CN108978975A - Fast-detachable modular integrated ceiling system - Google Patents
Fast-detachable modular integrated ceiling system Download PDFInfo
- Publication number
- CN108978975A CN108978975A CN201811174311.4A CN201811174311A CN108978975A CN 108978975 A CN108978975 A CN 108978975A CN 201811174311 A CN201811174311 A CN 201811174311A CN 108978975 A CN108978975 A CN 108978975A
- Authority
- CN
- China
- Prior art keywords
- ceiling
- connector
- prefabricated panel
- fast
- joist
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 241001669679 Eleotris Species 0.000 claims description 15
- 238000007789 sealing Methods 0.000 claims description 14
- 239000003063 flame retardant Substances 0.000 claims description 12
- 239000002184 metal Substances 0.000 claims description 8
- 235000019362 perlite Nutrition 0.000 claims description 4
- 239000010451 perlite Substances 0.000 claims description 4
- 230000002265 prevention Effects 0.000 claims description 4
- 238000002485 combustion reaction Methods 0.000 claims 1
- 238000009434 installation Methods 0.000 abstract description 8
- 230000000694 effects Effects 0.000 abstract description 4
- 238000010586 diagram Methods 0.000 description 7
- 238000000034 method Methods 0.000 description 4
- 238000000465 moulding Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 241000700647 Variola virus Species 0.000 description 1
- 210000000988 bone and bone Anatomy 0.000 description 1
- 239000010432 diamond Substances 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/04—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/06—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
Abstract
The present invention relates to a kind of fast-detachable modular integrated ceiling systems comprising ceiling, prefabricated panel, ceiling joist and ceiling board;The prefabricated panel is connected between ceiling and ground by the first connector, and the first stud connector design is Demountable;The ceiling joist is connected with prefabricated panel by the second connector, and the second stud connector design is Demountable;It is connected between the ceiling joist roof and ceiling by third connector, third stud connector design is Demountable;The ceiling board is connected with ceiling joist by the 4th connector, and the 4th stud connector design is Demountable.The present invention, which has, improves installation and conevying efficiency, easy-to-dismount effect.
Description
Technical field
The present invention relates to the technical fields of prefabricated house building, more particularly, to a kind of fast-detachable modular Integral ceiling system
System.
Background technique
In Chinese national economy development process, prefabricated house has a wide range of applications.Prefabricated house is many kinds of at present, and five
Hua Bamen, but be all with loose mails such as plate, roof truss, connectors, what assembly was got up built in the scene transported to.Heavy workload when transport,
Process is more, long in time limit when scene is built, and needs a large amount of manpower, once put up, when temporary needs is mobile, relatively difficult,
It is cumbersome.Especially in emergency, as needed to dispose a large amount of disaster affected peoples when battlefield hospital, field base depot, field work, earthquake
When, this movable plank house, which seems, to be far from suitable.
Summary of the invention
The object of the present invention is to provide a kind of fast demountables, integrated ceiling system convenient for safeguarding.
Foregoing invention purpose of the invention has the technical scheme that
A kind of fast-detachable modular integrated ceiling system, including ceiling, prefabricated panel, ceiling joist and ceiling board.
In order to enable prefabricated panel quickly to connect with ceiling and ground, and it is detachable, and the prefabricated panel passes through first
Connector is connected between ceiling and ground, and the first stud connector design is Demountable.
In order to enable ceiling joist both ends side to be quickly connected and fixed with prefabricated panel, and detachable, the ceiling joist
It is connected with prefabricated panel by the second connector, the second stud connector design is Demountable.
In order to enable ceiling joist top end part quickly to connect with ceiling, and detachable, the ceiling joist roof and day
It is connected between card by third connector, third stud connector design is Demountable.
In order to enable ceiling board quickly to connect with ceiling joist, and detachable, the ceiling board and ceiling joist pass through the
Four connectors are connected, and the 4th stud connector design is Demountable.
In order to make prefabricated panel have fire-retardant and heat insulating function, and energy partial installation, the prefabricated panel includes at least one
A list wallboard, the list wallboard includes the fire-retardant outside plate of inside and outside two layers, is provided with fire prevention perlite between two layers of fire-retardant outside plate.
It fixes on the ceiling, and can dismantle to enable single wallboard to be quickly installed, the list wallboard roof is provided with
For the sealing plate one of closed top end, baltimore groove is equipped in the middle part of the sealing plate one, which determines with the first connector
Position sliding block cooperation, constitutes the sliding way in single wallboard top wall surface;
It in order to enable single wallboard to be quickly mounted on ground, and can dismantle, the list wallboard bottom wall is provided with for closing bottom
The sealing plate two at end is equipped with trapezoidal groove, the trapezoidal sliding rail in the trapezoidal groove and the first connector in the middle part of the sealing plate two
It matches, constitutes the glide path in single wallboard wall surface.
In order to enable the first connector that rapidly prefabricated panel to be fixed between ceiling and ground, and can tear open
It unloads, first connector includes: the positioning slide being fixed on ceiling wall, and is mounted on positioning slide and prefabricated panel
Between baltimore groove and mutually matched positioning sliding block, and it is fixed on the trapezoidal sliding rail on ground;The positioning slide is a square
Shape steel pipe;The positioning sliding block is one piece and sets reeded rectangular metal block.
In order to enable the second connector that two end side portion of ceiling joist is rapidly supported and be positioned on prefabricated panel and can torn open
It unloading, second connector is the hanger that an one end connects prefabricated panel, the other end connects ceiling joist, it includes: it hangs over
Hanger at the top of prefabricated panel and the bracket plugged with hanger.
In order to enable hanger one end rapidly connect prefabricated panel, the other end also can rapidly connecting bracket, the extension
Frame is that an one end is equipped with the hook for matching and being engaged with prefabricated panel top wall surface groove, and hook is mounted on prefabricated panel
Between top wall surface groove and positioning sliding block;The other end is equipped with the metal connecting piece that the casing of grafting is matched with bracket.
Ceiling joist, the branch also can be rapidly supported in order to enable bracket one end rapidly to connect hanger, the other end
Frame is that a L-type connects plug-in unit, and transverse part is inserted into ceiling joist, is connected with ceiling joist, longitudinal direction portion inserted joint casing
In, it is now connect with casing;Longitudinal portion end is equipped with an one-way movable bolt, and the one-way movable bolt and casing cooperation are mutual
Lock.
In order to make ceiling joist longitudinal direction multiple spot stress, and it can be quickly installed or dismantle, the third connector includes: patch
The bolt that closes and be fixed on the first connecting plate at the top of ceiling joist, be connected with the first connecting plate and with connect the swollen of ceiling
Swollen screw and the adjusting nut being connected with bolt and setscrew, further includes: between the first connecting plate and ceiling joist
The spring secures rail to sleeper being fixedly connected.
It in order to enable ceiling board to be quickly mounted on ceiling joist, and can dismantle, the 4th connector includes: fitting
It is fixed on the second connecting plate of ceiling board roof, the spring secures rail to sleeper being connected with the second connecting plate and ceiling joist, described
Two connecting plates are an arch sheet, and design centre hole is moving hole, be displaced spring secures rail to sleeper can in moving hole, adjust ceiling board
Position location.
It in order to enable prefabricated panel to be quickly installed and transport, and can dismantle, the prefabricated panel includes multiple successively spelling
The single wallboard connect, it is described list wallboard forward and backward side on be arranged match yin, yang buckle, it is two neighboring list wallboard between
Connection is stitched together by the yin, yang buckle between two single wallboards, and end face is arranged in prefabricated panel length direction both ends
Plate.
In order to keep split type single wallboard interconnecting piece beautiful and generous, the yin, yang snaps connection place outside, be provided with
The trim moulding that yin, yang is clasped.
In conclusion advantageous effects of the invention are as follows:
1. using dismountable first connector, the second connector, third connector and the 4th connector, can play conveniently
The effect of ceiling board and prefabricated panel fast assembling-disassembling;
2. using multiple single wallboards for successively splicing fixation constitutes prefabricated panel, it can play and prefabricated panel is facilitated to carry and pacify
The effect of dress;
3. the second stud connector design is split type structure, hanger and bracket quickly can be connected or be dismantled, and also improve furred ceiling
The stable connection of keel in the horizontal plane.
Detailed description of the invention
Fig. 1 is overall structure diagram of the invention;
Fig. 2 is the structural schematic diagram of the first connector of the invention;
Fig. 3 is the structural schematic diagram of the second connector of the invention;
Fig. 4 is the partial enlargement diagram of part A in Fig. 1;
Fig. 5 is the partial enlargement diagram of part B in Fig. 1;
Fig. 6 is the structural schematic diagram of single wallboard of the invention;
Fig. 7 is the structural schematic diagram of the first connecting plate of the invention.
In figure, 1, ceiling;2, prefabricated panel;21, single wallboard;211, fire-retardant outside plate;212, fire prevention perlite;213, close
Sealing plate one;214, sealing plate two;22, baltimore groove;23, trapezoidal groove;24, yin buckle;25, sun buckle;26, end plates;27, block
Item;28, card slot;3, ceiling joist;4, ceiling board;5, the first connector;51, positioning slide;52, positioning sliding block;53, trapezoidal cunning
Rail;6, the second connector;61, hanger;611, it links up with;612, casing;62, bracket;621, transverse part;622, longitudinal direction portion;623,
One-way movable bolt;7, third connector;71, the first connecting plate;72, bolt;73, setscrew;74, adjusting nut;75,
One spring secures rail to sleeper;8, the 4th connector;81, the second connecting plate;82, the second spring secures rail to sleeper;83, moving hole;84, locating piece.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
A kind of fast-detachable modular integrated ceiling system, as shown in Figure 1, including ceiling 1, prefabricated panel 2, furred ceiling dragon
Bone 3 and ceiling board 4.Prefabricated panel 2 is connected between ceiling 1 and ground by the first connector 5, ceiling joist 3 with it is prefabricated
It is connected between wallboard 2 by the second connector 6,3 roof of ceiling joist is connect with ceiling 1 by third connector 7, ceiling board
4 are connect with ceiling joist 3 by the 4th connector 8.In order to enable entire integrated ceiling system quickly to connect, and it is detachable, the
A connection piece 5, the second connector 6, third connector 7 and the 4th connector 8 are both designed as Demountable.
As shown in Fig. 2, in order to enable the first connector 5 that prefabricated panel 2 is rapidly fixed on ceiling 1 and ground
Between, and can dismantle, prefabricated panel 2 is connected between ceiling 1 and ground by the sliding of the first connector 5.First connector 5
Including be fixed on 1 wall of ceiling positioning slide 51,2 roof of prefabricated panel is set baltimore groove 22, be mounted on positioning
Between 2 baltimore groove 22 of sliding rail 51 and prefabricated panel and mutually matched positioning sliding block 52, and it is fixed on the trapezoidal sliding rail on ground
53, the trapezoidal groove 23 of 2 bottom wall of prefabricated panel is set.Positioning sliding block 52 matches composition sliding way with baltimore groove 22, trapezoidal
Sliding rail 53 matches composition glide path with trapezoidal groove 23.Positioning slide 51 is a rectangular steel pipe;Positioning sliding block 52 is one piece
If reeded rectangular metal block.
As shown in figure 3, in order to enable the second connector 6 by ceiling joist 3(referring to Fig. 1) both ends side rapidly support and
Prefabricated panel 2(is positioned referring to Fig. 1) on, and can dismantle, the second connector 6 is one end connection prefabricated panel 2, an other end company
The hanger for connecing ceiling joist 3, it includes the brackets 62 for hanging over the hanger 61 at 2 top of prefabricated panel and plugging with hanger 61.It hangs
Frame 61 be one end be equipped with 2 top wall surface baltimore groove 22(of prefabricated panel referring to fig. 2) hook 611 that matches and be engaged,
Link up with 611 one end and be mounted on 2 top wall surface baltimore groove 22 of prefabricated panel and positioning sliding block 52(referring to fig. 2) between, the other end is equipped with
The metal connecting piece of the casing 612 of grafting is matched with bracket 62.Bracket 62 is that a L-type connects plug-in unit, and transverse part 621 is inserted
Enter in ceiling joist 3, be connected with ceiling joist 3, in 622 inserted joint casing 612 of longitudinal direction portion, is now connect with casing 612;It is longitudinal
622 end of portion is equipped with an one-way movable bolt 623, and the one-way movable bolt 623 and the cooperation of casing 612 interlock.
As shown in figure 4, in order to make the longitudinal multiple spot stress of ceiling joist 3, and can be quickly installed or dismantle, third connector
7 include: fitting be fixed on first connecting plate 71 at the top of ceiling joist 3, the bolt 72 being connected with the first connecting plate 71 and with
Connect the setscrew 73 of ceiling 1 and the adjusting nut 74 that is connected with bolt 72 and setscrew 7372, and for the
The first spring secures rail to sleeper 75 being fixedly connected between one connecting plate 71 and ceiling joist 3.First connecting plate 71(is referring to Fig. 7) it is square
Hardened structure, rectangular 71 middle part of the first connecting plate is upward to form the gap placed for 72 nut of bolt, the first connecting plate 71
Four angle points be fastened with ceiling joist 3 by the first spring secures rail to sleeper 75.The first spring secures rail to sleeper 75 is arranged in the present embodiment
It is the metal rivet of hollow diamonds for end, when installation, spiles in 3 roof of ceiling joist, connecting column passes through the first connecting plate
It 71 and protrudes into ceiling joist 3.
As shown in figure 5, in order to enable ceiling board 4 to be quickly mounted on ceiling joist 3, and can dismantle, the 4th connector 8
It include: that fitting is fixed on the second connecting plate 81 of 4 roof of ceiling board, the to be connected with the second connecting plate 81 and ceiling joist 3
Two spring secures rail to sleepers 82.Second connecting plate 81 is an arch sheet, and design centre hole is moving hole 83, makes the second spring secures rail to sleeper 82 can
It is displaced in moving hole 83, adjusts the position location of ceiling board 4.Be fixed in ceiling joist 3 for the second spring secures rail to sleeper 82
The locating piece 84 of clamping.
As shown in Fig. 2, prefabricated panel 2 includes at least one single wallboard 21, single wallboard 21 includes two layers of fire-retardant outside plate 211,
Fire prevention perlite 212 is provided between two layers of fire-retardant outside plate 211.To which prefabricated panel 2 has fire-retardant and heat insulating function, and can divide
Body installation.
As shown in Fig. 2, being fixed on ceiling 1 to enable single wallboard 21 to be quickly installed, and it can dismantle, single wallboard 21
Roof is provided with the sealing plate 1 for closed top end, and one 213 middle part of sealing plate is equipped with above-mentioned baltimore groove 22, the spill
The cooperation of the positioning slide 51 of slot 22 and the first connector 5 constitutes the sliding way in 21 top wall surface of single wallboard.In order to make single wallboard 21
It can be quickly mounted on ground, and can dismantle, single 21 bottom wall of wallboard is provided with the sealing plate 2 214 for closed bottom end, close
2 214 middle part of sealing plate is equipped with above-mentioned trapezoidal groove 23, the matching of trapezoidal sliding rail 53 of the trapezoidal groove 23 and the first connector 5
It closes, constitutes the glide path in 21 wall surface of single wallboard.
As shown in fig. 6, in order to enable prefabricated panel 2 to be quickly installed and transport, and can dismantle, prefabricated panel 2 includes more
A single wallboard 21 successively spliced, the yin buckle 24 and sun buckle 25 that setting matches on the forward and backward side of single wallboard 21 are adjacent
Connection between two single wallboards 21 is stitched together by the yin buckle 24 between two single wallboards 21 with sun buckle 25, in advance
End plates 26 are arranged in 2 length direction both ends of wallboard processed.In order to keep 21 interconnecting piece of split type single wallboard beautiful and generous, yin 24 Hes of buckle
On the outside of 25 junctions of sun buckle, it is provided with the trim moulding with 25 cooperation of yin buckle 24 and sun buckle, trim moulding includes strip
27, yin buckle 24 and sun buckle 25 and are provided with above-mentioned strip 27 towards the side of two layers of fire-retardant outside plate 211, and two layers fire-retardant outer
The card slot 28 being engaged by clamping with strip 27 is provided on the inside of plate 211.
The installation process of the present embodiment are as follows: positioning slide 51 and trapezoidal sliding rail 53 are fixed on smallpox by bolt 72 respectively
On plate 1 and ground, the inclination of baltimore groove 22 of prefabricated panel 2 is then docked on positioning sliding block 52 and is lifted prefabricated panel 2, is made
It is corresponding with trapezoidal sliding rail 53 to obtain trapezoidal groove 23, keeps prefabricated panel 2 vertical, prefabricated panel 2 is fastened under Gravitative Loads
On trapezoidal sliding rail 53, prefabricated panel 2 is not mutually disengaged with positioning sliding block 52 and trapezoidal sliding rail 53 at this time.By determining for ceiling joist 3
Position hanger 61 is articulated in baltimore groove 22, then the sliding insertion positioning sliding block 52 in baltimore groove 22, in realizations baltimore groove 22 and
The tight fit of positioning slide 51.
The transverse part 621 of bracket 62 is inserted into the end of ceiling joist 3, moves ceiling joist 3, longitudinal portion then up
In 622 inserted joint casings 612, now it is connect with casing 612;One-way movable bolt 623 and the cooperation of casing 612 interlock.Connected by third
Prefabricated ceiling joist 3 is mounted on 1 lower section of ceiling by fitting 7, completes the installation of ceiling joist 3.Then in 4 roof of ceiling board
The second connecting plate 81 is fixed, the installation of ceiling board 4 is realized by the second spring secures rail to sleeper 82.So far the fast of integrated ceiling system is completed
Speed installation, entire process are not necessarily to site welding, and each components are formed by prefabrication, improve installation effectiveness, convenient and efficient.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this
Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it
It is interior.
Claims (8)
1. a kind of fast-detachable modular integrated ceiling system, it is characterised in that: including ceiling (1), prefabricated panel (2), hang
Push up keel (3) and ceiling board (4);
The prefabricated panel (2) is connected between ceiling (1) and ground by the first connector (5), and the first connector (5) is set
It is calculated as Demountable;The ceiling joist (3) is connected with prefabricated panel (2) by the second connector (6), the second connection
Part (6) is designed as Demountable;Pass through third connector (7) phase between ceiling joist (3) roof and ceiling (1)
Connection, third connector (7) are designed as Demountable;The ceiling board (4) and ceiling joist (3) pass through the 4th connector
(8) it is connected, the 4th connector (8) is designed as Demountable.
2. fast-detachable modular integrated ceiling system according to claim 1, it is characterised in that: first connector
(5) include the positioning slide (51) that is fixed on ceiling (1) wall, and be mounted on positioning slide (51) and prefabricated panel (2)
Between and mutually matched positioning sliding block (52), and be fixed on the trapezoidal sliding rail (53) on ground;The positioning slide (51) is
One T-shaped metal block;The positioning sliding block (52) is a concave metal block.
3. fast-detachable modular integrated ceiling system according to claim 2, it is characterised in that: the prefabricated panel
It (2) include at least one single wallboard (21), the list wallboard (21) includes the fire-retardant outside plate of inside and outside two layers (211), two layers of resistance
Fire prevention perlite (212) is provided between combustion outside plate (211);
Described list wallboard (21) roof is provided with the sealing plate one (213) for closed top end, sealing plate one (213) middle part
Equipped with baltimore groove (22), the positioning sliding block (52) in the baltimore groove (22) and the first connector (5) cooperates, and constitutes single wallboard (21)
Sliding way in top wall surface;
Described list wallboard (21) bottom wall is provided with the sealing plate two (214) for closed bottom end, sealing plate two (214) middle part
Equipped with trapezoidal groove (23), which matches with the trapezoidal sliding rail (53) in the first connector (5), constitutes single wall
Glide path in plate (21) wall surface.
4. fast-detachable modular integrated ceiling system according to claim 3, it is characterised in that: second connector
(6) hanger that prefabricated panel (2), other end connection ceiling joist (3) are connected for an one end, it includes: hang over prefabricated panel
(2) hanger (61) at the top of and the bracket (62) plugged with hanger (61), the hanger (61) be an one end be equipped with
The hook (611) that prefabricated panel (2) top wall surface baltimore groove (22) is matched and is engaged, hook (611) are mounted on dry wall
Between plate (2) top wall surface baltimore groove (22) and positioning sliding block (52);The other end is equipped with the casing that grafting is matched with bracket (62)
(612) metal connecting piece;
The bracket (62) is that a L-type connects plug-in unit, and transverse part (621) is inserted into ceiling joist (3), with ceiling joist
(3) it is connected, in longitudinal direction portion (622) inserted joint casing (612), is connected with casing (612);Longitudinal portion (622) end
Portion is equipped with an one-way movable bolt (623), and the one-way movable bolt (623) and casing (612) cooperation interlock.
5. fast-detachable modular integrated ceiling system according to claim 1, it is characterised in that: the third connector
It (7) include: the first connecting plate (71) that fitting is fixed at the top of ceiling joist (3), the spiral shell being connected with the first connecting plate (71)
Bolt (72) and with the adjusting that connect the setscrew (73) of ceiling (1) and be connected with bolt (72) and setscrew (73)
Nut (74), further includes: the first spring secures rail to sleeper for being fixedly connected between the first connecting plate (71) and ceiling joist (3)
(75)。
6. fast-detachable modular integrated ceiling system according to claim 1, it is characterised in that: the 4th connector
(8) include: the second connecting plate (81) that fitting is fixed on ceiling board (4) roof, with the second connecting plate (81) and ceiling joist (3)
The second spring secures rail to sleeper (82) being connected, second connecting plate (81) are an arch sheet, and design centre hole is moving hole
(83), it be displaced the second spring secures rail to sleeper (82) can in moving hole (83), adjust the position location of ceiling board (4);Described hangs
The locating piece (84) for being clamped with the second spring secures rail to sleeper (82) is fixed in top keel (3).
7. fast-detachable modular integrated ceiling system according to claim 1, it is characterised in that: the prefabricated panel
(2) include multiple single wallboards (21) successively spliced, the yin, yang matched is set on the forward and backward side of the list wallboard (21)
It buckles (24,25), the connection between two neighboring list wallboard (21), is buckled by the yin, yang between two single wallboards (21)
(24,25) are stitched together, and end plates (26) are arranged in prefabricated panel (2) the length direction both ends.
8. fast-detachable modular integrated ceiling system according to claim 7, it is characterised in that: the yin, yang buckle
(24,25) it is provided with strip (27) towards the side of two layers of fire-retardant outside plate (211), on the inside of two layers of fire-retardant outside plate (211)
It is provided with the card slot (28) being engaged by clamping with strip (27).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811174311.4A CN108978975B (en) | 2018-10-09 | 2018-10-09 | Integrated furred ceiling system of modularization quick assembly disassembly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811174311.4A CN108978975B (en) | 2018-10-09 | 2018-10-09 | Integrated furred ceiling system of modularization quick assembly disassembly |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108978975A true CN108978975A (en) | 2018-12-11 |
CN108978975B CN108978975B (en) | 2024-02-27 |
Family
ID=64543376
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811174311.4A Active CN108978975B (en) | 2018-10-09 | 2018-10-09 | Integrated furred ceiling system of modularization quick assembly disassembly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108978975B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111576670A (en) * | 2020-04-20 | 2020-08-25 | 中铁建工集团有限公司 | Installation and construction process of partition boards on top of inner wall of paint spraying machine warehouse |
CN112459338A (en) * | 2020-12-02 | 2021-03-09 | 天津阳光力天装饰科技集团有限公司 | Suspended ceiling structure of light steel keel and mounting method |
CN113914664A (en) * | 2021-11-01 | 2022-01-11 | 中国人民解放军32181部队 | Quick-inserting combined movable house with door pocket |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2118763U (en) * | 1991-09-21 | 1992-10-14 | 顾业明 | Means for suspending the supporting ceiling |
CN203977674U (en) * | 2014-07-25 | 2014-12-03 | 德才装饰股份有限公司 | The plaster tablet suspended ceiling structure of sound insulation, noise reduction |
CN206273927U (en) * | 2016-12-14 | 2017-06-23 | 天津达因建材有限公司 | Furred ceiling component |
CN206538924U (en) * | 2017-01-17 | 2017-10-03 | 深圳市优住住区产业化科技发展有限公司 | Plug-in type ceiling decoration structure |
CN107514089A (en) * | 2017-08-22 | 2017-12-26 | 江苏江净空调设备有限公司 | The construction method that a kind of toilet's color steel is gone along with sb. to guard him |
CN207392570U (en) * | 2017-08-16 | 2018-05-22 | 亨特道格拉斯建筑产品(中国)有限公司 | A kind of furred ceiling push type articulating device |
CN209211747U (en) * | 2018-10-09 | 2019-08-06 | 杨建标 | Fast-detachable modular integrated ceiling system |
-
2018
- 2018-10-09 CN CN201811174311.4A patent/CN108978975B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2118763U (en) * | 1991-09-21 | 1992-10-14 | 顾业明 | Means for suspending the supporting ceiling |
CN203977674U (en) * | 2014-07-25 | 2014-12-03 | 德才装饰股份有限公司 | The plaster tablet suspended ceiling structure of sound insulation, noise reduction |
CN206273927U (en) * | 2016-12-14 | 2017-06-23 | 天津达因建材有限公司 | Furred ceiling component |
CN206538924U (en) * | 2017-01-17 | 2017-10-03 | 深圳市优住住区产业化科技发展有限公司 | Plug-in type ceiling decoration structure |
CN207392570U (en) * | 2017-08-16 | 2018-05-22 | 亨特道格拉斯建筑产品(中国)有限公司 | A kind of furred ceiling push type articulating device |
CN107514089A (en) * | 2017-08-22 | 2017-12-26 | 江苏江净空调设备有限公司 | The construction method that a kind of toilet's color steel is gone along with sb. to guard him |
CN209211747U (en) * | 2018-10-09 | 2019-08-06 | 杨建标 | Fast-detachable modular integrated ceiling system |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111576670A (en) * | 2020-04-20 | 2020-08-25 | 中铁建工集团有限公司 | Installation and construction process of partition boards on top of inner wall of paint spraying machine warehouse |
CN112459338A (en) * | 2020-12-02 | 2021-03-09 | 天津阳光力天装饰科技集团有限公司 | Suspended ceiling structure of light steel keel and mounting method |
CN113914664A (en) * | 2021-11-01 | 2022-01-11 | 中国人民解放军32181部队 | Quick-inserting combined movable house with door pocket |
Also Published As
Publication number | Publication date |
---|---|
CN108978975B (en) | 2024-02-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108978975A (en) | Fast-detachable modular integrated ceiling system | |
US3343321A (en) | Building structure with panel supports and a foundation | |
US8322096B2 (en) | Wall system for a building | |
CN209211747U (en) | Fast-detachable modular integrated ceiling system | |
CN103726597A (en) | Frame type unit curtain wall adopting auxiliary installing rack, tooth profile angle and tooth profile support | |
CN211714329U (en) | Light gauge steel gypsum board suspended ceiling structure | |
CN113914478A (en) | Modular assembly type building | |
CA2601590A1 (en) | Frames for building | |
US9453332B2 (en) | Building system, particularly a residential building | |
US3633326A (en) | Portable shelter and method for constructing the shelter | |
WO2016141488A1 (en) | Z-arch building system | |
CN209025277U (en) | A kind of metal Roof outer panel curtain wall installation part | |
US3134464A (en) | Combined joist-panel structure | |
CN206128370U (en) | Integrated wallboard and equipment room | |
CN115822160A (en) | Design structure of quick-mounting type arc ceiling decorative surface layer | |
US651251A (en) | Portable building. | |
CN210342377U (en) | Closed type combined floor support plate assembly | |
CN210342331U (en) | Assembled hard mounting wall structure | |
BR102019014272A2 (en) | constructive system of industrialized house | |
CN111335487A (en) | Assembled smoke-blocking vertical wall structure, construction method thereof and glass installation auxiliary part | |
US2363296A (en) | Securing means for insulating panels | |
CN216920949U (en) | A coupling assembling for connecting main joist and decorative board | |
CN116657813B (en) | Construction method of multi-curvature variable-angle type wavy roof system | |
CN210263476U (en) | Mounting structure of high wall body in large tracts of land unidirectional flow toilet | |
CN207944738U (en) | A kind of packaging board house |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |