foundation (34) is carried out to basin (4) after excavation.
7. the method for construction of large size all-weather wharf structure in multi-port pond according to claim 6, which is characterized in that step 2 In round-the-clock awning side column foundation pile should sheet-pile wharf reinforcing pull rod install before complete.
8. the method for construction of large size all-weather wharf structure in multi-port pond according to claim 6, which is characterized in that step 2 With in step 3) in harbour building course must setting grounded screen.
9. the method for construction of large size all-weather wharf structure in multi-port pond according to claim 6, which is characterized in that step 4) Described in lattice type steel column (13) due to figure it is huge, need to be segmented it is prefabricated, lifting before is assembled into complete cylinder, steel used at the scene Component need to be by preassembling, galvanizing, galvanizing post-processing, weld hot spray painted zinc and steel member oil paint coating before galvanizing.
10. the method for construction of large size all-weather wharf structure in multi-port pond according to claim 6, which is characterized in that step 5) after the completion of basin (4) excavates in, preservative treatment, processing mode choosing are carried out to two sides quay wall and interlude Pile Foundation of Wharf With sacrificial anode block (35) anti-corrosion.
CN201811007175.XA 2018-08-31 2018-08-31 A kind of multi-port pond large size all-weather wharf structure and its method of construction Pending CN108999143A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811007175.XA CN108999143A (en) 2018-08-31 2018-08-31 A kind of multi-port pond large size all-weather wharf structure and its method of construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811007175.XA CN108999143A (en) 2018-08-31 2018-08-31 A kind of multi-port pond large size all-weather wharf structure and its method of construction

Publications (1)

Publication Number Publication Date
CN108999143A true CN108999143A (en) 2018-12-14

Family

ID=64590463

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811007175.XA Pending CN108999143A (en) 2018-08-31 2018-08-31 A kind of multi-port pond large size all-weather wharf structure and its method of construction

Country Status (1)

Country Link
CN (1) CN108999143A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110467008A (en) * 2019-08-28 2019-11-19 中交第四航务工程勘察设计院有限公司 A kind of middle-size and small-size harbour and its handling method of horizontal layout
CN110482245A (en) * 2019-08-15 2019-11-22 王静波 Environment protection type multifunctional dry bulk cargo harbour and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06286881A (en) * 1993-04-05 1994-10-11 Hitachi Zosen Corp Wind and rain preventing device in cargo handling facility
CN107366435A (en) * 2017-05-25 2017-11-21 上海建工四建集团有限公司 Totally enclosed type green construction enclosing and its construction method
CN107558435A (en) * 2017-09-07 2018-01-09 中交第三航务工程勘察设计院有限公司 Ship under all-weather wharf and the structure is from pool operating type
CN108277882A (en) * 2017-12-21 2018-07-13 中交第三航务工程局有限公司 Super-huge steel structure canopy construction technology under mal-condition
CN108343028A (en) * 2018-03-14 2018-07-31 中交四航局港湾工程设计院有限公司 A kind of caisset jetty type wharf and its method of construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06286881A (en) * 1993-04-05 1994-10-11 Hitachi Zosen Corp Wind and rain preventing device in cargo handling facility
CN107366435A (en) * 2017-05-25 2017-11-21 上海建工四建集团有限公司 Totally enclosed type green construction enclosing and its construction method
CN107558435A (en) * 2017-09-07 2018-01-09 中交第三航务工程勘察设计院有限公司 Ship under all-weather wharf and the structure is from pool operating type
CN108277882A (en) * 2017-12-21 2018-07-13 中交第三航务工程局有限公司 Super-huge steel structure canopy construction technology under mal-condition
CN108343028A (en) * 2018-03-14 2018-07-31 中交四航局港湾工程设计院有限公司 A kind of caisset jetty type wharf and its method of construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110482245A (en) * 2019-08-15 2019-11-22 王静波 Environment protection type multifunctional dry bulk cargo harbour and construction method
CN110467008A (en) * 2019-08-28 2019-11-19 中交第四航务工程勘察设计院有限公司 A kind of middle-size and small-size harbour and its handling method of horizontal layout

Similar Documents

Publication Publication Date Title
CN101429752B (en) Pier column prefabrication splicing building technology
CN102720140A (en) Large-span prestress concrete continuous beam deepwater pier construction process
CN109750600B (en) Construction method of asymmetric cable crane
CN101597896B (en) Method for building riprap levee island wall of offshore artificial island by large box barge
CN108999143A (en) A kind of multi-port pond large size all-weather wharf structure and its method of construction
CN211172058U (en) Island type breakwater navigation light pile foundation with maintenance channel
CN102477716A (en) Application of trestle type beam slab bridge in inland river with beaches at both sides
CN109930610A (en) Constrained environment foundation pit adds the construction method of steel pipe mixing diagonal brace using concrete
Aikawa et al. Shatin to Central Link cross-harbour railway tunnel in Hong Kong
CN106284415A (en) A kind of water intake caisson hang floating construction method
De Wit et al. North/South Metro Line, Amsterdam, The Netherlands Technical challenges in immersed tunnelling
CN110331693A (en) A kind of full assembled steel dock structure and its construction method
CN100557139C (en) Construction is subjected to the die block cradle supporting method of the concrete work of tidewater restriction
CN112982131B (en) Offshore open type airport runway and construction method thereof
LINDSAY et al. Design and construction of Kwai Chung container terminal, Hong Kong, berths 1, 2 and 3
Havno THE ELBE TUNNEL, HAMBURG: SOUTHERN RAMP AND SUBMERGED TUNNEL.
CN104088273B (en) A kind of lattice steel sheet pile nominative 1/4 cylinder land-based area preassembling method
Fraenkel et al. SPECIAL FEATURES OF THE CIVIL ENGINEERING WORKS AT ABERTHAW POWER STATION.(INCLUDES PLATES.)
Binns THE KING GEORGE V DOCK, LONDON.
Nevell The River Irwell and the Archaeology of Manchester’s Early Waterfronts
CN116620800A (en) Marine steel pipe pile conveying device and conveying method
WO2023214438A1 (en) Plant for the construction of engineering works
Glover et al. PORT OF LONDON AUTHORITY: DEVELOPMENT OF TWO DOCK AREAS, 1959.(THE CANADA-GREENLAND PASSAGE AREA; IMPROVEMENT & DEVELOPMENT WORKS, CONNAUGHT ROAD PASSAGE, ROYAL DOCKS).(INCLUDES PLATES).
McGowan et al. MARITIME PAPER. OIL LOADING AND CARGO HANDLING FACILITIES AT MINA AL-AHMADI, PERSIAN GULF. PART I: PLANNING & DESIGN. PART II: CONSTRUCTION.
CN113931055A (en) Water landscape plank road combining prefabricated square pile and cast-in-place concrete member

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181214