CN108960560A - A kind of construction personnel's execution management method therefor - Google Patents

A kind of construction personnel's execution management method therefor Download PDF

Info

Publication number
CN108960560A
CN108960560A CN201810407407.4A CN201810407407A CN108960560A CN 108960560 A CN108960560 A CN 108960560A CN 201810407407 A CN201810407407 A CN 201810407407A CN 108960560 A CN108960560 A CN 108960560A
Authority
CN
China
Prior art keywords
construction
personnel
period
curve
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810407407.4A
Other languages
Chinese (zh)
Inventor
廖强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810407407.4A priority Critical patent/CN108960560A/en
Publication of CN108960560A publication Critical patent/CN108960560A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063118Staff planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Abstract

The present invention relates to a kind of construction personnel's execution management method therefors, including the following contents: 101, constructing the construction data-base of construction trade;102, obtain the construction data of construction personnel: motion bracelet detects construction personnel in the construction data of construction period at interval of the T1 time, while the construction data and current detection number being saved into record sheet;103, it analyzes the construction data of construction personnel and is managed: the construction data record sheet of background process center reading motion bracelet, generate the aim curve for the construction data that time interval is T1, compare aim curve and datum curve variation tendency, in turn, the construction personnel of substantial deviation datum curve is listed to replace the construction period.The present invention obtains the construction data of construction personnel and generates aim curve, compare aim curve and datum curve variation tendency, the construction personnel of substantial deviation datum curve is listed to replace the construction period, and then by repeatedly exchanging so that the construction personnel to be exchanged to the period best to its energy.

Description

A kind of construction personnel's execution management method therefor
Technical field
The present invention relates to building trade technical fields, more particularly to a kind of construction personnel's execution management method therefor.
Background technique
In traditional building trade, general (such as work in three shifts) in such a way that fixed shift takes turns to is constructed, it is specified that one The fixed period, and then constructed or rested in turn by each construction team, since human body is in each period energy and everyone body Gap may result in some construction personnel and construct in some construction period with the body of overstrain, and then is easy to cause Construction safety accident.After all since building operation environment is there are high risk sexual, reasonable arrangement construction time and time of having a rest are needed, it is no Worker then be may result in since overwork construction causes accident or construction personnel to go to non-one's own side's construction area in the construction period It rests and causes accident.
Summary of the invention
The purpose of the present invention is to provide a kind of construction personnel's execution management method therefors, can well solve construction personnel's The construction period arranges unreasonable problem.
To achieve the goals above, the present invention provides following technical schemes:
A kind of construction personnel's execution management method therefor provided by the invention, specifically includes the following contents:
101, construct the construction data-base of construction trade: the motion bracelet detection construction personnel based on built-in acceleration sensor exists The construction data including acceleration and vibration of hand when construction trains each work post and is constructing period construction data at any time The datum curve of variation, wherein time interval T1;
102, obtain the construction data of construction personnel: motion bracelet detects construction personnel's applying in the construction period at interval of the T1 time Number evidence, while the construction data and current detection number being saved into record sheet;
103, it analyzes the construction data of construction personnel and is managed: reading the motion bracelet of construction personnel in background process center Construction data record sheet generates the aim curve for the construction data that time interval is T1, compares aim curve and datum curve becomes Change trend lists the construction personnel of substantial deviation datum curve in turn to select in turn to the construction period for having neither part nor lot in construction When the aim curve of the construction personnel and datum curve being taken to deviate construction of the situation the smallest construction period as the construction personnel Section.
Further, in step 103, background process center also calculates the period of aim curve, in turn, is based on each construction The period of the aim curve of personnel forms the new construction team of several period summation equilibriums, and the number between each new construction team Gap is kept in a certain range.
Compared with prior art, the invention has the following advantages that
A kind of construction personnel's execution management method therefor of the invention, the motion bracelet building based on built-in acceleration sensor is each to be applied The construction data datum curve of work work post obtains the construction data of construction personnel and generates aim curve, compare aim curve with Datum curve variation tendency lists the construction personnel of substantial deviation datum curve to replace the construction period, and then by multiple It exchanges so that the construction personnel to be exchanged to the period best to its energy;The period of aim curve is calculated, each constructor is based on The period of the aim curve of member forms the new construction team of several period summation equilibriums, so as to applying for each construction team of reasonable distribution Work ability guarantees that the ability of each construction period is balanced.
Below by embodiment, technical scheme of the present invention will be described in further detail.
Specific embodiment
The embodiment of the present invention is illustrated below, it should be understood that embodiment described herein be merely to illustrate and It explains the present invention, is not intended to limit the present invention.
Embodiment 1
A kind of construction personnel's execution management method therefor provided in this embodiment, specifically includes the following contents:
Step 101, the construction data-base for constructing construction trade: the motion bracelet based on built-in acceleration sensor detects constructor Member in construction hand include acceleration and vibration construction data, train each work post construction period construction data with The datum curve of time change, wherein time interval T1.
Step 102, the construction data for obtaining construction personnel: motion bracelet detects construction personnel at interval of the T1 time and is constructing The construction data of period, while the construction data and current detection number being saved into record sheet.
Step 103, the construction data for analyzing construction personnel are simultaneously managed: the fortune of background process center reading construction personnel It starts the construction data record sheet of ring, generates the aim curve for the construction data that time interval is T1, compare aim curve and base Directrix curve variation tendency lists the construction personnel of substantial deviation datum curve in turn so as to the construction period for having neither part nor lot in construction, In turn, the aim curve and datum curve for choosing the construction personnel deviate the situation the smallest construction period as the construction personnel's It constructs the period.
In step 103, background process center also calculates the period of aim curve, in turn, the mesh based on each construction personnel The period of mark curve forms the new construction team of several period summation equilibriums, and the number gap between each new construction team is kept In a certain range (within the people of such as 1,3 or 5).
Motion bracelet based on built-in acceleration sensor constructs the construction data datum curve of each construction trade, obtains The construction data of construction personnel simultaneously generates aim curve, compares aim curve and datum curve variation tendency, lists substantial deviation The construction personnel of datum curve is exchanged the construction personnel to its essence by repeatedly exchanging to replace the construction period The power best period;The period of aim curve is calculated, construction ability is represented with this, aim curve based on each construction personnel Period form the new construction teams of several period summation equilibriums, so as to the construction ability of each construction team of reasonable distribution, guarantee The ability of each construction period is balanced, conducive to stable construction rate is kept.
It should be appreciated that the above embodiment of the present invention and example, be to be not intended to limit this hair for description and interpretation purpose Bright range.The scope of the present invention is defined by claim, rather than by above-described embodiment and example definition.

Claims (2)

1. a kind of construction personnel's execution management method therefor, which is characterized in that specifically include the following contents:
101, construct the construction data-base of construction trade: the motion bracelet detection construction personnel based on built-in acceleration sensor exists The construction data including acceleration and vibration of hand when construction trains each work post and is constructing period construction data at any time The datum curve of variation, wherein time interval T1;
102, obtain the construction data of construction personnel: motion bracelet detects construction personnel's applying in the construction period at interval of the T1 time Number evidence, while the construction data and current detection number being saved into record sheet;
103, it analyzes the construction data of construction personnel and is managed: reading the motion bracelet of construction personnel in background process center Construction data record sheet generates the aim curve for the construction data that time interval is T1, compares aim curve and datum curve becomes Change trend lists the construction personnel of substantial deviation datum curve in turn to select in turn to the construction period for having neither part nor lot in construction When the aim curve of the construction personnel and datum curve being taken to deviate construction of the situation the smallest construction period as the construction personnel Section.
2. a kind of construction personnel's execution management method therefor according to claim 1, which is characterized in that in the step 103, backstage Processing center also calculates the period of aim curve, and in turn, the period of the aim curve based on each construction personnel forms several The new construction team of period summation equilibrium, and the number gap between each new construction team is kept in a certain range.
CN201810407407.4A 2018-04-28 2018-04-28 A kind of construction personnel's execution management method therefor Withdrawn CN108960560A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810407407.4A CN108960560A (en) 2018-04-28 2018-04-28 A kind of construction personnel's execution management method therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810407407.4A CN108960560A (en) 2018-04-28 2018-04-28 A kind of construction personnel's execution management method therefor

Publications (1)

Publication Number Publication Date
CN108960560A true CN108960560A (en) 2018-12-07

Family

ID=64499082

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810407407.4A Withdrawn CN108960560A (en) 2018-04-28 2018-04-28 A kind of construction personnel's execution management method therefor

Country Status (1)

Country Link
CN (1) CN108960560A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109670795A (en) * 2018-12-28 2019-04-23 广州易宝信息技术有限公司 Project management system based on big data

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109670795A (en) * 2018-12-28 2019-04-23 广州易宝信息技术有限公司 Project management system based on big data
CN109670795B (en) * 2018-12-28 2023-06-09 广州易宝信息技术有限公司 Engineering management system based on big data

Similar Documents

Publication Publication Date Title
Bromley 1 Constructing Apocalypticism: Social and Cultural Elements of Radical Organization
Ismail et al. Leadership in construction: Leadership styles practiced in construction project–A review
CN108960560A (en) A kind of construction personnel's execution management method therefor
Hollnagel Becoming resilient
CN109636789A (en) The part of rail clip based on image segmentation lacks detection method and device
Thareja et al. The quality brilliance thru’brilliant people
Crabtree Alberto Vergara, La danza hostil: poderes subnacionales y Estado central en Bolivia y Perú (1952–2012)(Lima: Instituto de Estudios Peruanos, 2015), pp. 308, pb.
Noer Henry Kissinger's Philosophy of History
Huber “When I get that feeling…”-Emotion and Emancipation in Childhood and Youth
Yates Uncertainty and chaos.
English Six Sigma and Total Information Quality Management (TIQM); TIQM is a quality management system that focuses on business effectiveness and customer satisfaction, whether performed as a Six Sigma project or not.
Ting Research of Campus Security Awareness Diffusion Based on Lotka-Volterra Model
Modis Reply to Martino's comments on “The normal, the natural, and the harmonic”
Ward Exploring the benefit of participatory drama and storytelling workshops for people with young onset dementia and their carers
Sen et al. Columnas: The Honors Program Newsletter at Bentley University
Butsaban A comparative study of economic development planning organizations of South Korea and Thailand during 1960-1980
Decelle et al. The Restricted Boltzmann Machine: from the statistical physics of disordered systems to a practical and interpretative generative machine learning.
KOYAMA Leadership in Diversity Management Implementation of PM Theory
Weisskopf Book Review: Slaves to Fashion: Poverty and Abuse in the New Sweatshops Robert JS Ross; Ann Arbor: University of Michigan Press, 2004, xii+ 396 pp., $19.95 (paperback)
Guo et al. Efficiency-centered maintenance (EFCM)
London 4.13 Can Meta-Interpretive Learning outperform Deep Reinforcement Learning of Evaluable Game Strategies?
Kennedy et al. Prediction variance properties of bridge designs
Pringle WORKPOINT MANAGEMENT
CN107590649A (en) A kind of technology forms a partnership management mode
Sanders Strategic database planning.

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20181207

WW01 Invention patent application withdrawn after publication