CN108964954A - A kind of method and device of processing power-off net element information - Google Patents

A kind of method and device of processing power-off net element information Download PDF

Info

Publication number
CN108964954A
CN108964954A CN201710364634.9A CN201710364634A CN108964954A CN 108964954 A CN108964954 A CN 108964954A CN 201710364634 A CN201710364634 A CN 201710364634A CN 108964954 A CN108964954 A CN 108964954A
Authority
CN
China
Prior art keywords
network element
power
weighted value
network
priority
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710364634.9A
Other languages
Chinese (zh)
Other versions
CN108964954B (en
Inventor
章先阵
张鹤峰
张磊
郭锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201710364634.9A priority Critical patent/CN108964954B/en
Publication of CN108964954A publication Critical patent/CN108964954A/en
Application granted granted Critical
Publication of CN108964954B publication Critical patent/CN108964954B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/08Configuration management of networks or network elements
    • H04L41/0803Configuration setting
    • H04L41/0823Configuration setting characterised by the purposes of a change of settings, e.g. optimising configuration for enhancing reliability
    • H04L41/0826Configuration setting characterised by the purposes of a change of settings, e.g. optimising configuration for enhancing reliability for reduction of network costs
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/12Discovery or management of network topologies

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

A method of processing power-off net element information, comprising: determine the weighted value of the power-off network element and each network element in scheduled network element region;The power supply priority of the power-off network element is determined according to the weighted value of the network element.A kind of device of processing power-off net element information.This programme may be implemented power-off network element and restore electricity intelligent sequencing.

Description

A kind of method and device of processing power-off net element information
Technical field
The present embodiments relate to but be not limited to communication technique field, be related specifically to a kind of processing power-off net element information Method and device.
Background technique
With the high speed development of communication network, communication network scale and capacity are increasing, and the network element of network management management is more next More, the business of configuration is also more and more.In some exceedingly odious weather, many network elements may be made to power off, lead to large area Service disconnection.It needs manually to restore electricity to network element, makes business recovery normal as early as possible.One is faced when restoring electricity to network element A problem, it is thus necessary to determine that the sequence to restore electricity to network element.If recovery sequence is inappropriate, the time that will lead to service disconnection becomes Must be longer, huge loss is brought to operator.
Sequence is restored electricity mainly by the alarm status of artificial enquiry network element, the mechanical floor of network element to power-off network element at present Secondary, network element topologic network information, the business information etc. that network element is carried are extensive to power-off network element by these information of manual analysis Multiple power supply sequence.This dependence artificial team power-off network element restores electricity, and sequence efficiency is very low, and the sequence accuracy of row is not high, Whole power-off network elements are caused to restore the normal time elongated.
Summary of the invention
The embodiment of the present invention provides a kind of method and device of processing power-off net element information, to realize that power-off network element restores to supply Electric intelligent sequencing.
A method of processing power-off net element information, comprising:
Determine the weighted value of the power-off network element and each network element in scheduled network element region;
The power supply priority of the power-off network element is determined according to the weighted value of the network element.
Optionally, the weighted value according to the network element determines the power supply priority of the power-off network element, comprising:
The priority of each network topology unit in the network element region is determined according to the weighted value of the network element;
According to the weighted value of the network element in the priority of the network topology unit and the network topology unit, institute is determined State the power supply priority of power-off network element.
Optionally, the weighted value of the network element in the determination network element region, comprising:
If the description information in network element attribute is configured with weighted value, the network element is determined according to the weighted value configured Weighted value;
If being not configured with weighted value in the description information, all business by the network element are inquired, according to difference Type of service and quantity determine the weighted value of the network element.
Optionally, the network topology unit is a ring or a chain or isolated network element;It is described according to the network element Weighted value determine the priority of each network topology unit in the network element region, comprising:
As the network topology unit be a ring, then the priority of the network topology unit by the ring network element and The sum of weighted value of network element on chain connecting with the ring determines;
If the network topology unit is a chain, then the priority of the network topology unit is by the network element on the chain The sum of weighted value determines.
Optionally, it if the sum of weighted value of network element in the network topology unit is identical, is opened up according to the network The mark of unit is flutterred to determine the priority of the network topology unit.
Optionally, the power supply priority of the determination power-off network element, comprising:
Such as there are multiple power-off network elements in the same network topology unit, then poll judges the direct phase of the power-off network element Whether network element even is normal network element, in the case where the judgment result is yes, sets normal network element for the power-off network element, and The power supply priority of the power-off network element is determined, until the power supply of all power-off network elements in the same network topology unit is preferential Until grade has determined.
Optionally, if having with the power-off network element that normal network element is connected directly it is multiple, according to it is described power-off network element plus Weight size corresponds to the power supply priority of power-off network element to determine;If the weighted value of the power-off network element is identical, according to institute The mark of power-off network element is stated to determine the power supply priority of corresponding power-off network element.
A kind of device of processing power-off net element information, wherein include:
First determining module, for determining that the weighted value of power grid member and each network element is interrupted in scheduled network element region;
Second determining module, for determining the power supply priority of the power-off network element according to the weighted value of the network element.
Optionally, second determining module determines that the power supply of the power-off network element is excellent according to the weighted value of the network element First grade includes: that the priority of each network topology unit in the network element region is determined according to the weighted value of the network element;According to The weighted value of the priority of the network topology unit and the network element in the network topology unit determines the power-off network element Power supply priority.
Optionally, first determining module determines the weighted value of the network element in the network element region, comprising: if network element Description information in attribute is configured with weighted value, then the weighted value of the network element is determined according to the weighted value configured, if institute It states and is not configured with weighted value in description information, then all business by the network element are inquired, according to different service types sum number Measure the weighted value to determine the network element.
Optionally, second determining module determines each net in the network element region according to the weighted value of the network element The priority of network topology unit, comprising: such as network topology unit is a ring, then the priority of the network topology unit It is determined by the sum of the network element on the ring and the weighted value of network element on the chain being connect with the ring;If the network topology unit is one Chain, then the priority of the network topology unit is determined by the sum of the weighted value of network element on the chain, the network topology list Member is a ring or a chain or isolated network element.
Optionally, second determining module, if the sum of weighted value of network element in the network topology unit is identical, The priority of the network topology unit is then determined according to the mark of the network topology unit.
Optionally, second determining module determines that the power supply priority of power-off network element includes: such as in the same network There are multiple power-off network elements in topology unit, then whether the network element that poll judges that the power-off network element is connected directly is normal network element, In the case where the judgment result is yes, normal network element is set by the power-off network element, and determines that the power supply of the power-off network element is excellent First grade, until the power supply priority of all power-off network elements in the same network topology unit has determined.
Optionally, second determining module, if determining that the power supply priority of the power-off network element includes: and normal net The power-off network element that member is connected directly has multiple, then corresponding power-off network element is determined according to the weighted value size of the power-off network element Power supply priority;If the weighted value of the power-off network element is identical, determined according to the mark of the power-off network element corresponding disconnected The power supply priority of power grid member.
A kind of device of processing power-off net element information, including memory and processor, wherein
The memory is stored with to give an order: determining that the weighting of power grid member and each network element is interrupted in scheduled network element region Value;The power supply priority of the power-off network element is determined according to the weighted value of the network element;
The processor, for executing the instruction of the memory storage.
To sum up, the embodiment of the present invention provides a kind of method and device of processing power-off net element information, and power-off net may be implemented Member restores electricity intelligent sequencing.
Detailed description of the invention
Fig. 1 is the flow chart that a kind of processing of the embodiment of the present invention one powers off the method for net element information.
Fig. 2 is the flow chart that a kind of processing of the embodiment of the present invention two powers off the method for net element information.
Fig. 3 is the topologic network figure of the present embodiment.
Fig. 4 is the flow chart of the method for the determination network element priority of the embodiment of the present invention.
Fig. 5 is the schematic diagram that a kind of processing of the embodiment of the present invention four powers off the device of net element information.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction with attached drawing to the present invention Embodiment be described in detail.It should be noted that in the absence of conflict, in the embodiment and embodiment in the application Feature can mutual any combination.
Embodiment one
Fig. 1 is the flow chart that a kind of processing of the embodiment of the present invention powers off the method for net element information, as shown in Figure 1, this reality The method for applying example includes:
Step S11, the weighted value of the power-off network element and each network element in scheduled network element region is determined;
Step S12, the power supply priority of the power-off network element is determined according to the weighted value of the network element.
The basic network element data for needing inspection to assess network management is first uploaded to assessment tool, Huo Zhezhi by user in the present embodiment Connect the basic network element data using network management.There is " net in inspection and evaluation region further according to the region to be assessed actually is established in user The network element of first chain rupture " alarm counts the power supply priority of corresponding network element according to " power-off network element restore electricity ordering rule ", by net Member sorts according to the sequence of power supply priority from big to small and exports corresponding assessment report.
A kind of method of processing power-off net element information provided in an embodiment of the present invention, may be implemented power-off network element and restores electricity Intelligent sequencing improves efficiency, can be greatly saved network operation cost.
In one embodiment, the network topology unit for including in network element region, the network topology unit can be determined For a ring or a chain or isolated network element.If the network topology unit is ring, then the network topology unit Priority is determined by the sum of the network element on the ring and the weighted value of network element on the chain connecting with the ring;
If the network topology unit is a chain, then the priority of the network topology unit is by the network element on the chain The sum of weighted value determines.
In one embodiment,
If the sum of the weighted value of network element in the network topology unit is identical, according to the network topology unit Identify the priority to determine the network topology unit.
In one embodiment, when the different network elements being distributed on multiple and different rings or chain power off, according to ring or chain Weighted value sequence, the high ring of weighted value or chain are set to the power supply highest priority of ring or chain.The low ring of weighted value or chain are set to The power supply time high priority of ring or chain.Identical for weighted value, the ID (result returned inside program) according to ring or chain is small The power supply highest priority for being set to ring or chain.
When being powered off for the multiple and different network elements being distributed on the same ring or chain, if corresponding power-off network element is direct Connected network element is normal, the power supply priority of conduct first for the power-off network element for taking weighted value high.It is identical for weighted value, it takes and sets Standby ID small power-off network element is as the first power supply priority.
After often calculating a maximum supply power priority network element, which is set to normal network element, is continued according to upper The power supply priority that rule calculates other power-off network elements is stated, until the power supply priority of power-off network elements all on corresponding ring or chain is complete Until portion's calculating finishes.
The power supply precedence information for summarizing each power-off network element generates and exports assessment report.
Embodiment two
As shown in Fig. 2, the embodiment of the present invention provides a kind of method of processing power-off net element information, comprising the following steps:
Step S101: selection needs the network element region of inspection, creates patrol task, starts to execute automatic detecting.
Step S102: power-off network element is calculated.
In the present embodiment, by the current alarm of all network elements in query assessment region, according to whether in the presence of " network element is disconnected Chain " alarm judges whether network element powers off, and calculates power-off network element.
Step S103: by the description information in inquiry network element attribute, judging whether network element has configuration weighted value, if there is Configuration goes to step S104, otherwise goes to step S105.
Step S104: network element weighted value is calculated according to network element attribute.
It is calculated according to the weighted value of description information institute typing in network element attribute, with PTN (Packet Transport Network, Packet Transport Network) for equipment:
If there is " L2Z5 " to indicate two LTE (Long Term Evolution, long term evolution systems in network element description information System) base station, weighted value 5;
If there is " R1Z2 " to indicate a NodeB, weighted value 2 in network element description information;
If there is " G3Z6 " to indicate three base stations 2G, weighted value 6 in network element description information;
If there is " KS5Z10 " to indicate 5 transprovincially special lines, weighted value 10 in network element description information;
If there is " SN4Z6 " to indicate 4 trans-city special lines, weighted value 6 in network element description information.
Step S105: network element weighted value is calculated according to the business that network element is carried.
All business by network element are inquired, the weighted value of the network element is calculated according to different service types sum number amount.Such as Network element carries two 3G business, and the weighted value of a 3G business is 2, then the network element is 2*2 by the weighted value that business calculates =4.
Step S106: ring and chain weighted value are calculated.
Weighted value, the weighted value of chain of ring are counted respectively.The weighted value of one ring is to be directly connected on the ring and with the ring Chain all network elements the sum of weighted value, the weighted value of a chain is the sum of the weighted value of all network elements on the chain.
Step S107: the priority of ring and chain is calculated.
Step S108: the priority of the network element not on ring or chain is calculated.
For all lower than the network element on ring or chain not in the network element priority on ring perhaps chain.If there is no " the isolated network element " of weighted value (not having bearer service again without configuration weight information in network element attribute), weighted value is calculated as 0. These, not on ring or chain, network element network element is sorted from large to small by weighted value, output priority.
Step S109: summarize precedence information, element name, device type, the power-off time, weighting of each power-off network element Value information etc. generates and exports assessment report.
Embodiment two
Fig. 3 is the topologic network figure of the present embodiment, as shown in figure 3, the topologic network in the present embodiment includes: two convergences Ring and five access chains, mesh information are as follows:
Convergence layer ring 1 is made of network element 1, network element 2, network element 3, network element 4, network element 5, network element 6.
Convergence layer ring 2 is made of network element 7, network element 8, network element 9, network element 10.
Access layer chain 1 is made of network element 11, network element 12, network element 13, network element 14.
Access layer chain 2 is made of network element 15, network element 16, network element 17.
Access layer chain 3 is made of network element 18, network element 19.
Access layer chain 4 is by network element 20, network element 21, network element 22, network element 23, network element 24, network element 25, network element 26,27 groups of network element At.
Access layer chain 5 is made of network element 28, network element 29.
The weighted value of convergence layer ring 1 is by all network elements and access layer chain 1, access layer chain 2, access layer on convergence layer ring 1 The weighted value of chain 3 is added.
The weighted value of convergence layer ring 2 by all network elements and access layer chain 4, access layer chain 5 on convergence layer ring 2 weighted value It is added.
The weighted value of convergence layer ring 1 is added by the weighted value of network element 1, network element 2, network element 3, network element 4, network element 5, network element 6.
Convergence layer ring 2 is added by the weighted value of network element 7, network element 8, network element 9, network element 10.
The weighted value of access layer chain 1 is added by the weighted value of network element 11, network element 12, network element 13, network element 14.
The weighted value of access layer chain 2 is added by the weighted value of network element 15, network element 16, network element 17.
The weighted value of access layer chain 3 is added by the weighted value of network element 18, network element 19.
The weighted value of access layer chain 4, by network element 20, network element 21, network element 22, network element 23, network element 24, network element 25, network element 26, The weighted value of network element 27 is added.
The weighted value of access layer chain 5 is added by the weighted value of network element 28, network element 29.
Embodiment three
As shown in figure 4, the embodiment of the present invention provides a kind of method of determining network element priority, comprising the following steps:
Step S201: setting network element initial priority priority=1.
Step S202: sorting from large to small according to the weighted value of ring or chain, sequentially obtain network topology unit in ring or Chain.
Step S203: poll obtains the power-off network element on ring or chain.
Step S204: whether the weighted value for judging to power off network element is weighted value highest in all power-off network elements on the ring or chain , if it is step S205 is gone to, otherwise go to step S203.
Step S205: judge to power off whether network element is connected directly with no power-off (normal) network element, if it is going to step Otherwise S206 goes to step S203.
Step S206: it is priority:priority++ that the power-off network element priority, which is arranged, then sets the power-off network element It is set to normal network element.
Step S207: whether judgement all has been calculated power supply priority when the power-off network element in front ring or chain, if it is Step S208 is gone to, step S203 is otherwise gone to.
Step S208: judge whether the power supply priority of the power-off network element in all ring or chain all calculates and complete, such as It is then to terminate process, otherwise goes to step S202.
The embodiment of the invention also provides a kind of computer readable storage mediums, are stored with computer executable instructions, The computer executable instructions are performed the method for realizing the processing power-off net element information.
Example IV
Fig. 5 is the schematic diagram that a kind of processing of the embodiment of the present invention powers off the device of net element information, as shown in figure 5, this reality The device for applying example includes:
First determining module, for determining that the weighted value of power grid member and each network element is interrupted in scheduled network element region;
Second determining module, for determining the power supply priority of the power-off network element according to the weighted value of the network element.
A kind of device of processing power-off net element information provided in an embodiment of the present invention, may be implemented power-off network element and restores electricity Intelligent sequencing improves efficiency, can be greatly saved network operation cost.
Optionally, the second determining module determines the power supply priority of the power-off network element according to the weighted value of the network element It include: the priority that each network topology unit in the network element region is determined according to the weighted value of the network element;According to described The weighted value of the priority of network topology unit and the network element in the network topology unit determines the power supply of the power-off network element Priority.
First determining module determines the weighted value of the network element in the network element region, comprising: if in network element attribute Description information is configured with weighted value, then the weighted value of the network element is determined according to the weighted value configured, if the description is believed It is not configured with weighted value in breath, then inquires all business by the network element, is determined according to different service types and quantity The weighted value of the network element.
Optionally, second determining module determines each net in the network element region according to the weighted value of the network element The priority of network topology unit, comprising:
As the network topology unit be a ring, then the priority of the network topology unit by the ring network element and The sum of weighted value of network element on chain connecting with the ring determines;Such as network topology unit is a chain, then the network The priority of topology unit determines that the network topology unit is a ring or one by the sum of the weighted value of network element on the chain Chain or isolated network element.
Optionally, second determining module determines that the power supply priority of power-off network element includes: such as in the same network There are multiple power-off network elements in topology unit, then whether the network element that poll judges that the power-off network element is connected directly is normal network element, In the case where the judgment result is yes, normal network element is set by the power-off network element, and determines that the power supply of the power-off network element is excellent First grade, until the power supply priority of all power-off network elements in the same network topology unit has determined.
Optionally, second determining module, if determining that the power supply priority of the power-off network element includes: and normal net The power-off network element that member is connected directly has multiple, then corresponding power-off network element is determined according to the weighted value size of the power-off network element Power supply priority;If the weighted value of the power-off network element is identical, determined according to the mark of the power-off network element corresponding disconnected The power supply priority of power grid member.
The embodiment of the present invention also provides a kind of device of processing power-off net element information, including memory and processor, wherein
The memory is stored with to give an order: determining that the weighting of power grid member and each network element is interrupted in scheduled network element region Value;The power supply priority of the power-off network element is determined according to the weighted value of the network element;
The processor, for executing the instruction of the memory storage.
Those of ordinary skill in the art will appreciate that all or part of the steps in the above method can be instructed by program Related hardware is completed, and described program can store in computer readable storage medium, such as read-only memory, disk or CD Deng.Optionally, one or more integrated circuits can be used also to realize in all or part of the steps of above-described embodiment.Accordingly Ground, each module/unit in above-described embodiment can take the form of hardware realization, can also use the shape of software function module Formula is realized.The present invention is not limited to the combinations of the hardware and software of any particular form.
The above is only a preferred embodiment of the present invention, and certainly, the invention may also have other embodiments, without departing substantially from this In the case where spirit and its essence, those skilled in the art make various corresponding changes in accordance with the present invention And deformation, but these corresponding changes and modifications all should fall within the scope of protection of the appended claims of the present invention.

Claims (15)

1. a kind of method of processing power-off net element information, comprising:
Determine the weighted value of the power-off network element and each network element in scheduled network element region;
The power supply priority of the power-off network element is determined according to the weighted value of the network element.
2. the method as described in claim 1, which is characterized in that the weighted value according to the network element determines the power-off net The power supply priority of member, comprising:
The priority of each network topology unit in the network element region is determined according to the weighted value of the network element;
According to the weighted value of the network element in the priority of the network topology unit and the network topology unit, determine described disconnected The power supply priority of power grid member.
3. the method as described in claim 1, which is characterized in that the weighted value of the network element in the determination network element region, Include:
If the description information in network element attribute is configured with weighted value, adding for the network element is determined according to the weighted value configured Weight;
If being not configured with weighted value in the description information, all business by the network element are inquired, according to different business Type and quantity determine the weighted value of the network element.
4. method according to claim 2, which is characterized in that the network topology unit is a ring or a chain or isolates Network element;The weighted value according to the network element determines the priority of each network topology unit in the network element region, packet It includes:
As the network topology unit be a ring, then the priority of the network topology unit by the ring network element and with this The sum of the weighted value of network element on the chain of ring connection determines;
As the network topology unit be a chain, then the priority of the network topology unit by the network element on the chain weighting The sum of value determines.
5. method as claimed in claim 4, which is characterized in that
If the sum of the weighted value of network element in the network topology unit is identical, according to the mark of the network topology unit To determine the priority of the network topology unit.
6. the method according to claim 1 to 5, which is characterized in that the power supply of the determination power-off network element is preferential Grade, comprising:
Such as there are multiple power-off network elements in the same network topology unit, then poll judges what the power-off network element was connected directly Whether network element is normal network element, in the case where the judgment result is yes, sets normal network element for the power-off network element, and determine The power supply priority of the power-off network element, until the power supply priority of all power-off network elements in the same network topology unit is true Until having determined.
7. method as claimed in claim 6, which is characterized in that
If having with the power-off network element that normal network element is connected directly multiple, come according to the weighted value size of the power-off network element true The power supply priority of fixed corresponding power-off network element;If the weighted value of the power-off network element is identical, according to the power-off network element Identify the power supply priority to determine corresponding power-off network element.
8. a kind of device of processing power-off net element information characterized by comprising
First determining module, for determining that the weighted value of power grid member and each network element is interrupted in scheduled network element region;
Second determining module, for determining the power supply priority of the power-off network element according to the weighted value of the network element.
9. device as claimed in claim 8, it is characterised in that:
Second determining module determines that the power supply priority of the power-off network element includes: root according to the weighted value of the network element The priority of each network topology unit in the network element region is determined according to the weighted value of the network element;According to the network topology The weighted value of the priority of unit and the network element in the network topology unit determines the power supply priority of the power-off network element.
10. device as claimed in claim 8, it is characterised in that:
First determining module determines the weighted value of the network element in the network element region, comprising: if the description in network element attribute Information configuration has weighted value, then the weighted value of the network element is determined according to the weighted value configured, if in the description information It is not configured with weighted value, then inquires all business by the network element, is determined according to different service types and quantity described The weighted value of network element.
11. device as claimed in claim 9, it is characterised in that:
Second determining module determines each network topology unit in the network element region according to the weighted value of the network element Priority, comprising: if the network topology unit is a ring, then the priority of the network topology unit is by the net on the ring The sum of the weighted value of network element in member and the chain connecting with the ring determines;It is if the network topology unit is a chain, then described The priority of network topology unit determines by the sum of weighted value of network element on the chain, the network topology unit be a ring or One chain or isolated network element.
12. device as claimed in claim 11, it is characterised in that:
Second determining module, if the sum of weighted value of network element in the network topology unit is identical, according to The priority of network topology unit identified to determine the network topology unit.
13. such as the described in any item devices of claim 8-12, it is characterised in that:
Second determining module determines that the power supply priority of power-off network element includes: such as in the same network topology unit There are multiple power-off network elements, then whether the network element that poll judges that the power-off network element is connected directly is normal network element, in judging result In the case where being, normal network element is set by the power-off network element, and determine the power supply priority of the power-off network element, until same Until the power supply priority of all power-off network elements in one network topology unit has determined.
14. device as claimed in claim 13, it is characterised in that:
Second determining module, if the power supply priority for determining the power-off network element includes: to be connected directly with normal network element Power-off network element have multiple, then determine that the power supply of corresponding power-off network element is preferential according to the weighted value size of the power-off network element Grade;If the weighted value of the power-off network element is identical, corresponding power-off network element is determined according to the mark of the power-off network element Power supply priority.
15. a kind of device of processing power-off net element information, including memory and processor, which is characterized in that
The memory is stored with to give an order: determining that the weighted value of power grid member and each network element is interrupted in scheduled network element region;Root The power supply priority of the power-off network element is determined according to the weighted value of the network element;
The processor, for executing the instruction of the memory storage.
CN201710364634.9A 2017-05-22 2017-05-22 Method and device for processing outage network element information Active CN108964954B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710364634.9A CN108964954B (en) 2017-05-22 2017-05-22 Method and device for processing outage network element information

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710364634.9A CN108964954B (en) 2017-05-22 2017-05-22 Method and device for processing outage network element information

Publications (2)

Publication Number Publication Date
CN108964954A true CN108964954A (en) 2018-12-07
CN108964954B CN108964954B (en) 2023-04-07

Family

ID=64461545

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710364634.9A Active CN108964954B (en) 2017-05-22 2017-05-22 Method and device for processing outage network element information

Country Status (1)

Country Link
CN (1) CN108964954B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130134746A (en) * 2012-05-31 2013-12-10 주식회사 엘지화학 Energy management system for controlling priority of energy supply on occurrence of power failure in smart grid system and method thereof
CN105743704A (en) * 2016-03-30 2016-07-06 广东凯通软件开发有限公司 Fault analysis method and device for communication link
WO2016177046A1 (en) * 2015-08-27 2016-11-10 中兴通讯股份有限公司 Method and apparatus for determining network element information and network management topology system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130134746A (en) * 2012-05-31 2013-12-10 주식회사 엘지화학 Energy management system for controlling priority of energy supply on occurrence of power failure in smart grid system and method thereof
WO2016177046A1 (en) * 2015-08-27 2016-11-10 中兴通讯股份有限公司 Method and apparatus for determining network element information and network management topology system
CN105743704A (en) * 2016-03-30 2016-07-06 广东凯通软件开发有限公司 Fault analysis method and device for communication link

Also Published As

Publication number Publication date
CN108964954B (en) 2023-04-07

Similar Documents

Publication Publication Date Title
CN106911483B (en) Charging method based on block chain and cloud computing platform
CN107015892A (en) A kind of method for testing pressure, device and system
US9864660B2 (en) Backup management system and backup management method
CN110365748A (en) Treating method and apparatus, storage medium and the electronic device of business datum
CN109936613A (en) Disaster recovery method and device applied to server
CN106294073A (en) Service calling method and device
CN110428206B (en) Intelligent solution method and device for delivery of express delivery terminal, storage medium and electronic equipment
CN104125153A (en) Network topology discovery method and device
CN104022895B (en) Internet cascading failure diagnostic analysis system
WO2021183305A1 (en) Topology and phase detection for electrical supply network
CN109656783A (en) System platform monitoring method and device
CN108259195A (en) The determining method and system of the coverage of anomalous event
CN108830433A (en) A kind of O&M route planning method based on LBS, system
CN115277598A (en) Computing resource scheduling method and device and computer readable storage medium
CN109600268A (en) A kind of SDN matrixing network probe deployment method and apparatus based on greedy algorithm
CN105471938A (en) Server load management method and server load management device
CN109375146A (en) A kind of filling mining method, system and the terminal device of electricity consumption data
CN108964954A (en) A kind of method and device of processing power-off net element information
CN102984739A (en) Breakdown information processing method and processing device
CN109951330B (en) Management method for automatically identifying equipment type and communication manager
CN116467087A (en) Intelligent digital operation management system based on multi-service module
CN102385002B (en) Intelligent electricity meter and electricity using requirement controlling system and method
CN103096380B (en) Wireless access point load balancing load balancing
CN109687592A (en) Substation information display control method, device and electronic equipment
CN110377422A (en) A kind of method for managing resource, device, equipment and readable storage medium storing program for executing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant