CN108958709A - A kind of construction scheme of large enterprise website - Google Patents
A kind of construction scheme of large enterprise website Download PDFInfo
- Publication number
- CN108958709A CN108958709A CN201810597968.5A CN201810597968A CN108958709A CN 108958709 A CN108958709 A CN 108958709A CN 201810597968 A CN201810597968 A CN 201810597968A CN 108958709 A CN108958709 A CN 108958709A
- Authority
- CN
- China
- Prior art keywords
- website
- module
- program
- mould
- carry out
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F8/00—Arrangements for software engineering
- G06F8/10—Requirements analysis; Specification techniques
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F8/00—Arrangements for software engineering
- G06F8/20—Software design
Abstract
The invention discloses a kind of construction schemes of large enterprise website, specifically includes the following steps: S1, listing all thinkings of website: giving website positioning first, purpose of clearly building a station is that the first step will be done, when being positioned to website, it is discussed jointly with decision-making layer personage, other departments of company are transferred simultaneously to participate in discussion together, the suggestion that timely subsidiary company position has proposed, it is integrated in planning, S2, list website needed for function and needs: clear enterprise web site construction all thinkings after, be related to Website Building Techniques for Enterprises field.Large enterprise's website construction scheme, carry out code programming is expended considerable time and effort without designer, the work load of designer is alleviated well, improve the working efficiency of designer, realize not only quickly but also it is convenient directly extract programming from networking data library needed for program groups mould carry out using having achieved the purpose that designer is facilitated to carry out code programming.
Description
Technical field
The present invention relates to Website Building Techniques for Enterprises field, specially a kind of large enterprise website construction scheme.
Background technique
Web Hosting refers to using identifiable language, by a series of designs, modeling and the processes that execute by electronic format
Information by the Internet transmission, finally browsed in the form of graphic user interface (GUI) by user, in simple terms, webpage
The purpose of design is exactly to generate website, simple information such as text, and picture (GIF, JPEG, PNG) and table can pass through
It is placed into the indicating languages such as Hypertext Markup Language, extensible HyperText Markup Language on Website page, and more complicated letter
Breath needs plug-in card program to run if the multi-medium files such as vector graphics, animation, video, audio frequency, and similarly they are also needed
Indicating language is implanted in website, and Web Hosting is a broader term, is covered in many different technical ability and subject
The website of used production and maintenance, the webpage design of different field, web page graphics design, interface and creation, wherein
Including standardized code and proprietary software, user experience design and search engine optimization, many people can usually be divided into several
Work group is responsible for the design of website different aspect, and webpage design is the front end (client) of design process, commonly used to retouch
The website stated, is not a simple page, and a website is designed including much working including domain name registration
Effect picture, layout page write the work such as code, along with the rapid development of internet, website design have become government bodies,
One important form of enterprises and institutions or even personal publicity, how to design and safeguard website is pendulum in each website design
A top priority in face of person and manager.
Designer needs designer to carry out receiving edit code program when carrying out Design of enterprise networks station at present, comes
Each layout page design of website is realized, however, needing that a large amount of time and efforts of designer is spent to carry out code in this way
Programming, considerably increase the work load of designer, reduce the working efficiency of designer, can not achieve not only quickly but also
Program groups mould needed for easily directly extracting programming from networking data library is carried out using being unable to reach and facilitate designer
The purpose for carrying out code programming, so that the enterprise web site building-up work to designer to people brings great inconvenience.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, it the present invention provides a kind of construction scheme of large enterprise website, solves and needs to spend
Take a large amount of time and efforts of designer and carry out code programming, considerably increases the work load of designer, reduce and set
The working efficiency of meter personnel can not achieve not only quickly but also convenient directly from program groups needed for the extraction programming of networking data library
Mould come carry out using, be unable to reach facilitate designer carry out code programming purpose the problem of.
(2) technical solution
In order to achieve the above object, the present invention is achieved by the following technical programs: a kind of large enterprise website Construction Party
Case, specifically includes the following steps:
S1, all thinkings for listing website: positioning to website first, and purpose of clearly building a station is that the first step will be done, and gives net
When station positions, discussed jointly with decision-making layer personage, while transferring other departments of company and participating in discussion together, in time from
The suggestion that company's position has proposed is integrated in planning;
S2, list website needed for function and needs: clear enterprise web site construction all thinkings after, start to list
Function and demand needed for building website, and the subordinate relation of each function and demand is analyzed;
S3, planning homepage and subpage frame: website homepage is laid out and designed to website by table, to company
Brief introduction module, product demonstration system, news dynamic module, online message system, project management system, online question-answering module, letter
It ceases delivery system and mobile client carries out Functional Design, and carry out code programming design;
S4, program groups mould extract: in S3 homepage and subpage frame programming system carry out Code Edit when, designer
Member can be issued to program groups mould extraction system by Program Manager and be requested, and then the extraction in program groups mould extraction system refers to
It enables processing module that can carry out reception and analysis to the request instruction that Program Manager is sent, instruction processing is extracted after the completion of analysis
Request instruction can be sent to program groups mould identification module by module, and program groups mould identification module can be in program groups mould networking program
Required program mould group is identified in library, and corresponding program mould group is sent to program groups mould analysis module and analyze really
Recognize, corresponding program mould group is sent to program groups mould sending module, program groups mould after the completion of the confirmation of program groups mould analysis module
Corresponding program mould group can be sent to Web wrapper by key management unit and developed on design interface by sending module, to make to set
Meter personnel extract use;
S5, website backstage is built: by selecting the corresponding server of net background, to realize component website and corresponding clothes
Corresponding data transmission channel is built between business device, in order to normal network data transmission;
S6, registered domain name and space: registration information occurs for case website Accreditation System, it can be achieved that the domain name to website carries out
Registration, website domain name by English, number, letter and its can be connected each other and formed, and registered domain name while, which is realized, answers website
The space is defined, and is realized proper retrieval and the space storage of website, is realized to the parsing of website domain name and tying up for space
Band;
S7, website test and FTP certification: carrying out operation test to the website after the completion of the website domain name registration in S6, if
Website test operates normally, and website can be made to carry out the confirmation of File Transfer Protocol permission with server and client side respectively, after the completion of confirmation
It can guarantee normal wireless data transmission communication, the building-up work of entire website can be realized by uploading website later.
Preferably, the information issuing system includes that performance display module, Activity Show module, worker introduce module, logical
Know bulletin module, Project Exhibition module and product introduction module.
Preferably, the online question-answering module is connect with enquiry machine and information issuing system respectively.
(3) beneficial effect
The present invention provides a kind of construction schemes of large enterprise website.Have following the utility model has the advantages that the large enterprise website
Construction scheme, by specifically includes the following steps: S1, listing all thinkings of website: positioning to website, clearly build a station first
Purpose is that the first step will be done, and when positioning to website, discusses with decision-making layer personage, S2, lists needed for website jointly
Function and needs, S3, planning homepage and subpage frame, S4, program groups mould extract: in S3 homepage and subpage frame program system
When system carries out Code Edit, designer can be issued to program groups mould extraction system by Program Manager and be requested, and S5, be built
Website backstage: by selecting the corresponding server of net background, S6, registered domain name and space: case website Accreditation System occurs
, it can be achieved that the domain name to website is registered, S7, website test and FTP are authenticated registration information: being infused to the website domain name in S6
Website after the completion of volume carries out operation test, expends considerable time and effort carry out code programming without designer, very well
The work load for alleviating designer, improve the working efficiency of designer, realize not only quickly but also it is convenient directly
From networking data library extract programming needed for program groups mould come carry out using, reached facilitate designer carry out code programming
Purpose, to greatly facilitate the enterprise web site building-up work to designer of people.
Specific embodiment
Below in conjunction with the embodiment of the present invention, technical scheme in the embodiment of the invention is clearly and completely described,
Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based in the present invention
Embodiment, every other embodiment obtained by those of ordinary skill in the art without making creative efforts,
It shall fall within the protection scope of the present invention.
The embodiment of the present invention provides a kind of technical solution: a kind of construction scheme of large enterprise website.
The present invention proposes a kind of construction scheme of large enterprise website, includes the following steps:
S1, all thinkings for listing website: positioning to website first, and purpose of clearly building a station is that the first step will be done, and gives net
When station positions, discussed jointly with decision-making layer personage, while transferring other departments of company and participating in discussion together, in time from
The suggestion that company's position has proposed is integrated in planning;
S2, list website needed for function and needs: clear enterprise web site construction all thinkings after, start to list
Function and demand needed for building website, and the subordinate relation of each function and demand is analyzed;
S3, planning homepage and subpage frame: website homepage is laid out and designed to website by table, to company
Brief introduction module, product demonstration system, news dynamic module, online message system, project management system, online question-answering module, letter
It ceases delivery system and mobile client carries out Functional Design, and carry out code programming design;
S4, program groups mould extract: in S3 homepage and subpage frame programming system carry out Code Edit when, designer
Member can be issued to program groups mould extraction system by Program Manager and be requested, and then the extraction in program groups mould extraction system refers to
It enables processing module that can carry out reception and analysis to the request instruction that Program Manager is sent, instruction processing is extracted after the completion of analysis
Request instruction can be sent to program groups mould identification module by module, and program groups mould identification module can be in program groups mould networking program
Required program mould group is identified in library, and corresponding program mould group is sent to program groups mould analysis module and analyze really
Recognize, corresponding program mould group is sent to program groups mould sending module, program groups mould after the completion of the confirmation of program groups mould analysis module
Corresponding program mould group can be sent to Web wrapper by key management unit and developed on design interface by sending module, to make to set
Meter personnel extract use;
S5, website backstage is built: by selecting the corresponding server of net background, to realize component website and corresponding clothes
Corresponding data transmission channel is built between business device, in order to normal network data transmission;
S6, registered domain name and space: registration information occurs for case website Accreditation System, it can be achieved that the domain name to website carries out
Registration, website domain name by English, number, letter and its can be connected each other and formed, and registered domain name while, which is realized, answers website
The space is defined, and is realized proper retrieval and the space storage of website, is realized to the parsing of website domain name and tying up for space
Band;
S7, website test and FTP certification: carrying out operation test to the website after the completion of the website domain name registration in S6, if
Website test operates normally, and website can be made to carry out the confirmation of File Transfer Protocol permission with server and client side respectively, after the completion of confirmation
It can guarantee normal wireless data transmission communication, the building-up work of entire website can be realized by uploading website later.
In the present invention, information issuing system includes that performance display module, Activity Show module, worker introduce module, notice
Announce module, Project Exhibition module and product introduction module.
In the present invention, online question-answering module is connect with enquiry machine and information issuing system respectively.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, without necessarily requiring or implying between these entities or operation
There are any actual relationship or orders.Moreover, the terms "include", "comprise" or its any other variant are intended to
Cover non-exclusive inclusion, so that the process, method, article or equipment for including a series of elements not only includes that
A little elements, but also including other elements that are not explicitly listed, or further include for this process, method, article or
The intrinsic element of equipment.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (3)
1. a kind of construction scheme of large enterprise website, it is characterised in that: specifically includes the following steps:
S1, all thinkings for listing website: it is positioned first to website, purpose of clearly building a station is that the first step will be done, and is done to website
It when positioning, is discussed jointly with decision-making layer personage, while transferring other departments of company and participating in discussion together, timely subsidiary company is vertical
The suggestion that field has proposed is integrated in planning;
S2, list website needed for function and needs: clear enterprise web site construction all thinkings after, start to list construction net
Function and demand needed for standing, and the subordinate relation of each function and demand is analyzed;
S3, planning homepage and subpage frame: website homepage is laid out and designed to website by table, to company introduction mould
Block, product demonstration system, news dynamic module, online message system, project management system, online question-answering module, information publication
System and mobile client carry out Functional Design, and carry out code programming design;
S4, program groups mould extract: in S3 homepage and subpage frame programming system carry out Code Edit when, designer can lead to
It crosses Program Manager and issues request to program groups mould extraction system, then the extraction instruction processing mould in program groups mould extraction system
Block can carry out reception and analysis to the request instruction that Program Manager is sent, and extracting command process module after the completion of analysis can will ask
Instruction is asked to be sent to program groups mould identification module, program groups mould identification module can identify institute in program groups mould networking program library
The program mould group needed, and corresponding program mould group is sent to program groups mould analysis module and is analyzed to identify, program groups mould point
Corresponding program mould group is sent to program groups mould sending module after the completion of analysis module confirmation, program groups mould sending module can be by phase
The program mould group answered is sent to Web wrapper by key management unit and develops on design interface, makes extract designer
With;
S5, build website backstage: by selecting the corresponding server of net background, come realize component website and respective server it
Between build corresponding data transmission channel, in order to normal network data transmission;
S6, registered domain name and space: registration information occurs for case website Accreditation System, it can be achieved that the domain name to website is registered,
Website domain name by English, number, letter and its can be connected each other and be formed, registered domain name while realize to website should space
It is defined, realizes proper retrieval and the space storage of website, realize to the parsing of website domain name and the bandage in space;
S7, website test and FTP certification: operation test is carried out to the website after the completion of the website domain name registration in S6, if website
Test operates normally, and website can be made to carry out the confirmation of File Transfer Protocol permission with server and client side respectively, can guarantee after the completion of confirmation
Normal wireless data transmission communication, the building-up work of entire website can be realized by uploading website later.
2. a kind of large enterprise website construction scheme according to claim 1, it is characterised in that: the information issuing system
Module, notice bulletin module, Project Exhibition module and product exhibition are introduced including performance display module, Activity Show module, worker
Show module.
3. a kind of large enterprise website construction scheme according to claim 1, it is characterised in that: the online question-answering module
It is connect respectively with enquiry machine and information issuing system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810597968.5A CN108958709A (en) | 2018-06-11 | 2018-06-11 | A kind of construction scheme of large enterprise website |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810597968.5A CN108958709A (en) | 2018-06-11 | 2018-06-11 | A kind of construction scheme of large enterprise website |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108958709A true CN108958709A (en) | 2018-12-07 |
Family
ID=64488113
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810597968.5A Pending CN108958709A (en) | 2018-06-11 | 2018-06-11 | A kind of construction scheme of large enterprise website |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108958709A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111258579A (en) * | 2020-01-14 | 2020-06-09 | 郴州金通信息科技有限公司 | Website development system and method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1822005A (en) * | 2006-04-07 | 2006-08-23 | 张天山 | Information pushing system and method based on web sit automatic forming and search engine |
US20170098178A1 (en) * | 2015-10-02 | 2017-04-06 | Beyram Belhaj Amor | Project Assessment Tool |
CN107678739A (en) * | 2017-10-20 | 2018-02-09 | 温州市捷点信息技术有限公司 | A kind of Web Hosting system and method |
CN107957864A (en) * | 2016-10-14 | 2018-04-24 | 哈尔滨光凯科技开发有限公司 | A kind of online medical information service system design method based on J2EE |
-
2018
- 2018-06-11 CN CN201810597968.5A patent/CN108958709A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1822005A (en) * | 2006-04-07 | 2006-08-23 | 张天山 | Information pushing system and method based on web sit automatic forming and search engine |
US20170098178A1 (en) * | 2015-10-02 | 2017-04-06 | Beyram Belhaj Amor | Project Assessment Tool |
CN107957864A (en) * | 2016-10-14 | 2018-04-24 | 哈尔滨光凯科技开发有限公司 | A kind of online medical information service system design method based on J2EE |
CN107678739A (en) * | 2017-10-20 | 2018-02-09 | 温州市捷点信息技术有限公司 | A kind of Web Hosting system and method |
Non-Patent Citations (1)
Title |
---|
徐文亮: "基于IPv6的精品课程网站的研究与开发", 《中国优秀硕士学位论文全文数据库 信息科技辑》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111258579A (en) * | 2020-01-14 | 2020-06-09 | 郴州金通信息科技有限公司 | Website development system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108647330B (en) | 3D lightweight conversion method based on BIM model file | |
CN104809634B (en) | Tourism data is investigated and monitoring system | |
CN101409614B (en) | Data synchronization method, system and equipment | |
CN102800008B (en) | The system and method that a kind of accumulated point exchanging and integration are given | |
CN107730377A (en) | Qualification of providing a loan screening technique, device and computer-readable recording medium | |
CN101908165A (en) | Geographic information system (GIS)-based industrial cluster information integration service system and method | |
CN106713409A (en) | SaaS-based cloud disaster recovery system and method | |
CN103679476A (en) | Intelligent campus electronic commerce system based on WAMP framework and use method thereof | |
CN104102790A (en) | GIS (Geographic Information System)-based automatic diagram forming system and method of power supply diagram | |
CN108133024A (en) | Towards the geographical spatial data service integration method of the dynamic configuration of mobile client | |
CN106383720A (en) | Cloud sharing and collaborating method of software product prototype | |
CN104182846A (en) | Client management system | |
CN107861933A (en) | The method and apparatus for generating O&M form | |
CN107908390A (en) | A kind of extended method and system of WebGIS applications | |
CN105227592A (en) | A kind of Internet architecture and implementation method | |
CN107357810A (en) | A kind of method and system for being used to export special topic landing page | |
CN107993021A (en) | A kind of data center operation management system of centralization | |
CN204790977U (en) | APP automatic compilation system and management platform based on cloud calculates | |
CN110197339A (en) | One kind being based on big data cloud computing service platform and operation method | |
CN108958709A (en) | A kind of construction scheme of large enterprise website | |
CN104166581B (en) | A kind of virtual method towards increment manufacturing equipment | |
CN102868746B (en) | Method for realizing mobile informationization | |
CN116956326A (en) | Authority data processing method and device, computer equipment and storage medium | |
Dai et al. | Research on the design and application of sports competition ticketing platform based on edge computing | |
CN206975698U (en) | A kind of power transmission and transformation line equipment routing inspection system based on AR |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181207 |
|
RJ01 | Rejection of invention patent application after publication |