CN108966255A - Method and system based on the grade traffic monitoring of time stamp complement point optimization second - Google Patents

Method and system based on the grade traffic monitoring of time stamp complement point optimization second Download PDF

Info

Publication number
CN108966255A
CN108966255A CN201810941522.XA CN201810941522A CN108966255A CN 108966255 A CN108966255 A CN 108966255A CN 201810941522 A CN201810941522 A CN 201810941522A CN 108966255 A CN108966255 A CN 108966255A
Authority
CN
China
Prior art keywords
performance
time
code
flow
value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810941522.XA
Other languages
Chinese (zh)
Other versions
CN108966255B (en
Inventor
贺茂平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fiberhome Telecommunication Technologies Co Ltd
Original Assignee
Fiberhome Telecommunication Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fiberhome Telecommunication Technologies Co Ltd filed Critical Fiberhome Telecommunication Technologies Co Ltd
Priority to CN201810941522.XA priority Critical patent/CN108966255B/en
Publication of CN108966255A publication Critical patent/CN108966255A/en
Application granted granted Critical
Publication of CN108966255B publication Critical patent/CN108966255B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/02Arrangements for optimising operational condition
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/08Testing, supervising or monitoring using real traffic

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The invention discloses a kind of method and system based on the grade traffic monitoring of time stamp complement point optimization second, are related to second grade traffic monitoring field.Method includes the following steps: increasing time stab information in the flow performance value of second grade traffic monitoring;By the time stab information in flow performance value, the flow performance value cried and lost is mended.The present invention can mend the flow performance value cried and lost in second grade traffic monitoring, guarantee the integrality of flow performance data and flow performance curve, avoid the missing of significant data.

Description

Method and system based on the grade traffic monitoring of time stamp complement point optimization second
Technical field
The present invention relates to second grade traffic monitoring fields, are specifically related to a kind of based on the grade traffic monitoring of time stamp complement point optimization second Method and system.
Background technique
As mobile Internet access rate is increasingly accelerated, especially 4G business, private line service, WLAN (Wireless Local Area Networks, WLAN) business and mobile household broadband services fast development, carrier network carries More and more datas on flows, operator need the flow service condition of each node and business in sufficiently monitoring network, implement essence Flow monitoring and analysis are refined, Internet resources forewarning management is carried out, for the risks such as potential network congestion, flow be out-of-limit, in time Carry out the network optimization and dilatation, the effective utilization of Internet resources is improved, to obtain maximum economic interests.Therefore operator is to biography The traffic monitoring functional requirement of transfer device is more more and more intense, it is desirable that also higher and higher.
Each device manufacturer can generally support network interface, virtual path, Virtual Channel to meet this demand of operator Flow is sended and received, but time granularity is larger, is all the flow performance for taking 15 minutes in the industry at present, including 15 points It is as follows to receive flow, the calculating process of transmitted traffic for average flow rate, maximum value and the minimum value of clock:
Receive flow RX_FLOW=(△ RX_BYTES+ △ RX_PACKETS*20) the * 8/ △ time;
Transmitted traffic TX_FLOW=(△ TX_BYTES+ △ TX_PACKETS*20) the * 8/ △ time;
Wherein, the △ time is the time difference of this sampling and previous sampling, and △ RX_BYTES is the packet received in the △ time Byte number (without 12 byte frame gaps and 7 byte lead codes, 1 byte frame first symbol), △ RX_PACKETS are to receive in the △ time The total packet number arrived, △ TX_BYTES are that the packet byte number sent in the △ time (is free of 12 byte frame gaps and 7 byte lead codes, 1 Byte frame first symbol), △ TX_PACKETS is the total packet number sent in the △ time.
Flow performance maximum/minimum/average value calculating process is as follows:
N flow performance flow1, flow2...flown are sampled in 15 minutes:
Flow maximum=max (flow1, flow2 ..., flown);
Flow minimum=min (flow1, flow2 ..., flown);
Flow average value=(flow1+flow2+...+flown)/n.
But the practical abnormal conditions such as network service amount big, running environment is complicated, burst flow that show happen occasionally, with 15 points Clock is that the flow of time particle can no longer meet the daily O&M requirement of network, thus be badly in need of flow performance acquisition shorten delay, The monitoring solution of strong real-time.
It is not able to satisfy requirement of real time to solve the problem of that 15 minutes historical performance time granularities are too wide, in 15 minutes flows On the basis of performance, the implementation of second grade flow is released, the smallest collection period is 1 second, common by network management and equipment single-deck Cooperation is completed.
It is shown in Figure 1, the operating process of network management are as follows:
1, network management transmitting order to lower levels inquires the real-time performance code of all routes of certain block single-deck support;
2, route and performance code (time interval including record performance) that network management is selected according to user, transmitting order to lower levels is looked into Ask the real-time performance of single-deck given line particular code record;
3, performance number and markers rendering performance curve that network management is reported according to single-deck;
4, (1-10 seconds) network management retransmits querying command at regular intervals, and the real-time performance of inquiry single-deck record is simultaneously drawn Koji-making line, until user terminates to observe some performance.
The operating process of single-deck are as follows:
1, a real-time performance after single-deck powers at regular intervals (1-10 seconds), is recorded, it is most to every real-time performance Record 60, and circulating rolling is carried out, the automatic performance entry for covering aging;
2, after single-deck receives the inquiry real-time performance code commands of network management, response command, the institute for reporting single-deck to support is wired The real-time performance code on road;
3, after real-time performance order is specified in the inquiry that single-deck receives network management, response command, reporting current preservation, not upper The real-time performance value of report.
It, can be by current 15 points under conditions of equipment performance polling delay, task priority are seized, network management loses data Clock performance monitoring upgrades to second grade traffic monitoring scheme, monitors the flow performance of main port, important service etc. on network in real time Value and performance chart find the problem of network is caused due to Traffic Anomaly, to carry out the network optimization and expansion in time at the first time Hold, the effective utilization of Internet resources is improved, to obtain maximum economic interests.
Above scheme can solve the problem of equipment flow real time monitoring, but still remain following two problem:
1, equipment in the process of running, is contemplated to be 1 second (minimum period at present) acquisition and calculates a flow performance value, still Deviation and the problems such as seizing of different priorities task due to timer, equipment can not guarantee always per second can report one A flow performance value;
2, network management may also may be abandoned and be set due to acquisition tasks exception and the problems such as seizing of different priorities task The standby flow performance value reported.
Due to two above problem, final derived flow performance shortage of data or flow performance curve is caused not to connect Continuous, i.e., the particle of time shaft is not 1 second.
Summary of the invention
The purpose of the invention is to overcome the shortcomings of above-mentioned background technique, provide a kind of based on time stamp complement point optimization second grade The method and system of traffic monitoring can mend the flow performance value cried and lost in second grade traffic monitoring, guarantee flow performance number Accordingly and the integrality of flow performance curve, the missing of significant data is avoided.
The present invention provides a kind of method based on the grade traffic monitoring of time stamp complement point optimization second, comprising the following steps:
Increase time stab information in the flow performance value of second grade traffic monitoring;
By the time stab information in flow performance value, the flow performance value cried and lost is mended.
Based on the above technical solution, the time stab information by flow performance value mends the flow for crying and losing Performance number, specifically includes the following steps:
According to the time stab information carried in flow performance value, the flow performance value for analyzing certain time point is lost, again rope Will the time point flow performance value.
Based on the above technical solution, described according to the time stab information carried in flow performance value, analyze some time Between the flow performance value put lose, ask for the flow performance value at the time point again, specifically includes the following steps:
When having tomography between the time stab information that the flow performance value reported twice in succession carries, certain time point is analyzed Flow performance value is lost, and the command frame of real-time performance is obtained by sending, asks for the flow performance value at the time point again, benefit The flow performance value of loss.
Based on the above technical solution, when the command frame for obtaining real-time performance includes transparent frame frame head, acquisition Between, acquisition mark, relative start time, relative ending time, route number;
1 code of route, performance code number, performance code 1 ... performance code n;
Route m code, performance code number, performance code 1 ... performance code n, m, n are positive integer.
Based on the above technical solution, this method is further comprising the steps of:
After receiving the command frame for obtaining real-time performance, the real-time performance data recorded in specified time is reported, is specifically included:
Transparent frame frame head, acquisition time, times of collection, relative start time, route number;
1 code of route, performance code number, performance code 1, performance data type, performance number group number, performance number 1 ... property It can code r ... ... performance code n, performance data type, performance number group number, performance number 1 ... performance code r;
Route m code, performance code number, performance code 1, performance data type, performance number group number, performance number 1 ... property Energy code r ... ... performance code n, performance data type, performance number group number, performance number 1 ... performance code r, r are positive integer.
The present invention also provides a kind of systems based on the grade traffic monitoring of time stamp complement point optimization second, including time stab information to increase list Member mends and is unit, in which:
Time stab information adding unit is used for: increasing time stab information in the flow performance value of second grade traffic monitoring;
Benefit makes unit be used for: by the time stab information in flow performance value, mending the flow performance value cried and lost.
Based on the above technical solution, the time stab information adding unit is according to the time stamp carried in flow performance value Information, the flow performance value for analyzing certain time point are lost, and ask for the flow performance value at the time point again.
Based on the above technical solution, the time stab information adding unit is according to the time stamp carried in flow performance value Information, the flow performance value for analyzing certain time point are lost, and ask for the flow performance value at the time point, detailed process again are as follows:
When having tomography between the time stab information that the flow performance value reported twice in succession carries, certain time point is analyzed Flow performance value is lost, and the command frame of real-time performance is obtained by sending, asks for the flow performance value at the time point again, benefit The flow performance value of loss.
Based on the above technical solution, when the command frame for obtaining real-time performance includes transparent frame frame head, acquisition Between, acquisition mark, relative start time, relative ending time, route number;
1 code of route, performance code number, performance code 1 ... performance code n;
Route m code, performance code number, performance code 1 ... performance code n, m, n are positive integer.
Based on the above technical solution, which further includes reporting unit, is used for: receiving and obtains real-time performance After command frame, the real-time performance data recorded in specified time is reported, is specifically included:
Transparent frame frame head, acquisition time, times of collection, relative start time, route number;
1 code of route, performance code number, performance code 1, performance data type, performance number group number, performance number 1 ... property It can code r ... ... performance code n, performance data type, performance number group number, performance number 1 ... performance code r;
Route m code, performance code number, performance code 1, performance data type, performance number group number, performance number 1 ... property Energy code r ... ... performance code n, performance data type, performance number group number, performance number 1 ... performance code r, r are positive integer.
Compared with prior art, advantages of the present invention is as follows:
The present invention increases time stab information in the flow performance value of second grade traffic monitoring;Pass through the time stamp in flow performance value Information mends the flow performance value cried and lost, can guarantee the integrality of flow performance data and flow performance curve, avoids weight The missing of data is wanted, to guarantee the integrality of data and the continuity of visualization result.
Detailed description of the invention
Fig. 1 is the flow chart of existing second grade traffic monitoring.
Fig. 2 is the flow chart of the method based on the grade traffic monitoring of time stamp complement point optimization second in the embodiment of the present invention 1.
Fig. 3 is the command frame format that network management obtains real-time performance in the embodiment of the present invention 2.
Fig. 4 is the command frame format that single-deck response obtains real-time performance in the embodiment of the present invention 3.
Specific embodiment
With reference to the accompanying drawing and specific embodiment the present invention is described in further detail.
Embodiment 1
Shown in Figure 2, the embodiment of the present invention 1 provides a kind of method based on the grade traffic monitoring of time stamp complement point optimization second, The following steps are included:
Step 101 increases time stab information in the flow performance value of second grade traffic monitoring;
Step 102, by the time stab information in flow performance value, mend the flow performance value for being loss: according to flow performance The time stab information carried in value, the flow performance value for analyzing certain time point are lost, and ask for the flow performance at the time point again Value, specifically includes the following steps:
When having tomography between the time stab information that the flow performance value reported twice in succession carries, certain time point is analyzed Flow performance value is lost, and the command frame of real-time performance is obtained by sending, asks for the flow performance value at the time point again, benefit The flow performance value of loss.
In practical applications, it can be carried in the flow performance value that equipment single-deck reports when acquiring the flow performance value Time stamp, such as: the data time stab information acquired in certain t1~t1+6 period is as follows: t1, t1+1, t1+2, t1+3, t1+5, t1+ 6.Network management is easy to analyze, and the loss of data at t1+4 time point, therefore, network management want the t1+4 time to tables of equipment fake again The data of point.
In practical applications, network management sends the command frame for obtaining real-time performance, specifies the time interval of real-time performance acquisition, The line number and performance code of given query real-time performance;After equipment single-deck receives the command frame for obtaining real-time performance, finger is reported Fixed real-time performance value.
When having tomography between the time stamp that the flow performance value that network management discovering device single-deck reports twice carries, sends and obtain in fact The command frame of Shi Xingneng mends the flow performance value cried and lost;After equipment single-deck receives the command frame for obtaining real-time performance, finger is reported It fixes time the real-time performance data of interior record.
The embodiment of the present invention passes through the scheme of time stamp complement point, further improves second grade flow and loses certain performance numbers once in a while Problem guarantees the integrality of flow performance data and flow performance curve, the missing of significant data is avoided, to guarantee data Integrality and visualization result continuity.
Embodiment 2
On the basis of embodiment 1, shown in Figure 3, it includes transparent frame that network management, which sends and obtains the command frame of real-time performance, Frame head, acquisition time, acquisition mark, relative start time, relative ending time, route number;
1 code of route, performance code number, performance code 1 ... performance code n;
Route m code, performance code number, performance code 1 ... performance code n, m, n are positive integer, specific data lattice Formula is defined as follows:
Acquisition time: unit is the second, and value range 1-10 indicates the time interval of equipment single-deck acquisition real-time performance.
Acquisition mark: 0 indicates poll acquisition, and relative start time and relative ending time are invalid, fill out 0;1 indicates real-time It can mend and cry, benefit makes the time be determined by relative start time and end time.
Relative start time: unit second, the lead of relatively current time, value 0-600.
Relative ending time: unit second, the lead of relatively current time, value 0-600.
If current time be 10 points 50 seconds, relative start time 45, relative ending time 10, then mend be real-time The period of energy is 10 points of 5 seconds to 10 points 35 seconds performance numbers.
Embodiment 3
It is shown in Figure 4 on the basis of embodiment 2, after receiving the command frame for obtaining real-time performance, report specified time The real-time performance data of interior record, specifically includes:
Transparent frame frame head, acquisition time, times of collection, relative start time, route number;
1 code of route, performance code number, performance code 1, performance data type, performance number group number, performance number 1 ... property It can code r ... ... performance code n, performance data type, performance number group number, performance number 1 ... performance code r;
Route m code, performance code number, performance code 1, performance data type, performance number group number, performance number 1 ... property Energy code r ... ... performance code n, performance data type, performance number group number, performance number 1 ... performance code r, r are positive integer, Specific data format definition is as follows:
Acquisition time (1 byte), times of collection (4 byte), relative start time (2 byte), route number (2 byte),
1 code of route (2 byte), Obj State (two bytes), performance code number (2 byte),
Performance code 1 (2 byte), 1 data type of performance (1 byte), performance state (two bytes), performance number group number (2 Byte),
Performance number 1, year, the moon, day, when, point, the second
……
Performance number r, year, the moon, day, when, point, the second
……
Performance code n (2 byte), performance n data type (1 byte), performance state (two bytes), performance number group number (2 Byte),
Performance number 1, year, the moon, day, when, point, the second
……
Performance number r, year, the moon, day, when, point, the second
……
Embodiment 4
On the basis of embodiment 3, each field meanings of route m code are the same as each field meanings of 1 code of route.
Acquisition time: unit is second, value range 1-10, between the time for indicating two real-time performances that equipment single-deck reports Every.
Relative start time: the unit second indicates the lead of the real-time performance reported relatively current time.
Times of collection: initial value 0, when a system performance of every record, numerical value+1 is reset when reaching ffffffff.
Performance data type: 0x02 indicates that performance data length is 2 byte integers;
0x04 indicates that performance data length is 4 byte integers;
0x08 indicates that performance data length is 8 byte integers;
0x14 indicates that performance data length is 4 byte single precision floating datums;
0x18 indicates that performance data length is 8 byte double-precision floating points.
The length and type of performance number are provided by performance data type-byte.
Performance number 1 to performance number r by the sequencing arrangement of performance acquisition, adopt earlier than performance number r by the acquisition moment of performance number 1 Collect the moment.
When network management benefit is real-time performance, if performance number group number is 0, indicate that equipment single-deck does not mend the property cried in the period It can record, network management fills performance curve according to performance change trend.
The embodiment of the present invention mends the time stamp performance cried in mechanism and performance number by network management defined in data, can lead Complete flow performance data and depict continuous flow performance curve out.
Embodiment 5
The embodiment of the present invention 5 provides a kind of system based on the grade traffic monitoring of time stamp complement point optimization second, including time stab information Adding unit, benefit are unit, in which:
Time stab information adding unit is used for: increasing time stab information in the flow performance value of second grade traffic monitoring;
Benefit makes unit be used for: by the time stab information in flow performance value, mending the flow performance value cried and lost.
Time stab information adding unit analyzes the flow at certain time point according to the time stab information carried in flow performance value It can be worth and lose, ask for the flow performance value at the time point, detailed process again are as follows:
When having tomography between the time stab information that the flow performance value reported twice in succession carries, certain time point is analyzed Flow performance value is lost, and the command frame of real-time performance is obtained by sending, asks for the flow performance value at the time point again, benefit The flow performance value of loss.
Embodiment 6
Shown in Figure 3 on the basis of embodiment 5, the command frame for obtaining real-time performance includes transparent frame frame head, acquisition Time, acquisition mark, relative start time, relative ending time, route number;
1 code of route, performance code number, performance code 1 ... performance code n;
Route m code, performance code number, performance code 1 ... performance code n, m, n are positive integer.
Shown in Figure 4, in practical applications, what the embodiment of the present invention 6 provided optimizes second grade flow based on time stamp complement point The system of monitoring further includes reporting unit, is used for:
After receiving the command frame for obtaining real-time performance, the real-time performance data recorded in specified time is reported, is specifically included:
Transparent frame frame head, acquisition time, times of collection, relative start time, route number;
1 code of route, performance code number, performance code 1, performance data type, performance number group number, performance number 1 ... property It can code r ... ... performance code n, performance data type, performance number group number, performance number 1 ... performance code r;
Route m code, performance code number, performance code 1, performance data type, performance number group number, performance number 1 ... property Energy code r ... ... performance code n, performance data type, performance number group number, performance number 1 ... performance code r, r are positive integer.
Those skilled in the art can carry out various modifications to the embodiment of the present invention and modification, if these modifications and change For type within the scope of the claims in the present invention and its equivalent technologies, then these modifications and variations are also in protection scope of the present invention Within.
The prior art that the content being not described in detail in specification is known to the skilled person.

Claims (10)

1. a kind of method based on the grade traffic monitoring of time stamp complement point optimization second, which comprises the following steps:
Increase time stab information in the flow performance value of second grade traffic monitoring;
By the time stab information in flow performance value, the flow performance value cried and lost is mended.
2. the method as described in claim 1 based on the grade traffic monitoring of time stamp complement point optimization second, it is characterised in that: described to pass through Time stab information in flow performance value mends the flow performance value cried and lost, specifically includes the following steps:
According to the time stab information carried in flow performance value, the flow performance value for analyzing certain time point is lost, and asks for this again The flow performance value at time point.
3. the method as claimed in claim 2 based on the grade traffic monitoring of time stamp complement point optimization second, it is characterised in that: the basis The time stab information carried in flow performance value, the flow performance value for analyzing certain time point are lost, and ask for the time point again Flow performance value, specifically includes the following steps:
When having tomography between the time stab information that the flow performance value reported twice in succession carries, the flow at certain time point is analyzed Performance number is lost, and the command frame of real-time performance is obtained by sending, and asks for the flow performance value at the time point again, and benefit is loss Flow performance value.
4. the method as claimed in claim 3 based on the grade traffic monitoring of time stamp complement point optimization second, it is characterised in that: the acquisition The command frame of real-time performance includes transparent frame frame head, acquisition time, acquisition mark, relative start time, relative ending time, line Number;
1 code of route, performance code number, performance code 1 ... performance code n;
Route m code, performance code number, performance code 1 ... performance code n, m, n are positive integer.
5. the method as claimed in claim 4 based on the grade traffic monitoring of time stamp complement point optimization second, it is characterised in that: this method is also The following steps are included:
After receiving the command frame for obtaining real-time performance, the real-time performance data recorded in specified time is reported, is specifically included:
Transparent frame frame head, acquisition time, times of collection, relative start time, route number;
1 code of route, performance code number, performance code 1, performance data type, performance number group number, performance number 1 ... performance generation Code r ... ... performance code n, performance data type, performance number group number, performance number 1 ... performance code r;
Route m code, performance code number, performance code 1, performance data type, performance number group number, performance number 1 ... performance generation Code r ... ... performance code n, performance data type, performance number group number, performance number 1 ... performance code r, r are positive integer.
6. a kind of system based on the grade traffic monitoring of time stamp complement point optimization second, it is characterised in that: the system includes that time stab information increases Unit, benefit is added to be unit, in which:
Time stab information adding unit is used for: increasing time stab information in the flow performance value of second grade traffic monitoring;
Benefit makes unit be used for: by the time stab information in flow performance value, mending the flow performance value cried and lost.
7. the system as claimed in claim 6 based on the grade traffic monitoring of time stamp complement point optimization second, it is characterised in that: the time stamp Information adding unit according to the time stab information carried in flow performance value, lose by the flow performance value for analyzing certain time point, then The secondary flow performance value for asking for the time point.
8. the system as claimed in claim 7 based on the grade traffic monitoring of time stamp complement point optimization second, it is characterised in that: the time stamp Information adding unit according to the time stab information carried in flow performance value, lose by the flow performance value for analyzing certain time point, then The secondary flow performance value for asking for the time point, detailed process are as follows:
When having tomography between the time stab information that the flow performance value reported twice in succession carries, the flow at certain time point is analyzed Performance number is lost, and the command frame of real-time performance is obtained by sending, and asks for the flow performance value at the time point again, and benefit is loss Flow performance value.
9. the system as claimed in claim 8 based on the grade traffic monitoring of time stamp complement point optimization second, it is characterised in that: the acquisition The command frame of real-time performance includes transparent frame frame head, acquisition time, acquisition mark, relative start time, relative ending time, line Number;
1 code of route, performance code number, performance code 1 ... performance code n;
Route m code, performance code number, performance code 1 ... performance code n, m, n are positive integer.
10. the system as claimed in claim 9 based on the grade traffic monitoring of time stamp complement point optimization second, it is characterised in that: the system Further include reporting unit, be used for: after receiving the command frame for obtaining real-time performance, reporting the real-time performance recorded in specified time Data specifically include:
Transparent frame frame head, acquisition time, times of collection, relative start time, route number;
1 code of route, performance code number, performance code 1, performance data type, performance number group number, performance number 1 ... performance generation Code r ... ... performance code n, performance data type, performance number group number, performance number 1 ... performance code r;
Route m code, performance code number, performance code 1, performance data type, performance number group number, performance number 1 ... performance generation Code r ... ... performance code n, performance data type, performance number group number, performance number 1 ... performance code r, r are positive integer.
CN201810941522.XA 2018-08-17 2018-08-17 Method and system for optimizing second-level flow monitoring based on timestamp compensation point Active CN108966255B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810941522.XA CN108966255B (en) 2018-08-17 2018-08-17 Method and system for optimizing second-level flow monitoring based on timestamp compensation point

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810941522.XA CN108966255B (en) 2018-08-17 2018-08-17 Method and system for optimizing second-level flow monitoring based on timestamp compensation point

Publications (2)

Publication Number Publication Date
CN108966255A true CN108966255A (en) 2018-12-07
CN108966255B CN108966255B (en) 2021-12-21

Family

ID=64470659

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810941522.XA Active CN108966255B (en) 2018-08-17 2018-08-17 Method and system for optimizing second-level flow monitoring based on timestamp compensation point

Country Status (1)

Country Link
CN (1) CN108966255B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1747397A (en) * 2004-09-08 2006-03-15 中兴通讯股份有限公司 Performance data additional collecting system and method in telecommunication network management
CN101808007A (en) * 2010-02-22 2010-08-18 烽火通信科技股份有限公司 Method for acquiring real-time performance data by network manager
CN104092297A (en) * 2014-06-24 2014-10-08 国家电网公司 Monitoring system and method for monitoring running performance of power grid system in real time
CN105578115A (en) * 2015-12-22 2016-05-11 深圳市鹰硕音频科技有限公司 Network teaching method and system with voice assessment function

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1747397A (en) * 2004-09-08 2006-03-15 中兴通讯股份有限公司 Performance data additional collecting system and method in telecommunication network management
CN101808007A (en) * 2010-02-22 2010-08-18 烽火通信科技股份有限公司 Method for acquiring real-time performance data by network manager
CN104092297A (en) * 2014-06-24 2014-10-08 国家电网公司 Monitoring system and method for monitoring running performance of power grid system in real time
CN105578115A (en) * 2015-12-22 2016-05-11 深圳市鹰硕音频科技有限公司 Network teaching method and system with voice assessment function

Also Published As

Publication number Publication date
CN108966255B (en) 2021-12-21

Similar Documents

Publication Publication Date Title
CN100553217C (en) Transport layer trunking method and transport layer trunking
EP0994602A2 (en) Computer system and network performance monitoring
US8477653B2 (en) Monitoring individual data flow performance
MXPA01005187A (en) Apparatus and method for collecting and analyzing communications data.
EP3021609A1 (en) Network testing method and data collection method thereof, and network testing apparatus and system
EP3836611A1 (en) Method and device for obtaining scheduled throughput, base station, and storage medium
EP4122162B1 (en) Resource efficient network performance analytics
CN113364682B (en) Data transmission method and device, storage medium and electronic device
CN110831038A (en) Network slice resource scheduling method and device
US20130051252A1 (en) Methods, systems, and computer program products for monitoring network performance
KR101136529B1 (en) A system for traffic analysis based on session
CN108075946A (en) network flow monitoring method and system
CN107846310B (en) IPTV video quality difference linkage dial testing delimitation method based on client resource tree
EP2465283B1 (en) Estimation method and device for loss rates in a packetized network
CN106789429B (en) A kind of adaptive low-cost SDN network link utilization measurement method and system
CN108966255A (en) Method and system based on the grade traffic monitoring of time stamp complement point optimization second
CN107889126B (en) Network state identification method, DPI monitoring and analyzing equipment and network system
CN115766471B (en) Network service quality analysis method based on multicast flow
Michelinakis et al. Lightweight capacity measurements for mobile networks
US20210400506A1 (en) Wireless lan communication quality estimation method, wireless lan communication quality estimation system, information collection device, and wireless lan communication quality estimation device
CN101232404B (en) Remote network management method of EPON access system
US11265786B2 (en) Radio access network service mediated enhanced session records for artificial intelligence or machine learning
CN105592485A (en) Method for collecting and processing messages in real time based on SNMP
CN109728947A (en) A kind of network performance analysis method based on cloud computing in conjunction with network topological diagram
CN101917699B (en) Random reported signaling tracking method and device based on users

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant