CN108979033A - External corner, inner corner trim, metope and its preparation method and painting method of painting face - Google Patents

External corner, inner corner trim, metope and its preparation method and painting method of painting face Download PDF

Info

Publication number
CN108979033A
CN108979033A CN201810781716.8A CN201810781716A CN108979033A CN 108979033 A CN108979033 A CN 108979033A CN 201810781716 A CN201810781716 A CN 201810781716A CN 108979033 A CN108979033 A CN 108979033A
Authority
CN
China
Prior art keywords
bottom edge
substrate
painting
face
base material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810781716.8A
Other languages
Chinese (zh)
Other versions
CN108979033B (en
Inventor
陈增华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Heyi Architectural Decoration Engineering Co Ltd
Original Assignee
Shanghai Heyi Architectural Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Heyi Architectural Decoration Engineering Co Ltd filed Critical Shanghai Heyi Architectural Decoration Engineering Co Ltd
Priority to CN201810781716.8A priority Critical patent/CN108979033B/en
Publication of CN108979033A publication Critical patent/CN108979033A/en
Application granted granted Critical
Publication of CN108979033B publication Critical patent/CN108979033B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/02Borders; Finishing strips, e.g. beadings; Light coves

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

The present embodiments relate to decoration, a kind of external corner, inner corner trim, metope and its preparation method and painting method of painting face are disclosed.In the present invention, the preparation method in external corner painting face includes the following steps: to provide first base material and external corner line section bar;External corner line section bar is fixed on the first basal plane;First base material is posted and fixed on the first basal plane, while first base material is fitted in into first side;Putty material at least applies to the difference in height scraped and eliminated between the surface of first base material and the first bottom edge in the surface of first base material, and by using by the surface of painting Puttying material and the first bottom edge as the first face to be painted painted for emulsion paint.Compared with prior art, it is split so that being not likely to produce paint on the painting face of metope, also saves the manpower and material resources in later period, building decoration is more made to keep permanent aesthetics, cleaning, extend service life, more convenient decoration painting, so that painting more standard.

Description

External corner, inner corner trim, metope and its preparation method and painting method of painting face
Technical field
The present embodiments relate to decorations, in particular to external corner, inner corner trim, metope and its preparation method and painting of painting face Method.
Background technique
It is common decorating process to paint vehicles such as metope coating emulsion paints in existing decoration, and in existing building, with The vertical metope in ground, the ceiling being connected with metope are indispensable.In decoration, to meet inhabitation use demand, lead to Comprehensive mopping is often needed, and there are dilatancy for wall itself, in long-term use, the intersection of vertical metope and ceiling, i.e., At inner corner trim, easily paint vehicle fracture is first generated, paint block is fallen.Likewise, if the directly continuous mopping comprehensively of longer wall, long-term In use, also due to the expansion of wall generates lacquer painting slight crack, falls paint.In addition, protruding at outside corner, i.e., at external corner, And paint splits and is easier to generate.It is used to influence the normal occupancy of building, even needs periodically to carry out wall-surface patching paint Material, can not stabilize inhabitation, also waste paint vehicle with manually, building is more made to have lacked aesthetics, cleaning.And during painting, It needs to carry out paint thickness measurement standard in painting face fixed model, painting process is cumbersome.
Summary of the invention
Embodiment of the present invention be designed to provide a kind of external corner, inner corner trim, metope and its paint face preparation method and Painting method is split so that being not likely to produce paint on the painting face of the inner corner trim of metope, external corner and metope, and building inhabitation use is more long Long, the manpower and material resources in later period are also saved, more makes building decoration keep permanent aesthetics, cleaning, extends using the longevity Life, more convenient decoration painting, so that painting more standard.
In order to solve the above technical problems, embodiments of the present invention provide a kind of preparation method in external corner painting face, packet Include following steps:
First base material and external corner line section bar are provided;
The external corner line section bar is fixed on the first basal plane;Wherein, the external corner line section bar includes: perpendicular to described first The first side of basal plane, first bottom edge connected and opposite with first basal plane with the first side;
The first base material is posted and fixed on first basal plane, while the first base material being fitted in described First side;Wherein, the first base material is after fitting in the first side, first bottom edge and the first base material Difference in height is formed by the first side between surface, first bottom edge integrally externally protrudes out in the surface of the first base material;
Putty material is at least applied and scrapes the surface for eliminating the first base material in the surface of the first base material and described the Difference in height between one bottom edge, and by using by the surface of painting Puttying material and first bottom edge as being painted for emulsion paint First face to be painted, while using the described one end of first bottom edge far from the first side as the end in the described first face to be painted End.
The present invention also provides a kind of painting method, using emulsion paint painting in above-mentioned preparation-obtained described first to On painting face.
The present invention also provides a kind of painting method, using emulsion paint painting in above-mentioned preparation-obtained described second to On painting face.
The present invention also provides a kind of preparation methods in inner corner trim painting face, include the following steps:
Emulsion paint painting is painted into made first obtained of preparation method in face to be made and apply on painting face in above-mentioned external corner Charge level;
One substrate is provided, the substrate is attached to the first of the external corner profile in the form of perpendicular to the coated surface The end on bottom edge;
Second substrate and inner corner trim line section bar are provided;
The inner corner trim line section bar is fixed on the substrate in a manner of separating with the coated surface;Wherein, the yin Molding section material includes at least: protrude and be connected perpendicular to the second side of the substrate, with the second side and with the base The second opposite bottom edge of plate;
Second substrate is posted and fixed on the substrate, while second substrate is fitted in described second Side;Wherein, second substrate is after fitting in the second side, the surface on second bottom edge and second substrate Between by the second side formed difference in height, the second side integrally externally protrudes out in the surface of second substrate;
Putty material is at least applied and scrapes the surface for eliminating second substrate in the surface of second substrate and described the Difference in height between dual side-edge, and by using by the surface of painting Puttying material and second bottom edge as being painted for emulsion paint Second face to be painted, while using the described one end of second bottom edge far from the second side as the end in the described second face to be painted End.
The present invention also provides a kind of painting methods, using emulsion paint painting in the preparation method in above-mentioned inner corner trim painting face Preparation-obtained described second on painting face.
The present invention also provides the preparation methods that a kind of metope waits for painting face, include the following steps:
First base material, the second substrate and metope line section bar are provided;
The metope line section bar is fixed on basal plane;Wherein, the metope line section bar includes: perpendicular to the basal plane A side, be connected with the first side and first bottom edge opposite with the basal plane, perpendicular to the basal plane second side, Second bottom edge connected and opposite with the basal plane with the second side, first bottom edge is opposite with second bottom edge, And it is spaced from each other;
The first base material is posted and fixed on the basal plane, while the first base material is fitted in described first Side;Wherein, the first base material is after fitting in the first side, the surface on first bottom edge and the first base material Between by the first side formed difference in height, first bottom edge integrally externally protrudes out in the surface of the first base material;
Second substrate is posted and fixed on the basal plane, while second substrate is fitted in described second Side;Wherein, second substrate is after fitting in the second side, the surface on second bottom edge and second substrate Between by the second side formed difference in height, second bottom edge integrally externally protrudes out in the surface of second substrate;
Putty material is at least applied and scrapes the surface for eliminating the first base material in the surface of the first base material and described the Difference in height between one bottom edge, and by using by the surface of painting Puttying material and first bottom edge as being painted for emulsion paint First face to be painted, while using the described one end of first bottom edge far from the first side as the end in the described first face to be painted End;
Putty material is at least applied and scrapes the surface for eliminating second substrate in the surface of second substrate and described the Difference in height between two bottom edges, and by using by the surface of painting Puttying material and second bottom edge as being painted for emulsion paint Second face to be painted, while using the described one end of second bottom edge far from the second side as the end in the described second face to be painted End.
The present invention also provides a kind of painting methods, are painted using emulsion paint in the preparation method institute for waiting for painting face by metope The described first face to be painted being prepared and described second is on painting face.
Embodiment of the present invention in terms of existing technologies, due to providing first base material and external corner line section bar, external corner line Profile is fixed on the first basal plane, and first base material fits in first side, is passed through between the first bottom edge and the surface of first base material First side forms difference in height, and the first bottom edge integrally externally protrudes out in the surface of the first base material, putty material is at least applied and is scraped On the surface of first base material, the difference in height between the surface of first base material and the first bottom edge is eliminated, and will be by painting Puttying material The surface of material and first bottom edge are as the first face to be painted painted for emulsion paint, while by the first bottom edge far from described the End of the one end of a side as the first face to be painted, so that emulsion paint painting is directly first on painting face, that is, pass through First base material and external corner line section bar separate emulsion paint and metope, it is therefore prevented that and wall expansion allows emulsioni paint layer to generate slight crack, so that The wall of building keeps permanent aesthetics and cleaning, ensures that long-term stable inhabitation uses.And external corner line section bar is fixed on On one substrate, when applying Puttying material and emulsion paint, directly on the basis of the first side of external corner line section bar and the first bottom edge It is painted, so that painting is more convenient, without other painting auxiliary tools, is improved efficiency while reducing cost.Likewise, The same application method of inner corner trim line section bar, metope line section bar improves so that being not likely to produce slight crack after construction wall painting emulsion paint The service life of construction wall.
In addition, first bottom edge is bevel edge, and one end that first bottom edge is connected with the first side is described in The vertical range of first basal plane, less than the described one end of first bottom edge far from the first side between first basal plane Vertical range is at least applying putty material in the step of scraping in the surface of the first base material:
Putty material is applied from the surface of the first base material and is scraped to first bottom edge of external corner line section bar;Described first Also there are several grooves, for being embedded in by the putty material on side.To improve putty material and external corner line section bar it Between adhesive rate so that emulsion paint is not easy to fall off from external corner line section bar, and the bevel edge design on the first bottom edge, so that painting Effect it is more preferable, that paints when closer to the first bottom edge end is more smooth, improves whole painting planarization.
In addition, before the step of scraping putty material painting in the surface of the first base material, and by first base Material fitted in after the step of first side, further included following steps;
Sticky paper layer is provided, the mode by the sticky paper layer across the surface and first bottom edge of the first base material is pasted If being formed by seam when being bonded with the first side to the first base material to be sealed.To allow first base material with Installation between external corner line section bar more closely, keeps first base material to connect with external corner line section bar more secured, extends and use the longevity Life.
In addition, first basal plane also vertically connects the second basal plane;
While the external corner line section bar is fixed on first basal plane, it is also used to fix the external corner line section bar In second basal plane, the external corner line section bar further include: be bonded with second substrate and perpendicular to second basal plane Second side is connected and second bottom edge opposite with second basal plane with the second side, and by the external corner line style Material further includes following steps after being individually fixed in first basal plane and second basal plane:
Second substrate is provided, second substrate is posted and fixed on second basal plane, while by described second Substrate fits in the second side;Wherein, second substrate is after fitting in the second side, second bottom edge with Difference in height is formed by the second side between the surface of second substrate, second bottom edge integrally externally protrudes out in described the The surface of two substrates;
Putty material is at least applied and scrapes the surface for eliminating second substrate in the surface of second substrate and described the Difference in height between two bottom edges, and by using by the surface of painting Puttying material and second bottom edge as being painted for emulsion paint Second face to be painted, while using the described one end of second bottom edge far from the second side as the end in the described second face to be painted End.So that emulsion paint is by the expansion drive cracking of metope after preventing at the first bottom edge and coating emulsion paint at the second bottom edge.
It in addition, first bottom edge is also connected with second bottom edge, and is in an angle with second bottom edge;
Alternatively, first bottom edge is spaced from each other with second bottom edge.So that the first bottom edge and the second bottom edge phase The place that interaction needs to paint emulsion paint is not easy to crack after coating emulsion paint, and is not easy to be collided by foreign object and generates flaw.
In addition, second bottom edge is bevel edge, and one end that second bottom edge is connected with the second side is described in The vertical range of second basal plane, less than the described one end of second bottom edge far from the second side between second basal plane Vertical range is scraped in the specific step in the surface of second substrate at least applying putty material:
The putty material is applied from the surface of second substrate and is scraped to second bottom edge of external corner line section bar;It is described Second side also has several grooves, for being embedded in by putty material.To improve between putty material and external corner line section bar Adhesive rate so that emulsion paint is not easy to fall off from external corner line section bar, and the bevel edge design on the second bottom edge, so that painting Effect is more preferable, and that paints when closer to the second bottom edge end is more smooth, improves whole painting planarization.
In addition, before the step of scraping putty material painting in the surface of second substrate, and by second base Material fitted in after the step of second side, further included following steps;
Sticky paper layer is provided, the mode by the sticky paper layer across the surface and second bottom edge of second substrate is pasted If being formed by seam when being bonded with the second side to second substrate to be sealed.To allow the second substrate with Installation between external corner line section bar more closely, keeps the second substrate to connect with external corner line section bar more secured, extends and use the longevity Life.
In addition, second bottom edge is bevel edge, and one end that second bottom edge is connected with the second side is described in The vertical range on the surface of the second substrate, less than the described one end of second bottom edge far from the second side to second substrate Surface between vertical range, in putty material at least to be applied to the step of scraping in the surface of second substrate:
The putty material is applied from the surface of second substrate and is scraped to second bottom edge of inner corner trim line section bar;It is described Second side also has several grooves, for being embedded in by putty material.To improve between putty material and inner corner trim line section bar Adhesive rate so that emulsion paint is not easy to fall off from inner corner trim line section bar, and the bevel edge design on the second bottom edge, so that painting Effect is more preferable, and that paints when closer to the second bottom edge end is more smooth, improves whole painting planarization.
In addition, before the step of scraping putty material painting in the surface of second substrate, and by second base Material fitted in after the step of second side, further included following steps;
Sticky paper layer is provided, the sticky paper layer is pasted in a manner of surface and second bottom edge across second substrate If being formed by seam when being bonded with the second side to second substrate to be sealed.To allow the second substrate with Installation between inner corner trim line section bar more closely, keeps the second substrate to connect with inner corner trim line section bar more secured, extends and use the longevity Life.
In addition, first bottom edge is bevel edge, and one end that first bottom edge is connected with the first side is described in The vertical range of first basal plane, less than first bottom edge end to the vertical range between first basal plane;Will be greasy Sub- material, which at least applies, to be scraped in the step of surface of second substrate specifically includes:
Putty material is applied from the surface of the first base material and is scraped to first bottom edge of metope line section bar;Described first Also there are several grooves, for being embedded in by putty material on side;
Second bottom edge is bevel edge, and one end for being connected with the second side of second bottom edge is to second base The vertical range in face, less than second bottom edge end to the vertical range between second basal plane, by putty material It at least applies and scrapes in the surface of second substrate the step of:
Putty material is applied from the surface of the first base material and is scraped to second bottom edge of metope line section bar;Described second Also there are several grooves, for being embedded in by putty material on side.To improve between putty material and metope molding section material Adhesive rate so that emulsion paint is not easy to fall off from metope line section bar, and the bevel edge on the first bottom edge and the second bottom edge designs, So that the effect of painting is more preferable, when closer to the first bottom edge end and the second bottom end end, the coating of painting is thinner, more may be used To accomplish better flatness, whole painting planarization is improved.
In addition, before putty material is at least applied the step of scraping in the surface of the first base material, and by described It further include following steps after the step of two substrates fit in the second side;
First sticky paper layer and the second sticky paper layer are provided;
The first sticky paper layer is sticked in a manner of surface and first bottom edge across the first base material, to institute It states first base material and is formed by seam when being bonded with the first side and be sealed;
The second sticky paper layer is sticked in a manner of surface and second bottom edge across second substrate, to institute It states the second substrate and is formed by seam when being bonded with the second side and be sealed.To allow first base material, the second substrate Installation between metope line section bar more closely, keeps first base material, the second substrate to connect with metope line section bar more secured, Prolong the service life.
Detailed description of the invention
One or more embodiments are illustrated by the picture in corresponding attached drawing, these exemplary theorys The bright restriction not constituted to embodiment, the element in attached drawing with same reference numbers label are expressed as similar element, remove Non- to have special statement, composition does not limit the figure in attached drawing.
Fig. 1 is the flow chart of the preparation method in external corner painting face in first embodiment of the invention;
Fig. 2 is the painting face structural schematic diagram of the preparation method in external corner painting face in first embodiment of the invention;
Fig. 3 is the flow chart of the preparation method in external corner painting face in second embodiment of the invention;
Fig. 4 is the painting face structural schematic diagram of the preparation method in external corner painting face in second embodiment of the invention;
Fig. 5 is the flow chart of the preparation method in inner corner trim painting face in fifth embodiment of the invention;
Fig. 6 is the painting face structural schematic diagram of the preparation method in inner corner trim painting face in fifth embodiment of the invention;
Fig. 7 is the flow chart of the preparation method in wall plaster face in seventh embodiment of the invention;
Fig. 8 is the painting face structural schematic diagram of the preparation method in wall plaster face in seventh embodiment of the invention.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with attached drawing to the present invention Each embodiment be explained in detail.However, it will be understood by those skilled in the art that in each embodiment party of the present invention In formula, in order to make the reader understand this application better, many technical details are proposed.But even if without these technical details And various changes and modifications based on the following respective embodiments, the application technical solution claimed also may be implemented.
The first embodiment of the present invention is related to a kind of preparation methods in external corner painting face, as depicted in figs. 1 and 2, including Following steps:
Step 110 provides first base material 2 and external corner line section bar 3, and external corner line section bar 3 is mental section, using in corner Locate more firm, anticollision;First base material 2 is plasterboard, and is spliced by multiple small plasterboards, two adjacent plasterboards it Between gap pass through paper self-adhesive tape bond.
External corner line section bar 3 is fixed on the first basal plane 1 by step 120;Wherein, external corner line section bar 3 includes: perpendicular to the first base The first side 31 in face 1 is connected and first bottom edge 32 opposite with the first basal plane 1 with first side 31;Specifically external corner line Profile 3 be equipped with multiple lightening holes 5, mitigate external corner line section bar 3 quality simultaneously, do not influence its effect.Specifically, in order to Decoration demand installs keel and the basic plasterboard that is fixed on keel on building wall, and the basis plasterboard is towards external corner line The face of profile 3 is the first basal plane 1, and basic plasterboard is also to be made of multiple small plasterboard splicings, and external corner line section bar 3 can pass through Fixing screws are pinned on the first basal plane 1, and carry out applying gypsum patch eye on the surface of screw after having followed closely, and prevent screw surface It gets rusty.
Step 130 posts and fixes first base material 2 on the first basal plane 1, while first base material 2 is fitted in the first side Side 31;Wherein, first base material 2 is after fitting in first side 31, by the between the first bottom edge 32 and the surface of first base material 2 A side 31 forms difference in height, the whole surface for externally protruding out in first base material 2 in the first bottom edge 32;Specifically, first base material 2 is consolidated When determining onto the first basal plane 1, the gap in first base material 2 is staggered with the gap on the first basal plane 1, so that first base material 2 Entity shelter from the gap on the first basal plane 1 so that the first basal plane 1 and first base material 2 are more firm, extending the later period uses the longevity Life.
Step 140, which at least applies putty material, scrapes in the surface of first base material 2, eliminates the surface and first of first base material 2 Difference in height between bottom edge 32, forms putty material layer 7, and by using by the surface of painting Puttying material and the first bottom edge 32 as For the first face 6 to be painted of emulsion paint painting, while using first one end of bottom edge 32 far from first side 31 as first to powder The end of brush finish 6, and first one end of bottom edge 32 far from first side 31 can polish round and smooth, the fillet of the polishing can not paint paint Layer chooses the color that profile itself matches with decoration.Wherein, putty material is the materials such as land plaster, powder of lacquer putty for use on or talcum powder Material.
Embodiment of the present invention in terms of existing technologies, due to providing first base material 2 and external corner line section bar 3, external corner Line section bar 3 is fixed on the first basal plane 1, and first base material 2 fits in first side 31, the table on the first bottom edge 32 and first base material 2 Difference in height, the whole surface for externally protruding out in first base material 2 in the first bottom edge 32, by putty material are formed by first side 31 between face It at least applies and scrapes on the surface of first base material 2, eliminate the difference in height between the surface and the first bottom edge 32 of first base material 2, and will Using by the surface of painting Puttying material and the first bottom edge 32 as the first face 6 to be painted painted for emulsion paint, while by first End of the one end of bottom edge 32 far from first side 31 as the first face 6 to be painted, thus emulsion paint painting directly first to On painting face 6, i.e., emulsion paint and metope are separated by first base material 2 and external corner line section bar 3, it is therefore prevented that wall expansion allows latex Paint layer generates slight crack, so that the wall of building keeps permanent aesthetics and cleaning, ensures that long-term stable inhabitation uses.And sun Molding section material 3 is fixed in first base material 2, when applying Puttying material and emulsion paint, directly with the first side of external corner line section bar 3 It is painted on the basis of side 31 and the first bottom edge 32, so that painting is more convenient, without other painting auxiliary tools, reduces cost While improve efficiency.The same application method of same inner corner trim line section bar, metope line section bar, so that construction wall paints latex It is not likely to produce slight crack after paint, improves the service life of construction wall.
Further, as shown in Fig. 2, in step 140 putty material layer 7 formation specifically comprise the following steps:
Step 141 carries out filling muscle flatness in first base material 2 levelling;
On step 142 brush first layer land plaster to the surface and the first bottom edge of first base material 2;
Step 143 carries out filling muscle flatness on swiped through first layer land plaster levelling;
Step 144 brushes one layer of putty material again, which can be talcum powder, powder of lacquer putty for use on, installs decoration demand It is changed;
Step 145 polishes to the putty material painted in first base material 2, forms the lesser flat surface of roughness;
Wherein, in above-mentioned steps 141 into step 145, mountable practical decoration demand carries out adaptation adjustment, carries out multiple Fill that muscle flatness is levelling or the putty materials such as brushing gypsum powder, talcum powder, so that the first face 6 to be painted after molding is more It is flat and smooth secured.
It will be further appreciated that as shown in Fig. 2, the first bottom edge 32 is bevel edge, and the first bottom edge 32 and 31 phase of first side Even one end to the first basal plane 1 vertical range, less than first one end of bottom edge 32 far from first side 31 to the first basal plane 1 it Between vertical range, scraped in the surface of first base material 2 at least applying putty material:
Putty material is applied from the surface of first base material 2 and is scraped on 3 first bottom edge 32 of Zhiyang molding section material, putty material is formed Layer 7;Also there are several grooves 4, for being embedded in by putty material on first bottom edge 32.By the setting of groove 4, so that putty Material can be preferably adsorbed on the first bottom edge 32, be not easy to fall.And first bottom edge 32 be inclined-plane, from the when painting putty material One basal plane 1 is painted to the first bottom edge 32, more thinner towards 32 end of the first bottom edge, paint thickness and easier control, and what is brushed out is flat Whole Du Genggao, and painted along the first bottom edge 32, with first bottom edge 32 for painting standard, facilitate painting, reduces painting difficulty.
Further, as depicted in figs. 1 and 2, before the step of scraping putty material painting in the surface of first base material 2, It further include following steps and after the step of first base material 2 is fitted in first side 31;
Step 150 provides sticky paper layer, and the mode by sticky paper layer across the surface and the first bottom edge 32 of first base material 2 is sticked, Seam is formed by when being bonded with first side 31 to first base material 2 to be sealed.Specifically, the surface of first base material 2 Presence is had the gap with first side adjacent, is sealed gap by sticky paper, so that coplanar flat, is convenient for brush putty material and cream Shellac varnish.
Second embodiment of the present invention is related to a kind of preparation method in external corner painting face.In second embodiment of the invention In, it is the further improvement to first embodiment, there was only first base material in first embodiment, but in second embodiment In, as shown in Figure 4, since external corner metope is two sides turning metope, external corner line section bar 23 is stuck in corner and connects two face walls, external corner Line section bar 23 is different from first embodiment, additionally uses the second substrate 18, the first basal plane 8 also the second basal plane of vertical connection 19, while external corner line section bar 23 is fixed on the first basal plane 8, it is also used to external corner line section bar 23 being fixed on the second basal plane 19, external corner line section bar 23 further includes being bonded with the second substrate 18 and second side 15 and second side perpendicular to the second basal plane 19 Side 15 is connected and second bottom edge 14 opposite with the second basal plane 19 as shown in Figure 3 and Figure 4, specifically includes in the present embodiment Following steps:
Step 310 provides first base material 9 and external corner line section bar 23, and external corner line section bar 23 is mental section, using in wall It is more firm at angle, anticollision;First base material 9 is plasterboard, and is spliced by multiple small plasterboards, two adjacent plasterboards Between gap pass through paper self-adhesive tape bond.
External corner line section bar 23 is fixed on the first basal plane 8 by step 320;Wherein, external corner line section bar 23 includes: perpendicular to first The first side 13 of basal plane 8 is connected and first bottom edge 12 opposite with the first basal plane 8 with first side 13;Specifically, external corner Line section bar 23 be equipped with multiple lightening holes 21, mitigate external corner line section bar 23 quality simultaneously, do not influence its effect.Meanwhile being Decoration demand exists, the basic plasterboard installing keel on building wall and being fixed on keel, and the basis plasterboard is towards positive The face of molding section material 23 is the first basal plane 8, and basic plasterboard is also to be made of multiple small plasterboards splicings, and external corner line section bar 23 It can be pinned to by fixing screws on the first basal plane 8, and carry out applying gypsum patch eye on the surface of screw after having followed closely, prevent spiral shell Follow closely surface oxidisation.
Step 330 posts and fixes first base material 9 on the first basal plane 8, while first base material 9 is fitted in the first side Side 13;Wherein, first base material 9 is after fitting in first side 13, by the between the first bottom edge 12 and the surface of first base material 9 A side 13 forms difference in height, the whole surface for externally protruding out in first base material 9 in the first bottom edge 12;Specifically, first base material 9 is consolidated When determining onto the first basal plane 8, the gap in first base material 9 is staggered with the gap on the first basal plane 8, so that first base material 9 Entity shelter from the gap on the first basal plane 8 so that the first basal plane 8 and first base material 9 are more firm, extending the later period uses the longevity Life.
Step 340, which at least applies putty material, scrapes in the surface of first base material 9, eliminates the surface and first of first base material 9 Difference in height between bottom edge 12 forms putty material layer 10, and will be to be made by the surface of painting Puttying material and the first bottom edge 12 For the first face 11 to be painted painted for emulsion paint, at the same using first one end of bottom edge 12 far from first side 13 as first to The end in painting face 11, and first one end of bottom edge 12 far from first side 13 can polish round and smooth, be additionally provided on the first bottom edge 12 For increasing the groove 20 of adhesive force.Wherein, putty material is the materials such as land plaster, powder of lacquer putty for use on or talcum powder.
Further include following steps after step 330 before step 350:
Step 380 provides sticky paper layer, and the mode by sticky paper layer across the surface and the first bottom edge 12 of first base material 9 is sticked, Seam is formed by when being bonded with first side 13 to first base material 9 to be sealed.Specifically, the surface of first base material 9 Presence is had the gap with first side adjacent, is sealed gap by sticky paper, so that coplanar flat, is convenient for brush putty material and cream Shellac varnish.
And after external corner line section bar 23 to be individually fixed in the first basal plane 8 and the second basal plane 19 further include following steps:
Step 350 provides the second substrate 18, and the second substrate 18 is posted and fixed on the second basal plane 19, while by second Substrate 18 fits in second side 15;Wherein, the second substrate 18 is after fitting in second side 15, the second bottom edge 14 and the second base Difference in height, the whole surface for externally protruding out in the second substrate 18 in the second bottom edge 14 are formed by second side 15 between the surface of material 18; Specifically, the composition of the second substrate 18 and the composition of first base material 9 can be the same, also according to using needs to improve.Tool Body says that the second substrate 18 is plasterboard, and is spliced by multiple small plasterboards, the gap between two adjacent plasterboards It is bonded by paper self-adhesive tape.Second basal plane 19 is the surface of basic plasterboard, and basic plasterboard is also to be spliced by multiple small plasterboards Composition, and external corner line section bar 23 can be pinned on the second basal plane 19 by fixing screws, and the surface after having followed closely in screw is enterprising Row applies gypsum patch eye, prevents screw surface oxidisation.Second substrate 18 is fixed on the second basal plane 19, equally solid by screw It is fixed, screw surface is carried out after having fixed to apply gypsum patch eye, prevents screw surface oxidisation.
Step 360, which at least applies putty material, scrapes in the surface of the second substrate 18, forms putty material layer 17, eliminates second Difference in height between the surface of substrate 18 and the second bottom edge 14, and will be to be made by the surface of painting Puttying material and the second bottom edge 14 For the second face 16 to be painted painted for emulsion paint, at the same using second one end of bottom edge 14 far from second side 15 as second to The end in painting face 16.
Further, as shown in Figure 3 and Figure 4, before the step of scraping putty material painting in the surface of the second substrate 18, It further include following steps and after the step of the second substrate 18 is fitted in second side 15;
Step 370 provides sticky paper layer, and the mode by sticky paper layer across the surface and the second bottom edge 14 of the second substrate 18 is sticked, Seam is formed by when being bonded with second side 15 to the second substrate 18 to be sealed.Specifically, the table of the second substrate 18 Face and 15 adjacent of second side have the gap presence, are sealed gap by sticky paper, so that coplanar flat, is convenient for brush putty material And emulsion paint.
Wherein, by after step 350, step 380 and step 370 is carried out, carries out step 340 and step 360 again later.
Specifically, in step 360, putty material is the materials such as land plaster, powder of lacquer putty for use on or talcum powder, specifically include as Lower step:
Step 361 carries out filling muscle flatness on the second substrate 18 levelling;
On step 362 brush second layer land plaster to the surface and the second bottom edge 15 of the second substrate 18;
Step 363 carries out filling muscle flatness on swiped through second layer land plaster levelling;
Step 364 brushes one layer of putty material again, which can be talcum powder, powder of lacquer putty for use on, installs decoration demand It is changed;
Step 365 polishes to the putty material painted on the second substrate 18, forms the lesser flat surface of roughness;
Wherein, in above-mentioned steps 361 into step 365, mountable practical decoration demand carries out adaptation adjustment, carries out multiple Fill that muscle flatness is levelling or the putty materials such as brushing gypsum powder, talcum powder, so that the second face 16 to be painted after molding is more It is flat and smooth secured.
Further, the first bottom edge 12 is also connected with the second bottom edge 14, and is in an angle with the second bottom edge 14, which can The acute angle for thinking any degree such as 70 °, 80 ° or 60 °, is modified according to the angle of building wall.Alternatively, the first bottom edge 12 with Second bottom edge 14 is spaced from each other.
Further, the second bottom edge 14 is bevel edge, and one end for being connected with second side 15 of the second bottom edge 14 is to the second base The vertical range in face 19, less than second one end of bottom edge 14 far from second side 15 to the vertical range between the second basal plane 19, Putty material is at least applied in step 340 and is scraped in the surface of the second substrate 18 the step of:
As shown in Figure 3 and Figure 4, putty material is applied from the surface of the second substrate 18 and scrapes the low side of Zhiyang molding section material 23 second On, second side 15 also has several grooves 22, for being embedded in by putty material.By the setting of groove 22, so that putty Material can be preferably adsorbed on the second bottom edge 14, and putty material layer 17 is more stable, be not easy to fall.And second bottom edge 14 be oblique Face is painted when painting putty material from the second basal plane 19 to the second bottom edge 14, more thinner towards 14 end of the second bottom edge, and painting is thick Degree and easier control, the flatness brushed out is higher, and paints along the second bottom edge 14, with second bottom edge 14 for painting standard, Facilitate painting, reduces painting difficulty.
Third embodiment of the invention is related to a kind of painting method, is painted using emulsion paint in first embodiment and second In embodiment first on painting face.Specifically emulsion paint painting is divided into twice, and to the from the first basal plane orientation The end on one bottom edge is painted, so that painting is more uniform.In the present embodiment, painting can also be used spray painting mode it is complete At.
Four embodiment of the invention is related to a kind of painting method, using emulsion paint painting in second embodiment the Two on painting face.Specifically emulsion paint painting is divided into twice, and paints from the second basal plane to the end on the second bottom edge, makes What must be painted is more uniform.In the present embodiment, the mode that spray painting can also be used in painting is completed.
5th embodiment of the invention is related to a kind of preparation method in inner corner trim painting face, as shown in Figure 5 and Figure 6, including Following steps:
Emulsion paint is painted made the obtained of preparation method that external corner in such as embodiment one paints face by step 510 On one face 6 to be painted, coated surface is made;
Step 520 provides a substrate 35, and substrate 35 is attached at the first of external corner profile in the form of perpendicular to coated surface The end on bottom edge;The substrate 35 is plasterboard.
Step 530 provides the second substrate 25 and inner corner trim line section bar 34;Second substrate 25 is plasterboard, and inner corner trim line section bar 34 can Setting is on the ceiling.Second substrate 25 is plasterboard, identical as the construction in above embodiment, is no longer illustrated herein.
Inner corner trim line section bar 34 is fixed on substrate 35 by step 540 in a manner of separating with coated surface;Wherein, inner corner trim line style Material 34 includes at least: protruding and is connected perpendicular to the second side of substrate 35 29, with second side 29 and opposite with substrate 35 Second bottom edge 28;
Step 550 posts and fixes the second substrate 25 on substrate 35, while the second substrate 25 is fitted in second side Side 29;Wherein, the second substrate 25 passes through between second bottom edge 28 and the surface of the second substrate 25 after fitting in second side 29 Second side 29 forms difference in height, the whole surface for externally protruding out in the second substrate 25 in second side 29;
Step 560, which at least applies putty material, scrapes the surface that the second substrate 25 is eliminated in the surface of the second substrate 25 and the Difference in height between dual side-edge 29 forms render paint, and will be to be made by the surface of painting Puttying material and the second bottom edge 28 For the second face 27 to be painted painted for emulsion paint, at the same using second one end of bottom edge 28 far from second side 29 as second to The end in painting face 27.
In present embodiment, as shown in fig. 6, inner corner trim line section bar 34 is mental section, more securely, after emulsion paint painting not It is easy to crack, and basic model is provided to painting putty material and emulsion paint after inner corner trim profile use, the coating of more standard can be formed Face facilitates decoration.When being used cooperatively simultaneously by external corner line section bar 3 and inner corner trim line section bar 34, inner corner trim line section bar 34 is fixed to On ceiling, external corner line section bar 3 is fixed on the metope adjacent with ceiling, is adjusted the distance between two profiles, is made the first bottom Spacing is generated between side and the second bottom edge 28, be adjustable as 5mm or is adjusted according to use demand.First bottom edge and second at this time Bottom edge 28 is vertical, and the first bottom edge distal portion is sheltered from by inner corner trim line section bar 34, forms more exquisite finishing form, and use The two forced fits use, and directly fix two profile positions, and profile needs the corner angle end type decorate out, and decoration is more To be convenient, simply.
Specifically, as shown in figure 5, in step 560, putty material is the materials such as land plaster, powder of lacquer putty for use on or talcum powder, Specifically comprise the following steps:
Step 561 carries out filling muscle flatness on the second substrate 25 levelling;
On step 562 brush second layer land plaster to the surface and the second bottom edge 28 of the second substrate 25;
Step 563 carries out filling muscle flatness on swiped through second layer land plaster levelling;
Step 564 brushes one layer of putty material again, which can be talcum powder, powder of lacquer putty for use on, installs decoration demand It is changed;
Step 565 polishes to the putty material painted on the second substrate 25, forms the lesser flat surface of roughness;
Wherein, in above-mentioned steps 561 into step 565, mountable practical decoration demand carries out adaptation adjustment, carries out multiple Fill that muscle flatness is levelling or the putty materials such as brushing gypsum powder, talcum powder, so that the second face 27 to be painted after molding is more It is flat and smooth secured.
It will be further appreciated that as shown in Figure 5 and Figure 6, the second bottom edge 28 is bevel edge, and the second bottom edge 28 and second side 29 connected one end are arrived less than the second bottom edge 28 far from one end of second side 29 to the vertical range on the surface of the second substrate 25 Putty material is at least being applied the step of scraping in the surface of the second substrate 25 by the vertical range between the surface of the second substrate 25 In:
Putty material is applied from the surface of the second substrate 25 and is scraped to 34 second bottom edge 28 of inner corner trim line section bar;Second side 29 Also there are several grooves 33, for being embedded in by putty material.By the setting of groove 33, so that putty material can preferably be inhaled It is attached on the second bottom edge 28, forms the second putty material layer 26, be not easy to fall.And second bottom edge 28 be inclined-plane, paint putty material It is painted when material from the second basal plane 24 to the second bottom edge 28, more thinner towards 28 end of the second bottom edge, paint thickness also easier control, The flatness brushed out is higher, and paints along the second bottom edge 28, with second bottom edge 28 for painting standard, facilitates painting, reduces Paint difficulty.
Further, before the step of scraping putty material painting in the surface of the second substrate 25, and by the second substrate It further include following steps after 25 the step of fitting in second side 29;
Step 570 provides sticky paper layer, and sticky paper layer is pasted in a manner of surface and the second bottom edge 28 across the second substrate 25 If being formed by seam when being bonded with second side 29 to the second substrate 25 to be sealed.Specifically, second substrate 25 Surface and 29 adjacent of second side have the gap presence, are sealed gap by sticky paper, so that coplanar flat, is convenient for brush putty material Material and emulsion paint.
Sixth embodiment of the invention is related to a kind of painting method, using emulsion paint painting in the 5th embodiment the Two on painting face.Specifically, emulsion paint painting is divided into twice, and the end powder from second the second bottom edge of basal plane orientation Brush, so that painting is more uniform.In the present embodiment, the mode that spray painting can also be used in painting is completed.
Seventh embodiment of the invention is related to the preparation method that a kind of metope waits for painting face, as shown in Figure 7 and Figure 8, including Following steps:
Step 710 provides first base material 36, the second substrate 45 and metope line section bar 50;Metope line section bar 50 is equipped with multiple The structure of lightening hole 48, first base material 36 and the second substrate 45 is identical as above embodiment, is no longer specifically described herein.
Metope line section bar 50 is fixed on basal plane by step 720;Wherein, metope line section bar 50 includes: perpendicular to basal plane A side 39, be connected with first side 39 and first bottom edge 40 opposite with basal plane, perpendicular to the second side 42 of basal plane, with the Dual side-edge 42 is connected and second bottom edge 41 opposite with basal plane, and the first bottom edge 40 and the second bottom edge 41 are opposite, and are spaced from each other;
Step 730 posts and fixes first base material 36 on basal plane, while first base material 36 is fitted in first side 39;Wherein, first base material 36 is after fitting in first side 39, by the between the first bottom edge 40 and the surface of first base material 36 A side 39 forms difference in height, the whole surface for externally protruding out in first base material 36 in the first bottom edge 40;
Step 740 posts and fixes the second substrate 45 on basal plane, while the second substrate 45 is fitted in second side 42;Wherein, the second substrate 45 is after fitting in second side 42, by the between the second bottom edge 41 and the surface of the second substrate 45 Dual side-edge 42 forms difference in height, the whole surface for externally protruding out in the second substrate 45 in the second bottom edge 41;
Step 750, which at least applies putty material, scrapes the surface that first base material 36 is eliminated in the surface of first base material 36 and the Difference in height between one bottom edge 40 forms the first putty material layer 37, and will be by the surface of painting Puttying material and the first bottom Side 40 as the first face 38 to be painted painted for emulsion paint, while using first one end of bottom edge 40 far from first side 39 as The end in the first face 38 to be painted;
Step 760, which at least applies putty material, scrapes the surface that the second substrate 45 is eliminated in the surface of the second substrate 45 and the Difference in height between two bottom edges 41 forms the second putty material layer 44, and will be by the surface of painting Puttying material and the second bottom Side 41 as the second face 43 to be painted painted for emulsion paint, while using second one end of bottom edge 41 far from second side 42 as The end in the second face 43 to be painted.
It can be seen from the above content that passing through the setting of metope line section bar 50, metope line section bar 50 is mental section, more firm Gu emulsion paint will not cracking, and the profile can be used as the model of painting decoration, and painting is facilitated to decorate, so that the painting face formed is more For standard.Emulsion paint, and the first bottom edge 40 and 41 phase of the second bottom edge are coated in the first face 38 and the second face 43 to be painted to be painted It to setting, is spaced from each other, thus the latex that the metope line section bar 50 allows the first face 38 and the second face 43 to be painted to be painted to coat Paint will not connect, and be not susceptible to be broken in long-term use, prolong the service life, and metope line section bar 50 forms new-type crack Formula decoration, it is more aesthetically pleasing, make people's inhabitation use more comfortable.
Specifically, in step 750, putty material is the materials such as land plaster, powder of lacquer putty for use on or talcum powder, specifically include as Lower step:
Step 751 carries out filling muscle flatness in first base material 36 levelling;
On step 752 brush second layer land plaster to the surface and the first bottom edge 40 of first base material 36;
Step 753 carries out filling muscle flatness on swiped through second layer land plaster levelling;
Step 754 brushes one layer of putty material again, which can be talcum powder, powder of lacquer putty for use on, installs decoration demand It is changed;
Step 755 polishes to the putty material painted in first base material 36, forms the lesser flat surface of roughness;
Wherein, in above-mentioned steps 751 into step 755, mountable practical decoration demand carries out adaptation adjustment, carries out multiple Fill that muscle flatness is levelling or the putty materials such as brushing gypsum powder, talcum powder, so that the first face 38 to be painted after molding is more It is flat and smooth secured.
Likewise, in step 760, specifically comprising the following steps:
Step 761 carries out filling muscle flatness on the second substrate 45 levelling;
On step 762 brush second layer land plaster to the surface and the second bottom edge 41 of the second substrate 45;
Step 763 carries out filling muscle flatness on swiped through second layer land plaster levelling;
Step 764 brushes one layer of putty material again, which can be talcum powder, powder of lacquer putty for use on, installs decoration demand It is changed;
Step 765 polishes to the putty material painted on the second substrate 45, forms the lesser flat surface of roughness;
Wherein, in above-mentioned steps 761 into step 765, mountable practical decoration demand carries out adaptation adjustment, carries out multiple Fill that muscle flatness is levelling or the putty materials such as brushing gypsum powder, talcum powder, so that the second face 43 to be painted after molding is more It is flat and smooth secured.
It will be further appreciated that as shown in figure 8, the first bottom edge 40 is bevel edge, and the first bottom edge 40 and 39 phase of first side One end even to the first basal plane vertical range, less than the first bottom edge 40 end to the vertical range between the first basal plane;? Putty material is at least applied and is scraped in the surface step of the second substrate 45:
Putty material is applied from the surface of first base material 36 and is scraped to 50 first bottom edge 40 of metope line section bar, it is greasy to form first Sub- material layer 37,;Also there are several grooves 49, for being embedded in by putty material on first side 39;Pass through setting for groove 49 It sets, so that putty material can be preferably adsorbed on the first bottom edge 40, is not easy to fall.And first bottom edge 40 be inclined-plane, paint it is greasy It is painted when sub- material from the first basal plane to the first bottom edge 40, more thinner towards 40 end of the first bottom edge, paint thickness and the easier palm Control, the flatness brushed out is higher, and paints along the first bottom edge 40, with first bottom edge 40 for painting standard, facilitates painting, drops Self raising flour brush difficulty.
Meanwhile as shown in figure 8, the second bottom edge 41 is bevel edge, and one end that the second bottom edge 41 is connected with second side 42 is arrived The vertical range of second basal plane, less than the second bottom edge 41 end to the vertical range between the second basal plane, by putty material It at least applies and scrapes in the surface of the second substrate 45 the step of:
Putty material is applied from the surface of first base material 36 and is scraped to 50 second bottom edge 41 of metope line section bar, it is greasy to form second Sub- material layer 44;Also there are several grooves 46, for being embedded in by putty material on second side 42.Pass through setting for groove 46 It sets, so that putty material can be preferably adsorbed on the second bottom edge 41, is not easy to fall.And second bottom edge 41 be inclined-plane, paint it is greasy It is painted when sub- material from the second basal plane to the second bottom edge 41, more thinner towards 41 end of the second bottom edge, paint thickness and the easier palm Control, the flatness brushed out is higher, and paints along the second bottom edge 41, with second bottom edge 41 for painting standard, facilitates painting, drops Self raising flour brush difficulty.
Further, as shown in figure 8, before putty material is at least applied the step of scraping in the surface of first base material 36, It further include following steps and after the step of the second substrate 45 is fitted in second side 42;
Step 770 provides the first sticky paper layer and the second sticky paper layer;
First sticky paper layer is sticked by step 780 in a manner of surface and the first bottom edge 40 across first base material 36, to One substrate 36 is formed by seam when being bonded with first side 39 and is sealed;
Second sticky paper layer is sticked by step 790 in a manner of surface and the second bottom edge 41 across the second substrate 45, to Two substrates 45 are formed by seam when being bonded with second side 42 and are sealed.
Eighth embodiment of the invention is related to a kind of painting method, using emulsion paint painting in the 7th embodiment the One face to be painted and second is on painting face.Specifically emulsion paint painting is divided into twice, and from the first basal plane orientation first The first face to be painted is painted in the end on bottom edge, and the second face to be painted is painted in the end on second the second bottom edge of basal plane orientation, so that That paints is more uniform.In the present embodiment, the mode that spray painting can also be used in painting is completed.
It will be understood by those skilled in the art that the respective embodiments described above are to realize specific embodiments of the present invention, And in practical applications, can to it, various changes can be made in the form and details, without departing from the spirit and scope of the present invention.

Claims (17)

1. a kind of preparation method in external corner painting face, characterized by the following steps:
First base material and external corner line section bar are provided;
The external corner line section bar is fixed on the first basal plane;Wherein, the external corner line section bar includes: perpendicular to first basal plane First side, be connected with the first side and first bottom edge opposite with first basal plane;
The first base material is posted and fixed on first basal plane, while the first base material is fitted in described first Side;Wherein, the first base material is after fitting in the first side, the surface on first bottom edge and the first base material Between by the first side formed difference in height, first bottom edge integrally externally protrudes out in the surface of the first base material;
Putty material is at least applied and scrapes the surface for eliminating the first base material in the surface of the first base material and first bottom Difference in height between side, and by using by the surface of painting Puttying material and first bottom edge as first painted for emulsion paint Face to be painted, while using the described one end of first bottom edge far from the first side as the end in the described first face to be painted.
2. the preparation method in external corner painting according to claim 1 face, it is characterised in that: first bottom edge is bevel edge, And one end that first bottom edge is connected with the first side is less than first bottom to the vertical range of first basal plane It is scraped to the vertical range between first basal plane at least applying putty material in institute outlying one end from the first side In the step of stating the surface of first base material:
Putty material is applied from the surface of the first base material and is scraped to first bottom edge of external corner line section bar;The first side On also have several grooves, for being embedded in by the putty material.
3. the preparation method in external corner painting according to claim 1 face, it is characterised in that: scrape by putty material painting in institute Before the step of stating the surface of first base material, and after the step of first base material is fitted in the first side, also Include the following steps;
Sticky paper layer is provided, the mode by the sticky paper layer across the surface and first bottom edge of the first base material is sticked, right The first base material is formed by seam when being bonded with the first side and is sealed.
4. the preparation method in external corner painting according to claim 1 face, it is characterised in that: first basal plane also vertically connects Connect the second basal plane;
While the external corner line section bar is fixed on first basal plane, it is also used to the external corner line section bar being fixed on institute State the second basal plane, the external corner line section bar further include: be bonded with second substrate and perpendicular to the second of second basal plane Side, second bottom edge connected and opposite with second basal plane with the second side, and divide by the external corner line section bar Not being fixed on first basal plane and second basal plane further includes later following steps:
Second substrate is provided, second substrate is posted and fixed on second basal plane, while by second substrate Fit in the second side;Wherein, second substrate is after fitting in the second side, second bottom edge with it is described Difference in height is formed by the second side between the surface of second substrate, second bottom edge integrally externally protrudes out in second base The surface of material;
Putty material is at least applied to the surface and second bottom scraped and eliminate second substrate in the surface of second substrate Difference in height between side, and by using by the surface of painting Puttying material and second bottom edge as second painted for emulsion paint Face to be painted, while using the described one end of second bottom edge far from the second side as the end in the described second face to be painted.
5. the preparation method in external corner according to claim 4 painting face, it is characterised in that: first bottom edge also with it is described Second bottom edge is connected, and is in an angle with second bottom edge;
Alternatively, first bottom edge is spaced from each other with second bottom edge.
6. the preparation method in external corner painting according to claim 5 face, it is characterised in that: second bottom edge is bevel edge, And one end that second bottom edge is connected with the second side is less than second bottom to the vertical range of second basal plane It is scraped to the vertical range between second basal plane at least applying putty material in institute outlying one end from the second side In the step of stating the surface of the second substrate:
The putty material is applied from the surface of second substrate and is scraped to second bottom edge of external corner line section bar;Described second Side also has several grooves, for being embedded in by putty material.
7. the preparation method in external corner painting according to claim 4 face, it is characterised in that: scrape by putty material painting in institute Before the step of stating the surface of the second substrate, and after the step of second substrate is fitted in the second side, also Include the following steps;
Sticky paper layer is provided, the mode by the sticky paper layer across the surface and second bottom edge of second substrate is sticked, right Second substrate is formed by seam when being bonded with the second side and is sealed.
8. a kind of painting method, it is characterised in that: painted using emulsion paint in as prepared by any one of claim 1 to 7 Described first obtained is on painting face.
9. a kind of painting method, it is characterised in that: painted using emulsion paint in as prepared by any one of claim 4 to 7 Described second obtained is on painting face.
10. a kind of preparation method in inner corner trim painting face, characterized by the following steps:
Emulsion paint painting is painted to the made first obtained face to be painted of preparation method in face in external corner as described in claim 1 On, coated surface is made;
One substrate is provided, the substrate is attached to the first bottom edge of the external corner profile in the form of perpendicular to the coated surface End;
Second substrate and inner corner trim line section bar are provided;
The inner corner trim line section bar is fixed on the substrate in a manner of separating with the coated surface;Wherein, the inside corner line Profile includes at least: protrude and be connected perpendicular to the second side of the substrate, with the second side and with the substrate phase Pair the second bottom edge;
Second substrate is posted and fixed on the substrate, while second substrate is fitted in into described second side Side;Wherein, second substrate is after fitting in the second side, the surface of second bottom edge and second substrate it Between by the second side formed difference in height, the second side integrally externally protrudes out in the surface of second substrate;
Putty material is at least applied and scrapes the surface for eliminating second substrate in the surface of second substrate and described second side Difference in height between side, and by using by the surface of painting Puttying material and second bottom edge as second painted for emulsion paint Face to be painted, while using the described one end of second bottom edge far from the second side as the end in the described second face to be painted.
11. the preparation method in inner corner trim painting according to claim 10 face, it is characterised in that: second bottom edge is oblique Side, and one end that second bottom edge is connected with the second side is less than to the vertical range on the surface of second substrate The described one end of second bottom edge far from the second side is to the vertical range between the surface of second substrate, by putty Material, which at least applies, to be scraped in the surface of second substrate the step of:
The putty material is applied from the surface of second substrate and is scraped to second bottom edge of inner corner trim line section bar;Described second Side also has several grooves, for being embedded in by putty material.
12. the preparation method in inner corner trim according to claim 10 painting face, it is characterised in that: by putty material painting scrape in Before the step of surface of second substrate, and after the step of second substrate is fitted in the second side, It further include following steps;
Sticky paper layer is provided, the sticky paper layer is sticked in a manner of surface and second bottom edge across second substrate, Seam is formed by when being bonded with the second side to second substrate to be sealed.
13. a kind of painting method, it is characterised in that: painted using emulsion paint in by the preparation-obtained institute of claim 10-12 Second is stated on painting face.
14. the preparation method that a kind of metope waits for painting face, characterized by the following steps:
First base material, the second substrate and metope line section bar are provided;
The metope line section bar is fixed on basal plane;Wherein, the metope line section bar includes: the first side perpendicular to the basal plane Side, first bottom edge, second side perpendicular to the basal plane and the institute connected and opposite with the basal plane with the first side State second side be connected and second bottom edge opposite with the basal plane, first bottom edge is opposite with second bottom edge, and phase Mutually separate;
The first base material is posted and fixed on the basal plane, while the first base material is fitted in into first side Side;Wherein, the first base material is after fitting in the first side, the surface of first bottom edge and the first base material it Between by the first side formed difference in height, first bottom edge integrally externally protrudes out in the surface of the first base material;
Second substrate is posted and fixed on the basal plane, while second substrate is fitted in into described second side Side;Wherein, second substrate is after fitting in the second side, the surface of second bottom edge and second substrate it Between by the second side formed difference in height, second bottom edge integrally externally protrudes out in the surface of second substrate;
Putty material is at least applied and scrapes the surface for eliminating the first base material in the surface of the first base material and first bottom Difference in height between side, and by using by the surface of painting Puttying material and first bottom edge as first painted for emulsion paint Face to be painted, while using the described one end of first bottom edge far from the first side as the end in the described first face to be painted;
Putty material is at least applied to the surface and second bottom scraped and eliminate second substrate in the surface of second substrate Difference in height between side, and by using by the surface of painting Puttying material and second bottom edge as second painted for emulsion paint Face to be painted, while using the described one end of second bottom edge far from the second side as the end in the described second face to be painted.
15. the preparation method that metope according to claim 13 waits for painting face, it is characterised in that: first bottom edge is oblique Side, and one end for being connected with the first side of first bottom edge is to the vertical range of first basal plane is less than described the The one end of one bottom edge far from the first side is to the vertical range between first basal plane;It is scraped at least applying putty material In the surface step of second substrate:
Putty material is applied from the surface of the first base material and is scraped to first bottom edge of metope line section bar;The first side On also have several grooves, for being embedded in by putty material;
Second bottom edge is bevel edge, and one end for being connected with the second side of second bottom edge is to second basal plane Vertical range, less than second bottom edge end to the vertical range between second basal plane, by putty material at least Painting is scraped in the surface of second substrate the step of:
Putty material is applied from the surface of the first base material and is scraped to second bottom edge of metope line section bar;The second side On also have several grooves, for being embedded in by putty material.
16. the preparation method that metope according to claim 14 waits for painting face, it is characterised in that: by putty material at least Before painting is scraped in the surface of the first base material the step of, and the step of second substrate is fitted in the second side It later, further include following steps;
First sticky paper layer and the second sticky paper layer are provided;
The first sticky paper layer is sticked in a manner of surface and first bottom edge across the first base material, to described One substrate is formed by seam when being bonded with the first side and is sealed;
The second sticky paper layer is sticked in a manner of surface and second bottom edge across second substrate, to described Two substrates are formed by seam when being bonded with the second side and are sealed.
17. a kind of painting method, it is characterised in that: painted using emulsion paint in by the preparation-obtained institute of claim 14-16 The first face to be painted and described second is stated on painting face.
CN201810781716.8A 2018-07-17 2018-07-17 Preparation method and painting method of external corner, internal corner, wall surface and painting surface thereof Active CN108979033B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810781716.8A CN108979033B (en) 2018-07-17 2018-07-17 Preparation method and painting method of external corner, internal corner, wall surface and painting surface thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810781716.8A CN108979033B (en) 2018-07-17 2018-07-17 Preparation method and painting method of external corner, internal corner, wall surface and painting surface thereof

Publications (2)

Publication Number Publication Date
CN108979033A true CN108979033A (en) 2018-12-11
CN108979033B CN108979033B (en) 2021-07-06

Family

ID=64549052

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810781716.8A Active CN108979033B (en) 2018-07-17 2018-07-17 Preparation method and painting method of external corner, internal corner, wall surface and painting surface thereof

Country Status (1)

Country Link
CN (1) CN108979033B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110306800A (en) * 2019-07-25 2019-10-08 北京鑫源轩建筑装饰工程有限公司 A method of avoid coating in fitting-out work from cracking
WO2023108664A1 (en) * 2021-12-18 2023-06-22 苏州红泥新材料科技有限公司 Method for improving joint split resistance in plate material, joint split-resistant facing for plate material and manufacturing method therefor

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1165228A (en) * 1996-05-15 1997-11-19 于涛 Auxiliary bar for wall and its application method
WO2008010587A1 (en) * 2006-07-21 2008-01-24 Tokuyama Corporation Method of attaching decorative sheet
CN101694121A (en) * 2009-10-19 2010-04-14 湖南鑫美格新型装饰材料有限公司 External corner decorating method and external corner line applicable to decorating method
CN202148615U (en) * 2011-07-07 2012-02-22 青岛德才装饰安装工程有限公司 Waved multilayer plaster board wall surface
CN103437521A (en) * 2013-08-30 2013-12-11 陕西建工集团总公司 Plastic external corner angle bead for inner wall of building and construction method for internal and external corners of inner wall of building
CN205000612U (en) * 2015-08-13 2016-01-27 南京国豪装饰安装工程股份有限公司 Be used for fashioned scraping of wall reentrant corner piece
CN106088408A (en) * 2016-06-03 2016-11-09 浙江亚厦装饰股份有限公司 A kind of precast wall body external corner installs module
CN205875625U (en) * 2016-07-21 2017-01-11 云南工程建设总承包公司 Building wall exempts from to plaster in same direction as straight negative and positive corner structure
CN106760412A (en) * 2017-01-19 2017-05-31 俞昊 Using the door and window hole of prefabricated square staff, wall external corner and wall surface mortar construction method
CN206328983U (en) * 2016-11-09 2017-07-14 江苏爬山虎装饰工程有限公司 A kind of wall containing external corner strip

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1165228A (en) * 1996-05-15 1997-11-19 于涛 Auxiliary bar for wall and its application method
WO2008010587A1 (en) * 2006-07-21 2008-01-24 Tokuyama Corporation Method of attaching decorative sheet
CN101694121A (en) * 2009-10-19 2010-04-14 湖南鑫美格新型装饰材料有限公司 External corner decorating method and external corner line applicable to decorating method
CN202148615U (en) * 2011-07-07 2012-02-22 青岛德才装饰安装工程有限公司 Waved multilayer plaster board wall surface
CN103437521A (en) * 2013-08-30 2013-12-11 陕西建工集团总公司 Plastic external corner angle bead for inner wall of building and construction method for internal and external corners of inner wall of building
CN205000612U (en) * 2015-08-13 2016-01-27 南京国豪装饰安装工程股份有限公司 Be used for fashioned scraping of wall reentrant corner piece
CN106088408A (en) * 2016-06-03 2016-11-09 浙江亚厦装饰股份有限公司 A kind of precast wall body external corner installs module
CN205875625U (en) * 2016-07-21 2017-01-11 云南工程建设总承包公司 Building wall exempts from to plaster in same direction as straight negative and positive corner structure
CN206328983U (en) * 2016-11-09 2017-07-14 江苏爬山虎装饰工程有限公司 A kind of wall containing external corner strip
CN106760412A (en) * 2017-01-19 2017-05-31 俞昊 Using the door and window hole of prefabricated square staff, wall external corner and wall surface mortar construction method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
冯宪伟: "《做最好的装饰装修工程施工员》", 31 December 2014, 中国建材工业出版社 *
建筑工人职业技能培训教材编委会: "《建筑工人职业技能培训教材 装饰装修系列 涂裱工》", 31 August 2016, 中国建材工业出版社 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110306800A (en) * 2019-07-25 2019-10-08 北京鑫源轩建筑装饰工程有限公司 A method of avoid coating in fitting-out work from cracking
WO2023108664A1 (en) * 2021-12-18 2023-06-22 苏州红泥新材料科技有限公司 Method for improving joint split resistance in plate material, joint split-resistant facing for plate material and manufacturing method therefor

Also Published As

Publication number Publication date
CN108979033B (en) 2021-07-06

Similar Documents

Publication Publication Date Title
CN109025356A (en) A kind of exterior wall retrofit coating process
CN102518271B (en) Coating construction method of faux stones
CN108979033A (en) External corner, inner corner trim, metope and its preparation method and painting method of painting face
US20210262244A1 (en) System and method for installation of molding
CN101613570B (en) Colored gorgeous texture floor coating and construction method thereof
CN107989299A (en) A kind of coating application method of Assembled wall panels
CN103480549A (en) Construction process for wiping paint color
CN1807811A (en) Decorative anti-slip epoxy floor coating construction process
JP3191039B2 (en) Repainting method of tile and tile-like finish coating
CN110409725A (en) A kind of interior decoration method
JP5213301B2 (en) Design property imparting method and paint for design
CN209413232U (en) Profile
CN209413179U (en) Profile
JPH07119271A (en) Working method for outside angle
CN209413177U (en) Profile
CN209413181U (en) Profile
CN205476179U (en) Double -deck marine alga mud lacquer structure
CN105967760B (en) A kind of production method of Antique Imitation Tiles
CA3088901A1 (en) Method for priming silicone surfaces
JP4778979B2 (en) Coating method for design tile, design tile, polyvinyl chloride sheet or aluminum sheet
US20120324822A1 (en) Prefabricated Removable Molding System
CN219411582U (en) Artistic paint wall surface structure with pearl effect
CN103993714A (en) Method for applying alkyd resin paint to concrete wall
CN210563093U (en) Real stone paint coating for outer wall
CN107503481A (en) It is a kind of to ensure to spray straight construction method at true mineral varnish external corner

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant