CN108988341A - Distribution equipment malfunction adjusting method and device - Google Patents

Distribution equipment malfunction adjusting method and device Download PDF

Info

Publication number
CN108988341A
CN108988341A CN201811035093.6A CN201811035093A CN108988341A CN 108988341 A CN108988341 A CN 108988341A CN 201811035093 A CN201811035093 A CN 201811035093A CN 108988341 A CN108988341 A CN 108988341A
Authority
CN
China
Prior art keywords
electrical distribution
controller switching
switching equipment
distribution paths
determined
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811035093.6A
Other languages
Chinese (zh)
Other versions
CN108988341B (en
Inventor
张松
宋士瞻
田玉芳
张健
王传勇
康文文
杨凤文
代二刚
李森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zaozhuang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Zaozhuang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zaozhuang Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Zaozhuang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority to CN201811035093.6A priority Critical patent/CN108988341B/en
Publication of CN108988341A publication Critical patent/CN108988341A/en
Application granted granted Critical
Publication of CN108988341B publication Critical patent/CN108988341B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J3/005

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The embodiment of the invention provides a kind of distribution equipment malfunction adjusting method and devices, are related to electrical equipment technical field.Method include: when target controller switching equipment by from the power output that the first controller switching equipment obtains to first load during generate distribution fault when, according to preset distribution network topological diagram determine one without target controller switching equipment target electrical distribution paths;Distribution adjusting information is transmitted to the first controller switching equipment in target electrical distribution paths, so that the first controller switching equipment exports electric energy to the first load by target electrical distribution paths.Electric energy is output to the need to power first load by target electrical distribution paths by the distribution network topological diagram being made up of multiple star networks, it ensure that in target distribution equipment malfunction, user terminal first load also can normal electricity consumption, greatly improve user's adventure in daily life.

Description

Distribution equipment malfunction adjusting method and device
Technical field
The present invention relates to electrical equipment technical fields, in particular to a kind of distribution equipment malfunction adjusting method and dress It sets.
Background technique
With the development of science and technology and the improvement of people's living standards, the power load of people are growing day by day.
Electrical power distribution system is used to obtain electric energy correspondence from power grid by each controller switching equipment in system and is assigned to each use The load at family end.Therefore, the situation growing day by day in the power load of people guarantees that the normal work of each controller switching equipment is electric energy Can normal allocation to each corresponding load necessary condition.But it is current in the prior art, if some distribution equipment malfunction and It can not work normally, then will lead to the load that the controller switching equipment of the failure is connected can not obtain electric energy, and then just to user Common electricity causes strong influence, such as powers off during the broiling summer and the air-conditioning of user is caused not to be available, thus greatly Reduce user's adventure in daily life.
Summary of the invention
In view of this, the purpose of the present invention is to provide a kind of distribution equipment malfunction adjusting method and devices, with effective Improve drawbacks described above.
The embodiment of the present invention is achieved in that
In a first aspect, being applied to a power distribution the embodiment of the invention provides a kind of distribution equipment malfunction adjusting method In any one target controller switching equipment in multiple controller switching equipments of system, the target controller switching equipment and the multiple controller switching equipment The load of at least one of at least one first controller switching equipment and multiple external loadings first, which is all connected with, constitutes a star network.Institute The method of stating includes: when the target controller switching equipment is will be negative from the power output that first controller switching equipment obtains to described first When generating distribution fault during load, determine that one sets without the target distribution according to preset distribution network topological diagram Standby target electrical distribution paths, wherein the corresponding star network of each controller switching equipment, the distribution network topological diagram are matched by multiple Multiple star networks corresponding to electric equipment are constituted;A corresponding distribution, which is generated, according to the target electrical distribution paths adjusts information; Distribution adjusting information is transmitted to first controller switching equipment in the target electrical distribution paths, so that the first controller switching equipment The electric energy is exported by the target electrical distribution paths to first load.
The technical solution provided with reference to the above first aspect, it is described according to preset in some possible implementations Distribution network topological diagram determine one without the target controller switching equipment target electrical distribution paths.It include: according to described default Distribution network topological diagram determine without at least one electrical distribution paths of target controller switching equipment, at least one distribution Every electrical distribution paths in path are separately connected first controller switching equipment and first load;Match from described at least one The target electrical distribution paths that can transmit the electric energy are selected in power path.
The technical solution provided with reference to the above first aspect, in some possible implementations, it is described from it is described at least The target electrical distribution paths that can transmit the electric energy are selected in one electrical distribution paths.It include: to work as from described at least one When the electrical distribution paths to be determined for selecting controller switching equipment minimum number in electrical distribution paths are one, judge described to be determined with circuit Whether each controller switching equipment in diameter is all satisfied the preset condition for transmitting the electric energy;When to be, by the distribution to be determined Path is determined as the target electrical distribution paths;When to be no, selected from least one electrical distribution paths except described to true The electrical distribution paths of determining the outer controller switching equipment minimum number of electrical distribution paths, using the electrical distribution paths as be used to currently judge newly It is to be determined to match circuit.
The technical solution provided with reference to the above first aspect, in some possible implementations, described in the judgement to Determine whether each controller switching equipment in electrical distribution paths is all satisfied the preset condition for transmitting the electric energy are as follows: judge described to be determined Whether the power surplus of each controller switching equipment in electrical distribution paths is all larger than power demand required for the transmission electric energy Amount.
The technical solution provided with reference to the above first aspect, in some possible implementations, it is described from it is described at least The target electrical distribution paths that can transmit the electric energy are selected in one electrical distribution paths.Further include: when from described at least one When to select controller switching equipment minimum number electrical distribution paths to be determined in electrical distribution paths be at least two, at least two are obtained to true Determine the power headroom of every electrical distribution paths to be determined of electrical distribution paths, the power headroom of the electrical distribution paths to be determined be it is described to Determine the sum of the power surplus of each controller switching equipment in electrical distribution paths;From the function of at least two electrical distribution paths to be determined The maximum electrical distribution paths to be determined of power headroom are selected in rate surplus;Judge that the power headroom is maximum to be determined with circuit Whether each controller switching equipment in diameter is all satisfied the preset condition for transmitting the electric energy;When to be, most by the power headroom Big electrical distribution paths to be determined are determined as the target electrical distribution paths;When to be no, selected from least one electrical distribution paths An electrical distribution paths of the controller switching equipment minimum number in addition to the maximum electrical distribution paths to be determined of the power headroom are selected out, are matched by described in Power path is as new to be determined with circuit for what is currently judged.
Second aspect, the embodiment of the invention provides a kind of distribution equipment malfunction regulating devices, are applied to a power distribution In any one target controller switching equipment in multiple controller switching equipments of system, the target controller switching equipment and the multiple controller switching equipment The load of at least one of at least one first controller switching equipment and multiple external loadings first, which is all connected with, constitutes a star network.Institute Stating device includes: path determination module, for when the target controller switching equipment is in the electricity that will be obtained from first controller switching equipment When can generate distribution fault during output to first load, do not determined one not according to preset distribution network topological diagram By the target electrical distribution paths of the target controller switching equipment, wherein the corresponding star network of each controller switching equipment, the distribution Network topological diagram multiple star networks corresponding to multiple controller switching equipments are constituted.Information generating module, for according to the mesh Standard configuration power path generates a corresponding distribution and adjusts information.Information sending module, for distribution adjusting information to be transmitted to First controller switching equipment in the target electrical distribution paths, so that the first controller switching equipment matches the electric energy by the target Power path is exported to first load.
In conjunction with the technical solution that above-mentioned second aspect provides, in some possible implementations, the path determines mould Block includes: path determining unit, for being determined according to the preset distribution network topological diagram without the target distribution At least one electrical distribution paths of equipment, every electrical distribution paths at least one electrical distribution paths are separately connected described first and match Electric equipment and first load.Path selection unit, for selecting and can transmit from least one electrical distribution paths The target electrical distribution paths of the electric energy.
In conjunction with the technical solution that above-mentioned second aspect provides, in some possible implementations, the Path selection list Member includes: the first adjusting judgment sub-unit, selects controller switching equipment quantity most from least one electrical distribution paths for working as When few electrical distribution paths to be determined are one, judge whether each controller switching equipment in the electrical distribution paths to be determined is all satisfied biography The preset condition of the defeated electric energy.First path selects subelement, for when to be, the electrical distribution paths to be determined to be determined For the target electrical distribution paths;When to be no, selected from least one electrical distribution paths except described to be determined with circuit One electrical distribution paths of the outer controller switching equipment minimum number of diameter are matched the electrical distribution paths as newly to be determined for being used to currently judge Circuit.
In conjunction with above-mentioned second aspect provide technical solution, in some possible implementations, described in the judgement to Determine whether each controller switching equipment in electrical distribution paths is all satisfied the preset condition for transmitting the electric energy are as follows: judge described to be determined Whether the power surplus of each controller switching equipment in electrical distribution paths is all larger than power demand required for the transmission electric energy Amount.
In conjunction with the technical solution that above-mentioned second aspect provides, in some possible implementations, the Path selection list Member further include: power obtains subelement, selects controller switching equipment minimum number from least one electrical distribution paths for working as When electrical distribution paths to be determined are at least two, the function of every electrical distribution paths to be determined of at least two electrical distribution paths to be determined is obtained Rate surplus, the power headroom of the electrical distribution paths to be determined are each controller switching equipment in the electrical distribution paths to be determined The sum of power surplus.Power selection subelement, for being selected from the power headroom of at least two electrical distribution paths to be determined The maximum electrical distribution paths to be determined of power headroom.Second adjust judgment sub-unit, for judge the power headroom it is maximum to Determine whether each controller switching equipment in electrical distribution paths is all satisfied the preset condition for transmitting the electric energy.Second Path selection is single Member, for when to be, the maximum electrical distribution paths to be determined of the power headroom to be determined as the target electrical distribution paths;For When no, the distribution in addition to the maximum electrical distribution paths to be determined of the power headroom is selected from least one electrical distribution paths and is set One electrical distribution paths of standby minimum number new to be determined match circuit using the electrical distribution paths as be used to currently judge.
The beneficial effect of the embodiment of the present invention is:
It is correspondingly formed a star network by each controller switching equipment of electrical power distribution system, therefore electrical power distribution system can have The distribution network topological diagram for thering are a multiple star networks corresponding to multiple controller switching equipments to constitute.And then work as target controller switching equipment It, can be according to preset when generating distribution fault during by loading from the power output that the first controller switching equipment obtains to first Distribution network topological diagram determine one without target controller switching equipment target electrical distribution paths.Further, target controller switching equipment It generates a distribution corresponding with target electrical distribution paths and adjusts information, by the way that distribution adjusting information is transmitted to target electrical distribution paths In the first controller switching equipment so that the first controller switching equipment by electric energy by the target electrical distribution paths export to first load.Cause This, electric energy is output to by the distribution network topological diagram that can be made up of multiple star networks by target electrical distribution paths to be needed to power First load, ensure that in target distribution equipment malfunction, user terminal first load also can normal electricity consumption, greatly mention High user's adventure in daily life.
Other features and advantages of the present invention will be illustrated in subsequent specification, also, partly be become from specification It is clear that being understood by implementing the embodiment of the present invention.The objectives and other advantages of the invention can be by written Specifically noted structure is achieved and obtained in specification, claims and attached drawing.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention Example, for those of ordinary skill in the art, without creative efforts, can also obtain according to these attached drawings Obtain other attached drawings.By the way that shown in attached drawing, above and other purpose of the invention, feature and advantage will be more clear.In whole Identical appended drawing reference indicates identical part in attached drawing.Attached drawing, emphasis deliberately are not drawn by actual size equal proportion scaling It is to show the gist of the present invention.
Fig. 1 shows a kind of structural block diagram of electrical power distribution system of first embodiment of the invention offer;
Fig. 2 shows a kind of flow charts for distribution equipment malfunction adjusting method that second embodiment of the invention provides;
Fig. 3 shows a kind of structural block diagram of distribution equipment malfunction regulating device of third embodiment of the invention offer;
Fig. 4 shows path determination module in a kind of distribution equipment malfunction regulating device of third embodiment of the invention offer Structural block diagram;
Fig. 5 shows path selection unit in a kind of distribution equipment malfunction regulating device of third embodiment of the invention offer First structure block diagram;
Fig. 6 shows path selection unit in a kind of distribution equipment malfunction regulating device of third embodiment of the invention offer The second structural block diagram.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.The present invention being usually described and illustrated herein in the accompanying drawings is implemented The component of example can be arranged and be designed with a variety of different configurations.
Therefore, the detailed description of the embodiment of the present invention provided in the accompanying drawings is not intended to limit below claimed The scope of the present invention, but be merely representative of selected embodiment of the invention.Based on the embodiments of the present invention, this field is common Technical staff's every other embodiment obtained without creative efforts belongs to the model that the present invention protects It encloses.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.Term " first ", " the Two " etc. are only used for distinguishing description, are not understood to indicate or imply relative importance.
First embodiment
Referring to Fig. 1, first embodiment of the invention provides a kind of electrical power distribution system 10, the electrical power distribution system 10 packet It includes: controller switching equipment 11.
Controller switching equipment 11 can be common high voltage power distributing cabinet, transformer, low-tension switch cabinet, switch-box, and control cabinet etc. is set It is standby.In the present embodiment, controller switching equipment 11 can be to be multiple, any one controller switching equipment 11 in multiple controller switching equipments 11 can be used as Target controller switching equipment 101.Target controller switching equipment 101 and at least one first controller switching equipment 11 in multiple controller switching equipments 11 and multiple The load of at least one of external loading 12 first 12, which is all connected with, constitutes a star network, so that the electrical power distribution system 10 has Multiple star networks.
When electrical power distribution system 10 works normally, target controller switching equipment 101 passes through itself and connects the stellate reticulum formed Network obtains the electric energy for connecting the output of the first controller switching equipment 11.Wherein, the first controller switching equipment 11 is exported to target controller switching equipment 101 Electric energy be the first controller switching equipment 11 obtained from power grid.Then, target controller switching equipment 101 will obtain again according to preset distribution rule First load 12 of the power output obtained into the star network formed by itself connection, just with the first load 12 of guarantee Often work.
Second embodiment
Referring to Fig. 2, second embodiment of the invention provides a kind of distribution equipment malfunction adjusting method, controller switching equipment event Hinder any one target controller switching equipment that adjusting method is applied in multiple controller switching equipments of electrical power distribution system.Distribution equipment malfunction Adjusting method includes: step S100, step S200 and step S300.
Step S100: when the target controller switching equipment is will be from the power output that first controller switching equipment obtains to described When generating distribution fault during the first load, determined according to preset distribution network topological diagram one without the target The target electrical distribution paths of controller switching equipment, wherein the corresponding star network of each controller switching equipment, the distribution network topological diagram by Multiple star networks corresponding to multiple controller switching equipments are constituted.
In electrical power distribution system, target controller switching equipment can be separately connected at least first controller switching equipment and at least one A first load, to constitute the star network centered on the target controller switching equipment.Wherein, target controller switching equipment is at least The process flow of the first controller switching equipment of each of one first controller switching equipment is with this at least one first controller switching equipment Other first controller switching equipments are identical and target controller switching equipment is for the first place loaded of each of at least one first load It is identical to manage other first loads of the process with this at least one first load, therefore the present embodiment is at least one the first distribution The first controller switching equipment of any of equipment, and carried out in detail by taking the first load of any of at least one first load as an example It describes in detail bright.
In the case where normal distribution, target controller switching equipment with the first controller switching equipment by connecting, target controller switching equipment energy Enough obtain the electric energy that the slave power grid of the first controller switching equipment output obtains.And target controller switching equipment is connected by loading with first, mesh Standard configuration electric equipment will then be loaded from the power output that the first controller switching equipment obtains to first, to be embodied as the first load distribution.
In the case where matching electrical anomaly, for example, the failures such as short circuit or open circuit, which occurs, in target controller switching equipment needs service personnel When maintenance, target controller switching equipment can not will be loaded from the power output that the first controller switching equipment obtains to first at this time.At this point, target Controller switching equipment needs that distribution is adjusted, and to guarantee in target distribution equipment malfunction, the first load can also remain normal Distribution.
Specifically, being previously provided with the distribution network topological diagram of the electrical power distribution system in target controller switching equipment.In the electricity In power distribution system, the corresponding star network of each controller switching equipment, therefore distribution network topological diagram can be to be set by multiple distribution Standby corresponding multiple star networks are constituted.
For example, controller switching equipment A is by being separately connected load A1, load A2 and controller switching equipment B in an electrical power distribution system Star network A is constituted, controller switching equipment B loads B1 and controller switching equipment C composition star network B by being separately connected, and controller switching equipment C Star network C is constituted by being separately connected load C 1, load A1 and controller switching equipment B.And then star network A, star network B and star The distribution network topological diagram for the electrical power distribution system that l network C is constituted, the distribution network topological diagram are are as follows: controller switching equipment B points It is not connect with load B1, controller switching equipment A and controller switching equipment C, controller switching equipment A is connect with load A1 and load A2 respectively again, and is matched Electric equipment C is also connect with load A1 and load C 1 respectively.
Further, when target controller switching equipment is will be negative from the power output that the first controller switching equipment obtains to described first When generating distribution fault during load, target controller switching equipment can not determined one not according to preset distribution network topological diagram By the target electrical distribution paths of target controller switching equipment.For example, target controller switching equipment A is separately connected the first controller switching equipment B and first Load C, it is determined that going out one can set without the target electrical distribution paths of target controller switching equipment for the first controller switching equipment B connection distribution Standby D, controller switching equipment D reconnect the first load C.
It is to be understood that again may in distribution network topological diagram by the power output to the path of the first load It is at least one, therefore the target electrical distribution paths determined should be the optimal selection at least one path.
Specifically, determining that the mode of the target electrical distribution paths of optimal selection can open up for target controller switching equipment from distribution network It flutters in figure and determines all without at least one electrical distribution paths of target controller switching equipment, and at least one electrical distribution paths In every electrical distribution paths be separately connected the first controller switching equipment and the first load, with guarantee from the direction in path be can will The power output exported from the first controller switching equipment to first load.
After determining at least one electrical distribution paths, target electrical distribution paths go to obtain according at least one electrical distribution paths The power surplus of each controller switching equipment in every electrical distribution paths of at least one electrical distribution paths, and further obtain every The power headroom of each electrical distribution paths corresponding to the sum of power surplus superposition of each controller switching equipment in electrical distribution paths.Example Such as, in an electrical distribution paths A of at least one electrical distribution paths: the power surplus of controller switching equipment A1 is 3KW, controller switching equipment A2 Power surplus is 4KW and the power surplus of controller switching equipment A3 is 3KW, therefore the power headroom of electrical distribution paths A is 10KW.
Further, target controller switching equipment can select controller switching equipment minimum number from least one electrical distribution paths and wait for really Determine electrical distribution paths.Wherein, during selecting the electrical distribution paths to be determined, the quantity of the electrical distribution paths to be determined can have Two kinds of selectable situations.
It, i.e., should be to when selecting controller switching equipment minimum number electrical distribution paths to be determined is 1 as a kind of performance Determine that the controller switching equipment quantity in electrical distribution paths is least in all paths.At this point, target controller switching equipment can determine whether this to true Determine the preset condition whether each controller switching equipment in electrical distribution paths is all satisfied transmission electric energy, that is, judges in electrical distribution paths to be determined Each controller switching equipment power surplus whether be all larger than transmission electric energy required for power demand.
When being judged as YES, i.e., the power surplus of each controller switching equipment in the electrical distribution paths to be determined is all larger than transmission Power demand required for electric energy, therefore can meet electric energy will not lead when being transmitted to the first load in the electrical distribution paths to be determined Cause the controller switching equipment excess load in the electrical distribution paths to be determined.And then determine that the electrical distribution paths to be determined are that the target selected is matched Power path.
When being judged as NO, i.e., the electrical distribution paths to be determined have the power surplus of at least one controller switching equipment no more than biography Power demand required for transmission of electricity energy, therefore when electric energy transmits in the electrical distribution paths to be determined, no more than transmission electric energy institute At least one controller switching equipment of the power demand needed can overload operation.Therefore, which cannot function as Target electrical distribution paths.Later, target controller switching equipment is selected from least one electrical distribution paths again except last determination is to true Determine an electrical distribution paths of the outer controller switching equipment minimum number of electrical distribution paths, and using the electrical distribution paths as be used to currently judge newly It is to be determined to match circuit, and return and execute: " judge whether each controller switching equipment in the electrical distribution paths to be determined is all satisfied transmission The step of preset condition of the electric energy ", until determining the electrical distribution paths to be determined for meeting condition as target electrical distribution paths.
It is at least two when selecting controller switching equipment minimum number electrical distribution paths to be determined as another performance When, i.e., the controller switching equipment quantity at least two electrical distribution paths to be determined is least in all paths.At this point, target is matched Electric equipment needs determine optimal selection from least two electrical distribution paths to be determined first, i.e. target controller switching equipment obtains first Obtain the power headroom of every electrical distribution paths to be determined of at least two electrical distribution paths to be determined.Wherein, electrical distribution paths to be determined Power headroom is also the sum of the power surplus of each controller switching equipment in the electrical distribution paths to be determined.Later, target distribution is set It is standby that the maximum electrical distribution paths to be determined of power headroom are just selected from the power headroom of at least two electrical distribution paths to be determined.It can With it is understood that the maximum electrical distribution paths to be determined of power headroom be at least two electrical distribution paths to be determined most preferably It selects.
At this point, target controller switching equipment can determine whether each controller switching equipment in the maximum electrical distribution paths to be determined of the power headroom It whether is all satisfied the preset condition of transmission electric energy, i.e., also judges each distribution in the maximum electrical distribution paths to be determined of power headroom Whether the power surplus of equipment is all larger than power demand required for transmission electric energy.
When being judged as YES, i.e., the power of each controller switching equipment in the maximum electrical distribution paths to be determined of the power headroom is surplus Surplus is all larger than power demand required for transmission electric energy, therefore can meet electric energy in the maximum distribution to be determined of the power headroom The controller switching equipment that do not will lead in the maximum electrical distribution paths to be determined of the power headroom when being transmitted to the first load on path is super negative Lotus.And then determine that the maximum electrical distribution paths to be determined of the power headroom are the target electrical distribution paths selected.
When being judged as NO, i.e. the maximum electrical distribution paths to be determined of the power headroom power that has at least one controller switching equipment Surplus is no more than power demand required for transmission electric energy, therefore it is maximum to be determined with circuit in the power headroom to work as electric energy When transmitting on diameter, at least one controller switching equipment no more than power demand required for transmission electric energy can overload operation.Cause This, the maximum electrical distribution paths to be determined of the power headroom cannot function as target electrical distribution paths.Later, target controller switching equipment again to The controller switching equipment in addition to the maximum electrical distribution paths to be determined of the power headroom that the last time determines is selected in few electrical distribution paths One electrical distribution paths of minimum number, and the electrical distribution paths are new to be determined with circuit as be used to currently judge, and return It executes: " judging whether each controller switching equipment in the electrical distribution paths to be determined is all satisfied the preset condition for transmitting the electric energy " The step of, until determining the electrical distribution paths to be determined for meeting condition as target electrical distribution paths.
Step S200: a corresponding distribution is generated according to the target electrical distribution paths and adjusts information.
After determining target electrical distribution paths, target controller switching equipment produces and the target according to preset control program The corresponding distribution of electrical distribution paths adjusts information.Wherein, it includes each matching in the target electrical distribution paths that distribution, which is adjusted in information, The distribution of each controller switching equipment is shaken hands instruction in the ID of electric equipment and the target electrical distribution paths.
Certainly, generate in the present embodiment includes that the distribution of above- mentioned information adjusts a kind of embodiment party that information is only the present embodiment Formula is not intended as the restriction to the present embodiment.
S300: being transmitted to first controller switching equipment in the target electrical distribution paths for distribution adjusting information, with Export the first controller switching equipment the electric energy to first load by the target electrical distribution paths.
After target controller switching equipment generates distribution adjusting information, distribution can be adjusted information and sent first by target controller switching equipment The first controller switching equipment that target controller switching equipment is connected into target electrical distribution paths.Therefore first controller switching equipment is adjusted according to distribution Itself distribution is corresponded in information to shake hands instruction, the first controller switching equipment know need will output originally to target controller switching equipment electricity It can be exported again again through the connection relationship in target electrical distribution paths.Further, also according to distribution adjust information, first Distribution adjusting information is sent to the controller switching equipment connected in target electrical distribution paths by controller switching equipment.Therefore circuit is matched by target Each controller switching equipment adjusts the successively forwarding of information, each equal energy of controller switching equipment in the target electrical distribution paths to the distribution in diameter It is enough from distribution adjust information and correspond to itself distribution shake hands instruction, each controller switching equipment is all in accordance with the distribution in target electrical distribution paths It shakes hands instruction, so that by target electrical distribution paths by power output to the first load.
3rd embodiment
Referring to Fig. 3, third embodiment of the invention provides a kind of distribution equipment malfunction regulating device 100.Controller switching equipment Fault accommodation device 100 is applied to any one target controller switching equipment in multiple controller switching equipments of an electrical power distribution system, described Target controller switching equipment and at least one at least one first controller switching equipment and multiple external loadings in the multiple controller switching equipment A first load, which is all connected with, constitutes a star network.Distribution equipment malfunction regulating device 100 includes:
Path determination module 110, for when the target controller switching equipment is in the electricity that will be obtained from first controller switching equipment When can generate distribution fault during output to first load, do not determined one not according to preset distribution network topological diagram By the target electrical distribution paths of the target controller switching equipment, wherein the corresponding star network of each controller switching equipment, the distribution Network topological diagram multiple star networks corresponding to multiple controller switching equipments are constituted.
Information generating module 120 adjusts information for generating a corresponding distribution according to the target electrical distribution paths.
Information sending module 130, described in distribution adjusting information is transmitted in the target electrical distribution paths First controller switching equipment, so that the first controller switching equipment exports the electric energy to described first negative by the target electrical distribution paths It carries.
Referring to Fig. 4, provided in a kind of distribution equipment malfunction regulating device 100 in third embodiment of the invention, it is described Path determination module 110 includes:
Path determining unit 111, for being determined according to the preset distribution network topological diagram without the target At least one electrical distribution paths of controller switching equipment, every electrical distribution paths at least one electrical distribution paths are separately connected described One controller switching equipment and first load.
Path selection unit 112 can transmit the electric energy for selecting from least one electrical distribution paths The target electrical distribution paths.
Referring to Fig. 5, provided in a kind of distribution equipment malfunction regulating device 100 in third embodiment of the invention, it is described Path selection unit 111 includes:
First adjusts judgment sub-unit 1111, selects controller switching equipment number from least one electrical distribution paths for working as Measure least electrical distribution paths to be determined be one when, judge whether each controller switching equipment in the electrical distribution paths to be determined full Foot transmits the preset condition of the electric energy.
First path selects subelement 1112, for when to be, the electrical distribution paths to be determined to be determined as the mesh Standard configuration power path;When to be no, the distribution in addition to the electrical distribution paths to be determined is selected from least one electrical distribution paths The least electrical distribution paths of number of devices, the electrical distribution paths are new to be determined with circuit as be used to currently judge.
Referring to Fig. 6, provided in a kind of distribution equipment malfunction regulating device 100 in third embodiment of the invention, it is described Path selection unit 111 further include:
Power obtains subelement 1113, selects controller switching equipment quantity most from least one electrical distribution paths for working as When determining electrical distribution paths of waiting a little while,please are at least two, every electrical distribution paths to be determined of at least two electrical distribution paths to be determined are obtained Power headroom, the power headroom of the electrical distribution paths to be determined are each controller switching equipment in the electrical distribution paths to be determined The sum of power surplus.
Power selection subelement 1114, for selecting power from the power headroom of at least two electrical distribution paths to be determined The maximum electrical distribution paths to be determined of surplus.
Second adjusts judgment sub-unit 1115, every in the maximum electrical distribution paths to be determined of the power headroom for judging Whether a controller switching equipment is all satisfied the preset condition for transmitting the electric energy.
Second Path selection subelement 1116 to be determined matches circuit for the power headroom is maximum for when to be Diameter is determined as the target electrical distribution paths;When to be no, selected from least one electrical distribution paths except more than the power The electrical distribution paths for measuring the outer controller switching equipment minimum number of maximum electrical distribution paths to be determined, using the electrical distribution paths as being used to work as The new of preceding judgement to be determined matches circuit.
It should be noted that due to it is apparent to those skilled in the art that, for the convenience and letter of description Clean, system, the specific work process of device and unit of foregoing description can be with reference to corresponding in preceding method embodiment Journey, details are not described herein.
In conclusion the embodiment of the invention provides a kind of distribution equipment malfunction adjusting method and devices.Controller switching equipment event Hinder any one target controller switching equipment that adjusting method is applied in multiple controller switching equipments of an electrical power distribution system, target distribution is set It is standby to connect with the load of at least one of at least one first controller switching equipment and multiple external loadings first in multiple controller switching equipments It connects and constitutes a star network.Method includes: when target controller switching equipment is will be from the power output that the first controller switching equipment obtains to When generating distribution fault during one load, determine that one sets without target distribution according to preset distribution network topological diagram Standby target electrical distribution paths, wherein the corresponding star network of each controller switching equipment, distribution network topological diagram are set by multiple distribution Standby corresponding multiple star networks are constituted;A corresponding distribution, which is generated, according to target electrical distribution paths adjusts information;By distribution tune Section information is transmitted to the first controller switching equipment in target electrical distribution paths, so that electric energy is matched circuit by target by the first controller switching equipment Diameter is exported to the first load.
It is correspondingly formed a star network by each controller switching equipment of electrical power distribution system, therefore electrical power distribution system can have The distribution network topological diagram for thering are a multiple star networks corresponding to multiple controller switching equipments to constitute.And then work as target controller switching equipment It, can be according to preset when generating distribution fault during by loading from the power output that the first controller switching equipment obtains to first Distribution network topological diagram determine one without target controller switching equipment target electrical distribution paths.Further, target controller switching equipment It generates a distribution corresponding with target electrical distribution paths and adjusts information, by the way that distribution adjusting information is transmitted to target electrical distribution paths In the first controller switching equipment so that the first controller switching equipment by electric energy by the target electrical distribution paths export to first load.Cause This, electric energy is output to by the distribution network topological diagram that can be made up of multiple star networks by target electrical distribution paths to be needed to power First load, ensure that in target distribution equipment malfunction, user terminal first load also can normal electricity consumption, greatly mention High user's adventure in daily life.
These are only the preferred embodiment of the present invention, is not intended to restrict the invention, for those skilled in the art For member, the invention may be variously modified and varied.All within the spirits and principles of the present invention, it is made it is any modification, Equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of distribution equipment malfunction adjusting method, which is characterized in that multiple controller switching equipments applied to an electrical power distribution system In any one target controller switching equipment, the target controller switching equipment sets at least one first distribution in the multiple controller switching equipment The load of at least one of standby and multiple external loadings first, which is all connected with, constitutes a star network, which comprises
When the target controller switching equipment is in the mistake that will be loaded from the power output that first controller switching equipment obtains to described first In journey generate distribution fault when, according to preset distribution network topological diagram determine one without the target controller switching equipment mesh Standard configuration power path, wherein the corresponding star network of each controller switching equipment, the distribution network topological diagram is by multiple controller switching equipments Corresponding multiple star networks are constituted;
A corresponding distribution, which is generated, according to the target electrical distribution paths adjusts information;
Distribution adjusting information is transmitted to first controller switching equipment in the target electrical distribution paths, so that the first distribution Equipment exports the electric energy to first load by the target electrical distribution paths.
2. distribution equipment malfunction adjusting method according to claim 1, which is characterized in that described according to preset power distribution network Network topological diagram determine one without the target controller switching equipment target electrical distribution paths, comprising:
It is determined according to the preset distribution network topological diagram without at least one electrical distribution paths of target controller switching equipment, Every electrical distribution paths at least one electrical distribution paths are separately connected first controller switching equipment and first load;
The target electrical distribution paths that can transmit the electric energy are selected from least one electrical distribution paths.
3. distribution equipment malfunction adjusting method according to claim 2, which is characterized in that described to match from described at least one The target electrical distribution paths that can transmit the electric energy are selected in power path, comprising:
When the electrical distribution paths to be determined for selecting controller switching equipment minimum number from least one electrical distribution paths are one, Judge whether each controller switching equipment in the electrical distribution paths to be determined is all satisfied the preset condition for transmitting the electric energy;
When to be, the electrical distribution paths to be determined are determined as the target electrical distribution paths;When to be no, from described at least one An electrical distribution paths of the controller switching equipment minimum number in addition to the electrical distribution paths to be determined are selected in electrical distribution paths, will described in match Power path is as new to be determined with circuit for what is currently judged.
4. distribution equipment malfunction adjusting method according to claim 3, which is characterized in that the judgement is described to be determined to match Whether each controller switching equipment in power path is all satisfied the preset condition for transmitting the electric energy are as follows: judges described to be determined with circuit Whether the power surplus of each controller switching equipment in diameter is all larger than power demand required for the transmission electric energy.
5. distribution equipment malfunction adjusting method according to claim 4, which is characterized in that described to match from described at least one The target electrical distribution paths that can transmit the electric energy are selected in power path, further includes:
It is at least two when selecting controller switching equipment minimum number electrical distribution paths to be determined from least one electrical distribution paths When, the power headroom of every electrical distribution paths to be determined of at least two electrical distribution paths to be determined is obtained, it is described to be determined with circuit The power headroom of diameter is the sum of the power surplus of each controller switching equipment in the electrical distribution paths to be determined;
The maximum electrical distribution paths to be determined of power headroom are selected from the power headroom of at least two electrical distribution paths to be determined;
Judge whether each controller switching equipment in the maximum electrical distribution paths to be determined of the power headroom is all satisfied the transmission electricity The preset condition of energy;
When to be, the maximum electrical distribution paths to be determined of the power headroom are determined as the target electrical distribution paths;It is being no When, the controller switching equipment in addition to the maximum electrical distribution paths to be determined of the power headroom is selected from least one electrical distribution paths One electrical distribution paths of minimum number, the electrical distribution paths are new to be determined with circuit as be used to currently judge.
6. a kind of distribution equipment malfunction regulating device, which is characterized in that multiple controller switching equipments applied to an electrical power distribution system In any one target controller switching equipment, the target controller switching equipment sets at least one first distribution in the multiple controller switching equipment The load of at least one of standby and multiple external loadings first, which is all connected with, constitutes a star network, and described device includes:
Path determination module, for when the target controller switching equipment by from the power output that first controller switching equipment obtains to When generating distribution fault during first load, determined according to preset distribution network topological diagram one without described The target electrical distribution paths of target controller switching equipment, wherein the corresponding star network of each controller switching equipment, the distribution network topology Figure multiple star networks corresponding to multiple controller switching equipments are constituted;
Information generating module adjusts information for generating a corresponding distribution according to the target electrical distribution paths;
Information sending module, for distribution adjusting information to be transmitted to first distribution in the target electrical distribution paths Equipment, so that the first controller switching equipment exports the electric energy to first load by the target electrical distribution paths.
7. distribution equipment malfunction regulating device according to claim 6, which is characterized in that the path determination module packet It includes:
Path determining unit, for being determined according to the preset distribution network topological diagram without the target controller switching equipment At least one electrical distribution paths, every electrical distribution paths at least one electrical distribution paths are separately connected first distribution and set Standby and described first load;
Path selection unit, for selecting the target that can transmit the electric energy from least one electrical distribution paths Electrical distribution paths.
8. distribution equipment malfunction regulating device according to claim 7, which is characterized in that the path selection unit packet It includes:
First adjusts judgment sub-unit, selects controller switching equipment minimum number from least one electrical distribution paths for working as When electrical distribution paths to be determined are one, judge whether each controller switching equipment in the electrical distribution paths to be determined is all satisfied transmission institute State the preset condition of electric energy;
First path selects subelement, for when to be, the electrical distribution paths to be determined to be determined as the target with circuit Diameter;When to be no, the controller switching equipment quantity in addition to the electrical distribution paths to be determined is selected from least one electrical distribution paths A least electrical distribution paths, the electrical distribution paths are new to be determined with circuit as be used to currently judge.
9. distribution equipment malfunction regulating device according to claim 8, which is characterized in that the judgement is described to be determined to match Whether each controller switching equipment in power path is all satisfied the preset condition for transmitting the electric energy are as follows: judges described to be determined with circuit Whether the power surplus of each controller switching equipment in diameter is all larger than power demand required for the transmission electric energy.
10. distribution equipment malfunction regulating device according to claim 9, which is characterized in that the path selection unit is also Include:
Power obtains subelement, for be determined when selecting controller switching equipment minimum number from least one electrical distribution paths When electrical distribution paths are at least two, more than the power of every electrical distribution paths to be determined of at least two electrical distribution paths to be determined of acquisition Amount, the power headroom of the electrical distribution paths to be determined are the power of each controller switching equipment in the electrical distribution paths to be determined The sum of surplus;
Power selection subelement, for selecting power headroom maximum from the power headroom of at least two electrical distribution paths to be determined Electrical distribution paths to be determined;
Second adjusts judgment sub-unit, for judging that each distribution in the maximum electrical distribution paths to be determined of the power headroom is set It is standby whether to be all satisfied the preset condition for transmitting the electric energy;
Second Path selection subelement, for when to be, the maximum electrical distribution paths to be determined of the power headroom to be determined as The target electrical distribution paths;When to be no, selected from least one electrical distribution paths except the power headroom is maximum One electrical distribution paths of the outer controller switching equipment minimum number of electrical distribution paths to be determined, using the electrical distribution paths as being used to currently judge New is to be determined with circuit.
CN201811035093.6A 2018-09-05 2018-09-05 Power distribution equipment fault adjusting method and device Active CN108988341B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811035093.6A CN108988341B (en) 2018-09-05 2018-09-05 Power distribution equipment fault adjusting method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811035093.6A CN108988341B (en) 2018-09-05 2018-09-05 Power distribution equipment fault adjusting method and device

Publications (2)

Publication Number Publication Date
CN108988341A true CN108988341A (en) 2018-12-11
CN108988341B CN108988341B (en) 2020-11-17

Family

ID=64545689

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811035093.6A Active CN108988341B (en) 2018-09-05 2018-09-05 Power distribution equipment fault adjusting method and device

Country Status (1)

Country Link
CN (1) CN108988341B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103904773A (en) * 2014-04-02 2014-07-02 英利能源(中国)有限公司 Bypass device of power distribution equipment and control method of power distribution network
CN103986237A (en) * 2014-05-26 2014-08-13 湖南大学 Prevention control and fault processing method and system for power distribution network
CN104242294A (en) * 2013-06-18 2014-12-24 国家电网公司 Self-healing method and device for smart power grid
US20160099567A1 (en) * 2014-10-02 2016-04-07 Mitsubishi Electric Research Laboratories, Inc. Dynamic and Adaptive Configurable Power Distribution System
CN106685087A (en) * 2017-01-26 2017-05-17 南京陇源汇能电力科技有限公司 Distribution network management device for distribution automation system
CN107317335A (en) * 2017-09-04 2017-11-03 云南电网有限责任公司电力科学研究院 A kind of method and device of failure distribution network restoration
CN107846015A (en) * 2017-11-13 2018-03-27 湖南世优电力科技股份有限公司 Intelligent distribution network load transfer optimal route selection method based on peer-to-peer communication
CN108110808A (en) * 2017-12-28 2018-06-01 国网山东省电力公司蒙阴县供电公司 Load matching process and device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104242294A (en) * 2013-06-18 2014-12-24 国家电网公司 Self-healing method and device for smart power grid
CN103904773A (en) * 2014-04-02 2014-07-02 英利能源(中国)有限公司 Bypass device of power distribution equipment and control method of power distribution network
CN103986237A (en) * 2014-05-26 2014-08-13 湖南大学 Prevention control and fault processing method and system for power distribution network
US20160099567A1 (en) * 2014-10-02 2016-04-07 Mitsubishi Electric Research Laboratories, Inc. Dynamic and Adaptive Configurable Power Distribution System
CN106685087A (en) * 2017-01-26 2017-05-17 南京陇源汇能电力科技有限公司 Distribution network management device for distribution automation system
CN107317335A (en) * 2017-09-04 2017-11-03 云南电网有限责任公司电力科学研究院 A kind of method and device of failure distribution network restoration
CN107846015A (en) * 2017-11-13 2018-03-27 湖南世优电力科技股份有限公司 Intelligent distribution network load transfer optimal route selection method based on peer-to-peer communication
CN108110808A (en) * 2017-12-28 2018-06-01 国网山东省电力公司蒙阴县供电公司 Load matching process and device

Also Published As

Publication number Publication date
CN108988341B (en) 2020-11-17

Similar Documents

Publication Publication Date Title
KR20220115623A (en) Charging systems for swapping stations or for energy storage stations
US11316348B2 (en) Metering and communications for distributed energy resource devices
ZA200106533B (en) Improved structure cabling system.
KR102395252B1 (en) Hybrid Energy Storage Apparatus for Diesel Generator and Method therefor
JP2011010542A (en) Method and apparatus for monitoring and selectively controlling loads in power system
EP2986021B1 (en) Control system, control device, information appliance, and control method
KR20150111813A (en) Apparatus for controlling operation of electronic device
US20200287408A1 (en) Management system, management method, equipment, and management device
CN109417306A (en) Management method, management equipment, distributed generation resource and management system
WO2012056551A1 (en) Communication method of monitoring control system and monitoring control system
JP2015163033A (en) Dc power supply device and power supply control method
JP6802833B2 (en) Management system, management method, operation terminal and control device
US10476271B2 (en) Energy supply system and electrical outlet
JP2012235615A (en) Outlet device, power feeding state monitor, and energization control system
JP7014870B2 (en) Power converter and its control method
JP2018137993A (en) Power conversion device, power management device, and power management method
CN110100365A (en) Method for controlling rebuilding of power grid
CN106208384B (en) Household equipment power utilization safety learning system
CN105655814B (en) A kind of intelligent socket for energy internet
CN108988341A (en) Distribution equipment malfunction adjusting method and device
KR20150111804A (en) Intelligent power plug and power adapter
TWI697174B (en) Regulating method of integrated system of renewable energy and distribution automation
AU2016293631B2 (en) Storage battery control system, storage battery control method, and program
US20150244208A1 (en) Energy management apparatus and method of controlling the same
JP6328216B2 (en) Management system, management method, device and management apparatus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant