CN108978813A - A kind of decoration construction PVC water pipe union elbow dredger - Google Patents
A kind of decoration construction PVC water pipe union elbow dredger Download PDFInfo
- Publication number
- CN108978813A CN108978813A CN201810831820.3A CN201810831820A CN108978813A CN 108978813 A CN108978813 A CN 108978813A CN 201810831820 A CN201810831820 A CN 201810831820A CN 108978813 A CN108978813 A CN 108978813A
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- union elbow
- dredging
- rod
- water tank
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03C—DOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
- E03C1/00—Domestic plumbing installations for fresh water or waste water; Sinks
- E03C1/12—Plumbing installations for waste water; Basins or fountains connected thereto; Sinks
- E03C1/30—Devices to facilitate removing of obstructions in waste-pipes or sinks
- E03C1/302—Devices to facilitate removing of obstructions in waste-pipes or sinks using devices moved through the pipes
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03C—DOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
- E03C1/00—Domestic plumbing installations for fresh water or waste water; Sinks
- E03C1/12—Plumbing installations for waste water; Basins or fountains connected thereto; Sinks
- E03C1/30—Devices to facilitate removing of obstructions in waste-pipes or sinks
- E03C1/304—Devices to facilitate removing of obstructions in waste-pipes or sinks using fluid under pressure
- E03C1/308—Devices to facilitate removing of obstructions in waste-pipes or sinks using fluid under pressure by means of a pumping device
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Domestic Plumbing Installations (AREA)
- Sewage (AREA)
Abstract
The present invention relates to decoration construction technical field more particularly to a kind of decoration construction PVC water pipe union elbow dredgers.The technical problem to be solved by the present invention is to solve present dredger not dredging concrete, it has not been convenient to the problem of people use.In order to solve the above-mentioned technical problem, the present invention provides such a decoration construction PVC water pipe union elbow dredgers, including pedestal, protective frame is fixedly connected at the top of the pedestal, mounting plate is fixedly connected in the middle part of the base top, the top of the mounting plate, which is from left to right fixedly connected sequentially, water impact mechanism and bend pipe dredging mechanism.Bend pipe dredging mechanism of the present invention is slowly rotated to the concrete grinding in union elbow, dredged, be convenient for people to use, and noise adsorbing mechanism by bend pipe dredging mechanism work when noise adsorb, the propagation for reducing noise avoids noise harm caused by people.
Description
Technical field
The present invention relates to decoration construction technical fields more particularly to a kind of decoration construction PVC water pipe union elbow to dredge
Device.
Background technique
At present in construction, the connection between the PVC water pipe of toilet mostly uses union elbow to be attached, and makes
Used time can accumulate a part of water in pipe bent position and form water seal, prevent the foul smell in main drainage from entering toilet, still, in room
It is main to find that some union elbows are blocked by concrete when fitting up to house, it is well known that the union elbow of toilet is
At the top of the toilet of next layer of resident, after the toilet of next layer of resident carries out furred ceiling, union elbow can not then be carried out more
It changes, union elbow can only be dredged, however present dredger is preferable to the dredging effect of house refuse and hair, and
Concrete can not be dredged, it has not been convenient to the use of people, for this purpose, that we have proposed a kind of decoration constructions is curved with PVC water pipe
Pipe fitting dredger.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides a kind of decoration construction PVC water pipe union elbow dredger,
Has advantage easy to use, it is preferable to the dredging effect of house refuse and hair to solve present dredger, and can not
Concrete is dredged, it has not been convenient to the problem of people use.
(2) technical solution
To realize above-mentioned technical problem, the present invention provides such a decoration construction PVC water pipe union elbows to dredge
Device, including pedestal are fixedly connected with protective frame at the top of the pedestal, installation are fixedly connected in the middle part of the base top
Plate, the top of the mounting plate, which is from left to right fixedly connected sequentially, water impact mechanism and bend pipe dredging mechanism, the protection
Frame inner wall is fixedly connected with noise adsorbing mechanism at the top of bend pipe dredging mechanism side, and up and down two on the left of the protective frame
End is fixedly connected to the first arrangement bar, and the upper and lower ends on the right side of the protective frame are fixedly connected to the second arrangement bar, described
Middle part at the top of protective frame is fixedly connected with handle, is fixedly attached rubber sleeve in the middle part of the handle outer surface.
Further, the water impact mechanism includes water tank, and the bottom of the water tank is fixedly connected on mounting plate top
The left side in portion, the bottom inside the water tank are placed with water pump, and the drainage position fixation of the water pump is communicated with drainpipe, the row
Water pipe runs through far from one end of water pump and extends to the outside of water tank, and the junction of the drainpipe and water tank is provided with sealing
Set, the drainpipe are communicated with spray head far from one end fixation of water pump, and the side inside the water tank is provided with level measuring machine
The middle part fixation of structure, the tank top is communicated with filler pipe, and the screw top of the filler pipe is socketed with sealing cover.
Further, the level measuring mechanism includes buoyant spheres, and the buoyant spheres are located at the inside of water tank, described floating
It is fixedly connected with fixed block in the middle part of power top dome portion, fly rod, the top of the fly rod are fixedly connected at the top of the fixed block
Through water tank and the top of water tank is extended to, position-arresting disk is fixedly connected at the top of the fly rod, the top of the position-arresting disk is solid
Surely it is connected with measuring block.
Further, the bend pipe dredging mechanism includes pedestal, and the bottom of the pedestal is fixedly connected on mounting plate top
The right side in portion is fixedly connected with decelerating motor at the top of the pedestal, and the output shaft of the decelerating motor is fixed by shaft coupling
It is connected with rotating bar, the rotating bar runs through far from one end of decelerating motor and extend to the right side of protective frame, the rotating bar
One end far from decelerating motor is fixedly connected with the first connecting flange, and the side of first connecting flange is bolted company
It is connected to the second connecting flange, second connecting flange is fixedly connected with dredging hose, institute far from the side of the first connecting flange
The one end for stating dredging hose is fixedly connected with the first protective plate, and the upper and lower ends of first protective plate side are fixedly connected to
Connecting rod, one end of the connecting rod are fixedly connected with the second protective plate, and the one end of second protective plate far from connecting rod is solid
Surely it is connected with conditioning box, the middle part on the right side of the conditioning box inner wall is fixedly connected with mounting rod, inside second protective plate
Middle part is inlaid with threaded sleeve, and the internal whorl of the threaded sleeve is plugged with threaded rod, the left side of the screw thread rod outer surface
Screw thread is socketed with nut, and the right end of the left contact of the side of the nut and the second protective plate, the threaded rod runs through and prolongs
The inside of conditioning box is extended to, and is fixedly connected with telescopic rod between threaded rod and mounting rod, the right side of two sides above and below the threaded rod
End is connected with the first adjusting rod, and the two sides up and down of the mounting rod are connected with the second adjusting rod, and described first
Adjusting rod, which is intersected with the middle part of the second adjusting rod by shaft, to be flexibly connected, the one end of second adjusting rod far from mounting rod with
The one end for dredging block inner sidewall is flexibly connected, and the other end of the dredging block inner sidewall offers sliding slot, the inside of the sliding slot
Sliding block is slidably connected, the side of the sliding block is flexibly connected with the first adjusting rod far from one end of threaded rod, the dredging block
Lateral wall be fixedly connected with turning gear, be fixedly connected with rotating block on the right side of the conditioning box, the right side of the rotating block is solid
Surely it is connected with half knuckle-tooth.
Further, the outer ring of first protective plate and the second protective plate offers annular groove, and the annular is recessed
The internal activity of slot is socketed with wear-resistant pad.
Further, the noise adsorbing mechanism includes U-shaped bar, and one end of the U-shaped bar is fixedly connected on protective frame
The top of inner wall side, and U-shaped bar is located at the surface of decelerating motor, it is fixed between the U-shaped bar inner bottom wall and inner roof wall to connect
It is connected to abatvoix, the U-shaped bar is far from being fixedly connected with sound-absorbing ball in the middle part of protective frame one end.
(3) beneficial effect
The present invention provides a kind of decoration construction PVC water pipe union elbow dredger, have it is following the utility model has the advantages that
1, decoration construction PVC water pipe union elbow dredger, when being particularly suitable for decoration construction, PVC water pipe is curved
The dredging of concrete in pipe fitting dredges bend pipe by water impact mechanism slowly to filling the water in the union elbow of PVC water pipe
One end of mechanism is inserted into the position of PVC water pipe union elbow blocking, and bend pipe dredging mechanism is slowly rotated in union elbow
Concrete grinding, dredged, be convenient for people to use, and noise adsorbing mechanism by bend pipe dredging mechanism work when
Noise adsorbed, reduce the propagation of noise, avoid noise harm caused by people.
2, the decoration construction is inserted spray head by the setting of water impact mechanism with PVC water pipe union elbow dredger
Entering into the PVC water pipe of blocking, water pump is located at the bottom inside water tank, and the water in water tank is adsorbed in pump working operation,
It is sprayed from spray head by drainpipe, concrete in union elbow is soaked, facilitate bend pipe dredging mechanism in union elbow
Concrete is dredged.
3, decoration construction PVC water pipe union elbow dredger, through the setting of level measuring mechanism, in water tank
Water level rise when, buoyant spheres then move up, by fly rod drive measuring block move up, the water level decreasing in water tank
When, buoyant spheres then move down, so that measuring block moves down, so that water inside people's more intuitive understanding water tank
Number, meanwhile, avoid Water in Water Tanks amount less so that water pump dallies, cause water pump to damage, improve the service life of water pump.
4, decoration construction PVC water pipe union elbow dredger, passes through the setting of bend pipe dredging mechanism, decelerating motor
Work operation drives rotating bar rotation, and one end of rotating bar is solid by the first connecting flange and the second connecting flange and dredging hose
Fixed connection drives dredging hose rotation, and the one end for dredging hose is fixedly connected with the first protective plate, and the first protective plate passes through connecting rod
It is fixedly connected with the second protective plate, the side of the second protective plate is fixedly connected with conditioning box, and the side of conditioning box is fixedly connected with rotation
Block so that the rotation of conditioning box and rotating block simultaneously, is ground the concrete at union elbow, to union elbow into
Row dredging, is convenient for people to use.
5, decoration construction PVC water pipe union elbow dredger, passes through the first connecting flange and the second connecting flange
Setting, the first connecting flange and the second connecting flange be fixedly connected by bolt, is facilitated and is carried out more to dredging hose
It changes, better adaptability, different-diameter PVC water pipe particular situation can be effectively adapted to.
6, decoration construction PVC water pipe union elbow dredger, passes through the first protective plate, the second protective plate, annular
Groove and wear-resistant pad are used cooperatively, and the diameter of the first protective plate and the second protective plate and the diameter of union elbow are identical, are being dredged
When logical hose rotation, the inner wall sliding of the first protective plate and wear-resistant pad and union elbow on the second protective plate, to conditioning box and
Rotating block plays the effect of support and restriction, avoids conditioning box and rotating block and contacts with the inner wall of union elbow, causes curved
Pipe fitting damage, the effect of protection is played when being dredged to union elbow.
7, decoration construction PVC water pipe union elbow dredger is delayed by being used cooperatively for rotating block and half knuckle-tooth
The dynamic rotating block of slow-speed will drive semicircle tooth spiral and turn, and is slowly ground to the concrete inside union elbow, can be effective
Concrete in union elbow is smashed, to dredge union elbow.
8, decoration construction PVC water pipe union elbow dredger is used cooperatively by dredging block and turning gear,
When being tightened to nut, so that the first adjusting rod and the second adjusting rod are close to each other, so that the movement of dredging block outward, it will
The expansion outward of the aperture of concrete slowly, can mill to the concrete in union elbow from middle part when progressive outward
It cuts, improves the effect of dredging.
9, decoration construction PVC water pipe union elbow dredger, by the setting of telescopic rod, in the position to threaded rod
It sets when being adjusted, fixed and guiding effect is played to threaded rod, so that fixed more steady of threaded rod, mentions simultaneously
The high stability of dredging block work.
10, decoration construction PVC water pipe union elbow dredger, passes through the setting of noise adsorbing mechanism, abatvoix
The noise generated when decelerating motor can work with sound-absorbing ball is constantly eliminated, and is reduced the propagation of noise, is avoided noise pair
It is endangered caused by people.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Fig. 2 is level measuring mechanism structure schematic diagram of the present invention;
Fig. 3 is partial enlarged view at the A of Fig. 1 of the present invention;
Fig. 4 is rotating block structural side view of the present invention;
Fig. 5 is noise adsorbing mechanism structural schematic diagram of the present invention.
In figure: 1 pedestal, 2 protective frames, 3 mounting plates, 4 water impact mechanisms, 401 water tanks, 402 water pumps, 403 sealing shrouds,
404 drainpipes, 405 spray heads, 406 level measuring mechanisms, 4061 buoyant spheres, 4062 fixed blocks, 4063 fly rods, 4064 position-arresting disks,
4065 measuring blocks, 407 filler pipes, 408 sealing covers, 5 bend pipe dredging mechanisms, 501 pedestals, 502 decelerating motors, 503 rotating bars,
504 first connecting flanges, 505 second connecting flanges, 506 dredging hoses, 507 first protective plates, 508 connecting rods, 509 second are prevented
Protection plate, 510 annular grooves, 511 wear-resistant pads, 512 conditioning boxes, 513 mounting rods, 514 threaded sleeves, 515 threaded rods, 516 nuts,
517 first adjusting rods, 518 second adjusting rods, 519 dredging blocks, 520 sliding slots, 521 sliding blocks, 522 turning gears, 523 rotating blocks, 524
Telescopic rod, 525 half knuckle-tooth, 6 noise adsorbing mechanisms, 601U shape bar, 602 abatvoixs, 603 sound-absorbing balls, 7 first arrange bar, 8 second
Arrange bar, 9 handles, 10 rubber sleeves.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig. 1-5, a kind of decoration construction PVC water pipe union elbow dredger, including pedestal 1, the top of pedestal 1
Portion is fixedly connected with protective frame 2, and the middle part at 1 top of pedestal is fixedly connected with mounting plate 3, the top of mounting plate 3 from left to right according to
Secondary to be fixedly connected with water impact mechanism 4 and bend pipe dredging mechanism 5, water impact mechanism 4 includes water tank 401, water tank 401
Bottom is fixedly connected on the left side at 3 top of mounting plate, and the bottom inside water tank 401 is placed with water pump 402, the draining of water pump 402
Place's fixation is communicated with drainpipe 404, and drainpipe 404 runs through far from one end of water pump 402 and extend to the outside of water tank 401, row
The junction of water pipe 404 and water tank 401 is provided with sealing shroud 403, and drainpipe 404 is communicated with far from one end fixation of water pump 402
Spray head 405, the side inside water tank 401 are provided with level measuring mechanism 406, the middle part at 401 top of water tank is fixed be communicated with plus
Water pipe 407, the screw top of filler pipe 407 are socketed with sealing cover 408, by the setting of water impact mechanism 4, by spray head 405
It is inserted into the PVC water pipe of blocking, water pump 402 is located at the bottom inside water tank 401, and the work operation of water pump 402 will be in water tank 401
Water adsorbed, sprayed from spray head 405 by drainpipe 404, concrete in union elbow soaked, facilitate bend pipe dredge
Logical mechanism 5 dredges concrete in union elbow.
Level measuring mechanism 406 includes buoyant spheres 4061, and buoyant spheres 4061 are located at the inside of water tank 401, buoyant spheres
The middle part at 4061 tops is fixedly connected with fixed block 4062, and the top of fixed block 4062 is fixedly connected with fly rod 4063, fly rod
4063 top runs through water tank 401 and extends to the top of water tank 401, and the top of fly rod 4063 is fixedly connected with position-arresting disk
4064, the top of position-arresting disk 4064 is fixedly connected with measuring block 4065, by the setting of level measuring mechanism 406, in water tank 401
In water level rise when, buoyant spheres 4061 then move up, by fly rod 4063 drive measuring block 4065 move up, in water tank
When water level decreasing in 401, buoyant spheres 4061 are then moved down, so that measuring block 4065 moves down, so that people are more
Add get information about 401 inside water of water tank number, meanwhile, avoid in water tank 401 water less so that water pump 402 dallies,
It causes water pump 402 to damage, improves the service life of water pump 402.
Bend pipe dredging mechanism 5 includes pedestal 501, and the bottom of pedestal 501 is fixedly connected on the right side at 3 top of mounting plate,
The top of pedestal 501 is fixedly connected with decelerating motor 502, and the output shaft of decelerating motor 502 is fixedly connected with by shaft coupling to be turned
Lever 503, rotating bar 503 run through far from one end of decelerating motor 502 and extend to the right side of protective frame 2, and rotating bar 503 is separate
One end of decelerating motor 502 is fixedly connected with the first connecting flange 504, and the side of the first connecting flange 504 is bolted
It is connected with the second connecting flange 505, passes through the setting of the first connecting flange 504 and the second connecting flange 505, the first connecting flange
504 and second connecting flange 505 be fixedly connected by bolt, facilitate to dredging hose 506 replace, adaptability is more
It is good, different-diameter PVC water pipe particular situation can be effectively adapted to, the second connecting flange 505 is far from the first connecting flange 504
Side be fixedly connected with dredging hose 506, one end of dredging hose 506 is fixedly connected with the first protective plate 507, the first protection
The upper and lower ends of 507 side of disk are fixedly connected to connecting rod 508, and one end of connecting rod 508 is fixedly connected with the second protective plate
509, the outer ring of the first protective plate 507 and the second protective plate 509 offers annular groove 510, and the inside of annular groove 510 is living
It is dynamic to be socketed with wear-resistant pad 511, pass through matching for the first protective plate 507, the second protective plate 509, annular groove 510 and wear-resistant pad 511
It closes and uses, the diameter of the first protective plate 507 and the second protective plate 509 is identical as the diameter of union elbow, revolves in dredging hose 506
When turning, the inner wall of wear-resistant pad 511 and union elbow on the first protective plate 507 and the second protective plate 509 is slided, to conditioning box
512 and rotating block 523 play the effect of support and restriction, avoid the interior of conditioning box 512 and rotating block 523 and union elbow
Wall contact, causes union elbow to damage, plays the effect of protection to union elbow when being dredged.
Second protective plate 509 is fixedly connected with conditioning box 512,512 inner wall of conditioning box right side far from one end of connecting rod 508
Middle part be fixedly connected with mounting rod 513, the middle part inside the second protective plate 509 is inlaid with threaded sleeve 514, threaded sleeve
514 internal whorl is plugged with threaded rod 515, and the left side screw thread of 515 outer surface of threaded rod is socketed with nut 516, nut 516
The left contact of side and the second protective plate 509, the right end of threaded rod 515 run through and extend to the inside of conditioning box 512, and spiral shell
Telescopic rod 524 is fixedly connected between rasp bar 515 and mounting rod 513, by the setting of telescopic rod 524, to threaded rod 515
When position is adjusted, fixed and guiding effect is played to threaded rod 515, is more put down so that threaded rod 515 is fixed
Surely, while the stability that dredging block 519 works is improved, the right end of about 515 two sides of threaded rod is connected with the first tune
Pole 517, the two sides up and down of mounting rod 513 are connected with the second adjusting rod 518, and the first adjusting rod 517 and second is adjusted
The middle part of bar 518 is intersected by shaft to be flexibly connected, in the one end of the second adjusting rod 518 far from mounting rod 513 and dredging block 519
One end of side wall is flexibly connected, and the other end of dredging 519 inner sidewall of block offers sliding slot 520, the internal slide connection of sliding slot 520
There is sliding block 521, the side of sliding block 521 is flexibly connected with the first adjusting rod 517 far from one end of threaded rod 515, dredging block 519
Lateral wall is fixedly connected with turning gear 522, is used cooperatively by dredging block 519 and turning gear 522, carries out to nut 516
When tightening, so that the first adjusting rod 517 and the second adjusting rod 518 are close to each other, so that the movement of dredging block 519 outward, it will
The expansion outward of the aperture of concrete slowly, can mill to the concrete in union elbow from middle part when progressive outward
It cuts, improves the effect of dredging, the right side of conditioning box 512 is fixedly connected with rotating block 523, and the right side of rotating block 523 is fixed to be connected
It is connected to half knuckle-tooth 525, by being used cooperatively for rotating block 523 and half knuckle-tooth 525, the rotating block 523 slowly rotated will drive half
Knuckle-tooth 525 rotates, and is slowly ground to the concrete inside union elbow, can be effectively by concrete in union elbow
It smashes, to dredge union elbow, by the setting of bend pipe dredging mechanism 5, the work operation of decelerating motor 502 drives rotating bar
One end of 503 rotations, rotating bar 503 is fixed by the first connecting flange 504 and the second connecting flange 505 and dredging hose 506
Connection drives dredging hose 506 to rotate, and one end of dredging hose 506 is fixedly connected with the first protective plate 507, the first protective plate 507
It is fixedly connected with the second protective plate 509 by connecting rod 508, the side of the second protective plate 509 is fixedly connected with conditioning box 512, adjusts
The side of section frame 512 is fixedly connected with rotating block 523, so that the rotation of conditioning box 512 and rotating block 523 simultaneously, to bend pipe
The concrete of joint is ground, and is dredged to union elbow, is convenient for people to use.
2 inner wall of protective frame is fixedly connected with noise adsorbing mechanism 6 at the top of 5 side of bend pipe dredging mechanism, and noise is inhaled
Random structure 6 includes U-shaped bar 601, and one end of U-shaped bar 601 is fixedly connected on the top of 2 inner wall side of protective frame, and U-shaped bar
601 are located at the surface of decelerating motor 502, are fixedly connected with abatvoix 602, U-shaped between 601 inner bottom wall of U-shaped bar and inner roof wall
Bar 601 passes through the setting of noise adsorbing mechanism 6, abatvoix far from sound-absorbing ball 603 is fixedly connected in the middle part of 2 one end of protective frame
602 and sound-absorbing ball 603 when decelerating motor 502 can be worked the noise that generates constantly eliminate, reduce the propagation of noise, avoid
Noise is endangered caused by people.
The upper and lower ends in 2 left side of protective frame are fixedly connected to the first arrangement bar 7, arrange setting for bar 7 by two first
Set, drainpipe 404 when not in use, drainpipe 404 can be wrapped between two first arrangement bars 7, facilitate drainpipe
The upper and lower ends of 404 arrangement, two 2 right sides of protective frame are fixedly connected to the second arrangement bar 8, pass through two second arrangement bars
8 setting is dredging hose 506 when not in use, dredging hose 506 can be wrapped between two second arrangement bars 8, convenient
The middle part of the arrangement of dredging hose 506,2 top of protective frame is fixedly connected with handle 9, the middle part fixing sleeve of 9 outer surface of handle
It is connected to rubber sleeve 10, decoration construction PVC water pipe union elbow dredger, when being particularly suitable for decoration construction, PVC water pipe
The dredging of concrete in union elbow, by water impact mechanism 4 slowly to being filled the water in the union elbow of PVC water pipe, by bend pipe
One end of dredging mechanism 5 is inserted into the position of PVC water pipe union elbow blocking, and bend pipe dredging mechanism 5 is slowly rotated to bend pipe
Concrete grinding in connector, is dredged, is convenient for people to use, and noise adsorbing mechanism 6 is by bend pipe dredging machine
Noise when structure 5 works is adsorbed, and is reduced the propagation of noise, is avoided noise harm caused by people.
Working principle: when in use, spray head 405 being inserted into the PVC water pipe of blocking, and water pump 402 is located in water tank 401
Water in water tank 401 is adsorbed, is sprayed from spray head 405 by drainpipe 404 by the bottom in portion, the work operation of water pump 402,
Concrete in union elbow is soaked, dredging hose 506 is then inserted into blocking far from one end of the first connecting flange 505
In PVC water pipe, so that rotating block 523 is contacted with the concrete in union elbow, the work operation of decelerating motor 502 drives rotating bar
One end of 503 rotations, rotating bar 503 is fixed by the first connecting flange 504 and the second connecting flange 505 and dredging hose 506
Connection drives dredging hose 506 to rotate, and one end of dredging hose 506 is fixedly connected with the first protective plate 507, the first protective plate 507
It is fixedly connected with the second protective plate 509 by connecting rod 508, the side of the second protective plate 509 is fixedly connected with conditioning box 512, adjusts
The side of section frame 512 is fixedly connected with rotating block 523, so that the rotation of conditioning box 512 and rotating block 523 simultaneously, to bend pipe
The concrete of joint is ground, resistance on the first protective plate 507 and the second protective plate 509 when dredging the rotation of hose 506
The inner wall for grinding pad 511 and union elbow slides, and the effect of support and restriction is played to conditioning box 512 and rotating block 523, is avoided
Conditioning box 512 and rotating block 523 are contacted with the inner wall of union elbow, and union elbow is caused to damage, in rotating block 523 by coagulation
After earth boring auger goes out an aperture, conditioning box 512 is located at the inside in aperture, tightens to nut 516, so that the first adjusting rod
517 and second adjusting rod 518 it is close to each other so that the movement outward of dredging block 519, by the aperture of concrete slowly outside
Side expansion, can grinding to the concrete in union elbow from middle part when progressive outward, improve the effect of dredging,
Control mode of the invention is automatically controlled by controller, the skill that the control circuit of controller passes through this field
Art personnel's simple programming can be realized, and the offer of power supply also belongs to the common knowledge of this field, and the present invention is mainly used to protect
Mechanical device is protected, so the present invention is not explained control mode and circuit connection.
In conclusion decoration construction PVC water pipe union elbow dredger, when being particularly suitable for decoration construction, PVC
The dredging of concrete in water pipe union elbow will by water impact mechanism 4 slowly to filling the water in the union elbow of PVC water pipe
One end of bend pipe dredging mechanism 5 is inserted into the position of PVC water pipe union elbow blocking, the slowly rotation pair of bend pipe dredging mechanism 5
Concrete grinding in union elbow, is dredged, is convenient for people to use, and noise adsorbing mechanism 6 dredges bend pipe
Noise when logical mechanism 5 works is adsorbed, and is reduced the propagation of noise, is avoided noise harm caused by people.
By the setting of water impact mechanism 4, spray head 405 is inserted into the PVC water pipe of blocking, water pump 402 is located at water
Bottom inside case 401, the water in water tank 401 is adsorbed in the work operation of water pump 402, by drainpipe 404 from spray head 405
Concrete in union elbow is soaked in middle ejection, facilitates bend pipe dredging mechanism 5 and dredges to concrete in union elbow.
By the setting of level measuring mechanism 406, when water level in water tank 401 rises, buoyant spheres 4061 are then to moving up
It is dynamic, drive measuring block 4065 to move up by fly rod 4063, when water level decreasing in water tank 401, buoyant spheres 4061 then to
Lower movement, so that measuring block 4065 moves down, so that 401 inside water of people's more intuitive understanding water tank is more
It is few, meanwhile, avoid water in water tank 401 less so that the idle running of water pump 402, causes water pump 402 to damage, improve water pump 402
Service life.
By the setting of the first connecting flange 504 and the second connecting flange 505, the first connecting flange 504 and the second connection
Flange 505 is fixedly connected by bolt, is facilitated and is replaced to dredging hose 506, better adaptability can be effective
Adapt to different-diameter PVC water pipe particular situation.
By being used cooperatively for the first protective plate 507, the second protective plate 509, annular groove 510 and wear-resistant pad 511, first
The diameter of protective plate 507 and the second protective plate 509 is identical as the diameter of union elbow, and when dredging the rotation of hose 506, first is anti-
The inner wall of wear-resistant pad 511 and union elbow in protection plate 507 and the second protective plate 509 slides, to conditioning box 512 and rotating block
523 play the effect of support and restriction, avoid conditioning box 512 and rotating block 523 is contacted with the inner wall of union elbow, cause
Union elbow damage, the effect of protection is played when being dredged to union elbow.
It is used cooperatively by dredging block 519 and turning gear 522, when being tightened to nut 516, so that first is adjusted
Bar 517 and the second adjusting rod 518 are close to each other so that the movement outward of dredging block 519, by the aperture of concrete slowly to
Outside expansion, can grinding to the concrete in union elbow from middle part when progressive outward, improve the effect of dredging.
By being used cooperatively for rotating block 523 and half knuckle-tooth 525, the rotating block 523 slowly rotated will drive half knuckle-tooth 525
Rotation, is slowly ground the concrete inside union elbow, can effectively be smashed concrete in union elbow, from
And union elbow is dredged, by the setting of bend pipe dredging mechanism 5, the work operation of decelerating motor 502 drives rotating bar 503 to rotate,
One end of rotating bar 503 is fixedly connected by the first connecting flange 504 and the second connecting flange 505 with dredging hose 506, is driven
It dredges hose 506 to rotate, one end of dredging hose 506 is fixedly connected with the first protective plate 507, and the first protective plate 507 passes through connection
Bar 508 is fixedly connected with the second protective plate 509, and the side of the second protective plate 509 is fixedly connected with conditioning box 512, conditioning box 512
Side is fixedly connected with rotating block 523, so that the rotation of conditioning box 512 and rotating block 523 simultaneously, to mixing at union elbow
Solidifying soil is ground, and is dredged to union elbow, is convenient for people to use.
By the setting of noise adsorbing mechanism 6, abatvoix 602 and sound-absorbing ball 603 generate when decelerating motor 502 can work
Noise constantly eliminate, reduce the propagation of noise, avoid noise harm caused by people.
The configuration of the present invention is simple, design are reasonable and easy to operate, solve present dredger to house refuse and head
The dredging effect of hair is preferable, and can not dredge to concrete, it has not been convenient to the problem of people use.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (6)
1. a kind of decoration construction PVC water pipe union elbow dredger, including pedestal (1), it is characterised in that: the pedestal
(1) it is fixedly connected at the top of protective frame (2), the middle part at the top of the pedestal (1) is fixedly connected with mounting plate (3), the peace
The top of loading board (3), which is from left to right fixedly connected sequentially, water impact mechanism (4) and bend pipe dredging mechanism (5), the protection
Frame (2) inner wall is fixedly connected with noise adsorbing mechanism (6) at the top of bend pipe dredging mechanism (5) side, the protective frame (2)
The upper and lower ends in left side are fixedly connected to the first arrangement bar (7), and the upper and lower ends on the right side of the protective frame (2) are fixedly connected with
There is the second arrangement bar (8), the middle part at the top of the protective frame (2) is fixedly connected with handle (9), handle (9) outer surface
Middle part is fixedly attached rubber sleeve (10).
2. a kind of decoration construction according to claim 1 PVC water pipe union elbow dredger, it is characterised in that: institute
Stating water impact mechanism (4) includes water tank (401), and the bottom of the water tank (401) is fixedly connected at the top of mounting plate (3)
Left side, the internal bottom of the water tank (401) are placed with water pump (402), the fixed row of being communicated with of the drainage position of the water pump (402)
Water pipe (404), the outside of water tank (401) is run through and extended to the drainpipe (404) far from the one end of water pump (402), described
The junction of drainpipe (404) and water tank (401) is provided with sealing shroud (403), and the drainpipe (404) is far from water pump (402)
One end fixation be communicated with spray head (405), the internal side of the water tank (401) is provided with level measuring mechanism (406), described
Middle part fixation at the top of water tank (401) is communicated with filler pipe (407), and the screw top of the filler pipe (407) is socketed with sealing
It covers (408).
3. a kind of decoration construction according to claim 2 PVC water pipe union elbow dredger, it is characterised in that: institute
Stating level measuring mechanism (406) includes buoyant spheres (4061), and the buoyant spheres (4061) are located at the inside of water tank (401), institute
It states the middle part at the top of buoyant spheres (4061) to be fixedly connected with fixed block (4062), be fixedly connected at the top of the fixed block (4062)
Have fly rod (4063), the top of the fly rod (4063) runs through water tank (401) and extends to the top of water tank (401), described floating
It is fixedly connected at the top of bar (4063) position-arresting disk (4064), is fixedly connected with measuring block at the top of the position-arresting disk (4064)
(4065)。
4. a kind of decoration construction according to claim 3 PVC water pipe union elbow dredger, it is characterised in that: institute
Stating bend pipe dredging mechanism (5) includes pedestal (501), and the bottom of the pedestal (501) is fixedly connected at the top of mounting plate (3)
Right side is fixedly connected with decelerating motor (502) at the top of the pedestal (501), and the output shaft of the decelerating motor (502) passes through
Shaft coupling is fixedly connected with rotating bar (503), and the rotating bar (503) is run through and extended far from the one end of decelerating motor (502)
To the right side of protective frame (2), the rotating bar (503) is fixedly connected with the first connection method far from the one end of decelerating motor (502)
Blue (504), the side of first connecting flange (504) have been bolted to connection the second connecting flange (505), and described the
Two connecting flanges (505) are fixedly connected with dredging hose (506) far from the side of the first connecting flange (504), and the dredging is soft
One end of pipe (506) is fixedly connected with the first protective plate (507), and the upper and lower ends of the first protective plate (507) side are solid
Surely it is connected with connecting rod (508), one end of the connecting rod (508) is fixedly connected with the second protective plate (509), and described second is anti-
Protection plate (509) is fixedly connected with conditioning box (512) far from the one end of connecting rod (508), on the right side of conditioning box (512) inner wall
Middle part is fixedly connected with mounting rod (513), and the internal middle part of second protective plate (509) is inlaid with threaded sleeve (514), institute
The internal whorl for stating threaded sleeve (514) is plugged with threaded rod (515), the left side thread bush of threaded rod (515) outer surface
It is connected to nut (516), the side of the nut (516) and the left contact of the second protective plate (509), the threaded rod (515)
Right end run through and extend to the inside of conditioning box (512), and be fixedly connected between threaded rod (515) and mounting rod (513)
The right end of telescopic rod (524), the threaded rod (515) two sides up and down is connected with the first adjusting rod (517), the installation
The two sides up and down of bar (513) are connected with the second adjusting rod (518), first adjusting rod (517) and the second adjusting rod
(518) middle part by shaft intersect be flexibly connected, second adjusting rod (518) far from mounting rod (513) one end and dredge
One end of logical block (519) inner sidewall is flexibly connected, and the other end of described dredging block (519) inner sidewall offers sliding slot (520), institute
The internal slide for stating sliding slot (520) is connected with sliding block (521), and the side of the sliding block (521) and the first adjusting rod (517) are separate
One end of threaded rod (515) is flexibly connected, and the lateral wall of dredging block (519) is fixedly connected with turning gear (522), the tune
It is fixedly connected with rotating block (523) on the right side of section frame (512), is fixedly connected with half knuckle-tooth on the right side of the rotating block (523)
(525)。
5. a kind of decoration construction according to claim 4 PVC water pipe union elbow dredger, it is characterised in that: institute
The outer ring for stating the first protective plate (507) and the second protective plate (509) offers annular groove (510), the annular groove
(510) internal activity is socketed with wear-resistant pad (511).
6. a kind of decoration construction according to claim 5 PVC water pipe union elbow dredger, it is characterised in that: institute
Stating noise adsorbing mechanism (6) includes U-shaped bar (601), and one end of the U-shaped bar (601) is fixedly connected on protective frame (2) inner wall
The top of side, and U-shaped bar (601) is located at the surface of decelerating motor (502), U-shaped bar (601) inner bottom wall and inner roof wall
Between be fixedly connected with abatvoix (602), the U-shaped bar (601) is far from being fixedly connected with sound-absorbing in the middle part of protective frame (2) one end
Ball (603).
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010203220.XA CN111350246B (en) | 2018-07-26 | 2018-07-26 | PVC water pipe elbow joint dredging device and method for decoration construction |
CN201810831820.3A CN108978813B (en) | 2018-07-26 | 2018-07-26 | PVC water pipe elbow fitting pull throughs for fitment construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810831820.3A CN108978813B (en) | 2018-07-26 | 2018-07-26 | PVC water pipe elbow fitting pull throughs for fitment construction |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010203220.XA Division CN111350246B (en) | 2018-07-26 | 2018-07-26 | PVC water pipe elbow joint dredging device and method for decoration construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108978813A true CN108978813A (en) | 2018-12-11 |
CN108978813B CN108978813B (en) | 2020-06-09 |
Family
ID=64551623
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810831820.3A Expired - Fee Related CN108978813B (en) | 2018-07-26 | 2018-07-26 | PVC water pipe elbow fitting pull throughs for fitment construction |
CN202010203220.XA Active CN111350246B (en) | 2018-07-26 | 2018-07-26 | PVC water pipe elbow joint dredging device and method for decoration construction |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010203220.XA Active CN111350246B (en) | 2018-07-26 | 2018-07-26 | PVC water pipe elbow joint dredging device and method for decoration construction |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN108978813B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113431151A (en) * | 2021-07-08 | 2021-09-24 | 汪垒 | PVC water pipe elbow fitting pull throughs for building decoration construction |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108978813B (en) * | 2018-07-26 | 2020-06-09 | 南京溧水高新创业投资管理有限公司 | PVC water pipe elbow fitting pull throughs for fitment construction |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1018406A (en) * | 1996-06-28 | 1998-01-20 | Yokoshima:Kk | Dredging method for earth and sand built up in pipeline |
KR20020057863A (en) * | 2002-05-03 | 2002-07-12 | 유애권 | Pipe boring machine |
CN201857654U (en) * | 2010-11-17 | 2011-06-08 | 康会生 | Multifunctional toilet bowl dredger |
CN203559469U (en) * | 2013-11-07 | 2014-04-23 | 栾玉春 | Screw-in type pipeline dredging and cleaning device |
CN204429793U (en) * | 2014-12-30 | 2015-07-01 | 无锡市南长区科技创业服务中心 | A kind of Multifunctional cleaning device |
CN105509843A (en) * | 2016-01-25 | 2016-04-20 | 苏州市尚科产品检测中心 | Device for detecting water level in water tank |
CN107190843A (en) * | 2017-06-28 | 2017-09-22 | 常州蓝森环保设备有限公司 | A kind of drainage dredging device and its application process |
CN206794288U (en) * | 2017-05-20 | 2017-12-26 | 盐城大丰尊一环保科技有限公司 | A kind of kitchen pipe inner wall cleaning plant |
CN207160210U (en) * | 2017-08-21 | 2018-03-30 | 广东银浩市政工程有限公司 | Urban discharging pipeline dredges clearly Accrete clearing device |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2612791Y (en) * | 2003-01-29 | 2004-04-21 | 张阳生 | Reaming bit |
CN102704851A (en) * | 2012-06-07 | 2012-10-03 | 三一重工股份有限公司 | Bottom expanding drill bit and rotary drilling machine |
CN203022632U (en) * | 2012-12-14 | 2013-06-26 | 贵州高峰石油机械股份有限公司 | Six-cone reamer |
CN105369888B (en) * | 2014-08-08 | 2017-09-22 | 湘潭腾升机械研究制造有限公司 | A kind of drainage dredging device |
CN205146813U (en) * | 2015-10-30 | 2016-04-13 | 四川信息职业技术学院 | Pipeline cleaner |
CN205604436U (en) * | 2016-04-26 | 2016-09-28 | 李小燕 | Mobilizable municipal pipeline dredging car |
CN107882510A (en) * | 2016-09-30 | 2018-04-06 | 上海城地建设股份有限公司 | A kind of boring drill bit device of reducing and construction method |
CN206590362U (en) * | 2017-03-30 | 2017-10-27 | 陇东学院 | A kind of bunker dredging is bored with rotary digging broken arch |
CN107442530A (en) * | 2017-08-21 | 2017-12-08 | 浙江海洋大学 | A kind of marine piping connecting-rod mechanism type cleaning device and its cleaning method |
CN107470286A (en) * | 2017-08-28 | 2017-12-15 | 六安市金安区元通包装设计中心(普通合伙) | A kind of municipal pipeline cleaning plant |
CN108978813B (en) * | 2018-07-26 | 2020-06-09 | 南京溧水高新创业投资管理有限公司 | PVC water pipe elbow fitting pull throughs for fitment construction |
-
2018
- 2018-07-26 CN CN201810831820.3A patent/CN108978813B/en not_active Expired - Fee Related
- 2018-07-26 CN CN202010203220.XA patent/CN111350246B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1018406A (en) * | 1996-06-28 | 1998-01-20 | Yokoshima:Kk | Dredging method for earth and sand built up in pipeline |
KR20020057863A (en) * | 2002-05-03 | 2002-07-12 | 유애권 | Pipe boring machine |
CN201857654U (en) * | 2010-11-17 | 2011-06-08 | 康会生 | Multifunctional toilet bowl dredger |
CN203559469U (en) * | 2013-11-07 | 2014-04-23 | 栾玉春 | Screw-in type pipeline dredging and cleaning device |
CN204429793U (en) * | 2014-12-30 | 2015-07-01 | 无锡市南长区科技创业服务中心 | A kind of Multifunctional cleaning device |
CN105509843A (en) * | 2016-01-25 | 2016-04-20 | 苏州市尚科产品检测中心 | Device for detecting water level in water tank |
CN206794288U (en) * | 2017-05-20 | 2017-12-26 | 盐城大丰尊一环保科技有限公司 | A kind of kitchen pipe inner wall cleaning plant |
CN107190843A (en) * | 2017-06-28 | 2017-09-22 | 常州蓝森环保设备有限公司 | A kind of drainage dredging device and its application process |
CN207160210U (en) * | 2017-08-21 | 2018-03-30 | 广东银浩市政工程有限公司 | Urban discharging pipeline dredges clearly Accrete clearing device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113431151A (en) * | 2021-07-08 | 2021-09-24 | 汪垒 | PVC water pipe elbow fitting pull throughs for building decoration construction |
Also Published As
Publication number | Publication date |
---|---|
CN111350246A (en) | 2020-06-30 |
CN111350246B (en) | 2021-06-11 |
CN108978813B (en) | 2020-06-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210788470U (en) | A pipeline dredging device for municipal administration environmental protection | |
CN108978813A (en) | A kind of decoration construction PVC water pipe union elbow dredger | |
CN107190821A (en) | A kind of anti-blocking easy to clean sewer | |
CN205415156U (en) | Bar polisher | |
CN207309590U (en) | A kind of sander with dust reduction capability | |
CN212026571U (en) | Sewage discharge structure for building water supply and drainage | |
CN212348151U (en) | Efficient is dust fall equipment for construction | |
CN109235630B (en) | A pipeline silt washing unit for hydraulic engineering pipeline desilting | |
CN215759204U (en) | Basement waterproof structure | |
CN215236055U (en) | Underwater cleaning robot | |
CN112695868B (en) | Drainage pipe for hydraulic engineering convenient to fast assembly and installation | |
CN107821175A (en) | A kind of rabbit home excrement cleaning plant | |
CN104621020A (en) | All-direction stain-absorption sweeper | |
CN107998698A (en) | A kind of center-transmission single-pipe suction dredger and operating method | |
CN204246068U (en) | What be applicable to production management system can welt cleaner | |
CN109296057A (en) | A kind of sponge urban road pipeline anti-clogging equipment | |
CN208455752U (en) | A kind of portable type pipe-dredging cleaning device | |
CN212271718U (en) | Assembled bathroom of hotel | |
CN220727533U (en) | Water conservancy pipeline with clearance structure | |
CN215907323U (en) | Construction machinery equipment with self-cleaning function | |
CN220978009U (en) | Hydraulic engineering grouting construction device | |
CN213926668U (en) | Pipeline dredging and cleaning device for water conservancy | |
CN219527458U (en) | Road isolation fence cleaning equipment | |
CN109326993A (en) | One kind being convenient for clean cable testing bridge | |
CN218374094U (en) | Water supply and drainage pipeline deep basal pit excavating gear |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200520 Address after: 210000 Kechuang building, Futian Road, Zhetang street, Lishui Economic Development Zone, Nanjing City, Jiangsu Province Applicant after: Nanjing Lishui hi tech Venture Capital Management Co.,Ltd. Address before: 230000 Anhui construction university, 292 Ziyun Road, Hefei economic and Technological Development Zone, Anhui Applicant before: Zhang Risheng |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |