CN108964024A - A kind of traction substation automatic closing process recollects analysis method - Google Patents

A kind of traction substation automatic closing process recollects analysis method Download PDF

Info

Publication number
CN108964024A
CN108964024A CN201810695039.8A CN201810695039A CN108964024A CN 108964024 A CN108964024 A CN 108964024A CN 201810695039 A CN201810695039 A CN 201810695039A CN 108964024 A CN108964024 A CN 108964024A
Authority
CN
China
Prior art keywords
throwing
inlet wire
main transformer
pressure side
mode
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810695039.8A
Other languages
Chinese (zh)
Other versions
CN108964024B (en
Inventor
周小金
范红疆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDU SOUTHWEST JIAOTONG UNIVERSITY XUJI ELECTRIC Co Ltd
Original Assignee
CHENGDU SOUTHWEST JIAOTONG UNIVERSITY XUJI ELECTRIC Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU SOUTHWEST JIAOTONG UNIVERSITY XUJI ELECTRIC Co Ltd filed Critical CHENGDU SOUTHWEST JIAOTONG UNIVERSITY XUJI ELECTRIC Co Ltd
Priority to CN201810695039.8A priority Critical patent/CN108964024B/en
Publication of CN108964024A publication Critical patent/CN108964024A/en
Application granted granted Critical
Publication of CN108964024B publication Critical patent/CN108964024B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of traction substation automatic closing processes to recollect analysis method, including described method includes following steps: S1: prepare from throwing recovering and analysis, it selects to cater to lock certainly from throwing mode, switchtype, device definite value from throwing setting project in device definite value first, be moved back from the switch throwing in congenial lock project, and identified by different running method of the system to use;S2: switching value is generated according to definite value and limits, if definite value " inlet wire decompression throws mode certainly " adjusting is " in-line ", then create switching value " inlet wire decompression is in-line from the mode of throwing ", value is TRUE, all opened firmly into creation switching value, when opening effective into input firmly, switching magnitude is TRUE, otherwise is FALSE;S3: drafting acts playback logic figure, and the realization played back from throwing process needs the switching value information created using S3 step to draw prepared auto restart action diagram, by being patterned display to from Investment Trust breath from throwing action diagram.

Description

A kind of traction substation automatic closing process recollects analysis method
Technical field
The present invention relates to a kind of from throwing process analysis method, and in particular to a kind of traction substation automatic closing process Recollect analysis method.
Background technique
Traction substation, that is, electric propulsion house substation, the electric energy that it sends regional power system, according to electric power It draws and electric current and the different of voltage is required, be changed into the electric energy suitable for electric propulsion, be then sent to railway line overhead respectively The contact net of erection is powered for electric locomotive, or power supply system needed for being sent to the urban transportations such as underground railway, is electric vehicle Or electric car power supply, since traction substation carries the vital task of uninterrupted power supply, therefore it is required that have dual power supply, double masters Transformer fixation is spare, and has the function of automatic switching.It is set since spare power automatic switching system is related to largely switch and other electromechanics It is standby, therefore failure rate is higher, usually will appear the case where prepared auto restart fails.When there is prepared auto restart failure, operator is often It can only be judged by experience, and relatively large deviation may also occur in micro-judgment, and then influence the troubleshooting of prepared auto restart failure. For this reason, it may be necessary to a kind of systematization, standardized diagnostic method, it is accurately and rapidly fixed to accomplish come failure when failing to prepared auto restart Fault removal efficiency is improved in position.
Summary of the invention
Staff cannot be allowed intuitive from throwing process analysis method the technical problem to be solved by the present invention is to existing Recognize entirely from Output-input analysis of Nutrients process, is unfavorable for staff and is adjusted, and it is an object of the present invention to provide a kind of traction substation is spare Power switchover process recollects analysis method, solves the problem above-mentioned.
The present invention is achieved through the following technical solutions:
A kind of traction substation automatic closing process recollects analysis method, including described method includes following steps: S1: carrying out from recovering and analysis preparation is thrown, described from the mode of throwing from throwing mode from selection in setting project is thrown in device definite value first Mode is thrown certainly from throwing mode and main transformer failure including inlet wire decompression;Device definite value is carried out while setting from throwing mode to cater to certainly Lock is moved back from the switch throwing of congenial lock, and setting device is opened into signal firmly, and is known by different running method of the system to use Not;S2: switching value is generated according to definite value and limits, generates intermediate switch amount state;S3: drafting acts playback logic figure, The realization played back from throwing process needs the switching value information created using S2 step to draw prepared auto restart action diagram, by dynamic from throwing Mapping is patterned display to from Investment Trust breath;S4: checking movement playback logic, and automatic bus will start dynamic when acting from throwing Each switching value recording in mapping, until entire prepared auto restart process terminates, in device generation recorded wave file.The playback of prepared auto restart process Switching value information of the needs using creation is realized to draw prepared auto restart action diagram, which belongs to a part of visual programming, By visual programming, staff is facilitated to be monitored to from Output-input analysis of Nutrients process, and can intervened at any time, from throwing action logic Figure compiles together with prepared auto restart program.Need drawing system in 1~work of working method for typical electric railway substation The inlet wire decompression and main transformer failure made under mode 4 have 8 kinds of action diagrams altogether, staff can be allowed to obtain by different working methods Get different action diagrams.
Further, the method for operation in the step S1 includes: the method for operation 1: this side inlet wire is by electricity, this side main transformer fortune Row, opposite side inlet wire, opposite side main transformer are spare;The method of operation 2: this side inlet wire is by electricity, the operation of opposite side main transformer, opposite side inlet wire, this side master Become spare;The method of operation 3: opposite side inlet wire is by electricity, and the operation of this side main transformer, this side inlet wire, opposite side main transformer are spare;The method of operation 4: right Side inlet wire is by electricity, and the operation of opposite side main transformer, this side inlet wire, this side main transformer are spare;The method of operation 5: the invalid method of operation.
Further, playback logic figure is drawn according to the step S3, plot step is as follows: S31: in the visual of prepared auto restart Change and finally create a workspace in program, the movement playback attribute of workspace is set as TRUE, and workspace is named as operation side Formula 1 is played back from throwing;S32: it will be used as first starting state from starting is thrown, and will be plotted in the workspace leftmost side, then successively draws Low-pressure side β phase breaker open operation, low-pressure side α phase breaker open operation, rail reflux separates separating brake, neutral point separates, high-pressure side open circuit Device separating brake, inlet wire separate, from throw contact output, from throw contact open into, this side main transformer failure open into, A phase capacitor coincidence open into, B phase capacitor coincidence open into, high-pressure side breaker closing, neutral point separate combined floodgate, rail reflux separate combined floodgate, low-pressure side α phase is broken Road device combined floodgate, low-pressure side β phase breaker closing are outputed from throwing contact, from throwing successfully, and each state is connected using arrow connecting line It connects;S33: the case where decompression and main transformer failure of other working methods are drawn out according to S32 method.
Further, when firmly open into inlet wire from throw investment effectively or main transformer from throw investment effectively, operational mode effectively and on It is secondary to meet from indicating when throwing involution from ready condition is thrown.
Further, which is characterized in that in the step S2, when definite value " inlet wire decompression throws mode certainly " adjusting is " straight Column " then create switching value " inlet wire decompression throws mode certainly as array ", are worth for TRUE;When catering to lock definite value " 2QF low-pressure side α certainly Phase breaker " adjusting is investment, then creates switching value " 2QF low-pressure side α phase breaker closing investment ", be worth for TRUE., opened when firmly Entering switching magnitude when inputting effective is TRUE, otherwise is FALSE.It is opened firmly for the two-position of breaker, disconnecting switch into creation Such as " high-pressure side 1QF breaker coincidence " and " high-pressure side 1QF breaker quartile " switching value, value is divided by input, runs jointly and determine into value It is fixed.
The advantage of present specification is that backup auto-activating device will start each switching value record in action diagram when acting from throwing Wave, until entire prepared auto restart process terminates, in device generation recorded wave file.Using the matched waveform analysis tool of platform WaveAnalyze open wave file, choose display logic figure, can checking device from throw action process.Can drag manually or Automatically move time shaft, in dragging process, the state of triggering can become red, and the state not triggered becomes grey, detailed exhibition The detailed process of existing prepared auto restart.
Compared with prior art, the present invention having the following advantages and benefits:
1, a kind of traction substation automatic closing process of the present invention recollects analysis method, will entirely carry out from the process of throwing Image conversion analysis processing, can more intuitively show overall process;
2, a kind of traction substation automatic closing process of the present invention recollects analysis method, and backup auto-activating device is dynamic from throwing As when will start each switching value recording in action diagram, until entire prepared auto restart process terminates, generate recorded wave file in device, be convenient for Later period is read out;
Detailed description of the invention
Attached drawing described herein is used to provide to further understand the embodiment of the present invention, constitutes one of the application Point, do not constitute the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 traction substation main electrical scheme schematic diagram.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below with reference to embodiment and attached drawing, to this Invention is described in further detail, and exemplary embodiment of the invention and its explanation for explaining only the invention, are not made For limitation of the invention.
Embodiment
As shown in Figure 1, a kind of traction substation automatic closing process of the present invention recollects analysis method, divide from playback is thrown Condition needed for analysis:
Device definite value is from throwing setting project: inlet wire decompression throws mode (array or falling to intersect), main transformer failure certainly certainly Throwing mode (array or falling to intersect), low-side switch type (breaker or disconnecting switch), (open circuit of 2QS and 4QS switchtype Device or disconnecting switch), 3QS bridge separate stand-by heat (put into or exit), control 3QS bridge separate and (put into or exit).
Device definite value is from catering to lock, moving back from the switch throwing in congenial lock project, and switch has: 1QS inlet wire separates, 2QS is neutral Point separates, the reflux of 4QS rail separates, the high-pressure side 1QF breaker, 2QF low-pressure side α phase breaker, 3QF low-pressure side β phase breaker.
Device is opened firmly into signal: main transformer is from investment, inlet wire from investment, opposite side main transformer failure, opposite side decompression, this side master Accident barrier, in attached drawing 1 whole position of the switch two point open firmly into.
System operation mode identification meets condition 1 simultaneously according to table 1 and condition 2 obtains system operation mode, each operation side Formula meaning are as follows: the method for operation 1: this side inlet wire is by electricity, and the operation of this side main transformer, opposite side inlet wire, opposite side main transformer are spare.The method of operation 2: This side inlet wire is by electricity, and the operation of opposite side main transformer, opposite side inlet wire, this side main transformer are spare.The method of operation 3: opposite side inlet wire is by electricity, this side master Become operation, this side inlet wire, opposite side main transformer are spare.The method of operation 4: opposite side inlet wire is by electricity, the operation of opposite side main transformer, this side inlet wire, sheet Side main transformer is spare.The method of operation 5: the invalid method of operation.From throwing ready condition.It is effectively or main from investment into inlet wire when opening firmly Become from investment effectively, operational mode is effectively and last time meets from indicating when throwing involution from ready condition is thrown.Run judgement side Formula is as shown in following table 1.
1 method of operation of table determines
C generates intermediate switch amount state: switching value is generated according to definite value and limits, as definite value " throw certainly by inlet wire decompression Mode " adjusting is " array ", then creates switching value " inlet wire decompression is in-line from the mode of throwing ", be worth for TRUE.For another example from throwing Combined floodgate definite value " 2QF low-pressure side α phase breaker " adjusting is investment, then creating switching value, " 2QF low-pressure side α phase breaker closing is thrown Enter ", it is worth for TRUE.
Above-mentioned whole is opened firmly into creation switching value, when opening effective into input firmly, switching magnitude is TRUE, otherwise is FALSE.It is opened firmly for the two-position of breaker, disconnecting switch into creation such as " high-pressure side 1QF breaker coincidence " and " 1QF high pressure Side breaker quartile " switching value, value by input point, run jointly and determined into value.
Drafting acts playback logic figure: the realization of prepared auto restart process playback needs the switching value information using Section 2 creation Prepared auto restart action diagram is drawn, which belongs to a part of visual programming, from throwing action logic figure and prepared auto restart program one Play compiling.Inlet wire of the drawing system under 1~working method of working method 4 is needed to lose for typical electric railway substation Pressure has 8 kinds of action diagrams altogether with main transformer failure, by taking this side inlet wire decompression of working method 1 as an example, step are as follows: in the visual of prepared auto restart Change and finally create a workspace in program, the movement playback attribute of workspace is set as TRUE, and workspace is named as work side Formula 1 is played back from throwing.It will be used as first starting state from starting is thrown, and be plotted in the workspace leftmost side, then successively draw low pressure Side β phase breaker open operation, low-pressure side α phase breaker open operation, rail reflux separates separating brake, neutral point separates, high-pressure side breaker point Lock, inlet wire separate, outputs, is opened into, B phase into, A phase capacitor coincidence from throwing contact and open to open into, this side main transformer failure from throwing contact Capacitor coincidence open into, high-pressure side breaker closing, neutral point separate combined floodgate, rail reflux separate combined floodgate, low-pressure side α phase breaker Combined floodgate, low-pressure side β phase breaker closing are outputed from throwing contact, from throwing successfully, and each state is connected using arrow connecting line.
Check that movement playback is patrolled: backup auto-activating device will start each switching value recording in action diagram when acting from throwing, until Entire prepared auto restart process terminates, and generates recorded wave file in device.It is beaten using the matched waveform analysis tool WaveAnalyze of platform Open wave file, choose display logic figure, can checking device from throw action process.It can drag or automatically move manually the time Axis, in dragging process, the state of triggering can become red, and the state not triggered becomes grey, detailed to show the detailed of prepared auto restart Thread journey.
Above-described specific embodiment has carried out further the purpose of the present invention, technical scheme and beneficial effects It is described in detail, it should be understood that being not intended to limit the present invention the foregoing is merely a specific embodiment of the invention Protection scope, all within the spirits and principles of the present invention, any modification, equivalent substitution, improvement and etc. done should all include Within protection scope of the present invention.

Claims (6)

1. a kind of traction substation automatic closing process recollects analysis method, which is characterized in that the method includes as follows Step:
S1: carrying out from recovering and analysis preparation is thrown, and it is described to throw certainly from throwing mode to throw selection in setting project certainly in device definite value first Mode includes inlet wire decompression from throwing mode and main transformer failure from throwing mode;Device definite value is carried out while setting from throwing mode from throwing It closes a floodgate, moved back from the switch throwing of congenial lock, setting device is opened into signal firmly, and is carried out by different running method of the system to use Identification;
S2: switching value is generated according to definite value and limits, generates intermediate switch amount state;
S3: drafting act playback logic figure, from throwing process play back realizations need using S2 step creation switching value information come Prepared auto restart action diagram is drawn, by being patterned display to from Investment Trust breath from throwing action diagram;
S4: movement playback logic is checked, automatic bus will start each switching value recording in action diagram when acting from throwing, until whole A prepared auto restart process terminates, and generates recorded wave file in device.
2. a kind of traction substation automatic closing process according to claim 1 recollects analysis method, feature exists In the method for operation in the step S1 includes:
The method of operation 1: this side inlet wire is by electricity, and the operation of this side main transformer, opposite side inlet wire, opposite side main transformer are spare;
The method of operation 2: this side inlet wire is by electricity, and the operation of opposite side main transformer, opposite side inlet wire, this side main transformer are spare;
The method of operation 3: opposite side inlet wire is by electricity, and the operation of this side main transformer, this side inlet wire, opposite side main transformer are spare;
The method of operation 4: opposite side inlet wire is by electricity, and the operation of opposite side main transformer, this side inlet wire, this side main transformer are spare;
The method of operation 5: the invalid method of operation.
3. a kind of traction substation automatic closing process according to claim 2 recollects analysis method, feature exists According to step S3 drafting playback logic figure, plot step is as follows:
S31: finally creating a workspace in the visualization procedure of prepared auto restart, and the movement playback attribute of workspace is set as TRUE, workspace are named as the method for operation 1 from throwing playback;
S32: it will be used as first starting state from starting is thrown, and will be plotted in the workspace leftmost side, then successively draws low-pressure side β phase Breaker open operation, low-pressure side α phase breaker open operation, rail reflux separate separating brake, neutral point separates, high-pressure side breaker open operation, into Line separates, outputs, is opened into, B phase capacitor into, A phase capacitor coincidence from throwing contact and open to open into, this side main transformer failure from throwing contact Coincidence open into, high-pressure side breaker closing, neutral point separate combined floodgate, rail reflux separate combined floodgate, low-pressure side α phase breaker closing, Low-pressure side β phase breaker closing is outputed from throwing contact, from throwing successfully, and each state is connected using arrow connecting line;
S33: the case where decompression and main transformer failure of other working methods are drawn out according to S32 method.
4. a kind of traction substation automatic closing process according to claim 1 recollects analysis method, feature exists In, when firmly open into inlet wire from throw investment effectively or main transformer from throw investment effectively, operational mode effectively and last time from throw involution when, It indicates to meet from throwing ready condition.
5. a kind of traction substation automatic closing process according to claim 1 recollects analysis method, feature exists In, in the step S1, device definite value from cater to lock, thrown from the switch in congenial lock project move back the switch of use include 1QS into Line separates, 2QS neutral point separates, the reflux of 4QS rail separates, the high-pressure side 1QF breaker, 2QF low-pressure side α phase breaker, 3QF low pressure Side β phase breaker is controlled by each switch from throwing process.
6. a kind of traction substation automatic closing process according to claim 5 recollects analysis method, feature exists In in the step S2, adjusting when definite value " inlet wire decompression throws mode certainly " is " in-line ", then creates switching value " inlet wire decompression It is in-line from the mode of throwing ", it is worth for TRUE;When catering to lock definite value " 2QF low-pressure side α phase breaker " adjusting certainly for investment, then create Switching value " 2QF low-pressure side α phase breaker closing investment " is built, is worth for TRUE.
CN201810695039.8A 2018-06-29 2018-06-29 Backup power source automatic switching process recall analysis method for traction substation Active CN108964024B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810695039.8A CN108964024B (en) 2018-06-29 2018-06-29 Backup power source automatic switching process recall analysis method for traction substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810695039.8A CN108964024B (en) 2018-06-29 2018-06-29 Backup power source automatic switching process recall analysis method for traction substation

Publications (2)

Publication Number Publication Date
CN108964024A true CN108964024A (en) 2018-12-07
CN108964024B CN108964024B (en) 2021-05-18

Family

ID=64487949

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810695039.8A Active CN108964024B (en) 2018-06-29 2018-06-29 Backup power source automatic switching process recall analysis method for traction substation

Country Status (1)

Country Link
CN (1) CN108964024B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110323821A (en) * 2019-07-15 2019-10-11 上海思源输配电工程有限公司 A kind of control method of more segmentation loop-network switch cabinet prepared auto restarts
CN112100544A (en) * 2020-09-07 2020-12-18 贵州电网有限责任公司 Spare power automatic switching installation device and spare power automatic switching action logic monitoring technology visualization method
CN112421761A (en) * 2020-11-29 2021-02-26 西南交通大学 Relay protection reconstruction self-healing method for hub traction power supply system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009065775A (en) * 2007-09-06 2009-03-26 Tokyo Electric Power Co Inc:The Method of preraring procedure for confirming switch operation
CN102496930A (en) * 2011-12-28 2012-06-13 浙江省电力公司 Remote inversion method of internal action logic of protection device
CN103853807A (en) * 2013-11-26 2014-06-11 许继电气股份有限公司 Visual analysis method of power faults
CN204118855U (en) * 2014-06-05 2015-01-21 成都交大运达电气有限公司 High-speed overload railway digital traction substation main transformer measure and control device
CN104360181A (en) * 2014-10-08 2015-02-18 成都交大许继电气有限责任公司 Method for quick fault diagnosis when spare power automatic switching of traction substation fails

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009065775A (en) * 2007-09-06 2009-03-26 Tokyo Electric Power Co Inc:The Method of preraring procedure for confirming switch operation
CN102496930A (en) * 2011-12-28 2012-06-13 浙江省电力公司 Remote inversion method of internal action logic of protection device
CN103853807A (en) * 2013-11-26 2014-06-11 许继电气股份有限公司 Visual analysis method of power faults
CN204118855U (en) * 2014-06-05 2015-01-21 成都交大运达电气有限公司 High-speed overload railway digital traction substation main transformer measure and control device
CN104360181A (en) * 2014-10-08 2015-02-18 成都交大许继电气有限责任公司 Method for quick fault diagnosis when spare power automatic switching of traction substation fails

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110323821A (en) * 2019-07-15 2019-10-11 上海思源输配电工程有限公司 A kind of control method of more segmentation loop-network switch cabinet prepared auto restarts
CN112100544A (en) * 2020-09-07 2020-12-18 贵州电网有限责任公司 Spare power automatic switching installation device and spare power automatic switching action logic monitoring technology visualization method
CN112100544B (en) * 2020-09-07 2023-03-28 贵州电网有限责任公司 Spare power automatic switching installation device and spare power automatic switching action logic monitoring technology visualization method
CN112421761A (en) * 2020-11-29 2021-02-26 西南交通大学 Relay protection reconstruction self-healing method for hub traction power supply system

Also Published As

Publication number Publication date
CN108964024B (en) 2021-05-18

Similar Documents

Publication Publication Date Title
CN108964024A (en) A kind of traction substation automatic closing process recollects analysis method
CN109693690B (en) Magnetic suspension running control system
EP2800672B2 (en) Rail vehicle brake device
CN105751916B (en) A kind of magnetic floating train suspending control method
CN104460611B (en) A kind of distributed locker control system and its control method
CN109917778B (en) High-redundancy locomotive network control system
CN105824273A (en) Ground object controller in train operation control system
CN105197068A (en) Dual-computer safety redundancy type LKJ mainframe system and method
CN110171445A (en) Vehicle safety loop wire fault point detection system and fault judgment method
CN109606433B (en) Road traffic signal simulation system applied to tramcar
CN109878333A (en) Ac bus control method and system are pressed in one kind
CN101752904B (en) Power supply system distributed controlling and managing subsystem computer
CN110758489A (en) Automatic protection system of train
CN103346497B (en) Intelligent substation electrical virtual circuit isolation method and system
DE102013210018A1 (en) Method for switching on and off a train and route and train configuration for carrying out the method
CN105756392B (en) A kind of parking apparatus control device
CN109521316A (en) Busbar short-circuit test method is pressed in a kind of EMU
CN109557410A (en) The method for diagnosing faults of intelligent network connection electric vehicle power converter of switch reluctance motor
CN105911464A (en) Method, device and system for online monitoring of circuit breaker based on acceleration sensor
CN104360181B (en) Fault Quick Diagnosis method when traction substation prepared auto restart fails
CN105034813B (en) Train power supply control device
JP2003264901A (en) Electric vehicle controller
CN114715225B (en) Unmanned system of maglev train
CN107082074A (en) Railway shunting intelligence track indicator
CN109774479A (en) A kind of subordinate inverter system grid connection method of supplying power to based on network-control

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant