CN108957378A - It is a kind of for testing the test platform of Energy Management System - Google Patents

It is a kind of for testing the test platform of Energy Management System Download PDF

Info

Publication number
CN108957378A
CN108957378A CN201810820214.1A CN201810820214A CN108957378A CN 108957378 A CN108957378 A CN 108957378A CN 201810820214 A CN201810820214 A CN 201810820214A CN 108957378 A CN108957378 A CN 108957378A
Authority
CN
China
Prior art keywords
power
unit
energy
data
instruction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810820214.1A
Other languages
Chinese (zh)
Other versions
CN108957378B (en
Inventor
胡超
蔡壮
余勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sungrow Power Supply Co Ltd
Original Assignee
Sungrow Power Supply Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sungrow Power Supply Co Ltd filed Critical Sungrow Power Supply Co Ltd
Priority to CN201810820214.1A priority Critical patent/CN108957378B/en
Publication of CN108957378A publication Critical patent/CN108957378A/en
Application granted granted Critical
Publication of CN108957378B publication Critical patent/CN108957378B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R35/00Testing or calibrating of apparatus covered by the other groups of this subclass

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The present invention provides a kind of for testing the test platform of Energy Management System, including power grid simulation system, adapted electric analog system and energy-controllable system, grid operation data is sent to Energy Management System respectively, send out electricity consumption data and power storage state, enable Energy Management System according to grid operation data, hair electricity consumption data and power storage state generate and export controlling electric energy instruction, it records simultaneously and exports grid operation data, send out electricity consumption data, power storage state and controlling electric energy instruction, to be used to confirm whether the work of Energy Management System is normal, and then test of the realization to Energy Management System.Also, increase power grid simulation system in the present invention in test platform, it can be considered that influence of the operating status of external power grid to the operating status of micro-capacitance sensor, so that the test platform of simulation meets the running environment of true micro-capacitance sensor.

Description

It is a kind of for testing the test platform of Energy Management System
Technical field
The present invention relates to micro-capacitance sensor fields, more specifically, it is flat to be related to a kind of test for testing Energy Management System Platform.
Background technique
With the gradually development of distributed power generation, the problems such as stability of power system is with safety, is more and more prominent.Micro- electricity Net as include including Energy Management System, distributed power generation, load, energy-storage units and protection device integration system System can not only solve the problems such as intermittence of traditional distributed power generation is with uncertainty, while can participate in electric system It adjusts, has huge meaning and value for the raising of Power System Reliability.
Energy Management System is realized in micro-capacitance sensor between energy storage management of charging and discharging, load scheduling, micro-capacitance sensor and external power grid Coordinated control core, Energy Management System directly determines the operation characteristic of micro-capacitance sensor.
In the prior art, it when testing Energy Management System, needs to construct the fortune that can simulate micro-capacitance sensor in advance The test platform of row state.It include wind power generation simulation experiment platform, photovoltaic power generation simulation experiment platform, energy storage in test platform Simulation experiment platform and load simulation experiment porch etc..Micro-capacitance sensor in actual motion, the operating status of micro-capacitance sensor by with it is micro- The influence of the operating status of the external power grid of power grid connection, but test platform in the prior art, do not consider the fortune of external power grid Influence of the row state to the operating status of micro-capacitance sensor, so that the operating status of the test platform of simulation and true micro-capacitance sensor It is inconsistent.
Summary of the invention
In view of this, the present invention provide it is a kind of for testing the test platform of Energy Management System, to solve the prior art In do not consider the influence of the operating status of external power grid to the operating status of micro-capacitance sensor so that the test platform of simulation and true The inconsistent problem of the operating status of micro-capacitance sensor.
In order to solve the above technical problems, present invention employs following technical solutions:
It is a kind of for testing the test platform of Energy Management System, including power grid simulation system, adapted electric analog system and Energy-controllable system;The output end of the power grid simulation system, the output end of the adapted electric analog system and the energy can The output end of control system is connected to ac bus;The power grid simulation system, the adapted electric analog system and the energy Controllable system is communicated to connect with the Energy Management System in micro-capacitance sensor;Wherein,
The power grid simulation system is used for: being obtained the operation of power networks state for the external power grid connecting with the micro-capacitance sensor, is based on The operation of power networks state, simulates the external power grid, detects and sends the obtained grid operation data of simulation to the energy pipe Reason system;
The adapted electric analog system is used for: the power for simulating the generator unit and power unit in the micro-capacitance sensor is defeated Out, hair electricity consumption data is sent to the Energy Management System;Wherein, the hair electricity data include each generator unit The electricity consumption data for the data and each power unit of generating electricity;
The energy-controllable system is used for: being simulated the power supply and power storage of the micro-capacitance sensor, is detected and send the energy The power storage state of controllable system is measured to the Energy Management System, so that the Energy Management System is transported according to the power grid Row data, the hair electricity consumption data and the power storage state generate and export controlling electric energy instruction, while the energy Management system records and exports the grid operation data, described generates electricity consumption data, the power storage state and the electricity It can control instruction;Also, the energy-controllable system is also used to: receiving and respond the electricity that the Energy Management System is sent It can control instruction.
Preferably, the power grid simulation system includes: grid configuration unit, the first power supply unit, the first rectifier and One inverter;The input terminal of first rectifier is connect with the output end of first power supply unit, first rectifier Output end connect with the input terminal of first inverter, the output end of first inverter and the ac bus connect It connects, the control terminal point of the control terminal and first inverter of the output end of the grid configuration unit and first rectifier It does not connect;Wherein,
The grid configuration unit is used for: being obtained the operating parameter of external power grid, is generated three-phase electricity according to the operating parameter Pressure generates instruction and the first rectification instruction;Wherein, the three-phase voltage generates the parameter that instruction includes three-phase voltage;
First rectifier is used for: being received the first rectification instruction, is obtained the of first power supply unit output One power supply, and first power supply is rectified to obtain the first DC power supply according to the first rectification instruction, by described the One DC power supply is exported to first inverter;
First inverter is used for: according to the parameter of the three-phase voltage, first DC power supply converted, Three-phase voltage is obtained, and exports the three-phase voltage to the ac bus.
Preferably, it is specific to use when the grid configuration unit generates three-phase voltage generation instruction according to the operating parameter In:
The operating parameter is calculated using predeterminated voltage calculation formula, obtains the parameter of the three-phase voltage, it is raw Instruction is generated at the three-phase voltage for the parameter for including the three-phase voltage.
Preferably, first power supply unit includes three phase mains and the first isolating transformer;
The output end of the three phase mains is connect with the input terminal of first isolating transformer, the first isolation transformation The output end of device is connect with the input terminal of first rectifier.
Preferably, the power grid simulation system includes control unit and external power grid analogue unit;The external power grid simulation is single The control terminal of member and the output end of described control unit connect, the output end and the ac bus of the external power grid analogue unit Connection;Wherein,
Described control unit is used for: being obtained the operating parameter of external power grid, is determined the three of external power grid according to the operating parameter Phase voltage analogue data;
The external power grid analogue unit is used for: three-phase voltage corresponding with the three-phase voltage analogue data is generated, and The three-phase voltage is exported to the ac bus.
Preferably, the adapted electric analog system include with electricity consumption configuration unit, the second power supply unit, the second rectifier and Second inverter;The input terminal of second rectifier is connect with the output end of second power supply unit;Second rectification The output end of device is connect with the input terminal of second inverter, and the output end and the ac bus of second inverter connect It connects, the control terminal of the control terminal of second rectifier and second inverter matches the defeated of electricity consumption configuration unit with described respectively Outlet connection;Wherein,
It is described to be used for electricity consumption configuration unit: to obtain the power generation data of each generator unit in the micro-capacitance sensor and each The electricity consumption data of power unit, the power generation data of each generator unit according to acquisition and the electricity consumption data of each power unit, Generate power control instruction and the second rectification instruction;
Second rectifier is used for: being received the second rectification instruction, is obtained the of second power supply unit output Two power supplys, and obtain the second DC power supply after rectifying according to the second rectification instruction to the second source, and by institute The second DC power supply is stated to export to second inverter;
Second inverter is used for: according to the power control instruction, calculating the parameter of three-phase current to be generated, base In the parameter of the three-phase current to be generated, second DC power supply is converted, three-phase current is obtained, and exports institute Three-phase current is stated to the ac bus.
Preferably, the power generation data with electricity consumption configuration unit according to each generator unit obtained and each electricity consumption list The electricity consumption data of member is specifically used for when generating power control instruction:
Using predetermined power calculation formula to the power generation data of each generator unit of acquisition and each power unit Electricity consumption data is calculated, and obtains total active power of generator unit and power unit all in the micro-capacitance sensor, owns Power unit total reactive power;
Generate the power control instruction including total active power and total reactive power.
Preferably, the adapted electric analog system further includes multiple communication modules;Each communication module respectively with institute It states and is communicated to connect with electricity consumption configuration unit, the Energy Management System;Wherein,
The communication module is used for: receiving the data acquisition instruction that the Energy Management System is sent, and by the data Acquisition instruction is sent to described with electricity consumption configuration unit, and receives the data sent with electricity consumption configuration unit, and by institute It states data and is sent to the Energy Management System;
It is described to be also used to electricity consumption configuration unit: to be instructed, obtained and each data according to each data acquisition received The corresponding each data of acquisition instruction, and be respectively sent to each data corresponding each with the instruction of each data acquisition Communication module;Wherein, the data are the power generation data an of generator unit or the electricity consumption data of a power unit.
Preferably, the energy-controllable system includes the second isolating transformer, generator unit and at least one energy storage list Member;Each energy-storage units are connect with one end of second isolating transformer;The other end of second isolating transformer, The output end of the generator unit is connect with the ac bus respectively;Each energy-storage units, the generator unit It is communicated to connect respectively with the Energy Management System;Wherein,
The energy-storage units are used for: being sent battery charge state information to the Energy Management System, received the electric energy Charge and discharge control instruction in control instruction instructs progress charge and discharge electrically operated according to the charge and discharge control;The power storage State includes battery charge state information;
The generator unit is used for: when receiving the generation control instruction in the controlling electric energy instruction, being sent out It is electrically operated, and the electric energy of sending is transferred to the ac bus;
Wherein, the charge and discharge control instruction and the generation control instruction are the Energy Management System according to described in Grid operation data, the hair electricity consumption data and the battery charge state information and generate.
Preferably, the energy-storage units include:
Energy-storage travelling wave tube, battery management system and current transformer;The energy-storage travelling wave tube, the battery management system and the unsteady flow Device is sequentially connected, and the other end of the current transformer is connect with second isolating transformer;The battery management system with it is described Energy Management System communication connection.
Compared to the prior art, the invention has the following advantages:
The present invention provides a kind of for testing the test platform of Energy Management System, including power grid simulation system, adapted Electric analog system and energy-controllable system.The power grid simulation system can simulate the external power grid, detect and send and simulate The grid operation data arrived is to the Energy Management System.The adapted electric analog system simulates the power generation list in the micro-capacitance sensor The power output of member and power unit sends hair electricity consumption data to the Energy Management System.The energy-controllable system simulation The power supply and power storage of the micro-capacitance sensor detect and send the power storage state of the energy-controllable system to the energy Management system receives and responds the controlling electric energy instruction that the Energy Management System is sent.Make institute by above-mentioned principle Stating Energy Management System can generate according to the grid operation data, the hair electricity consumption data and the power storage state And controlling electric energy instruction is exported, while recording and exporting the grid operation data, the hair electricity consumption data, the power storage State and controlling electric energy instruction;The grid operation data of output, the hair electricity consumption data, the power storage state with And the controlling electric energy instruction, can be used to confirm whether the work of Energy Management System is normal, and then realize to energy management The test of system.Also, increase power grid simulation system in the present invention in test platform, it can be considered that the operating status of external power grid Influence to the operating status of micro-capacitance sensor, so that the test platform of simulation meets the running environment of true micro-capacitance sensor.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this The embodiment of invention for those of ordinary skill in the art without creative efforts, can also basis The attached drawing of offer obtains other attached drawings.
Fig. 1 is a kind of structural schematic diagram of test platform provided in an embodiment of the present invention;
Fig. 2 is the structural schematic diagram of another test platform provided in an embodiment of the present invention;
Fig. 3 is a kind of structural schematic diagram of Energy Management System provided in an embodiment of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
The embodiment of the invention provides a kind of for testing the test platform of Energy Management System, referring to Fig.1, test platform It may include power grid simulation system 101, adapted electric analog system 201 and energy-controllable system 301;Power grid simulation system 101 The output end of output end, the output end of adapted electric analog system 201 and energy-controllable system 301 is connected to ac bus 1;Electricity Net simulation system 101, adapted electric analog system 201 and energy-controllable system 301 are logical with the Energy Management System 2 in micro-capacitance sensor Letter connection;Power grid simulation system 101, adapted electric analog system 201 and energy-controllable system 301 can by serial ports, network interface or The modes such as wireless and Energy Management System 2 communicate to connect.
Power grid simulation system 101 is used for: being obtained the operation of power networks state for the external power grid connecting with micro-capacitance sensor, is transported based on power grid Row state simulates external power grid, detects and sends the obtained grid operation data of simulation to Energy Management System 2;
Adapted electric analog system 201 is used for: the power output of generator unit and power unit in simulation micro-capacitance sensor is sent Electricity consumption data is sent out to Energy Management System 2;Wherein, hair electricity data include the power generation data and each electricity consumption of each generator unit The electricity consumption data of unit;
Energy-controllable system 301 is used for: being simulated the power supply and power storage of micro-capacitance sensor, is detected and send energy-controllable system 301 power storage state is to Energy Management System 2, so that Energy Management System 2 is according to grid operation data, hair electricity consumption data And power storage state generates and exports controlling electric energy and instructs to energy-controllable system 301, while Energy Management System 2 records And export grid operation data, hair electricity consumption data, power storage state and controlling electric energy instruction;Also, energy-controllable system 301 are also used to: receiving and respond the controlling electric energy instruction of the transmission of Energy Management System 2.
Specifically, power grid simulation system 101 is the equipment of software and hardware combining, the operation of power networks state of external power grid can be saved It into the database in power grid simulation system 101, can also be obtained from external equipment, can specifically pass through wireless, data line Etc. modes get the operation of power networks state.Operation of power networks state may include operating parameter.
Grid operation data can be the parameters such as exchange power, mains frequency, power grid amplitude, and power grid simulation system 101 is examined Grid operation data is measured, can be sent in Energy Management System 2, so that Energy Management System 2 understands power grid simulation system The operating status of system 101, and energy-controllable system 301 is carried out accordingly according to the operating status of power grid simulation system 101 Control.
It should be noted that power grid simulation system 101 is for constructing external power grid ac bus voltage.Here it does not directly adopt True three phase network, and be using the reason of simulation external power grid of power grid simulation system 101, micro-capacitance sensor needs under grid connection state The electric power back-up needs such as frequency modulation peak regulation are undertaken, the operation of power networks state of external power grid will directly affect micro-capacitance sensor and externally export at this time State, and the operation of power networks state of different location, different periods external power grid does not have uniformity, therefore uses power grid mould here The application of quasi- 101 analog energy management system 2 of system, i.e. the operation of power networks state of local external power grid, to improve whole The validity of a test platform.On the other hand, Energy Management System 2 can be carried out using power grid simulation system 101 such as lonely The reliability of Energy Management System 2 is further verified in pressure test under the fault conditions such as island, low-voltage, high voltage.
It may include multiple generator units and multiple power units in micro-capacitance sensor, generator unit can be wind-power electricity generation, light Volt power generation etc..Power unit can be load etc..Adapted electric analog system 201 is set, exactly for simulating the hair in micro-capacitance sensor The power output of electric unit and power unit, power include reactive power and active power.In addition, adapted electric analog system 201 It can also detect and send hair electricity data to Energy Management System 2.Hair electricity data include the power generation number of each generator unit According to the electricity consumption data with each power unit.Wherein it is possible to which hair electricity consumption data, which is packaged into a data packet, is sent to energy pipe Reason system 2 can also will send out the electricity consumption data of the power generation data and each power unit of each generator unit in electricity consumption data Individually it is sent to Energy Management System 2.
It should be noted that the operation of power networks state due to external power grid changes in real time, generator unit and use in micro-capacitance sensor The power output of electric unit changes in real time, and then in order to determine that test platform can really simulate micro-capacitance sensor, in the present embodiment " power grid simulation system 101 detects and sends the obtained grid operation data of simulation to Energy Management System 2, adapted electrical analogue System 201 detects and sends the grid operation data simulated and obtained to Energy Management System 2, and energy-controllable system 301 detects simultaneously After the power storage state to Energy Management System 2 for sending energy-controllable system 301, Energy Management System 2 is according to operation of power networks Data, hair electricity consumption data and power storage state generate and export controlling electric energy and instruct to energy-controllable system 301, and energy can The course of work of the reception of control system 301 and the controlling electric energy instruction for responding the transmission of Energy Management System 2 " is to execute in the period, week Phase can be one second.
Energy Management System 2 records and exports grid operation data, hair electricity consumption data, power storage state and electric energy control After system instruction, technical staff can determine whether Energy Management System 2 works normally according to the data of output.
It present embodiments provides a kind of for testing the test platform of Energy Management System 2, including power grid simulation system 101, adapted electric analog system 201 and energy-controllable system 301.Power grid simulation system 101 can simulate external power grid, and detection is concurrent The grid operation data for sending simulation to obtain is to Energy Management System 2.Adapted electric analog system 201 simulates the power generation list in micro-capacitance sensor The power output of member and power unit sends hair electricity consumption data to Energy Management System 2.Energy-controllable system 301 simulates micro- electricity The power supply and power storage of net, detect and send energy-controllable system 301 power storage state to Energy Management System 2, connect Receive and respond the controlling electric energy instruction of the transmission of Energy Management System 2.Enable 2 foundation of Energy Management System by above-mentioned principle Grid operation data, hair electricity consumption data and power storage state generate and export controlling electric energy instruction, while recording and exporting Grid operation data, hair electricity consumption data, power storage state and controlling electric energy instruction;The grid operation data of output, hair Electric data, power storage state and controlling electric energy instruction, can be used to confirm whether the work of Energy Management System 2 is normal, And then test of the realization to Energy Management System 2.Also, increase power grid simulation system 101, energy in the present invention in test platform Enough consider influence of the operating status to the operating status of micro-capacitance sensor of external power grid so that the test platform of simulation meet it is true micro- The running environment of power grid.
Optionally, on the basis of the embodiment of above-mentioned test platform, referring to Fig. 2, power grid simulation system 101 be can wrap It includes:
Grid configuration unit 1011, the first power supply unit 1014, the first rectifier 1013 and the first inverter 1012;First The input terminal of rectifier 1013 is connect with the output end of the first power supply unit 1014, the output end and first of the first rectifier 1013 The input terminal of inverter 1012 connects, and the output end of the first inverter 1012 is connect with ac bus 1, grid configuration unit 1011 Output end be separately connected with the control terminal of the first rectifier 1013 and the control terminal of the first inverter 1012.
Grid configuration unit 1011 is specifically as follows the hardware such as control chip, and grid configuration unit 1011 is control chip When, setting operation program in chip is controlled, to realize corresponding function.
First rectifier 1013 and the first inverter 1012 may each be back-to-back converter.
Optionally, on the basis of the present embodiment, the first power supply unit 1014 includes three phase mains 1024 and the first isolation Transformer 1034;
The output end of three phase mains 1024 is connect with the input terminal of the first isolating transformer 1034, the first isolating transformer 1034 output end is connect with the input terminal of the first rectifier 1013.
Three phase mains 1024 exports the first three phase mains to the first isolating transformer 1034, and the first isolating transformer 1034 will To the first rectifier 1013, the output of the first isolating transformer 1034 is first for output after first three phase mains carries out electrical isolation Power supply, wherein the first power supply is alternating current.
The first three phase mains that three phase mains 1024 exports is the three phase mains of common three phase network output.First every Buffer action is played from transformer 1034, it is ensured that 1013 electrical isolation of three phase mains 1024 and the first rectifier.
The function of each equipment in power grid simulation system 101 are as follows:
Grid configuration unit 1011 is used for: obtaining the operating parameter of external power grid, it is raw to generate three-phase voltage according to operating parameter At instruction and the first rectification instruction;Wherein, three-phase voltage generates the parameter that instruction includes three-phase voltage;
First rectifier 1013 is used for: being received the first rectification instruction, is obtained the first electricity of the first power supply unit 1014 output Source, and according to first rectification instruction the first power supply is rectified to obtain the first DC power supply, by the first DC power supply export to First inverter 1012;
First inverter 1012 is used for: according to the parameter of three-phase voltage, being converted to the first DC power supply, is obtained three-phase Voltage, and three-phase voltage is exported to ac bus 1.
Optionally, on the basis of the present embodiment, grid configuration unit 1011 generates three-phase voltage life according to operating parameter When at instruction, it is specifically used for:
Operating parameter is calculated using predeterminated voltage calculation formula, obtains the parameter of three-phase voltage, generating includes three The three-phase voltage of the parameter of phase voltage generates instruction.
Specifically, the operating parameter of external power grid can be the parameters such as the initial phase angle of external power grid time-sequential voltage, frequency, voltage. Wherein, the operating parameter for obtaining external power grid was carried out with the period, and a period can be 1s.The parameter of three-phase voltage may include Voltage magnitude, frequency and phase angle.The parameter for determining three-phase voltage is to generate a three-phase voltage for meeting the parameter.
The calculation formula of each phase voltage amplitude in predeterminated voltage calculation formula are as follows:
Wherein, Varef、VbrefAnd VcrefFor the voltage magnitude of each phase of power grid, f is frequency, θ0For the initial phase angle of voltage, T is the time, and V is external power grid time-sequential voltage.
After the voltage magnitude of each phase is calculated, phase angle can be calculated by the initial phase angle of voltage, hereafter can be with It generates the three-phase voltage including voltage magnitude, frequency and phase angle and generates instruction.
After grid configuration unit 1011 generates three-phase voltage generation instruction and the first rectification instruction, to the first rectifier 1013 Voltage V/ frequency f control is carried out with the first inverter 1012.Specifically, the first rectification instruction is sent to the first rectifier 1013, three-phase voltage is generated into instruction and is sent to the first inverter 1012, the first rectifier 1013 rectifies the first power supply Operation, obtains the first DC power supply, the first DC power supply is exported to the first inverter 1012.First inverter 1012 is to first DC power supply carries out inverter operation, obtains the three-phase voltage for the parameter for meeting three-phase voltage and output.
In the present embodiment, the specific structure of power grid simulation system 101 is given, and then can be used what the present embodiment provided Internal structure chart, to be configured to the power grid simulation system 101 of simulation external power grid.
Optionally, on the basis of the embodiment of above-mentioned test platform, power grid simulation system 101 is including control unit and outside The output end of power grid analogue unit, the control terminal of external power grid analogue unit and control unit connects, external power grid analogue unit it is defeated Outlet is connect with ac bus 1;Wherein,
Control unit is used for: obtaining the operating parameter of external power grid, the three-phase electricity pressing mold of external power grid is determined according to operating parameter Quasi- data.
External power grid analogue unit is used for: being generated three-phase voltage corresponding with three-phase voltage analogue data, and is exported three-phase Voltage is to ac bus 1.
Specifically, the operating parameter of external power grid is in addition to may include above-mentioned power grid time-sequential voltage, frequency, voltage initial phase It can also include the parameters such as harmonic frequency, external power grid load, generator amature, damped coefficient, three-phase voltage analogue data outside angle It may include voltage magnitude, frequency and phase angle, control unit generates three-phase voltage analogue data according to the operating parameter of external power grid Process be similar to grid configuration unit 1011 generate three-phase voltage generate instruction process it is similar, only calculation formula is different.
External power grid analogue unit can be the first above-mentioned rectifier 1013, the first inverter 1012 and the first power supply unit 1014。
In addition, external power grid analogue unit can also be including A phase analogue unit, B phase analogue unit and C phase analogue unit, this Three analogue units simulate the phase in three phase network according to three-phase voltage analogue data self contained function respectively.
In the present embodiment, the structure of another power grid simulation system 101 is given, and then can be in different usage scenarios It is lower to simulate external power grid using the power grid simulation system 101 with different structure.
Optionally, on the basis of the embodiment of any of the above-described test platform, referring to Fig. 2, adapted electric analog system 201 is wrapped It includes with electricity consumption configuration unit 2011, the second power supply unit 2014, the second rectifier 2013 and the second inverter 2012;Second rectification The input terminal of device 2013 is connect with the output end of the second power supply unit 2014;The output end of second rectifier 2013 and the second inversion The input terminal of device 2012 connects, and the output end of the second inverter 2012 is connect with ac bus 1, the control of the second rectifier 2013 The control terminal of end and the second inverter 2012 is connect with the output end with electricity consumption configuration unit 2011 respectively;
Second power supply unit 2014 includes three phase mains 2024 and isolating transformer 2034, and three phase mains 2024 and isolation become The function of depressor 2034 with three phase mains 1024 and the first isolating transformer 1034, please refers to above-mentioned corresponding description, herein respectively It repeats no more.Second rectifier 2013 and the second inverter 2012 may each be back-to-back converter.
The course of work of each equipment in adapted electric analog system 201 are as follows:
It is used for electricity consumption configuration unit 2011: obtaining the power generation data and each electricity consumption of each generator unit in micro-capacitance sensor The electricity consumption data of unit is generated according to the power generation data of each generator unit obtained and the electricity consumption data of each power unit Power control instruction and the second rectification instruction;
Second rectifier 2013 is used for: being received the second rectification instruction, is obtained the second electricity of the second power supply unit 2014 output Source, and the second DC power supply is obtained after rectifying according to the second rectification instruction to second source, and the second DC power supply is defeated Out to the second inverter 2012;
Second inverter 2012 is used for: according to power control instruction, calculate the parameter of three-phase current to be generated, based on to The parameter of the three-phase current of generation converts the second DC power supply, obtains three-phase current, and exports three-phase current to exchange Bus 1.
Specifically, due in micro-capacitance sensor include multiple generator units and multiple power units, generator unit can be wind-powered electricity generation, The renewable generator unit of photovoltaic distributed, power unit can be various loads, it is contemplated that distributed generation resource and load type And quantity is various, being respectively provided with simulator to each distributed generation unit and load, to will lead to test platform excessively complicated, Therefore here by the way of lump simulation, implementation are as follows:
Power generation data and each power unit with each generator unit in the acquisition micro-capacitance sensor of electricity consumption configuration unit 2011 Electricity consumption data, according to obtain each generator unit power generation data and each power unit electricity consumption data, generation power Control instruction and the second rectification instruction.The power generation data of generator unit and the electricity consumption data of power unit may each comprise wattful power Rate and reactive power.
Optionally, each generator unit on the basis of the present embodiment, with electricity consumption configuration unit 2011 according to acquisition The electricity consumption data for the data and each power unit of generating electricity is specifically used for when generating power control instruction:
Using predetermined power calculation formula to the power generation data of each generator unit of acquisition and each power unit Electricity consumption data is calculated, and total active power, all use of generator unit and power unit all in micro-capacitance sensor are obtained Total reactive power of electric unit generates the power control instruction including total active power and total reactive power.
Predetermined power calculation formula are as follows:
Wherein, Pref、QrefRespectively total active power and total reactive power, HpvFor photovoltaic generation unit intersection, Ppv_iFor The output power of No. i-th photovoltaic generation unit;HwtFor wind power generation unit intersection, Pwt_iFor the defeated of jth wind power generation unit Power out;HlFor power unit intersection, Pl_nFor the active power of No. n-th power unit, Ql_nFor the idle of No. n-th power unit Power.By matching electricity consumption configuration unit 2011, renewable energy, the quantity of load and the ginseng of simulation micro-capacitance sensor can be adjusted flexibly Number, and be integrated into the single source PQ and output is realized by current transformer.
Total active power and total reactive power is calculated by above-mentioned formula, hereafter generation is including total active power and always The power control instruction of reactive power.In addition, also generating the second rectification instruction with electricity consumption configuration unit 2011, and respectively by power Control instruction and the second rectification instruction are sent to the second inverter 2012 and the second rectifier 2013.
Second rectifier 2013 receives the second rectification instruction, obtains the second source of the second power supply unit 2014 output, and The second DC power supply is obtained after rectifying according to the second rectification instruction to second source, and the second DC power supply is exported to the Two inverters 2012;
Second inverter 2012 calculates the parameter of three-phase current to be generated according to power control instruction, based on to be generated Three-phase current parameter, the second DC power supply is converted, three-phase current is obtained, and exports three-phase current to ac bus 1。
Wherein, the second inverter 2012 calculates the parameter of three-phase current to be generated according to power control instruction, specific to use In:
Total active power and total reactive power are calculated using default three-phase current calculation formula, obtained to be generated Three-phase current parameter.The parameter of three-phase current includes current amplitude, frequency and phase angle.
Wherein, presetting three-phase current calculation formula can be
Wherein, PrefFor total active power, QrefFor total reactive power, θ0For the initial phase angle of power grid, f is frequency, when t is Between, V is the power grid time-sequential voltage of three phase mains 2024.
By above-mentioned formula, the current amplitude of each phase can be calculated, phase angle can be according to the initial phase angle meter of power grid It obtains, frequency can directly acquire.
It is straight to second based on the parameter of three-phase current to be generated after the parameter of three-phase current to be generated is calculated Amplitude, frequency and the phase angle of the electric current in galvanic electricity source are adjusted, and obtain the three-phase electricity for meeting the parameter of three-phase current to be generated Stream.
In the present embodiment, with the renewable power generation such as all scene in the form simulation micro-capacitance sensor of lump simulation and load electricity consumption Power, renewable energy and load quantity and parameter can be adjusted flexibly.In addition, giving a kind of ginseng of determining three-phase current Number and the process for generating three-phase current, and then can be met according to the generation of the method in the present embodiment all in micro-capacitance sensor The three-phase current of the power output of generator unit and power unit, and then realize generator unit and electricity consumption list in simulation micro-capacitance sensor The power output function of member.
Optionally, it is above-mentioned " adapted electric analog system 201 include match electricity consumption configuration unit 2011, the second power supply unit 2014, on the basis of the embodiment of the second rectifier 2013 and the second inverter 2012 ", adapted electric analog system 201 further includes Multiple communication modules;Each communication module is communicated to connect with electricity consumption configuration unit 2011, Energy Management System 2 respectively;Wherein,
Communication module is used for: receiving the data acquisition instruction that Energy Management System 2 is sent, and data acquisition is instructed and is sent Match the data that electricity consumption configuration unit 2011 is sent to electricity consumption configuration unit 2011, and reception, and sends data to energy Management system 2;
It is also used to electricity consumption configuration unit 2011: being instructed according to each data acquisition received, obtained and each data The corresponding each data of acquisition instruction, and be respectively sent to each data corresponding each with the instruction of each data acquisition Communication module;Wherein, data are the power generation data an of generator unit or the electricity consumption data of a power unit.
Specifically, with the power generation data and each power unit that are stored with each generator unit in electricity consumption configuration unit 2011 Electricity consumption data can specifically be prestored to the data stored in electricity consumption configuration unit 2011 with electricity consumption configuration unit In 2011, it is also possible to match what electricity consumption configuration unit 2011 was obtained from external equipment.Communication module receives energy management system The data acquisition instruction that system 2 is sent, and data acquisition instruction is sent to electricity consumption configuration unit 2011, match electricity consumption configuration unit 2011 search data corresponding with the instruction of each data acquisition, and are transferred to Energy Management System 2 by communication module.Communicate mould The quantity of block is identical as generator unit, the quantity summation of power unit, and each communication module transmits the power generation number of a generator unit According to or a power unit electricity consumption data, and each communication module use independent mailing address and communication protocol.
In the present embodiment, multiple communication modules and separated communication are set, are in order to true by the simulation of complete communication construction The communication scenes of real micro-capacitance sensor, and then the more complete test realized for the Energy Management System 2.
Optionally, based on any of the above embodiments, referring to Fig. 2, energy-controllable system 301 includes that the second isolation becomes Depressor 402, generator unit 401 and at least one energy-storage units 3011-301n;Each energy-storage units and the second isolating transformer 402 one end connection;The other end of second isolating transformer 402, generator unit 401 output end respectively with ac bus 1 Connection;Each energy-storage units, generator unit 401 are communicated to connect with Energy Management System 2 respectively.
Energy-storage units can be battery system, when the electric energy that battery system is used to generate in test platform is more, to electricity It can be carried out storage, and when electric energy deficiency in test platform, discharge into ac bus 1.Specific energy-storage units are chargings Or it discharges, is controlled by the control of Energy Management System 2, Energy Management System 2 is based on according to grid operation data, hair electricity number Accordingly and battery charge state information determines the electrical energy demands in test platform to control energy-storage units be to be charged or discharged.
Optionally, on the basis of the present embodiment, referring to the energy-storage units 3011 in Fig. 2, energy-storage units 3011 include:
Energy-storage travelling wave tube, battery management system and current transformer 3211;Energy-storage travelling wave tube, battery management system and current transformer 3211 according to Secondary connection, the other end of current transformer 3211 are connect with the second isolating transformer 402;Battery management system and Energy Management System 2 Communication connection.Wherein, energy-storage travelling wave tube and battery management system are set together, forming member 3111.Wherein, current transformer 3211 can Think energy accumulation current converter PCS.Energy-storage travelling wave tube can be battery.It should be noted that the specific structure of energy-storage units 3012-301n Referring to figure 2., it specifically no longer illustrates.
It should be noted that the present embodiment uses true energy-storage units, and simulator is not used, it is contemplated that electric Pond charge-discharge characteristic is influenced by the environmental factors such as temperature, height above sea level, humidity and the multiple of charge-discharge magnification, avoids battery charge shape It is larger that state SOC calculates error.
In addition, generator unit 401 can be diesel generating set, the speed regulation excitation property structure of diesel generating set is multiple Miscellaneous, the non-linear factors such as all kinds of delays are more, therefore do not use simulator here, but use practical bavin hair unit as survey Try equipment.
The function of each equipment in energy-controllable system 301 are as follows:
Energy-storage units are used for: being sent battery charge state information to Energy Management System 2, received in controlling electric energy instruction Charge and discharge control instruction instructs progress charge and discharge electrically operated according to charge and discharge control;Power storage state includes battery charge state Information;
Generator unit 401 is used for: when receiving the generation control instruction in controlling electric energy instruction, carrying out power generation behaviour Make, and the electric energy of sending is transferred to ac bus 1;
Wherein, charge and discharge control instruction and generation control instruction are Energy Management System 2 according to grid operation data, hair Electricity consumption data and battery charge state information and generate.
Specifically, battery management system (the Battery Management that Energy Management System 2 passes through energy-storage units System, BMS) its battery charge state information, i.e. SOC information are obtained, and combine grid operation data, hair electricity consumption data and energy Measure the charge-discharge electric power that regulatory requirement calculates energy-storage units.When energy-storage units SOC is in a high position, reduces it and absorb power or increasing Add its output power, when energy-storage units SOC is in low level, increases it and absorb power or reduce its output power, open when necessary Dynamic diesel generating set carries out energy supplement.
When energy-storage travelling wave tube progress charge and discharge is electrically operated, the electric energy of storage and the electric energy of release pass through current transformer, and current transformer rises To the function of rectification or inversion, when charging, current transformer plays the function of rectification, and upon discharging, current transformer plays the work of inversion With.
Optionally, on the basis of the present embodiment, referring to Fig. 3, the function mould that tested Energy Management System 2 should include Block, respectively human-computer interaction module 11, energy management module 12, communication dispatch module 13 and data memory module 14, wherein people Machine interactive module 11 should use visual man-machine interface, display grid operation data, hair electricity consumption data, power storage state with And the information such as controlling electric energy instruction, and man-machine user interface is provided and facilitates user setting and query-related information.Energy management mould Block 12 should determine that controlling electric energy instructs according to grid operation data, hair electricity consumption data, power storage state.Communication dispatch module 13 The controlling electric energy being calculated should be instructed, be sent to energy-controllable system 301 according to set sequence and communications protocol and execute, and Receive the feedback information of power grid simulation system 101, adapted electric analog system 201 and energy-controllable system 301.Data memory module 14 should determine that controlling electric energy instruction stores to grid operation data, hair electricity consumption data, power storage state, and with table or The output of alternative document form, the foundation as the evaluation of 2 control performance of Energy Management System.
Tested 2 control process of Energy Management System are as follows:
1, the work at present timing of Energy Management System 2 is determined by human-computer interaction module 11;
2, communication dispatch module 13 obtains the grid operation data that power grid simulation system 101 exports;
3, communication dispatch module 13 obtains the hair electricity consumption data that adapted electric analog system 201 exports;
4, communication dispatch module 13 obtains the power storage state of energy-controllable system 301;
5, energy management module 12 is generated and is exported according to grid operation data, hair electricity consumption data and power storage state Controlling electric energy instruction;Wherein, controlling electric energy instruction includes charge and discharge control instruction and generation control instruction;
6, communication dispatch module 13 instructs charge and discharge control and generation control instruction is sent respectively to energy-storage units and bavin Oily generating set is to respond;
7, the step 2-6 data for obtaining and generating are added in history intersection by energy management module 12, and pass through data Memory module 14 is stored;
8, data memory module 14 exports the data that step 2-6 is obtained and generated with document form.
In the present embodiment, using energy-storage units and generator unit as the energy transmission dispatched by Energy Management System 2 Device, scheduling of the work of energy-controllable system 301 by Energy Management System 2, and then can be in the electric energy in test platform When insufficient and sufficient, corresponding charge and discharge and generating operation are carried out.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.

Claims (10)

1. a kind of for testing the test platform of Energy Management System, which is characterized in that including power grid simulation system, match electricity consumption mould Quasi- system and energy-controllable system;The output end of the power grid simulation system, the output end of the adapted electric analog system and institute The output end for stating energy-controllable system is connected to ac bus;The power grid simulation system, the adapted electric analog system and The energy-controllable system is communicated to connect with the Energy Management System in micro-capacitance sensor;Wherein,
The power grid simulation system is used for: the operation of power networks state for the external power grid connecting with the micro-capacitance sensor is obtained, based on described Operation of power networks state simulates the external power grid, detects and sends the obtained grid operation data of simulation to the energy management system System;
The adapted electric analog system is used for: being simulated the power output of the generator unit and power unit in the micro-capacitance sensor, is sent out Send hair electricity consumption data to the Energy Management System;Wherein, the hair electricity data include the power generation of each generator unit The electricity consumption data of data and each power unit;
The energy-controllable system is used for: simulating the power supply and power storage of the micro-capacitance sensor, detecting and send the energy can The power storage state of control system is to the Energy Management System, so that the Energy Management System is according to the operation of power networks number Controlling electric energy instruction, while the energy management are generated and exported according to, the hair electricity consumption data and the power storage state System records and exports the grid operation data, the hair electricity consumption data, the power storage state and the electric energy control System instruction;Also, the energy-controllable system is also used to: receiving and respond the electric energy control that the Energy Management System is sent System instruction.
2. test platform according to claim 1, which is characterized in that the power grid simulation system includes: grid configuration list Member, the first power supply unit, the first rectifier and the first inverter;The input terminal of first rectifier and first power supply are single The output end connection of member, the output end of first rectifier are connect with the input terminal of first inverter, and described first is inverse The output end for becoming device is connect with the ac bus, the control of the output end of the grid configuration unit and first rectifier The control terminal of end and first inverter is separately connected;Wherein,
The grid configuration unit is used for: obtaining the operating parameter of external power grid, it is raw to generate three-phase voltage according to the operating parameter At instruction and the first rectification instruction;Wherein, the three-phase voltage generates the parameter that instruction includes three-phase voltage;
First rectifier is used for: being received the first rectification instruction, is obtained the first electricity of the first power supply unit output Source, and first power supply is rectified to obtain the first DC power supply according to the first rectification instruction, it is straight by described first Galvanic electricity source is exported to first inverter;
First inverter is used for: according to the parameter of the three-phase voltage, being converted, is obtained to first DC power supply Three-phase voltage, and the three-phase voltage is exported to the ac bus.
3. test platform according to claim 2, which is characterized in that the grid configuration unit is according to the operating parameter When generating three-phase voltage generation instruction, it is specifically used for:
The operating parameter is calculated using predeterminated voltage calculation formula, obtains the parameter of the three-phase voltage, generates packet The three-phase voltage for including the parameter of the three-phase voltage generates instruction.
4. test platform according to claim 2, which is characterized in that first power supply unit includes three phase mains and One isolating transformer;
The output end of the three phase mains is connect with the input terminal of first isolating transformer, first isolating transformer Output end is connect with the input terminal of first rectifier.
5. test platform according to claim 1, which is characterized in that the power grid simulation system includes control unit and outer Power grid analogue unit;The control terminal of the external power grid analogue unit and the output end of described control unit connect, the external power grid The output end of analogue unit is connect with the ac bus;Wherein,
Described control unit is used for: obtaining the operating parameter of external power grid, the three-phase electricity of external power grid is determined according to the operating parameter Press analogue data;
The external power grid analogue unit is used for: being generated three-phase voltage corresponding with the three-phase voltage analogue data, and is exported The three-phase voltage is to the ac bus.
6. test platform according to claim 1, which is characterized in that the adapted electric analog system includes configuring with electricity consumption Unit, the second power supply unit, the second rectifier and the second inverter;The input terminal of second rectifier and second power supply The output end of unit connects;The output end of second rectifier is connect with the input terminal of second inverter, and described second The output end of inverter is connect with the ac bus, the control of the control terminal of second rectifier and second inverter End is connect with the output end with electricity consumption configuration unit respectively;Wherein,
It is described to be used for electricity consumption configuration unit: to obtain the power generation data and each electricity consumption of each generator unit in the micro-capacitance sensor The electricity consumption data of unit is generated according to the power generation data of each generator unit obtained and the electricity consumption data of each power unit Power control instruction and the second rectification instruction;
Second rectifier is used for: being received the second rectification instruction, is obtained the second electricity of the second power supply unit output Source, and obtain the second DC power supply after rectifying according to the second rectification instruction to the second source, and by described the Two DC power supplies are exported to second inverter;
Second inverter is used for: according to the power control instruction, being calculated the parameter of three-phase current to be generated, is based on institute The parameter for stating three-phase current to be generated converts second DC power supply, obtains three-phase current, and exports described three Phase current is to the ac bus.
7. test platform according to claim 6, which is characterized in that described each according to what is obtained with electricity consumption configuration unit The power generation data of generator unit and the electricity consumption data of each power unit are specifically used for when generating power control instruction:
Using predetermined power calculation formula to the power generation data of each generator unit of acquisition and the electricity consumption of each power unit Data are calculated, and total active power, all use of generator unit and power unit all in the micro-capacitance sensor are obtained Total reactive power of electric unit;
Generate the power control instruction including total active power and total reactive power.
8. test platform according to claim 6, which is characterized in that the adapted electric analog system further includes multiple communications Module;Each communication module is communicated to connect with described with electricity consumption configuration unit, the Energy Management System respectively;Wherein,
The communication module is used for: receiving the data acquisition instruction that the Energy Management System is sent, and by the data acquisition Instruction is sent to described with electricity consumption configuration unit, and receives the data sent with electricity consumption configuration unit, and by the number According to being sent to the Energy Management System;
It is described to be also used to electricity consumption configuration unit: to be instructed, obtained and each data acquisition according to each data acquisition received Corresponding each data are instructed, and each data are sent to each communication corresponding with the instruction of each data acquisition respectively Module;Wherein, the data are the power generation data an of generator unit or the electricity consumption data of a power unit.
9. test platform according to claim 1, which is characterized in that the energy-controllable system includes the second isolation transformation Device, generator unit and at least one energy-storage units;One end of each energy-storage units and second isolating transformer connects It connects;The other end of second isolating transformer, the output end of the generator unit are connect with the ac bus respectively;Often One energy-storage units, the generator unit are communicated to connect with the Energy Management System respectively;Wherein,
The energy-storage units are used for: being sent battery charge state information to the Energy Management System, received the controlling electric energy Charge and discharge control instruction in instruction instructs progress charge and discharge electrically operated according to the charge and discharge control;The power storage state Including battery charge state information;
The generator unit is used for: when receiving the generation control instruction in the controlling electric energy instruction, carrying out power generation behaviour Make, and the electric energy of sending is transferred to the ac bus;
Wherein, the charge and discharge control instruction and the generation control instruction are the Energy Management System according to the power grid Operation data, the hair electricity consumption data and the battery charge state information and generate.
10. test platform according to claim 9, which is characterized in that the energy-storage units include:
Energy-storage travelling wave tube, battery management system and current transformer;The energy-storage travelling wave tube, the battery management system and the current transformer according to Secondary connection, the other end of the current transformer are connect with second isolating transformer;The battery management system and the energy Communication connection.
CN201810820214.1A 2018-07-24 2018-07-24 Test platform for testing energy management system Active CN108957378B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810820214.1A CN108957378B (en) 2018-07-24 2018-07-24 Test platform for testing energy management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810820214.1A CN108957378B (en) 2018-07-24 2018-07-24 Test platform for testing energy management system

Publications (2)

Publication Number Publication Date
CN108957378A true CN108957378A (en) 2018-12-07
CN108957378B CN108957378B (en) 2021-01-08

Family

ID=64463150

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810820214.1A Active CN108957378B (en) 2018-07-24 2018-07-24 Test platform for testing energy management system

Country Status (1)

Country Link
CN (1) CN108957378B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110687889A (en) * 2019-09-30 2020-01-14 武汉烽火富华电气有限责任公司 New energy micro-grid system automatic testing method based on loadrunner
CN113484648A (en) * 2021-07-29 2021-10-08 哈尔滨工业大学(深圳)(哈尔滨工业大学深圳科技创新研究院) Power electronic simulation device for power grid frequency operation characteristics
CN114137346A (en) * 2021-11-26 2022-03-04 国网湖南省电力有限公司 Energy storage power station battery management system testing arrangement based on digifax simulation platform
US11921145B1 (en) 2020-10-12 2024-03-05 Regents Of The University Of Minnesota Electrical emulator system

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103078316A (en) * 2013-01-06 2013-05-01 湖北省电力公司电力科学研究院 Network voltage disturbance generating device and control method thereof
CN103605014A (en) * 2013-10-23 2014-02-26 国家电网公司 Test platform for large energy storage converters
CN104330979A (en) * 2014-10-31 2015-02-04 国家电网公司 Analog simulation system of complex power distribution network
CN204789831U (en) * 2015-07-23 2015-11-18 南京旷森电气技术有限公司 Little electric wire netting simulation experiment platform
CN105093045A (en) * 2015-09-14 2015-11-25 哈尔滨工程大学 Wind-solar-diesel-accumulator hybrid ship micro-grid system test platform
US20160139212A1 (en) * 2014-11-13 2016-05-19 Eleon Energy, Inc. Methods and systems for power restoration planning employing simulation and transient test analysis
WO2016097551A1 (en) * 2014-12-18 2016-06-23 Peugeot Citroen Automobiles Sa Method and device for diagnosing an electric-energy management device
CN106205308A (en) * 2016-08-08 2016-12-07 中车株洲电力机车研究所有限公司 A kind of electrical network analog systems and control method thereof
CN106451759A (en) * 2015-08-07 2017-02-22 国网智能电网研究院 Micro-power grid monitoring system based on power line carrier communication
CN206774058U (en) * 2016-06-02 2017-12-19 三江学院 A kind of distributed photovoltaic power generation training platform
CN107643457A (en) * 2017-09-12 2018-01-30 上海电气分布式能源科技有限公司 A kind of method of testing and system for microgrid energy management system

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103078316A (en) * 2013-01-06 2013-05-01 湖北省电力公司电力科学研究院 Network voltage disturbance generating device and control method thereof
CN103605014A (en) * 2013-10-23 2014-02-26 国家电网公司 Test platform for large energy storage converters
CN104330979A (en) * 2014-10-31 2015-02-04 国家电网公司 Analog simulation system of complex power distribution network
US20160139212A1 (en) * 2014-11-13 2016-05-19 Eleon Energy, Inc. Methods and systems for power restoration planning employing simulation and transient test analysis
WO2016097551A1 (en) * 2014-12-18 2016-06-23 Peugeot Citroen Automobiles Sa Method and device for diagnosing an electric-energy management device
CN204789831U (en) * 2015-07-23 2015-11-18 南京旷森电气技术有限公司 Little electric wire netting simulation experiment platform
CN106451759A (en) * 2015-08-07 2017-02-22 国网智能电网研究院 Micro-power grid monitoring system based on power line carrier communication
CN105093045A (en) * 2015-09-14 2015-11-25 哈尔滨工程大学 Wind-solar-diesel-accumulator hybrid ship micro-grid system test platform
CN206774058U (en) * 2016-06-02 2017-12-19 三江学院 A kind of distributed photovoltaic power generation training platform
CN106205308A (en) * 2016-08-08 2016-12-07 中车株洲电力机车研究所有限公司 A kind of electrical network analog systems and control method thereof
CN107643457A (en) * 2017-09-12 2018-01-30 上海电气分布式能源科技有限公司 A kind of method of testing and system for microgrid energy management system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吉小鹏 等: "微网能量管理系统实时数字仿真测试平台研究", 《陕西电力》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110687889A (en) * 2019-09-30 2020-01-14 武汉烽火富华电气有限责任公司 New energy micro-grid system automatic testing method based on loadrunner
CN110687889B (en) * 2019-09-30 2022-05-03 武汉烽火富华电气有限责任公司 New energy micro-grid system automatic testing method based on loadrunner
US11921145B1 (en) 2020-10-12 2024-03-05 Regents Of The University Of Minnesota Electrical emulator system
CN113484648A (en) * 2021-07-29 2021-10-08 哈尔滨工业大学(深圳)(哈尔滨工业大学深圳科技创新研究院) Power electronic simulation device for power grid frequency operation characteristics
CN114137346A (en) * 2021-11-26 2022-03-04 国网湖南省电力有限公司 Energy storage power station battery management system testing arrangement based on digifax simulation platform
CN114137346B (en) * 2021-11-26 2023-09-12 国网湖南省电力有限公司 Energy storage power station battery management system testing device based on number simulation real platform

Also Published As

Publication number Publication date
CN108957378B (en) 2021-01-08

Similar Documents

Publication Publication Date Title
CN110011422A (en) Intelligent power distribution operation monitoring system and regulation method based on artificial neural network
CN108957378A (en) It is a kind of for testing the test platform of Energy Management System
CN105205232B (en) Micro-grid system Simulation of stability test platform based on RTDS
WO2018014450A1 (en) Rt-lab-based real microgrid operation dynamic simulation testing platform
CN104485681B (en) A kind of monitoring method of wind energy turbine set energy-storage system
CN110286606B (en) Comprehensive energy microgrid control experiment system based on semi-physical simulation
CN108092288A (en) Load control unit, AC charging system and control method
CN206099371U (en) New forms of energy microgrid system of community
CN107069693A (en) Control method for coordinating applied to direct-current grid distributed super-capacitor energy storage
CN106872818A (en) The grid-connected Performance Test System and method of a kind of smooth storing cogeneration device
CN107134977B (en) A kind of family use up storage all-in-one machine test method
CN105720573B (en) Honourable electricity storage station based on measured data is active and powerless control system modeling method
CN103199560A (en) Box-type integrated multiple micro source interface micro power grid connected system device
CN110137992A (en) A kind of isolated island direct-current grid stable coordination progress control method
CN104298127A (en) Micro-grid semi-digital semi-physical real-time simulation system based on RT-LAB
CN104505907B (en) A kind of supervising device of the battery energy storage system with Reactive-power control function
CN103246283A (en) Closed loop testing method of power plant side automatic voltage control system
CN105515032B (en) intelligent micro-grid energy storage control method
Raducu et al. Design and implementation of a hybrid power plant controller
CN105867161A (en) Wind-power-generation digital physical hybrid simulation system based on RTDS and method thereof
CN104538981B (en) A kind of monitoring method of the battery energy storage system with Reactive-power control function
CN110208700A (en) The calculation method of energy-storage system virtual battery open-circuit voltage in a kind of direct-current micro-grid
Restrepo-Zambrano et al. Experimental framework for laboratory scale microgrids
CN207353855U (en) A kind of wind-light storage complementation power grid tests system
KR101316550B1 (en) System for testing energy storage device using static simulator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant