CN108995042A - A kind of building concrete processing configuration equipment - Google Patents

A kind of building concrete processing configuration equipment Download PDF

Info

Publication number
CN108995042A
CN108995042A CN201810717462.3A CN201810717462A CN108995042A CN 108995042 A CN108995042 A CN 108995042A CN 201810717462 A CN201810717462 A CN 201810717462A CN 108995042 A CN108995042 A CN 108995042A
Authority
CN
China
Prior art keywords
bull stick
bearing seat
block
rod
sliding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810717462.3A
Other languages
Chinese (zh)
Other versions
CN108995042B (en
Inventor
李市生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Xinhua Concrete Products Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810717462.3A priority Critical patent/CN108995042B/en
Publication of CN108995042A publication Critical patent/CN108995042A/en
Application granted granted Critical
Publication of CN108995042B publication Critical patent/CN108995042B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C5/00Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions
    • B28C5/48Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions wherein the mixing is effected by vibrations
    • B28C5/485Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions wherein the mixing is effected by vibrations with reciprocating or oscillating stirrers; Stirrers therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C5/00Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions
    • B28C5/08Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions using driven mechanical means affecting the mixing
    • B28C5/0806Details; Accessories
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C5/00Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions
    • B28C5/08Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions using driven mechanical means affecting the mixing
    • B28C5/0806Details; Accessories
    • B28C5/0831Drives or drive systems, e.g. toothed racks, winches
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C5/00Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions
    • B28C5/08Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions using driven mechanical means affecting the mixing
    • B28C5/0806Details; Accessories
    • B28C5/0856Supporting frames or structures, e.g. supporting wheels
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C5/00Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions
    • B28C5/08Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions using driven mechanical means affecting the mixing
    • B28C5/10Mixing in containers not actuated to effect the mixing
    • B28C5/12Mixing in containers not actuated to effect the mixing with stirrers sweeping through the materials, e.g. with incorporated feeding or discharging means or with oscillating stirrers
    • B28C5/16Mixing in containers not actuated to effect the mixing with stirrers sweeping through the materials, e.g. with incorporated feeding or discharging means or with oscillating stirrers the stirrers having motion about a vertical or steeply inclined axis

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The present invention relates to a kind of building concrete process equipment more particularly to a kind of building concrete processing configuration equipment.Technical problems to be solved: providing one kind will not be such that the building concrete that concrete batching slatterns, configuration process is time saving and energy saving processes with configuration equipment.Technical solution is: a kind of building concrete processing configuration equipment, includes bottom plate, positioning plate, hopper, guide rail, guide sleeve, push rod, mounting ring, first bearing seat, link block, second bearing seat, connecting rod, 3rd bearing seat etc.;Middle part connection is there are two positioning plate on bottom plate, and the left and right sides is placed with hopper on bottom plate, and middle part is connected with guide rail on bottom plate, and slidingtype is connected with guide sleeve on guide rail.The mode that the present invention switches mutually by using paddle and hammer block, paddle can be made to be stirred to concrete batching and overturn to concrete batching, configure concrete uniform, and in such a way that hopper is configured, it can make directly to use after the completion of concrete configuration, not will cause waste.

Description

A kind of building concrete processing configuration equipment
Technical field
The present invention relates to a kind of building concrete process equipment more particularly to a kind of building concrete processing with match install It is standby.
Background technique
Concrete is a kind of construction material, and the concrete in building site all requires machining for configuration, processing before being put into use It is improved with the concrete availability postponed, at present when carrying out the configuration of concrete to building site in building, some is to adopt Manually concrete batching is placed on the ground and is configured, but some concrete batchings can be made in this way by having the drawback that Waste, and it is time-consuming and laborious during configuration.
Summary of the invention
In order to overcome, presence can make some concrete batchings slattern, configure when configuring to concrete at present The time-consuming and laborious disadvantage of process, technical problems to be solved: provide one kind concrete batching will not be made to slattern, configuration process save When labour-saving building concrete processing with configuration equipment.
Technical solution is: a kind of building concrete processing configuration equipment, include bottom plate, positioning plate, hopper, guide rail, Guide sleeve, push rod, mounting ring, first bearing seat, link block, second bearing seat, connecting rod, 3rd bearing seat, the first bull stick, stirring Leaf, first gear, fourth bearing seat, the second bull stick, second gear and crank, there are two positioning plate, bottoms for middle part connection on bottom plate The left and right sides is placed with hopper on plate, and middle part is connected with guide rail on bottom plate, and slidingtype is connected with guide sleeve, guide sleeve left side on guide rail Top is connected with push rod, and mounting ring is connected on the downside of guide sleeve, and the outer side-lower of mounting ring is connected with first bearing seat, first bearing seat Right side is connected with link block, and right side is connected with second bearing seat in link block, and connecting rod, connecting rod are connected in second bearing seat Interior left side is connected with 3rd bearing seat, and the first bull stick is connected in 3rd bearing seat, is connected with paddle on the downside of the first bull stick, the First gear is connected on the upside of one bull stick, right side is connected with fourth bearing seat in connecting rod, is connected with second in fourth bearing seat Bull stick, the second bull stick lower end are connected with second gear, and second gear is engaged with first gear, and the second bull stick upper end, which is connected with, shakes ?.
It further, further include having the first sliding rail, the first sliding block, clamping plate, the first screw rod and nut, the left and right sides in bottom plate It is respectively connected with the first sliding rail, slidingtype is connected with the first sliding block in the first sliding rail, and the first upper end of slide block is respectively connected with clamping plate, folder The first threaded hole is provided on the downside of plate, the outer side-lower of positioning plate is respectively connected with the first screw rod, and the first screw rod is each passed through the first spiral shell Pit, the first screw rod outside are screwed with nut.
Further, further include overturning device, overturn device include third bull stick, turntable, convex block, the second sliding rail, Second sliding block, the first spring, support rod, contact bar and hammer block, connecting rod top, which is equipped with, overturns device, the connection of the first bull stick upper end There is third bull stick, third bull stick upper end is connected with turntable, and the left and right sides is respectively connected with convex block, left on the upside of connecting rod on the downside of turntable It is connected with the second sliding rail, the second sliding rail inner sliding type is connected with the second sliding block, and the second sliding block lower end is connected with the first spring, and second Sliding block left end is connected with support rod, and support rod lower right-hand side is connected with contact bar, contact bar can with bump contact, on support rod End is connected with hammer block.
It further, further include having clamping device, clamping device includes third sliding rail, third sliding block, second spring, consolidates Determine block, mounting rod, positioning sleeve, 5th bearing seat, the 4th bull stick and idler wheel, clamping device is equipped with below connecting rod, connecting rod is right Side-lower is connected with third sliding rail, and third sliding rail inner sliding type is connected with third sliding block, and third sliding block right end is connected with the second bullet Spring, third sliding block lower end are connected with fixed block, and lower end of fixing block is connected with mounting rod, and mounting rod left end is connected with positioning sleeve, fixed Position set inner wall right side central is connected with 5th bearing seat, and the 4th bull stick, the 4th bull stick upper and lower ends are connected in 5th bearing seat It is respectively connected with idler wheel.
Further, further include having the second screw rod and briquetting, be provided with the second threaded hole, the second threaded hole inward turning on the downside of push rod There is the second screw rod, the second screw rod and the second threaded hole cooperate, and the second screw rod right end is rotatably connected with briquetting.
When user needs to configure concrete for building, user can move up push rod, and push rod drive is led Set moves up, to drive mounting ring, link block, connecting rod and the first bull stick to move up, to make the first bull stick and stir It mixes leaf and stretches out right side hopper, the water of concrete configuration and concrete and its other ingredients can be placed on right side material by user at this time In case, then user can move down push rod, move down the first bull stick and paddle and put in the hopper of right side, then use Family can rotate crank, and crank drives the second bull stick and second gear rotation, and second gear drives first gear rotation, the first tooth Wheel drives the rotation of the first bull stick, so that paddle rotation be driven to be stirred the concrete batching in the hopper of right side, works as stirring After the completion, user can move up push rod, so that the first bull stick and paddle be made to stretch out right side hopper, and the hopper be taken Under, it is put into new hopper and concrete is stirred, user can also place concrete batching in the hopper of two sides, then use Family can make the first bull stick and paddle stretch out right side hopper, and then user can rotate connecting rod and link block, connecting rod and Link block is rotated by mounting ring, is stirred above the hopper of left side so that the first bull stick and paddle be made to be rotated in place, this Sample can increase the efficiency of concrete configuration, and user can also rotate connecting rod by second bearing seat, so that paddle be made to revolve It goes to above connecting rod, what such user can be convenient cleans paddle.
Because further including having the first sliding rail, the first sliding block, clamping plate, the first screw rod and nut, the left and right sides connects in bottom plate It is connected to the first sliding rail, slidingtype is connected with the first sliding block in the first sliding rail, and the first upper end of slide block is respectively connected with clamping plate, under clamping plate Side is provided with the first threaded hole, and the outer side-lower of positioning plate is respectively connected with the first screw rod, and the first screw rod is each passed through the first threaded hole, Nut is screwed on the outside of first screw rod, when user, which needs that hopper is fixed, to be configured again to concrete, user can be with Hopper is placed on, is located at hopper between each positioning plate and clamping plate, then user can push away inwardly Dynamic clamping plate, contacts clamping plate with hopper, then user can pass through the inside sidespin of cooperation with the first screw rod with rotating nuts, nut Into to fix hopper, making the concrete in hopper will not in configuration process so that nut be made to fix the position of clamping plate Hopper is driven to shake.
Because further including overturning device, overturning device includes third bull stick, turntable, convex block, the second sliding rail, the second cunning Block, the first spring, support rod, contact bar and hammer block, connecting rod top, which is equipped with, overturns device, and the first bull stick upper end is connected with third Bull stick, third bull stick upper end are connected with turntable, and the left and right sides is respectively connected with convex block on the downside of turntable, and left is connected on the upside of connecting rod Second sliding rail, the second sliding rail inner sliding type are connected with the second sliding block, and the second sliding block lower end is connected with the first spring, and the second sliding block is left End is connected with support rod, and support rod lower right-hand side is connected with contact bar, and contact bar can be with bump contact, post upper connection There is hammer block, when user needs to shake concrete batching and stir, so that concrete can mix uniform, Yong Huke To rotate connecting rod after the completion of paddle stirs the concrete in hopper, it is located at hammer block above hopper, then user can So that hammer block is moved down and put in hopper, then user can rotate crank, and crank drives the rotation of the first bull stick that will drive the The rotation of three bull sticks, third bull stick drives turntable rotation, so that convex block is driven to rotate, when convex block, which is rotated to, to be contacted with contact bar, Convex block will drive contact bar to move up, so that support rod, hammer block and the second sliding block be driven to move up, will compress first at this time Spring, when convex block rotate to not with contact bar contact when, the first spring will restore from compressive state, promotion the second sliding block to Lower movement turns over the concrete in hopper so that hammer block be made to move up and down so that support rod and hammer block be driven to move down It is dynamic, so that it is more uniform to mix it.
Because further including having clamping device, clamping device include third sliding rail, third sliding block, second spring, fixed block, Mounting rod, positioning sleeve, 5th bearing seat, the 4th bull stick and idler wheel, connecting rod lower section are equipped with clamping device, connecting rod lower right-hand side It is connected with third sliding rail, third sliding rail inner sliding type is connected with third sliding block, and third sliding block right end is connected with second spring, third Sliding block lower end is connected with fixed block, and lower end of fixing block is connected with mounting rod, and mounting rod left end is connected with positioning sleeve, positioning sleeve inner wall Right side central is connected with 5th bearing seat, and the 4th bull stick is connected in 5th bearing seat, and the 4th bull stick upper and lower ends are respectively connected with Idler wheel, when user needs, and the first bull stick or third bull stick is made to carry out vertical stabilization when being located at below connecting rod, to keep away When exempting from the first bull stick and third bull stick and shaking, when user needs to switch the first bull stick or third bull stick is located at connecting rod lower section When, user can first move right fixed block, and fixed block drives third sliding block to move right, second spring will be compressed at this time, Gu Determining block will also drive mounting rod and positioning sleeve to move right, to drive the 4th bull stick and idler wheel to move right, to make to position Set will not block the stroke of the first bull stick or third bull stick, and after user has switched, user can unclamp fixed block, and at this time the Two springs will restore from compressive state, to push mounting rod and positioning sleeve to be moved to the left, so that positioning sleeve be made to cover at first turn Bar perhaps make on third bull stick idler wheel touch the first bull stick perhaps third bull stick so in the first bull stick or third bull stick When rotation, perhaps third bull stick will rotate so that positioning sleeve be made to limit the first bull stick or third the first bull stick on idler wheel The angle of bull stick, so that it will not shake.
It is provided with the second threaded hole because further including having the second screw rod and briquetting, on the downside of push rod, the second threaded hole is internally screwed with the Two screw rods, the second screw rod and the second threaded hole cooperate, and the second screw rod right end is rotatably connected with briquetting, pushes away when user moves up and down After bar makes guide sleeve move up and down required position, user can rotate the second screw rod, the second screw rod by with the second threaded hole Cooperate precession to the right, to make the second screw rod that briquetting be pushed to move right, so that briquetting be made to fix the height of push rod.
It has the beneficial effect that the mode that the present invention switches mutually by using paddle and hammer block, paddle can be made to mixed Solidifying soil ingredient is stirred and overturns to concrete batching, configures concrete uniform, and matched using hopper The mode set can make directly to use after the completion of concrete configuration, not will cause waste.
Detailed description of the invention
Fig. 1 is schematic view of the front view of the invention.
Fig. 2 is the schematic view of the front view of clamping plate of the present invention.
Fig. 3 is the schematic view of the front view that the present invention overturns device.
Fig. 4 is the right side structural representation of convex block of the present invention.
Fig. 5 is the schematic view of the front view of clamping device of the present invention.
Fig. 6 is the vertical view schematic view of the front view of positioning sleeve of the present invention.
Fig. 7 is the schematic view of the front view of briquetting of the present invention.
Drawing reference numeral: 1 bottom plate, 2 positioning plates, 3 hoppers, 4 guide rails, 5 guide sleeves, 6 push rods, 7 mounting rings, 8 first Bearing block, 9 link blocks, 10 second bearing seats, 11 connecting rods, 12 3rd bearing seats, 13 first bull sticks, 14 paddles, 15 first gears, 16 fourth bearing seats, 17 second bull sticks, 18 second gears, 19 cranks, 101 first sliding rails, 102 One sliding block, 103 clamping plates, 104 first threaded holes, 105 first screw rods, 106 nuts, 30 overturn device, and 301 thirds turn Bar, 302 turntables, 303 convex blocks, 304 second sliding rails, 305 second sliding blocks, 306 first springs, 307 support rods, 308 connect Feeler lever, 309 hammer blocks, 31 clamping devices, 311 third sliding rails, 312 third sliding blocks, 313 second springs, 314 fixed blocks, 315 mounting rods, 316 positioning sleeves, 317 5th bearing seats, 318 the 4th bull sticks, 319 idler wheels, 3,121 second threaded holes, 3122 second screw rods, 3123 briquettings.
Specific embodiment
The present invention is specifically described with reference to the accompanying drawing.
Embodiment 1
A kind of building concrete processing configuration equipment, as shown in figs. 1-7, include bottom plate 1, positioning plate 2, hopper 3, guide rail 4, Guide sleeve 5, push rod 6, mounting ring 7, first bearing seat 8, link block 9, second bearing seat 10, connecting rod 11,3rd bearing seat 12, One bull stick 13, paddle 14, first gear 15, fourth bearing seat 16, the second bull stick 17, second gear 18 and crank 19, bottom plate 1 The connection of upper middle part is there are two positioning plate 2, and the left and right sides is placed with hopper 3 on bottom plate 1, and middle part is connected with guide rail 4 on bottom plate 1, Slidingtype is connected with guide sleeve 5 on guide rail 4, and 5 left side top of guide sleeve is connected with push rod 6, mounting ring 7 is connected on the downside of guide sleeve 5, is installed The outer side-lower of ring 7 is connected with first bearing seat 8, and link block 9 is connected on the right side of first bearing seat 8, and right side is connected in link block 9 Second bearing seat 10 is connected with connecting rod 11 in second bearing seat 10, and left side is connected with 3rd bearing seat 12 in connecting rod 11, the It is connected with the first bull stick 13 in three bearing blocks 12, paddle 14 is connected on the downside of the first bull stick 13, is connected on the upside of the first bull stick 13 There is first gear 15, right side is connected with fourth bearing seat 16 in connecting rod 11, the second bull stick 17 is connected in fourth bearing seat 16, Second bull stick, 17 lower end is connected with second gear 18, and second gear 18 is engaged with first gear 15, the connection of 17 upper end of the second bull stick There is crank 19.
Embodiment 2
A kind of building concrete processing configuration equipment, as shown in figs. 1-7, include bottom plate 1, positioning plate 2, hopper 3, guide rail 4, Guide sleeve 5, push rod 6, mounting ring 7, first bearing seat 8, link block 9, second bearing seat 10, connecting rod 11,3rd bearing seat 12, One bull stick 13, paddle 14, first gear 15, fourth bearing seat 16, the second bull stick 17, second gear 18 and crank 19, bottom plate 1 The connection of upper middle part is there are two positioning plate 2, and the left and right sides is placed with hopper 3 on bottom plate 1, and middle part is connected with guide rail 4 on bottom plate 1, Slidingtype is connected with guide sleeve 5 on guide rail 4, and 5 left side top of guide sleeve is connected with push rod 6, mounting ring 7 is connected on the downside of guide sleeve 5, is installed The outer side-lower of ring 7 is connected with first bearing seat 8, and link block 9 is connected on the right side of first bearing seat 8, and right side is connected in link block 9 Second bearing seat 10 is connected with connecting rod 11 in second bearing seat 10, and left side is connected with 3rd bearing seat 12 in connecting rod 11, the It is connected with the first bull stick 13 in three bearing blocks 12, paddle 14 is connected on the downside of the first bull stick 13, is connected on the upside of the first bull stick 13 There is first gear 15, right side is connected with fourth bearing seat 16 in connecting rod 11, the second bull stick 17 is connected in fourth bearing seat 16, Second bull stick, 17 lower end is connected with second gear 18, and second gear 18 is engaged with first gear 15, the connection of 17 upper end of the second bull stick There is crank 19.
It further include having the first sliding rail 101, the first sliding block 102, clamping plate 103, the first screw rod 105 and nut 106, in bottom plate 1 The left and right sides is respectively connected with the first sliding rail 101, and slidingtype is connected with the first sliding block 102, the first sliding block in the first sliding rail 101 102 upper ends are respectively connected with clamping plate 103, and 103 downside of clamping plate is provided with the first threaded hole 104, and the outer side-lower of positioning plate 2 is respectively connected with First screw rod 105, the first screw rod 105 are each passed through the first threaded hole 104, and 105 outside of the first screw rod is screwed with nut 106.
Embodiment 3
A kind of building concrete processing configuration equipment, as shown in figs. 1-7, include bottom plate 1, positioning plate 2, hopper 3, guide rail 4, Guide sleeve 5, push rod 6, mounting ring 7, first bearing seat 8, link block 9, second bearing seat 10, connecting rod 11,3rd bearing seat 12, One bull stick 13, paddle 14, first gear 15, fourth bearing seat 16, the second bull stick 17, second gear 18 and crank 19, bottom plate 1 The connection of upper middle part is there are two positioning plate 2, and the left and right sides is placed with hopper 3 on bottom plate 1, and middle part is connected with guide rail 4 on bottom plate 1, Slidingtype is connected with guide sleeve 5 on guide rail 4, and 5 left side top of guide sleeve is connected with push rod 6, mounting ring 7 is connected on the downside of guide sleeve 5, is installed The outer side-lower of ring 7 is connected with first bearing seat 8, and link block 9 is connected on the right side of first bearing seat 8, and right side is connected in link block 9 Second bearing seat 10 is connected with connecting rod 11 in second bearing seat 10, and left side is connected with 3rd bearing seat 12 in connecting rod 11, the It is connected with the first bull stick 13 in three bearing blocks 12, paddle 14 is connected on the downside of the first bull stick 13, is connected on the upside of the first bull stick 13 There is first gear 15, right side is connected with fourth bearing seat 16 in connecting rod 11, the second bull stick 17 is connected in fourth bearing seat 16, Second bull stick, 17 lower end is connected with second gear 18, and second gear 18 is engaged with first gear 15, the connection of 17 upper end of the second bull stick There is crank 19.
It further include having the first sliding rail 101, the first sliding block 102, clamping plate 103, the first screw rod 105 and nut 106, in bottom plate 1 The left and right sides is respectively connected with the first sliding rail 101, and slidingtype is connected with the first sliding block 102, the first sliding block in the first sliding rail 101 102 upper ends are respectively connected with clamping plate 103, and 103 downside of clamping plate is provided with the first threaded hole 104, and the outer side-lower of positioning plate 2 is respectively connected with First screw rod 105, the first screw rod 105 are each passed through the first threaded hole 104, and 105 outside of the first screw rod is screwed with nut 106.
It further include overturning device 30, overturning device 30 includes third bull stick 301, turntable 302, the cunning of convex block 303, second Rail 304, the first spring 306, support rod 307, contacts bar 308 and hammer block 309 at second sliding block 305, is equipped with and turns over above connecting rod 11 Coating device 30,13 upper end of the first bull stick are connected with third bull stick 301, and 301 upper end of third bull stick is connected with turntable 302, turntable 302 Convex block 303 is respectively connected at left and right sides of downside, 11 upside left of connecting rod is connected with the second sliding rail 304, slides in the second sliding rail 304 Dynamic formula is connected with the second sliding block 305, and 305 lower end of the second sliding block is connected with the first spring 306, and 305 left end of the second sliding block is connected with Support rod 307,307 lower right-hand side of support rod are connected with contact bar 308, and contact bar 308 can be contacted with convex block 303, support rod 307 upper ends are connected with hammer block 309.
Embodiment 4
A kind of building concrete processing configuration equipment, as shown in figs. 1-7, include bottom plate 1, positioning plate 2, hopper 3, guide rail 4, Guide sleeve 5, push rod 6, mounting ring 7, first bearing seat 8, link block 9, second bearing seat 10, connecting rod 11,3rd bearing seat 12, One bull stick 13, paddle 14, first gear 15, fourth bearing seat 16, the second bull stick 17, second gear 18 and crank 19, bottom plate 1 The connection of upper middle part is there are two positioning plate 2, and the left and right sides is placed with hopper 3 on bottom plate 1, and middle part is connected with guide rail 4 on bottom plate 1, Slidingtype is connected with guide sleeve 5 on guide rail 4, and 5 left side top of guide sleeve is connected with push rod 6, mounting ring 7 is connected on the downside of guide sleeve 5, is installed The outer side-lower of ring 7 is connected with first bearing seat 8, and link block 9 is connected on the right side of first bearing seat 8, and right side is connected in link block 9 Second bearing seat 10 is connected with connecting rod 11 in second bearing seat 10, and left side is connected with 3rd bearing seat 12 in connecting rod 11, the It is connected with the first bull stick 13 in three bearing blocks 12, paddle 14 is connected on the downside of the first bull stick 13, is connected on the upside of the first bull stick 13 There is first gear 15, right side is connected with fourth bearing seat 16 in connecting rod 11, the second bull stick 17 is connected in fourth bearing seat 16, Second bull stick, 17 lower end is connected with second gear 18, and second gear 18 is engaged with first gear 15, the connection of 17 upper end of the second bull stick There is crank 19.
It further include having the first sliding rail 101, the first sliding block 102, clamping plate 103, the first screw rod 105 and nut 106, in bottom plate 1 The left and right sides is respectively connected with the first sliding rail 101, and slidingtype is connected with the first sliding block 102, the first sliding block in the first sliding rail 101 102 upper ends are respectively connected with clamping plate 103, and 103 downside of clamping plate is provided with the first threaded hole 104, and the outer side-lower of positioning plate 2 is respectively connected with First screw rod 105, the first screw rod 105 are each passed through the first threaded hole 104, and 105 outside of the first screw rod is screwed with nut 106.
It further include overturning device 30, overturning device 30 includes third bull stick 301, turntable 302, the cunning of convex block 303, second Rail 304, the first spring 306, support rod 307, contacts bar 308 and hammer block 309 at second sliding block 305, is equipped with and turns over above connecting rod 11 Coating device 30,13 upper end of the first bull stick are connected with third bull stick 301, and 301 upper end of third bull stick is connected with turntable 302, turntable 302 Convex block 303 is respectively connected at left and right sides of downside, 11 upside left of connecting rod is connected with the second sliding rail 304, slides in the second sliding rail 304 Dynamic formula is connected with the second sliding block 305, and 305 lower end of the second sliding block is connected with the first spring 306, and 305 left end of the second sliding block is connected with Support rod 307,307 lower right-hand side of support rod are connected with contact bar 308, and contact bar 308 can be contacted with convex block 303, support rod 307 upper ends are connected with hammer block 309.
It further include having clamping device 31, clamping device 31 includes third sliding rail 311, third sliding block 312, second spring 313, fixed block 314, mounting rod 315, positioning sleeve 316,5th bearing seat 317, the 4th bull stick 318 and idler wheel 319, connecting rod 11 Lower section is equipped with clamping device 31, and 11 lower right-hand side of connecting rod is connected with third sliding rail 311, the connection of 311 inner sliding type of third sliding rail There is third sliding block 312,312 right end of third sliding block is connected with second spring 313, and 312 lower end of third sliding block is connected with fixed block 314,314 lower end of fixed block is connected with mounting rod 315, and 315 left end of mounting rod is connected with positioning sleeve 316, and 316 inner wall of positioning sleeve is right Middle side part is connected with 5th bearing seat 317, and the 4th bull stick 318, the 4th bull stick about 318 two are connected in 5th bearing seat 317 End is respectively connected with idler wheel 319.
Embodiment 5
A kind of building concrete processing configuration equipment, as shown in figs. 1-7, include bottom plate 1, positioning plate 2, hopper 3, guide rail 4, Guide sleeve 5, push rod 6, mounting ring 7, first bearing seat 8, link block 9, second bearing seat 10, connecting rod 11,3rd bearing seat 12, One bull stick 13, paddle 14, first gear 15, fourth bearing seat 16, the second bull stick 17, second gear 18 and crank 19, bottom plate 1 The connection of upper middle part is there are two positioning plate 2, and the left and right sides is placed with hopper 3 on bottom plate 1, and middle part is connected with guide rail 4 on bottom plate 1, Slidingtype is connected with guide sleeve 5 on guide rail 4, and 5 left side top of guide sleeve is connected with push rod 6, mounting ring 7 is connected on the downside of guide sleeve 5, is installed The outer side-lower of ring 7 is connected with first bearing seat 8, and link block 9 is connected on the right side of first bearing seat 8, and right side is connected in link block 9 Second bearing seat 10 is connected with connecting rod 11 in second bearing seat 10, and left side is connected with 3rd bearing seat 12 in connecting rod 11, the It is connected with the first bull stick 13 in three bearing blocks 12, paddle 14 is connected on the downside of the first bull stick 13, is connected on the upside of the first bull stick 13 There is first gear 15, right side is connected with fourth bearing seat 16 in connecting rod 11, the second bull stick 17 is connected in fourth bearing seat 16, Second bull stick, 17 lower end is connected with second gear 18, and second gear 18 is engaged with first gear 15, the connection of 17 upper end of the second bull stick There is crank 19.
It further include having the first sliding rail 101, the first sliding block 102, clamping plate 103, the first screw rod 105 and nut 106, in bottom plate 1 The left and right sides is respectively connected with the first sliding rail 101, and slidingtype is connected with the first sliding block 102, the first sliding block in the first sliding rail 101 102 upper ends are respectively connected with clamping plate 103, and 103 downside of clamping plate is provided with the first threaded hole 104, and the outer side-lower of positioning plate 2 is respectively connected with First screw rod 105, the first screw rod 105 are each passed through the first threaded hole 104, and 105 outside of the first screw rod is screwed with nut 106.
It further include overturning device 30, overturning device 30 includes third bull stick 301, turntable 302, the cunning of convex block 303, second Rail 304, the first spring 306, support rod 307, contacts bar 308 and hammer block 309 at second sliding block 305, is equipped with and turns over above connecting rod 11 Coating device 30,13 upper end of the first bull stick are connected with third bull stick 301, and 301 upper end of third bull stick is connected with turntable 302, turntable 302 Convex block 303 is respectively connected at left and right sides of downside, 11 upside left of connecting rod is connected with the second sliding rail 304, slides in the second sliding rail 304 Dynamic formula is connected with the second sliding block 305, and 305 lower end of the second sliding block is connected with the first spring 306, and 305 left end of the second sliding block is connected with Support rod 307,307 lower right-hand side of support rod are connected with contact bar 308, and contact bar 308 can be contacted with convex block 303, support rod 307 upper ends are connected with hammer block 309.
It further include having clamping device 31, clamping device 31 includes third sliding rail 311, third sliding block 312, second spring 313, fixed block 314, mounting rod 315, positioning sleeve 316,5th bearing seat 317, the 4th bull stick 318 and idler wheel 319, connecting rod 11 Lower section is equipped with clamping device 31, and 11 lower right-hand side of connecting rod is connected with third sliding rail 311, the connection of 311 inner sliding type of third sliding rail There is third sliding block 312,312 right end of third sliding block is connected with second spring 313, and 312 lower end of third sliding block is connected with fixed block 314,314 lower end of fixed block is connected with mounting rod 315, and 315 left end of mounting rod is connected with positioning sleeve 316, and 316 inner wall of positioning sleeve is right Middle side part is connected with 5th bearing seat 317, and the 4th bull stick 318, the 4th bull stick about 318 two are connected in 5th bearing seat 317 End is respectively connected with idler wheel 319.
Further include having the second screw rod 3122 and briquetting 3123, the second threaded hole 3121, the second threaded hole are provided on the downside of push rod 6 3121 are internally screwed with the second screw rod 3122, and the second screw rod 3122 and the second threaded hole 3121 cooperate, the rotation of 3122 right end of the second screw rod Formula is connected with briquetting 3123.
When user needs to configure concrete for building, user can move up push rod 6, and push rod 6 drives Guide sleeve 5 moves up, to drive mounting ring 7, link block 9, connecting rod 11 and the first bull stick 13 to move up, to make first Bull stick 13 and paddle 14 stretch out right side hopper 3, and user by water and concrete that concrete configures and its other can match at this time Material is placed in the hopper 3 of right side, and then user can move down push rod 6, move down the first bull stick 13 and paddle 14 It puts in the hopper 3 of right side, then user can rotate crank 19, and crank 19 drives the second bull stick 17 and second gear 18 to rotate, Second gear 18 drives first gear 15 to rotate, and first gear 15 drives the rotation of the first bull stick 13, so that paddle 14 be driven to revolve Turn to be stirred the concrete batching in right side hopper 3, after the completion of stirring, user can move up push rod 6, to make First bull stick 13 and paddle 14 stretch out right side hopper 3, and the hopper 3 is removed, and are put into new hopper 3 and stir concrete It mixes, user can also place concrete batching in two sides hopper 3, and then user can make the first bull stick 13 and paddle 14 Right side hopper 3 is stretched out, then user can rotate connecting rod 11 and link block 9, and connecting rod 11 and link block 9 pass through mounting ring 7 Rotation, is stirred above left side hopper 3 so that the first bull stick 13 and paddle 14 be made to be rotated in place, can increase so mixed The efficiency of solidifying soil configuration, user can also rotate connecting rod 11 by second bearing seat 10, to make 14 company of rotating to of paddle 11 top of extension bar, what such user can be convenient cleans paddle 14.
Because further including having the first sliding rail 101, the first sliding block 102, clamping plate 103, the first screw rod 105 and nut 106, bottom plate The left and right sides is respectively connected with the first sliding rail 101 in 1, and slidingtype is connected with the first sliding block 102 in the first sliding rail 101, and first is sliding 102 upper end of block is respectively connected with clamping plate 103, and 103 downside of clamping plate is provided with the first threaded hole 104, and the outer side-lower of positioning plate 2 is all connected with There is the first screw rod 105, the first screw rod 105 is each passed through the first threaded hole 104, and 105 outside of the first screw rod is screwed with nut 106, When user, which needs that hopper 3 is fixed, to be configured again to concrete, hopper 3 can be placed on bottom plate 1 by user, be made Hopper 3 is located between each positioning plate 2 and clamping plate 103, and then user can push clamping plate 103 inwardly, makes clamping plate 103 contact with hopper 3, and then user can pass through the inside sidespin of cooperation with the first screw rod 105 with rotating nuts 106, nut 106 Into to fix hopper 3, configuring the concrete in hopper 3 so that nut 106 be made to fix the position of clamping plate 103 The shaking of hopper 3 is not will drive in journey.
Because further including overturning device 30, overturning device 30 includes third bull stick 301, turntable 302, convex block 303, Two sliding rails 304, the first spring 306, support rod 307, contact bar 308 and hammer block 309 at second sliding block 305, set above connecting rod 11 Device 30 is overturned, 13 upper end of the first bull stick is connected with third bull stick 301, and 301 upper end of third bull stick is connected with turntable 302, turns The 302 downside left and right sides of disk is respectively connected with convex block 303, and 11 upside left of connecting rod is connected with the second sliding rail 304, the second sliding rail 304 inner sliding types are connected with the second sliding block 305, and 305 lower end of the second sliding block is connected with the first spring 306,305 left end of the second sliding block It is connected with support rod 307,307 lower right-hand side of support rod is connected with contact bar 308, and contact bar 308 can be contacted with convex block 303, 307 upper end of support rod is connected with hammer block 309, when user needs to shake concrete batching and stir, so as to concrete What can be mixed is uniform, and user can rotate connecting rod 11 after the completion of paddle 14 stirs the concrete in hopper 3, makes to hammer into shape Block 309 is located at the top of hopper 3, and then user can make to hammer block 309 into shape to move down and put in hopper 3, and then user can rotate Crank 19, crank 19 drive the rotation of the first bull stick 13 that third bull stick 301 will be driven to rotate, and third bull stick 301 drives turntable 302 to revolve Turn, so that convex block 303 be driven to rotate, when convex block 303, which is rotated to, to be contacted with contact bar 308, convex block 303 will drive and contact bar 308 move up, so that support rod 307, hammer block 309 and the second sliding block 305 be driven to move up, will compress the first spring at this time 306, when convex block 303, which is rotated to, not to be contacted with contact bar 308, the first spring 306 will restore from compressive state, promotion the Two sliding blocks 305 move down, so that support rod 307 and hammer block 309 be driven to move down, move up and down pair to make to hammer block 309 into shape Concrete in hopper 3 is stirred, so that it is more uniform to mix it.
Because further including having clamping device 31, clamping device 31 includes third sliding rail 311, third sliding block 312, the second bullet Spring 313, fixed block 314, mounting rod 315, positioning sleeve 316,5th bearing seat 317, the 4th bull stick 318 and idler wheel 319, connecting rod 11 lower sections are equipped with clamping device 31, and 11 lower right-hand side of connecting rod is connected with third sliding rail 311, and 311 inner sliding type of third sliding rail connects It is connected to third sliding block 312,312 right end of third sliding block is connected with second spring 313, and 312 lower end of third sliding block is connected with fixed block 314,314 lower end of fixed block is connected with mounting rod 315, and 315 left end of mounting rod is connected with positioning sleeve 316, and 316 inner wall of positioning sleeve is right Middle side part is connected with 5th bearing seat 317, and the 4th bull stick 318, the 4th bull stick about 318 two are connected in 5th bearing seat 317 End is respectively connected with idler wheel 319, when user needs that the first bull stick 13 or third bull stick 301 is made to be located at the when progress of 11 lower section of connecting rod When vertical stabilization, thus when the first bull stick 13 and third bull stick 301 being avoided to shake, when user need to switch the first bull stick 13 or When person's third bull stick 301 is located at 11 lower section of connecting rod, user can first move right fixed block 314, and fixed block 314 drives third Sliding block 312 moves right, and will compress second spring 313 at this time, fixed block 314 will also drive mounting rod 315 and positioning sleeve 316 to It moves right, to drive the 4th bull stick 318 and idler wheel 319 to move right, so that positioning sleeve 316 be made not block the first bull stick 13 Or the stroke of third bull stick 301, after user has switched, user can unclamp fixed block 314, and second spring 313 will at this time Restore from compressive state, so that mounting rod 315 and positioning sleeve 316 be pushed to be moved to the left, thus make 316 sets of positioning sleeve at first turn Bar 13 perhaps makes idler wheel 319 touch the first bull stick 13 or third bull stick 301 on third bull stick 301, so in the first bull stick 13 perhaps third bull stick 301 rotate when the first bull stick 13 or third bull stick 301 will be rotated on idler wheel 319, to make to position Set 316 limits the angle of the first bull stick 13 or third bull stick 301, and so that it will not shake.
Because further including having the second screw rod 3122 and briquetting 3123, the second threaded hole 3121, the second spiral shell are provided on the downside of push rod 6 Pit 3121 is internally screwed with the second screw rod 3122, and the second screw rod 3122 and the second threaded hole 3121 cooperate, 3122 right end of the second screw rod It rotatably is connected with briquetting 3123, after user moves up and down push rod 6, and guide sleeve 5 is made to move up and down required position, user can be with The second screw rod 3122 is rotated, the second screw rod 3122 is by the cooperation precession to the right with the second threaded hole 3121, to make the second spiral shell Bar 3122 pushes briquetting 3123 to move right, so that briquetting 3123 be made to fix the height of push rod 6.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered It is considered as protection scope of the present invention.

Claims (5)

1. a kind of building concrete processing configuration equipment, which is characterized in that include bottom plate (1), positioning plate (2), hopper (3), guide rail (4), guide sleeve (5), push rod (6), mounting ring (7), first bearing seat (8), link block (9), second bearing seat (10), Connecting rod (11), 3rd bearing seat (12), the first bull stick (13), paddle (14), first gear (15), fourth bearing seat (16), the second bull stick (17), second gear (18) and crank (19), there are two positioning plate (2), bottoms for middle part connection on bottom plate (1) The left and right sides is placed with hopper (3) on plate (1), and middle part is connected with guide rail (4) on bottom plate (1), and slidingtype connects on guide rail (4) Have guide sleeve (5), top is connected with push rod (6) on the left of guide sleeve (5), is connected with mounting ring (7) on the downside of guide sleeve (5), mounting ring (7) is outside Side-lower is connected with first bearing seat (8), is connected with link block (9) on the right side of first bearing seat (8), and right side connects in link block (9) It is connected to second bearing seat (10), is connected with connecting rod (11) in second bearing seat (10), left side is connected with the in connecting rod (11) Three bearing blocks (12), 3rd bearing seat (12) is interior to be connected with the first bull stick (13), is connected with paddle on the downside of the first bull stick (13) (14), it being connected with first gear (15) on the upside of the first bull stick (13), right side is connected with fourth bearing seat (16) in connecting rod (11), It is connected with the second bull stick (17) in fourth bearing seat (16), the second bull stick (17) lower end is connected with second gear (18), the second tooth Wheel (18) is engaged with first gear (15), and the second bull stick (17) upper end is connected with crank (19).
2. a kind of building concrete processing configuration equipment according to claim 1, which is characterized in that further include having first Sliding rail (101), the first sliding block (102), clamping plate (103), the first screw rod (105) and nut (106), the interior left and right sides of bottom plate (1) It is respectively connected with the first sliding rail (101), equal slidingtype is connected with the first sliding block (102), the first sliding block in the first sliding rail (101) (102) upper end is respectively connected with clamping plate (103), is provided with the first threaded hole (104) on the downside of clamping plate (103), under positioning plate (2) outside Side is respectively connected with the first screw rod (105), and the first screw rod (105) is each passed through the first threaded hole (104), and the first screw rod (105) is outside Side is screwed with nut (106).
3. a kind of building concrete processing configuration equipment according to claim 2, which is characterized in that further include overturning Device (30), overturning device (30) includes third bull stick (301), turntable (302), convex block (303), the second sliding rail (304), Two sliding blocks (305), the first spring (306), support rod (307), contact bar (308) and hammer block (309), connecting rod (11) top are set It overturns device (30), the first bull stick (13) upper end is connected with third bull stick (301), and third bull stick (301) upper end, which is connected with, to be turned Disk (302), turntable (302) the downside left and right sides are respectively connected with convex block (303), and it is sliding to be connected with second for left on the upside of connecting rod (11) Rail (304), the second sliding rail (304) inner sliding type are connected with the second sliding block (305), and the second sliding block (305) lower end is connected with first Spring (306), the second sliding block (305) left end are connected with support rod (307), and support rod (307) lower right-hand side is connected with contact bar (308), contact bar (308) can be contacted with convex block (303), and support rod (307) upper end is connected with hammer block (309).
4. a kind of building concrete processing configuration equipment according to claim 3, which is characterized in that further include having clamping Device (31), clamping device (31) include third sliding rail (311), third sliding block (312), second spring (313), fixed block (314), mounting rod (315), positioning sleeve (316), 5th bearing seat (317), the 4th bull stick (318) and idler wheel (319), connecting rod (11) lower section is equipped with clamping device (31), and connecting rod (11) lower right-hand side is connected with third sliding rail (311), third sliding rail (311) Inner sliding type is connected with third sliding block (312), and third sliding block (312) right end is connected with second spring (313), third sliding block (312) lower end is connected with fixed block (314), and fixed block (314) lower end is connected with mounting rod (315), and mounting rod (315) left end connects It is connected to positioning sleeve (316), positioning sleeve (316) inner wall right side central is connected with 5th bearing seat (317), 5th bearing seat (317) It is inside connected with the 4th bull stick (318), the 4th bull stick (318) upper and lower ends are respectively connected with idler wheel (319).
5. a kind of building concrete processing configuration equipment according to claim 4, which is characterized in that further include having second Screw rod (3122) and briquetting (3123), push rod (6) downside are provided with the second threaded hole (3121), and the second threaded hole (3121) is internally screwed with Second screw rod (3122), the second screw rod (3122) and the second threaded hole (3121) cooperate, and the second screw rod (3122) right end is rotary It is connected with briquetting (3123).
CN201810717462.3A 2018-07-03 2018-07-03 Configuration equipment for building concrete processing Active CN108995042B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810717462.3A CN108995042B (en) 2018-07-03 2018-07-03 Configuration equipment for building concrete processing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810717462.3A CN108995042B (en) 2018-07-03 2018-07-03 Configuration equipment for building concrete processing

Publications (2)

Publication Number Publication Date
CN108995042A true CN108995042A (en) 2018-12-14
CN108995042B CN108995042B (en) 2020-04-21

Family

ID=64599754

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810717462.3A Active CN108995042B (en) 2018-07-03 2018-07-03 Configuration equipment for building concrete processing

Country Status (1)

Country Link
CN (1) CN108995042B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050259511A1 (en) * 2004-05-24 2005-11-24 Orton Mark B Apparatus and method for mixing materials
CN103407743A (en) * 2013-08-29 2013-11-27 安庆市灵宝机械有限责任公司 Bidirectional vibrating feeding device
CN204687084U (en) * 2015-04-29 2015-10-07 何佑兵 A kind of movable high-efficiency mortar mixer for building
CN205576118U (en) * 2016-05-09 2016-09-14 兴文县新星农业发展有限责任公司 Automatic upender of fermentation bed
CN206551229U (en) * 2016-11-10 2017-10-13 广西辉瑞建筑工程有限公司 A kind of efficient mixing arrangement of cement mortar for building
CN207027876U (en) * 2017-06-20 2018-02-23 浙江天峰机械有限公司 A kind of concrete central mix plant of adjustable puddler height

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050259511A1 (en) * 2004-05-24 2005-11-24 Orton Mark B Apparatus and method for mixing materials
CN103407743A (en) * 2013-08-29 2013-11-27 安庆市灵宝机械有限责任公司 Bidirectional vibrating feeding device
CN204687084U (en) * 2015-04-29 2015-10-07 何佑兵 A kind of movable high-efficiency mortar mixer for building
CN205576118U (en) * 2016-05-09 2016-09-14 兴文县新星农业发展有限责任公司 Automatic upender of fermentation bed
CN206551229U (en) * 2016-11-10 2017-10-13 广西辉瑞建筑工程有限公司 A kind of efficient mixing arrangement of cement mortar for building
CN207027876U (en) * 2017-06-20 2018-02-23 浙江天峰机械有限公司 A kind of concrete central mix plant of adjustable puddler height

Also Published As

Publication number Publication date
CN108995042B (en) 2020-04-21

Similar Documents

Publication Publication Date Title
CN106733985A (en) A kind of construction site barrel of cement cleaning equipment
CN110281386A (en) The automation circulation stirring technique of concrete
CN206851694U (en) A kind of trough for being easy to stirring
CN215754875U (en) A conveyer for ready-mixed concrete
CN106902686A (en) Dispensing Efficient Agitator is used in a kind of brake block production
CN108668578A (en) A kind of novel agricultural fertilizer apparatus
CN108995042A (en) A kind of building concrete processing configuration equipment
CN108214898A (en) A kind of mixing plant that dipping and heaving stirring can be carried out to cement
CN112919857B (en) Preparation method of polymer cement waterproof mortar
CN207465540U (en) A kind of concrete central mix plant being convenient to clean
CN106217642B (en) A kind of construction stirring system
CN211221358U (en) Novel mortar stirring mechanism
CN107638845A (en) A kind of chemical industry agitator dedicated cleaning apparatus
CN108680390B (en) Sampling device for premixed concrete mixture
CN203957139U (en) A kind of concrete agitator
CN207734922U (en) A kind of dye sample mixing machine
CN110921798A (en) Waste liquid treatment device that clinical laboratory used
CN216230108U (en) Concrete mixing tank
CN109092857A (en) Environmentally friendly food waste treatment device
CN107824080A (en) A kind of chemicals dosing plant of soil remediation
CN107856186A (en) A kind of Simple cement sandstone stir stroller
CN210474969U (en) Soil remediation agent mixing equipment
CN207495787U (en) A kind of Simple cement sandstone stir cart
CN207140071U (en) A kind of mortar mixer
CN207163730U (en) A kind of mechanization portable soil mixes four points of devices

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200326

Address after: 226126 group 23, Tangxi village, Sanchang Town, Haimen City, Nantong City, Jiangsu Province

Applicant after: NANTONG XINHUA CONCRETE PRODUCTS Co.,Ltd.

Address before: 518054 Room 602, Unit B1, Kexing Science Park, Keyuan Avenue, Yuehai Street Science Park, Nanshan District, Shenzhen City, Guangdong Province

Applicant before: Li Shisheng

GR01 Patent grant
GR01 Patent grant