CN108979173A - A kind of multi-functional building site construction line-marking vehicle - Google Patents

A kind of multi-functional building site construction line-marking vehicle Download PDF

Info

Publication number
CN108979173A
CN108979173A CN201811079366.7A CN201811079366A CN108979173A CN 108979173 A CN108979173 A CN 108979173A CN 201811079366 A CN201811079366 A CN 201811079366A CN 108979173 A CN108979173 A CN 108979173A
Authority
CN
China
Prior art keywords
coating
storage device
coating storage
connection
handle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811079366.7A
Other languages
Chinese (zh)
Other versions
CN108979173B (en
Inventor
刘丽军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaocheng Zerun Decoration Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811079366.7A priority Critical patent/CN108979173B/en
Publication of CN108979173A publication Critical patent/CN108979173A/en
Application granted granted Critical
Publication of CN108979173B publication Critical patent/CN108979173B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates

Abstract

The present invention relates to a kind of lineation devices, it in particular is a kind of multi-functional building site construction line-marking vehicle, only need a people, that is, operable, the coating storage device enough time that can reduce addition coating greatly, coating is nebulized ejection by spray head, mobile device is mounted on the total frame of vehicle body, air charging system mounting base is mounted on the total frame of vehicle body, air charging system is mounted in air charging system mounting base, check valve is mounted on air charging system, coating storage device is mounted on the total frame of vehicle body, inlet pipe connection is mounted on coating storage device, coating material agitator is mounted on coating storage device, coating storage device sealing cover is mounted on coating storage device, handrail is pushed to be mounted on the total frame of vehicle body, pipe connects elbow and is mounted on coating storage device connector, upper end bridge piece is mounted on pipe and connects on elbow, coating passes through device It is mounted on the total frame of vehicle body, paint spray device is mounted on the total frame of vehicle body.

Description

A kind of multi-functional building site construction line-marking vehicle
Technical field
The present invention relates to a kind of lineation devices, are in particular a kind of multi-functional building site construction line-marking vehicles.
Background technique
For building site building of today no longer as other mode of building a house a before, present building is all extensive collectivization Construction simultaneously, there is many buildings same time to break ground so you can see some building site, the same time is completed, and needs before breaking ground Point is marked, line is spread out with lime and forms pattern range, not only need certain manpower in this way, also shown in the efficiency of scribing line It is low to obtain some, influences the time broken ground, but also there is certain errors, so having invented the multi-functional building site construction scribing line of kind Vehicle.
Summary of the invention
The invention mainly solves the technical problem of providing a kind of lineation device of Multifunctional mobile, achievable length, in, Dash line, it is only necessary to which a people, that is, operable, the coating storage device enough time that can reduce addition coating greatly, shortening is opened Time before work, movable type scribing line can be improved the accuracy of line, and coating is nebulized ejection by spray head, can save material etc. Function.
The present invention relates to a kind of lineation devices, be in particular a kind of multi-functional building site construction line-marking vehicle include mobile dress It sets, the storage of the total frame of vehicle body, air charging system mounting base, triangle conveyer belt A, air charging system, check valve, inlet pipe connection, coating Device, coating material agitator, coating storage device sealing cover, push handrail, coating storage device connector, pipe connect elbow, on It holds bridge piece, coating by device, triangular driving band B, paint spray device, realizes achievable long, medium and short scribing line, only It needs a people i.e. operable, the coating storage device enough time that can reduce addition coating greatly, shortens the standard before going into operation Standby time, movable type scribing line can be improved the accuracy of line, and coating is nebulized ejection by spray head, can save the functions such as material.
The mobile device is made of mobile device installation axle, movable pulley, vee-pulley, and movable pulley is mounted on movement In device installation axle, the bearing on movable pulley and mobile device installation axle is interference fitted, and vee-pulley is mounted on shifting by bolt On driving wheel;
The total frame of the vehicle body is led to by braced frame, paint spray device installation folder, mobile device mounting base, coating It crosses device mounting seat, coating storage device fixing seat, coating storage device neonychium, the fixed square tube of handrail pushed to constitute, coating Flusher installation folder is installed on the support frame, and mobile device mounting base is installed on the support frame, and coating is pacified by device Fill seat installation on the support frame, coating storage device fixing seat is installed on the support frame, coating storage device neonychium peace Dress on the support frame, pushes the fixed square tube installation of handrail on the support frame;
The air charging system is made of cylindrical shell, belt wheel rotor, rotation separating plate, inlet air filtration net, band rotation Son is mounted on inside cylindrical shell, and rotation separating plate is mounted on belt wheel rotor, rotates separating plate and the cooperation of belt wheel rotor clearance, Separating plate and cylindrical shell cooperation are rotated, inlet air filtration net is mounted on cylindrical shell, inlet air filtration net and cylindrical shell interference Cooperation;
The coating storage device is made of coating storage bin, closed coating material agitator fixing bearing, closing Formula coating material agitator fixing bearing is mounted on coating storage bin, closed coating material agitator fixing bearing and coating storage Case interference fit;
The coating material agitator is to reinforce spiral shell by connection shaft, agitator arm connecting key, agitator arm, agitator arm Mother, agitating device handle, agitating device handle connecting key, agitating device handle are reinforced nut and are constituted, agitator arm connecting key peace On connection shaft, agitator arm connecting key and connection shaft clearance fit, agitator arm are mounted on connection shaft, stirring Impeller and connection shaft clearance fit, agitator arm and the cooperation of agitator arm connecting key, agitator arm reinforce nut and are mounted on company On spindle bar, agitator arm reinforces nut and connection shaft is threadedly engaged, and agitator arm reinforces nut and agitator arm cooperation, stirs It mixes impeller and reinforces nut and the cooperation of agitator arm connecting key, agitating device handle is mounted on connection shaft, agitating device handle With connection shaft clearance fit, agitating device handle connecting key is mounted on connection shaft, agitating device handle connecting key and company Spindle bar clearance fit, agitating device handle connecting key and the cooperation of agitating device handle, agitating device handle reinforce nut installation On connection shaft, agitating device handle reinforces nut and connection shaft is threadedly engaged, and agitating device handle is reinforced nut and stirred The cooperation of device handle is mixed, agitating device handle reinforces nut and the cooperation of agitating device handle connecting key;
The agitating device handle is made of connecting rod, rotation handle, baffle, fixed pin, and rotation handle is mounted on connection On bar, handle and connecting rod clearance fit are rotated, baffle is mounted on rotation upper, baffle and rotate clearance fit, baffle and company Extension bar cooperation, fixed pin are mounted on rotation upper, and fixed pin and rotation cooperate clearance fit, fixed pin and baffle;
The promotion handrail is made of handle connecting square pipes, non-slip rubber sleeve, and non-slip rubber sleeve is mounted on handle On hand connecting square pipes, non-slip rubber sleeve is interference fitted handle connecting square pipes;
The coating storage device connector is made of connection screw thread set, filtration gauze, and filtration gauze is mounted on company It connects inside thread bush;
The pipe, which connects elbow, to be made of bending channel, attaching nut, and bending channel is mounted on attaching nut, bending Channel and attaching nut's clearance fit;
The upper end bridge piece is by device by coating to connection pad, high-intensitive hose adapter, hose adapter connector, close It seals leakproof cushion rubber to constitute, coating is mounted on high-intensitive hose adapter connection pad by device, and coating is by device to connection pad and height Intensity hose adapter transition fit, hose adapter connector are mounted on high-intensitive hose adapter, and sealing and anti-leakage cushion rubber is mounted on hose adapter On connector, sealing and anti-leakage cushion rubber and hose adapter connector interference fit;
The coating by device is by turntable when belt wheel, is fixedly connected with shell, rolls ball, reset spring, sliding Valve plate is constituted, and rolls ball when being mounted on belt wheel on turntable, is fixedly connected when shell is mounted on belt wheel on turntable, is fixedly connected outer Turntable clearance cooperates when shell and belt wheel, rolls ball and cooperates with shell is fixedly connected with, when reset spring is mounted on belt wheel in turntable Turntable clearance cooperates when portion, reset spring and belt wheel, when sliding valve plate is mounted on belt wheel inside turntable, when sliding valve plate and belt wheel Valve plate and reset spring cooperation are slided in turntable clearance cooperation;
The paint spray device is to be made up of coating device butt joint, the hard bend pipe of connection, changeable type spray head, Coating is mounted on the hard bend pipe of connection by device butt joint, and changeable type spray head is mounted on the hard bend pipe of connection, changeable type Spray head and the hard bend pipe of connection are threadedly engaged;
Mobile device is mounted on the total frame of vehicle body, and mobile device installation axle and mobile device mounting base interference fit are filled Device of air mounting base is mounted on the total frame of vehicle body, and air charging system is mounted in air charging system mounting base, and check valve, which is mounted on, to be filled On device of air, check valve and air charging system are threadedly engaged, and coating storage device is mounted on the total frame of vehicle body, coating storage bin and Coating storage device fixing seat excessively cooperates, and inlet pipe connection is mounted on coating storage device, inlet pipe connection and coating storage Cryopreservation device interference fit, check valve inlet pipe connection are threadedly engaged, and coating material agitator is mounted on coating storage device, connection Shaft and closed coating material agitator fixing bearing interference fit, coating storage device sealing cover are mounted on coating storage device On, coating storage device sealing cover and coating storage bin are threadedly engaged, and push handrail to be mounted on the total frame of vehicle body, handle connection Square tube and the fixed square tube clearance fit of promotion handrail, coating storage device connector are mounted on coating storage device, connect spiral shell Line set and coating storage bin are threadedly engaged, and pipe connects elbow and is mounted on coating storage device connector, attaching nut and connection spiral shell The cooperation of line external threading, bending channel and connection screw thread set cooperation, upper end bridge piece are mounted on pipe and connect on elbow, hose adapter connection Head and bending channel are threadedly engaged, and coating is mounted on the total frame of vehicle body by device, and coating passes through device mounting seat and fixation Connected with outer casing cooperation, coating are mounted on connection pad by bolt by device with shell cooperation, paint spray device is fixedly connected with On the total frame of vehicle body, hard bend pipe and paint spray device installation folder transition fit are connected, coating passes through spiral shell by device butt joint Bolt is mounted in mobile device and air charging system with shell cooperation, triangle conveyer belt A is fixedly connected with, and triangular driving band B is mounted on Mobile device and coating pass through on device.
As advanced optimizing for the technical program, mobile dress described in a kind of multi-functional building site construction line-marking vehicle of the present invention There are two setting.
As advanced optimizing for the technical program, vehicle body described in a kind of multi-functional building site construction line-marking vehicle of the present invention is total Control structural member is welded when the braced frame of frame, paint spray device installation folder, mobile device mounting base, coating pass through device Mounting base, coating storage device neonychium, pushes the fixed square tube of handrail to be welded to support frame at coating storage device fixing seat On frame, there are six paint spray device installation folders, and there are four mobile device mounting bases, and coating has two by device mounting seat, There are four coating storage device fixing seats, and there are two coating storage device neonychiums, pushes there are two the fixed square tubes of handrail.
As advanced optimizing for the technical program, promotion described in a kind of multi-functional building site construction line-marking vehicle of the present invention is helped There are two hands.
As advanced optimizing for the technical program, coating described in a kind of multi-functional building site construction line-marking vehicle of the present invention is logical Cross being fixedly connected there are two shells of device, roll ball several, there are four reset springs, slides there are four valve plates.
A kind of multi-functional building site construction line-marking vehicle of the present invention has the beneficial effect that
The present invention relates to a kind of lineation devices, are in particular a kind of multi-functional building site construction line-marking vehicles, realizing can Complete long, medium and short scribing line, it is only necessary to which a people, that is, operable, enough can reduce greatly of coating storage device add coating Time shortens the time before going into operation, and movable type scribing line can be improved the accuracy of line, and coating is nebulized ejection by spray head, The functions such as material can be saved.
Detailed description of the invention
The present invention will be further described in detail with specific implementation method with reference to the accompanying drawing.
Fig. 1 is a kind of overall structure diagram of multi-functional building site construction line-marking vehicle of the present invention.
Fig. 2 is a kind of 1 structural schematic diagram of mobile device of multi-functional building site construction line-marking vehicle of the present invention.
Fig. 3 is a kind of total 2 schematic diagram of frame of the vehicle body of multi-functional building site construction line-marking vehicle of the present invention.
Fig. 4 is a kind of 5 schematic diagram of air charging system of multi-functional building site construction line-marking vehicle of the present invention.
Fig. 5 is a kind of 6 schematic diagram of check valve of multi-functional building site construction line-marking vehicle of the present invention.
Fig. 6 is a kind of 8 schematic diagram of coating storage device of multi-functional building site construction line-marking vehicle of the present invention.
Fig. 7 is a kind of 9 structural schematic diagram of coating material agitator of multi-functional building site construction line-marking vehicle of the present invention.
Fig. 8 is a kind of agitating device handle 9-5 schematic diagram of multi-functional building site construction line-marking vehicle of the present invention.
Fig. 9 is a kind of agitating device handle 9-5 enlarged diagram of multi-functional building site construction line-marking vehicle of the present invention.
Figure 10 is a kind of 11 schematic diagram of handle connecting square pipes of multi-functional building site construction line-marking vehicle of the present invention.
Figure 11 is a kind of 12 schematic diagram of coating storage device connector of multi-functional building site construction line-marking vehicle of the present invention.
Figure 12 is that a kind of pipe of multi-functional building site construction line-marking vehicle of the present invention connects 13 schematic diagram of elbow.
Figure 13 is a kind of 14 schematic diagram of upper end bridge piece of multi-functional building site construction line-marking vehicle of the present invention.
Figure 14 is that a kind of coating of multi-functional building site construction line-marking vehicle of the present invention passes through 15 schematic diagram of device.
Figure 15 is a kind of paint spray schematic device of multi-functional building site construction line-marking vehicle of the present invention.
In figure: mobile device 1;Mobile device installation axle 1-1;Movable pulley 1-2;Vee-pulley 1-3;The total frame 2 of vehicle body;By Braced frame 2-1;Paint spray device installation folder 2-2;Mobile device mounting base 2-3;Coating passes through device mounting seat 2-4;It applies Expect storage device fixing seat 2-5;Coating storage device neonychium 2-6;Push the fixed square tube 2-7 of handrail;Air charging system mounting base 3;Triangle conveyer belt A4;Air charging system 5;By cylindrical shell 5-1;Belt wheel rotor 5-2;Rotate separating plate 5-3;Inlet air filtration net 5- 4;Check valve 6;Inlet pipe connection 7;Coating storage device 8;Coating storage bin 8-1;Closed coating material agitator fixing bearing 8-2;Coating material agitator 9;Connect shaft 9-1;Agitator arm connecting key 9-2;Agitator arm 9-3;Agitator arm reinforces nut 9-4;Agitating device handle 9-5;Connecting rod 9-5-1;Rotation is 9-5-2;Baffle 9-5-3;Fixed pin 9-5-4;Agitating device handle Hand connecting key 9-6;Agitating device handle reinforces nut 9-7;Coating storage device sealing cover 10;Push handrail 11;Handle connection Square tube 11-1;Non-slip rubber sleeve 11-2;Coating storage device connector 12;Connection screw thread covers 12-1;Filtration gauze 12-2;Pipe Connect elbow 13;Bending channel 13-1;Attaching nut 13-2;Upper end bridge piece 14;Coating is by device to connection pad 14-1;It is high-strength Spend hose adapter 14-2;Hose adapter connector 14-3;Sealing and anti-leakage cushion rubber 14-4;Coating passes through device 15;Turntable 15-1 when belt wheel; It is fixedly connected with shell 15-2;Roll ball 15-3;Reset spring 15-4;Slide valve plate 15-5;Triangular driving band B16;Coating spray Spill device 17;Coating passes through device butt joint 17-1;Connect hard bend pipe 17-2;Changeable type spray head 17-3.
Specific embodiment
Specific embodiment 1:
Illustrate that present embodiment, the present invention relate to below with reference to Fig. 1,2,3,4,5,6,7,8,9,10,11,12,13,14,15 And a kind of lineation device, be in particular a kind of multi-functional building site construction line-marking vehicle include mobile device 1, the total frame 2 of vehicle body, Air charging system mounting base 3, triangle conveyer belt A4, air charging system 5, check valve 6, inlet pipe connection 7, coating storage device 8, coating Agitating device 9, coating storage device sealing cover 10, push handrail 11, coating storage device connector 12, pipe connect elbow 13, on It holds bridge piece 14, coating by device 15, triangular driving band B16, paint spray device 17, realizes achievable long, medium and short Scribing line, it is only necessary to which a people, that is, operable, the coating storage device enough time that can reduce addition coating greatly, shortening goes into operation Preceding time, movable type scribing line can be improved the accuracy of line, and coating is nebulized ejection by spray head, can save the function such as material Energy.
The mobile device 1 is made of mobile device installation axle 1-1, movable pulley 1-2, vee-pulley 1-3, mobile dress It sets installation axle 1-1 mobile device 1 to be mounted on the total frame 2 of vehicle body, movable pulley 1-2 facilitates the movement of spraying vehicle, and by power Vee-pulley 1-3 is passed to, the power of receiving is passed to belt wheel rotor by triangle conveyer belt A4 by vee-pulley 1-3, mobile Wheel 2 is mounted on mobile device installation axle 1-1, the bearing interference fit on movable pulley 1-2 and mobile device installation axle 1-1, and three Belt pulley 1-3 is mounted on movable pulley 1-2 by bolt;
The total frame 2 of the vehicle body is by braced frame 2-1, paint spray device installation folder 2-2, mobile device mounting base 2-3, coating are helped by device mounting seat 2-4, coating storage device fixing seat 2-5, coating storage device neonychium 2-6, promotion The fixed square tube 2-7 of hand is constituted, and braced frame 2-1 support load-bearing entirely sprays vehicle, and coating storage device neonychium 2-6 is in propulsion Coating storage device 8 is protected in the process, paint spray device installation folder 2-2 is mounted on braced frame 2-1, mobile dress It sets mounting base 2-3 to be mounted on braced frame 2-1, coating is mounted on braced frame 2-1 by device mounting seat 2-4, coating Storage device fixing seat 2-5 is mounted on braced frame 2-1, and coating storage device neonychium 2-6 is mounted on braced frame 2-1 On, push the fixed square tube 2-7 of handrail to be mounted on braced frame 2-1;
The air charging system 5 is by cylindrical shell 5-1, belt wheel rotor 5-2, rotation separating plate 5-3, inlet air filtration net 5- 4 are constituted, cylindrical shell 5-1 filling gas, and belt wheel rotor 5-2 drives dynamic separating plate 5-3 rotation, and rotation separating plate 5-3 will enter The gas of cylindrical shell 5-1 is compressed to small space from large space and then squeezes out from gas outlet, has prevented impurity from passing in and out air charging system 5 In damage, belt wheel rotor 5-2 is mounted on inside cylindrical shell 5-1, rotation separating plate 5-3 be mounted on belt wheel rotor 5-2, Separating plate 5-3 and belt wheel rotor 5-2 clearance fit are rotated, separating plate 5-3 and cylindrical shell 5-1 cooperation, inlet air filtration net are rotated 5-4 is mounted on cylindrical shell 5-1, inlet air filtration net 5-4 and cylindrical shell 5-1 interference fit;
The coating storage device 8 is by coating storage bin 8-1, closed coating material agitator fixing bearing 8-2 structure At coating storage bin 8-1 loads coating connection and installs other components, and closed coating material agitator fixing bearing 8-2 is reduced Friction when coating material agitator rotates, prolongs the service life, closed coating material agitator fixing bearing 8-2 is mounted on coating On storage bin 8-1, closed coating material agitator fixing bearing 8-2 and coating storage bin 8-1 interference fit;
The coating material agitator 9 is by connection shaft 9-1, agitator arm connecting key 9-2, agitator arm 9-3, stirring Impeller reinforces nut 9-4, agitating device handle 9-5, agitating device handle connecting key 9-6, agitating device handle and reinforces nut 9-7 It constitutes, connection shaft 9-1 regards the tie point of device, and it is more firm that agitator arm connecting key 9-2 allows agitator arm 9-3 to install Gu agitator arm 9-3 more fully stirs coating, agitating device handle 9-5 is more easily stirred, agitator arm connecting key 9-2 It is mounted on connection shaft 9-1, agitator arm connecting key 9-2 and connection shaft 9-1 clearance fit, agitator arm 9-3 are mounted on It connects on shaft 9-1, agitator arm 9-3 and connection shaft 9-1 clearance fit, agitator arm 9-3 and agitator arm connecting key 9-2 Cooperation, agitator arm are reinforced nut 9-4 and are mounted on connection shaft 9-1, and agitator arm reinforces nut 9-4 and connection shaft 9-1 It is threadedly engaged, agitator arm reinforces nut 9-4 and agitator arm 9-3 cooperation, and agitator arm reinforces nut 9-4 and agitator arm connects Key 9-2 cooperation is connect, agitating device handle 9-5 is mounted on connection shaft 9-1, between agitating device handle 9-5 and connection shaft 9-1 Gap cooperation, agitating device handle connecting key 9-6 are mounted on connection shaft 9-1, agitating device handle connecting key 9-6 and connecting shaft Bar 9-1 clearance fit, agitating device handle connecting key 9-6 and agitating device handle 9-5 cooperation, agitating device handle reinforce nut 9-7 is mounted on connection shaft 9-1, and agitating device handle reinforces nut 9-7 and connection shaft 9-1 is threadedly engaged, agitating device Handle reinforces nut 9-7 and agitating device handle 9-5 cooperation, and agitating device handle reinforces nut 9-7 and agitating device handle connects Connect key 9-6 cooperation;
The agitating device handle 9-5 is by connecting rod 9-5-1, rotation 9-5-2, baffle 9-5-3, fixed pin 9-5- 4 are constituted, and rotation is mounted on 9-5-2 on connecting rod 9-5-1, are rotated 9-5-2 and connecting rod 9-5-1 clearance fit, baffle 9- 5-3 is mounted on rotation on 9-5-2, baffle 9-5-3 and rotation are 9-5-2 clearance fit, baffle 9-5-3 and connecting rod 9-5-1 Cooperation, fixed pin 9-5-4 are mounted on rotation on 9-5-2, and fixed pin 9-5-4 and rotation are 9-5-2 clearance fit, fixed pin 9- 5-4 and baffle 9-5-3 cooperation;
The promotion handrail 11 is made of handle connecting square pipes 11-1, non-slip rubber sleeve 11-2, handle connection side The rotation of handrail 11 is pushed when pipe 11-1 prevents from promoting, non-slip rubber sleeve 11-2 is mounted on handle connecting square pipes 11-1, is prevented Sliding gum sleeve 11-2 is interference fitted handle connecting square pipes 11-1;
The coating storage device connector 12 is made of connection screw thread set 12-1, filtration gauze 12-2, and yarn is filtered 12-2 impurity screening is netted, in order to avoid blocking spray head, filtration gauze 12-2 is mounted on inside connection screw thread set 12-1;
The pipe, which connects elbow 13, to be made of bending channel 13-1, attaching nut 13-2, and attaching nut 13-2 facilitates peace Assembly and disassembly are unloaded, and pipe is allowed to connect the tighter of the cooperation of elbow 13, and bending channel 13-1 facilitates connection upper end bridge piece 14, that bending is logical Road 13-1 is mounted on attaching nut 13-2, bending channel 13-1 and attaching nut's 13-2 clearance fit;
The upper end bridge piece 14 be by coating by device to connection pad 14-1, high-intensitive hose adapter 14-2, soft connect Pipe connector 14-3, sealing and anti-leakage cushion rubber 14-4 are constituted, and coating can make upper end bridge piece to connection pad 14-1 by device 14 and coating cooperate closer, the high-intensitive adjustable position hose adapter 14-2 by device, coating is by device to connection pad 14-1 is mounted on high-intensitive hose adapter 14-2, and coating matches connection pad 14-1 and high-intensitive hose adapter 14-2 transition by device It closes, hose adapter connector 14-3 is mounted on high-intensitive hose adapter 14-2, and sealing and anti-leakage cushion rubber 14-4 is mounted on hose adapter connection On head 14-3, sealing and anti-leakage cushion rubber 14-4 and hose adapter connector 14-3 interference fit;
The coating by device 15 be by turntable 15-1 when belt wheel, be fixedly connected shell 15-2, roll ball 15-3, Reset spring 15-4, sliding valve plate 15-5 are constituted, and turntable 15-1 receives kinetic energy when belt wheel, generates centrifugal force, is fixedly connected with shell 15-2 facilitates installation to cooperate, and rolls friction when ball 15-3 reduces rotation, rolls turntable 15- when ball 15-3 is mounted on belt wheel On 1, it is fixedly connected when shell 15-2 is mounted on belt wheel on turntable 15-1, when being fixedly connected with shell 15-2 and belt wheel between turntable 15-1 Gap cooperation rolls ball 15-3 and cooperates with shell 15-2 is fixedly connected with, when reset spring 15-4 is mounted on belt wheel in turntable 15-1 Turntable 15-1 clearance fit when portion, reset spring 15-4 and belt wheel, when sliding valve plate 15-5 is mounted on belt wheel inside turntable 15-1, Turntable 15-1 clearance fit when sliding valve plate 15-5 and belt wheel slides valve plate 15-5 and reset spring 15-4 cooperation;
The paint spray device 17 is to pass through device butt joint 17-1 by coating, connect hard bend pipe 17-2, replaceable Formula spray head 17-3 is constituted, and coating allows paint spray device 17 and coating to pass through device 15 to cooperate more by device butt joint 17-1 Closely, paint spray device 17 can be supported by connecting hard bend pipe 17-2, and changeable type spray head 17-3 nebulizes coating ejection, can The range sprayed is adjusted to replace paint spray device 17, coating is mounted on the hard bend pipe 17-2 of connection by device butt joint 17-1 On, changeable type spray head 17-3 is mounted on the hard bend pipe 17-2 of connection, changeable type spray head 17-3 and the hard bend pipe 17-2 spiral shell of connection Line cooperation;
Mobile device 1 is mounted on the total frame 2 of vehicle body, mobile device installation axle 1-1 and mobile device mounting base 2-3 interference Cooperation, air charging system mounting base 3 are mounted on the total frame 2 of vehicle body, and air charging system 5 is mounted in air charging system mounting base 3, unidirectionally Valve 6 is mounted on air charging system 5, and check valve 6 and air charging system 5 are threadedly engaged, and coating storage device 8 is mounted on the total frame of vehicle body On 2, coating storage bin 8-1 and coating storage device fixing seat 2-5 excessively cooperate, and inlet pipe connection 7 is mounted on coating storage dress It sets on 8, inlet pipe connection 7 and coating storage device 8 are interference fitted, and 6 inlet pipe connection 7 of check valve is threadedly engaged, coating stirring Device 9 is mounted on coating storage device 8, connects shaft 9-1 and closed coating material agitator fixing bearing 8-2 interference is matched It closes, coating storage device sealing cover 10 is mounted on coating storage device 8, coating storage device sealing cover 10 and coating storage bin 8-1 is threadedly engaged, and handrail 11 is pushed to be mounted on the total frame 2 of vehicle body, handle connecting square pipes 11-1 and the fixed square tube of promotion handrail 2-7 clearance fit, coating storage device connector 12 are mounted on coating storage device 8, and connection screw thread covers 12-1 and coating storage It deposits case 8-1 to be threadedly engaged, pipe connects elbow 13 and is mounted on coating storage device connector 12, attaching nut 13-2 and connection screw thread Set 12-1 is threadedly engaged, and bending channel 13-1 and connection screw thread set 12-1 cooperation, upper end bridge piece 14 are mounted on pipe and connect elbow On 13, hose adapter connector 14-3 and bending channel 13-1 are threadedly engaged, and coating is mounted on the total frame 2 of vehicle body by device 15 On, coating passes through bolt to connection pad 14-1 by device with shell 15-2 cooperation, coating is fixedly connected with by device mounting seat 2-4 Cooperate with shell 15-2 is fixedly connected with, paint spray device 17 is mounted on the total frame 2 of vehicle body, connects hard bend pipe 17-2 and coating Flusher installation folder 2-2 transition fit, coating are matched by bolt with shell 15-2 is fixedly connected with by device butt joint 17-1 It closes, triangle conveyer belt A4 is mounted in mobile device 1 and air charging system 5, and triangular driving band B16 is mounted on mobile device 1 and applies Material passes through on device 15.
As advanced optimizing for the technical program, mobile dress described in a kind of multi-functional building site construction line-marking vehicle of the present invention It sets there are two 1.
As advanced optimizing for the technical program, vehicle body described in a kind of multi-functional building site construction line-marking vehicle of the present invention is total Control structural member is welded when the braced frame 2-1 of frame 2, paint spray device installation folder 2-2, mobile device mounting base 2-3, is applied Material is fixed by device mounting seat 2-4, coating storage device fixing seat 2-5, coating storage device neonychium 2-6, promotion handrail Square tube 2-7 is welded on braced frame 2-1, and there are six paint spray device installation folder 2-2, mobile device mounting base 2-3 There are four, coating has two by device mounting seat 2-4, and there are four coating storage device fixing seat 2-5, and coating storage device is protected There are two protection pad 2-6, pushes there are two the fixed square tube 2-7 of handrail.
Specific embodiment 2:
Illustrate present embodiment, this embodiment party below with reference to Fig. 1,2,3,4,5,6,7,8,9,10,11,12,13,14,15 Formula is described further embodiment one, and there are two the mobile devices 1.
Specific embodiment 3:
Illustrate present embodiment, this embodiment party below with reference to Fig. 1,2,3,4,5,6,7,8,9,10,11,12,13,14,15 Formula is described further embodiment one, and control structural member is welded when the braced frame 2-1 of the total frame 2 of the vehicle body, applies Material flusher installation folder 2-2, mobile device mounting base 2-3, coating are fixed by device mounting seat 2-4, coating storage device Seat 2-5, coating storage device neonychium 2-6, the fixed square tube 2-7 of handrail is pushed to be welded on braced frame 2-1, coating spray It spills there are six device installation folder 2-2, there are four mobile device mounting base 2-3, and coating has two by device mounting seat 2-4, applies Expect that there are two coating storage device neonychium 2-6 there are four storage device fixing seat 2-5, the fixed square tube 2-7 of handrail is pushed to have two It is a.
Specific embodiment 4:
Illustrate present embodiment, this embodiment party below with reference to Fig. 1,2,3,4,5,6,7,8,9,10,11,12,13,14,15 Formula is described further embodiment one, and there are two the promotion handrails 11.
Specific embodiment 5:
Illustrate present embodiment, this embodiment party below with reference to Fig. 1,2,3,4,5,6,7,8,9,10,11,12,13,14,15 Formula is described further embodiment one, and the coating is fixedly connected there are two shell 15-2 by device 15, rolls Ball 15-3 several, there are four reset spring 15-4, slide valve plate 15-5 there are four.
The working principle of the invention is:
When a kind of working principle of multi-functional building site construction line-marking vehicle, when needing storing coating when scribing line Device sealing cover 10 is opened, and suitable coating is added into coating storage device 8, then by 10 He of coating storage device sealing cover Coating storage bin 8-1 works good, then drives connecting shaft without connecting rod 9-5-1 rotating stirring device handle 9-5 is held with hand Vehicle thus agitation and dilution coating, is then shifted onto and is crossed so that agitator arm 9-3 be driven to rotate by bar 9-1 rotation Triangle conveyer belt A4, is first mounted on vee-pulley 1-3 and belt wheel rotor 5-2 by starting point, then shifts vehicle onto and needs to carry out The starting point of scribing line, then shift onto this section of distance of starting point, when pushing vehicle forward, the vee-pulley 1-3 of mobile device 1 is logical It crosses triangle conveyer belt A band movable belt pulley rotor 5-2 to rotate, because cylindrical shell 5-1 and belt wheel rotor 5-2 are not with one heart, to turn Dynamic separating plate 5-3 can follow belt wheel rotor 5-2 and rotate and both ends cooperate with cylindrical shell 5-1 inner wall always, by gas by The gas that inlet air filtration net 5-4 has been filtered is pressed onto small space from large space, then enters air inlet by check valve 6 from venthole and connect In pipe 7, then entering coating storage device 8, it, then again will be to triangle to increase the air pressure in coating storage device 8 When transmission belt B16 is mounted on vee-pulley 1-3 and belt wheel on turntable 15-1, further along the point cart forward of label, vee-pulley 1-3 is slided valve plate 15-5 under the influence of centrifugal force and is being taken turns by turntable 15-1 high-speed rotation when triangular driving band B band movable belt pulley When turntable 15-1 inside move out, to form a hole, and under the action of coating storage bin 8-1 pressure, coating is by applying Expect flusher 17, is then sprayed on the ground by changeable type spray head 17-3 with mist, in the process of movement, air charging system 5 constantly inflate to coating storage device 8, so that the power for maintaining coating to spray slides valve plate 15-5 when vehicle stops It is shut to by coating by device in the effect of reset spring 15-4, to stop spraying.
Certainly, above description is not limitation of the present invention, and the present invention is also not limited to the example above, the art The variations, modifications, additions or substitutions that those of ordinary skill is made within the essential scope of the present invention also belong to guarantor of the invention Protect range.

Claims (5)

1. a kind of multi-functional building site construction line-marking vehicle, including mobile device (1), the total frame of vehicle body (2), air charging system mounting base (3), triangle conveyer belt A (4), air charging system (5), check valve (6), inlet pipe connection (7), coating storage device (8), coating stir It mixes device (9), coating storage device sealing cover (10), handrail (11), coating storage device connector (12), pipe pushed to connect elbow (13), upper end bridge piece (14), coating are special by device (15), triangular driving band B (16), paint spray device (17) Sign is: mobile device (1) is made of mobile device installation axle (1-1), movable pulley (1-2), vee-pulley (1-3), mobile Wheel (2) is mounted on mobile device installation axle (1-1), the bearing interference on movable pulley (1-2) and mobile device installation axle (1-1) Cooperation, vee-pulley (1-3) are mounted on movable pulley (1-2) by bolt;
The total frame of vehicle body (2) is by braced frame (2-1), paint spray device installation folder (2-2), mobile device mounting base (2- 3), coating passes through device mounting seat (2-4), coating storage device fixing seat (2-5), coating storage device neonychium (2-6), pushes away Dynamic handrail fixed square tube (2-7) is constituted, and paint spray device installation folder (2-2) is mounted on braced frame (2-1), mobile device Mounting base (2-3) is mounted on braced frame (2-1), and coating is mounted on braced frame (2-1) by device mounting seat (2-4) On, coating storage device fixing seat (2-5) is mounted on braced frame (2-1), and coating storage device neonychium (2-6) is mounted on In braced frame (2-1), handrail fixed square tube (2-7) is pushed to be mounted on braced frame (2-1);
Air charging system (5) is by cylindrical shell (5-1), belt wheel rotor (5-2), rotation separating plate (5-3), inlet air filtration net (5- 4) it constitutes, belt wheel rotor (5-2) is mounted on cylindrical shell (5-1) inside, and rotation separating plate (5-3) is mounted on belt wheel rotor (5- 2) on, separating plate (5-3) and belt wheel rotor (5-2) clearance fit is rotated, separating plate (5-3) is rotated and cylindrical shell (5-1) is matched It closes, inlet air filtration net (5-4) is mounted on cylindrical shell (5-1), and inlet air filtration net (5-4) and cylindrical shell (5-1) interference are matched It closes;
Coating storage device (8) is made of coating storage bin (8-1), closed coating material agitator fixing bearing (8-2), envelope Enclosed coating material agitator fixing bearing (8-2) is mounted on coating storage bin (8-1), closed coating material agitator fixing axle Hold (8-2) and coating storage bin (8-1) interference fit;
Coating material agitator (9) is by connection shaft (9-1), agitator arm connecting key (9-2), agitator arm (9-3), paddle Wheel reinforces nut (9-4), agitating device handle (9-5), agitating device handle connecting key (9-6), agitating device handle reinforcing spiral shell Female (9-7) is constituted, and agitator arm connecting key (9-2) is mounted in connection shaft (9-1), agitator arm connecting key (9-2) and company Spindle bar (9-1) clearance fit, agitator arm (9-3) are mounted in connection shaft (9-1), agitator arm (9-3) and connecting shaft Bar (9-1) clearance fit, agitator arm (9-3) and agitator arm connecting key (9-2) cooperation, agitator arm reinforce nut (9-4) It is mounted in connection shaft (9-1), agitator arm reinforces nut (9-4) and connection shaft (9-1) is threadedly engaged, and agitator arm adds Gu nut (9-4) and agitator arm (9-3) cooperation, agitator arm reinforces nut (9-4) and agitator arm connecting key (9-2) is matched It closes, agitating device handle (9-5) is mounted in connection shaft (9-1), between agitating device handle (9-5) and connection shaft (9-1) Gap cooperation, agitating device handle connecting key (9-6) be mounted on connection shaft (9-1) on, agitating device handle connecting key (9-6) and Connect shaft (9-1) clearance fit, agitating device handle connecting key (9-6) and agitating device handle (9-5) cooperation, agitating device Handle is reinforced nut (9-7) and is mounted in connection shaft (9-1), and agitating device handle reinforces nut (9-7) and connection shaft (9- 1) it is threadedly engaged, agitating device handle reinforces nut (9-7) and agitating device handle (9-5) cooperation, and agitating device handle is reinforced Nut (9-7) and agitating device handle connecting key (9-6) cooperation;
Agitating device handle (9-5) is by connecting rod (9-5-1), rotation (9-5-2), baffle (9-5-3), fixed pin (9-5- 4) it constitutes, rotation is mounted on (9-5-2) on connecting rod (9-5-1), and the gap (9-5-2) and connecting rod (9-5-1) is matched in rotation It closing, baffle (9-5-3), which is mounted on, to be rotated on (9-5-2), baffle (9-5-3) and rotation are (9-5-2) clearance fit, baffle The cooperation of (9-5-3) and connecting rod (9-5-1), fixed pin (9-5-4) are mounted on rotation on (9-5-2), fixed pin (9-5-4) and Rotation is (9-5-2) clearance fit, fixed pin (9-5-4) and baffle (9-5-3) cooperation;
Pushing handrail (11) is made of handle connecting square pipes (11-1), non-slip rubber sleeve (11-2), non-slip rubber sleeve (11-2) is mounted on handle connecting square pipes (11-1), and non-slip rubber sleeve (11-2) is interference fitted handle connecting square pipes (11- 1);
Coating storage device connector (12) is made of connection screw thread set (12-1), filtration gauze (12-2), filtration gauze It is internal that (12-2) is mounted on connection screw thread set (12-1);
Pipe, which connects elbow (13), to be made of bending channel (13-1), attaching nut (13-2), bending channel (13-1) company of being mounted on On connected nut (13-2), bending channel (13-1) and attaching nut (13-2) clearance fit;
Upper end bridge piece (14) is connected by device to connection pad (14-1), high-intensitive hose adapter (14-2), hose adapter by coating Connector (14-3), sealing and anti-leakage cushion rubber (14-4) are constituted, and coating is mounted on high-intensitive hose adapter to connection pad (14-1) by device On (14-2), coating is by device to connection pad (14-1) and high-intensitive hose adapter (14-2) transition fit, hose adapter connector (14-3) is mounted on high-intensitive hose adapter (14-2), and sealing and anti-leakage cushion rubber (14-4) is mounted on hose adapter connector (14-3) On, sealing and anti-leakage cushion rubber (14-4) and hose adapter connector (14-3) interference fit;
Coating by device (15) is by turntable when belt wheel (15-1), is fixedly connected with shell (15-2), rolls ball (15-3), multiple Position spring (15-4), sliding valve plate (15-5) are constituted, and are rolled when ball (15-3) is mounted on belt wheel on turntable (15-1), fixed to connect It connects when shell (15-2) is mounted on belt wheel on turntable (15-1), the gap turntable (15-1) when being fixedly connected with shell (15-2) and belt wheel Cooperation rolls ball (15-3) and cooperates with shell (15-2) is fixedly connected with, turntable when reset spring (15-4) is mounted on belt wheel (15-1) is internal, and turntable (15-1) clearance fit when reset spring (15-4) and belt wheel slides valve plate (15-5) and is mounted on belt wheel When turntable (15-1) it is internal, turntable (15-1) clearance fit when sliding valve plate (15-5) and belt wheel is slided valve plate (15-5) and is answered Position spring (15-4) cooperates;
Paint spray device (17) is to pass through device butt joint (17-1), the hard bend pipe (17-2) of connection, changeable type spray by coating Head (17-3) is constituted, and coating is mounted on the hard bend pipe (17-2) of connection by device butt joint (17-1), changeable type spray head (17-3) is mounted on the hard bend pipe (17-2) of connection, and changeable type spray head (17-3) and the hard bend pipe (17-2) of connection are threadedly engaged;
Mobile device (1) is mounted on the total frame of vehicle body (2), mobile device installation axle (1-1) and mobile device mounting base (2-3) Interference fit, air charging system mounting base (3) are mounted on the total frame of vehicle body (2), and air charging system (5) is mounted on air charging system installation On seat (3), check valve (6) is mounted on air charging system (5), and check valve (6) and air charging system (5) are threadedly engaged, coating storage Device (8) is mounted on the total frame of vehicle body (2), and coating storage bin (8-1) and coating storage device fixing seat (2-5) are excessively matched It closes, inlet pipe connection (7) is mounted on coating storage device (8), and inlet pipe connection (7) and coating storage device (8) interference are matched It closes, check valve (6) inlet pipe connection (7) is threadedly engaged, and coating material agitator (9) is mounted on coating storage device (8), connection Shaft (9-1) and closed coating material agitator fixing bearing (8-2) interference fit, coating storage device sealing cover (10) installation On coating storage device (8), coating storage device sealing cover (10) and coating storage bin (8-1) are threadedly engaged, and push handrail (11) it is mounted on the total frame of vehicle body (2), handle connecting square pipes (11-1) and fixed square tube (2-7) clearance fit of promotion handrail, Coating storage device connector (12) is mounted on coating storage device (8), connection screw thread set (12-1) and coating storage bin (8- 1) it is threadedly engaged, pipe connects elbow (13) and is mounted on coating storage device connector (12), attaching nut (13-2) and connection spiral shell Line set (12-1) is threadedly engaged, bending channel (13-1) and connection screw thread set (12-1) cooperation, upper end bridge piece (14) installation It is connect on elbow (13) in pipe, hose adapter connector (14-3) and bending channel (13-1) are threadedly engaged, and coating passes through device (15) It is mounted on the total frame of vehicle body (2), coating is led to by device mounting seat (2-4) with shell (15-2) cooperation, coating is fixedly connected with It crosses device and vehicle body is mounted on shell (15-2) cooperation, paint spray device (17) is fixedly connected with by bolt to connection pad (14-1) On total frame (2), hard bend pipe (17-2) and paint spray device installation folder (2-2) transition fit are connected, coating passes through device pair Connector (17-1) by bolt and be fixedly connected shell (15-2) cooperate, triangle conveyer belt A (4) be mounted on mobile device (1) and On air charging system (5), triangular driving band B (16) is mounted on mobile device (1) and coating and passes through on device (15).
2. a kind of multi-functional building site construction line-marking vehicle according to claim 1, it is characterised in that: mobile device (1) has two It is a.
3. a kind of multi-functional building site construction line-marking vehicle according to claim 1, it is characterised in that: the total frame of vehicle body (2) Control structural member is welded when braced frame (2-1), paint spray device installation folder (2-2), applies mobile device mounting base (2-3) Material is helped by device mounting seat (2-4), coating storage device fixing seat (2-5), coating storage device neonychium (2-6), promotion Hand fixed square tube (2-7) is welded on braced frame (2-1), and there are six paint spray device installation folders (2-2), mobile dress It sets there are four mounting base (2-3), coating has two by device mounting seat (2-4), and coating storage device fixing seat (2-5) has four A, there are two coating storage device neonychiums (2-6), pushes there are two handrail fixed square tube (2-7).
4. a kind of multi-functional building site construction line-marking vehicle according to claim 1, it is characterised in that: handrail (11) is pushed to have two It is a.
5. a kind of multi-functional building site construction line-marking vehicle according to claim 1, it is characterised in that: coating passes through device (15) Be fixedly connected there are two shell (15-2), roll ball (15-3) several, there are four reset springs (15-4), slide valve plate There are four (15-5).
CN201811079366.7A 2018-09-17 2018-09-17 Multi-functional building site construction marking vehicle Active CN108979173B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811079366.7A CN108979173B (en) 2018-09-17 2018-09-17 Multi-functional building site construction marking vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811079366.7A CN108979173B (en) 2018-09-17 2018-09-17 Multi-functional building site construction marking vehicle

Publications (2)

Publication Number Publication Date
CN108979173A true CN108979173A (en) 2018-12-11
CN108979173B CN108979173B (en) 2020-10-30

Family

ID=64545607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811079366.7A Active CN108979173B (en) 2018-09-17 2018-09-17 Multi-functional building site construction marking vehicle

Country Status (1)

Country Link
CN (1) CN108979173B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109332038A (en) * 2018-12-14 2019-02-15 叶德美 A kind of multifunctional safe mark spray equipment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2091368U (en) * 1991-04-03 1991-12-25 南林 Hand mini-inflator
EP0803611A1 (en) * 1996-04-19 1997-10-29 Euroliners Operating means for supply circuit specially adapted for road marking machine
CN2427691Y (en) * 1999-11-07 2001-04-25 韩世平 Centrifugical safety valve
CN2740661Y (en) * 2004-08-06 2005-11-16 李相民 Road-sweeping lorry
CN108442226A (en) * 2018-04-10 2018-08-24 成都凌凌漆科技有限公司 A kind of town road index device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2091368U (en) * 1991-04-03 1991-12-25 南林 Hand mini-inflator
EP0803611A1 (en) * 1996-04-19 1997-10-29 Euroliners Operating means for supply circuit specially adapted for road marking machine
CN2427691Y (en) * 1999-11-07 2001-04-25 韩世平 Centrifugical safety valve
CN2740661Y (en) * 2004-08-06 2005-11-16 李相民 Road-sweeping lorry
CN108442226A (en) * 2018-04-10 2018-08-24 成都凌凌漆科技有限公司 A kind of town road index device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109332038A (en) * 2018-12-14 2019-02-15 叶德美 A kind of multifunctional safe mark spray equipment

Also Published As

Publication number Publication date
CN108979173B (en) 2020-10-30

Similar Documents

Publication Publication Date Title
CN207919624U (en) A kind of environmental improvement river excavation mud transmission collecting cart
CN107498711A (en) A kind of middle-size and small-size concrete suitable for villages and small towns stirs transportation integration belt feeder
CN207278294U (en) One kind is used for underground mine use atomizing de-dusting apparatus
CN105840214A (en) Concrete guniting set
CN110420989A (en) A kind of soil remediation backfilling apparatus
CN108068214A (en) A kind of concrete mixer of hopper door external-open and roller defective material easy-clear
CN108979173A (en) A kind of multi-functional building site construction line-marking vehicle
CN102556607A (en) Automatic spiral feeding machine
CN202964900U (en) Portable mining concrete mixing machine
CN205477667U (en) Over -and -under type patching machine
CN208100746U (en) A kind of disc type agitating device
CN110043037A (en) A kind of cement pump truck convenient for high-altitude conveying
CN206954203U (en) A kind of hydraulic pressure moves car device
CN206815509U (en) A kind of multifunctional pipe dredging vehicle
CN206982979U (en) A kind of novel building site construction concrete central mix plant
CN205475226U (en) Double automatic pile driver equipment of 60o
CN201202490Y (en) Automatic spraying device of rake machine for rake installing machine
CN107503517A (en) A kind of concrete belt conveying, pumping all-in-one
CN105858274B (en) A kind of tippler clear vehicle device of wind-force and its method of work
CN209430215U (en) A kind of tunnel construction cement transportation equipment
CN209303441U (en) Contaminated soil remediation dispenses vehicle
CN205662109U (en) Clear car equipment of wind -force for tipper
CN113323693A (en) Novel automatic pouring system of lining trolley
CN220395764U (en) Multi-dimensional telescopic drainage and pretreatment combined device for tunnel construction
CN208050230U (en) A kind of drainage pipeline reparation spraying application vehicle

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200929

Address after: Baiyang Industrial Zone, Baizhang Town, Minqing County, Fuzhou City, Fujian Province

Applicant after: FUZHOU XINYANG MACHINERY MANUFACTURING Co.,Ltd.

Address before: 210093 Hankou Road, Gulou District, Jiangsu,, No. 22, Nanjing University

Applicant before: Liu Lijun

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211018

Address after: 102200 423, 4 / F, block a, Xinhua future city building, 175 Litang Road, Changping District, Beijing

Patentee after: Li Qiannan

Address before: 350806 Baiyang Industrial Zone, Baizhang Town, Minqing County, Fuzhou City, Fujian Province

Patentee before: FUZHOU XINYANG MACHINERY MANUFACTURING Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221026

Address after: No. 70, Qiu Miao Village, Beicheng Office, Liaocheng Economic Development Zone, Shandong Province, 252000

Patentee after: Liaocheng Zerun Decoration Engineering Co.,Ltd.

Address before: 102200 423, 4 / F, block a, Xinhua future city building, 175 Litang Road, Changping District, Beijing

Patentee before: Li Qiannan