CN108956201A - A kind of sewage treatment sampling tool case - Google Patents

A kind of sewage treatment sampling tool case Download PDF

Info

Publication number
CN108956201A
CN108956201A CN201810590779.5A CN201810590779A CN108956201A CN 108956201 A CN108956201 A CN 108956201A CN 201810590779 A CN201810590779 A CN 201810590779A CN 108956201 A CN108956201 A CN 108956201A
Authority
CN
China
Prior art keywords
fixed
placing frame
cover board
installs case
sampling tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810590779.5A
Other languages
Chinese (zh)
Inventor
李德福
吴春良
李玉刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810590779.5A priority Critical patent/CN108956201A/en
Publication of CN108956201A publication Critical patent/CN108956201A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N1/00Sampling; Preparing specimens for investigation
    • G01N1/02Devices for withdrawing samples
    • G01N1/10Devices for withdrawing samples in the liquid or fluent state

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

The present invention relates to a kind of tool box more particularly to a kind of sewage treatment sampling tool casees.Sampling tool can be stored the technical problem to be solved in the present invention is to provide a kind of, so that sampling tool is hardly damaged, while can protect the test tube sample after sampling, mitigates the sewage treatment sampling tool case of intensity of workers.In order to solve the above-mentioned technical problem, the present invention provides such a sewage treatment sampling tool casees, include universal wheel, the first fixed mechanism, installs case, placement mechanism, the first magnet, mobile mechanism, clamp system, the second fixed mechanism, the first pull ring, the second pull ring, the first cover board, support base, hinge, the first placing frame, third pull ring, the second cover board, the second magnet, the 4th pull ring, fixture block and elevating mechanism;Support base is fixed in installs case bottom along the vertical direction, and universal wheel is fixed in support base bottom;First fixed mechanism is fixed in support base side, and the output end of the first fixed mechanism and universal wheel inserting cooperate.Invention achieves sampling tool can be stored, so that sampling tool is hardly damaged, while can protect the test tube sample after sampling, mitigate the effect of intensity of workers.

Description

A kind of sewage treatment sampling tool case
Technical field
The present invention relates to a kind of tool box more particularly to a kind of sewage treatment sampling tool casees.
Background technique
It in actual production, need to be in sewage treatment plant according to sewage treatment plant's production technology scene open work demand On-site measurement activated sludge settling ratio on biological reaction pool, used sampling tool are usual are as follows: graduated cylinder, graduated cylinder brush and sampling tank Deng.Graduated cylinder is glass material, it is easy to it is broken, and need to keep cleaning, graduated cylinder brush is required to keep clear for scrubbing graduated cylinder Clean, sampling tank is plastic material, is exposed to easy to aging, embrittlement if outdoor for a long time.Existing sewage sampling is usually to work Personnel hold a lot of sampling tools and sample to specified place, and sampling tool is so caused to hold during carrying Breakage easily occurs, and staff is also easy to cause test tube to damage during holding sampling test tube and returning after sampling, from And the sewage of sampling is caused to be lost, the personnel of working at the same time hold a lot of sampling tools and also increase their labor intensity, Therefore need to research and develop it is a kind of can store sampling tool so that sampling tool is hardly damaged, while can protect the test tube sample after sampling This, mitigates the sewage treatment sampling tool case of intensity of workers.
Summary of the invention
(1) technical problems to be solved
The present invention is usually that staff holds a lot of sampling tools to specifying to overcome the sampling of existing sewage Place sampled, so cause sampling tool to be easy to happen breakage during carrying, and the people that works after sampling Member is also easy to cause test tube to damage during holding sampling test tube and returning, and is lost, works at the same time so as to cause the sewage of sampling Personnel hold the shortcomings that a lot of sampling tools also increases their labor intensity, the technical problem to be solved by the present invention is to There is provided it is a kind of can store sampling tool so that sampling tool is hardly damaged, while the test tube sample after sampling can be protected, mitigate work Make the sewage treatment sampling tool case of personnel labor intensity.
(2) technical solution
In order to solve the above-mentioned technical problems, the present invention provides such a sewage treatment sampling tool casees, include Universal wheel, the first fixed mechanism, installs case, placement mechanism, the first magnet, mobile mechanism, clamp system, the second fixed mechanism, First pull ring, the second pull ring, the first cover board, support base, hinge, the first placing frame, third pull ring, the second cover board, the second magnet, 4th pull ring, fixture block and elevating mechanism;Support base is fixed in installs case bottom along the vertical direction, and universal wheel is fixed in support base bottom Portion;First fixed mechanism is fixed in support base side, and the output end of the first fixed mechanism and universal wheel inserting cooperate;Placement machine Structure is fixed in bottom in installs case;Mobile mechanism is fixed in installs case, and is located above placement mechanism;First placing frame is affixed In the output end of mobile mechanism, and in the first placing frame, bottom offers placing groove;Third pull ring is fixed in the first placing frame, folder Tight mechanism is fixed in the first placing frame;Hinged at the top of first cover board one end and the first placing frame, fixture block is fixed in the first cover board The other end;First placing frame offers card slot, and card slot and fixture block inserting cooperate;Second pull ring is fixed in the first cover board top Portion, the first pull ring are fixed at the top of installs case, and the second cover board side is hinged by hinge and installs case, and the 4th pull ring is fixed in the Two cover boards, the first magnet are fixed in installs case;Second magnet is fixed in the second cover board, and the second magnet and the first magnet match It closes;Second fixed mechanism is fixed in side of the installs case far from the second cover board, and the output end of the second fixed mechanism and the second lid Plate is engaged by clamping;Elevating mechanism is fixed on rear side of installs case.
Preferably, the first fixed mechanism includes that first connecting rod, the first oscillating rod, the first fixed block and second are fixed Block;Universal wheel offers the second fixing groove, and support base side offers the first fixing groove;First connecting rod is fixed in support base one Side, and be located at below the first fixing groove;It is hinged with first connecting rod at the top of first oscillating rod;Second fixed block is fixed in the first pendulum Lever is close to the side of universal wheel, and the second fixed block and the inserting of the second fixing groove cooperate;First fixed block is fixed in the first pendulum Side of the lever far from universal wheel, and the first fixed block and the inserting of the first fixing groove cooperate.
Preferably, placement mechanism includes the first sliding rail, the first sliding block, the second placing frame, sampling tank, first partition, branch Strut, second partition, places bucket, places ring, hairbrush, the first wing bolt and the 5th pull ring graduated cylinder;First sliding rail is fixed in peace Bottom in casing, the second placing frame are slidably connected by the first sliding block and the first sliding rail, side of the installs case far from the second cover board Offer the first threaded hole;First wing bolt and the first screw hole, and the first wing bolt and the second placing frame match It closes;First partition and second partition are fixed in bottom in the second placing frame along the vertical direction;Sampling tank is placed in the second placement Bottom in frame, and be isolated by first partition;Support rod is fixed in bottom in the second placing frame along the vertical direction, and is located at Between first partition and second partition;Graduated cylinder is buckled on support rod;Placement bucket for holding bottled cleaning agent is fixed in Bottom in two placing frames, and between second partition and the second placing frame;It places ring and is fixed in the second placing frame close to second The inner sidewall of partition, hairbrush pass through placement ring and are placed in the second placing frame, and the 5th pull ring is fixed in the second placing frame.
Preferably, mobile mechanism includes the second sliding rail, mounting plate, the second sliding block and the second wing bolt;Mounting plate edge Horizontal direction is fixed in installs case, and the second sliding rail is fixed at the top of mounting plate, and the first placing frame passes through the first sliding block and first Sliding rail is slidably connected, and installs case offers the second threaded hole far from one end of the second cover board;Second wing bolt and the second screw thread Hole is spirally connected, and the second wing bolt is matched with the first placing frame.
Preferably, clamp system includes connecting plate, third sliding rail, third sliding block, first clamping plate, second clamping plate, fixation Plate and third wing bolt;Two sides are connected with connecting plate in first placing frame;Second clamping plate, third sliding rail are fixed in connection Side of the plate far from the first placing frame, and second clamping plate is located at the rear side of third sliding rail;First clamping plate passes through third sliding block and the Three sliding rails are slidably connected;Fixed plate is fixed in side of the third sliding block far from second clamping plate, and third spiral shell is offered in fixed plate Pit;Third wing bolt and third screw hole.
Preferably, the second fixed mechanism includes third fixed block, the second oscillating rod, the second connecting rod and the first elasticity Part;Second connecting rod is fixed in side of the installs case far from the second cover board, and second the second connecting rod of oscillating rod is hinged;Third is fixed Block is fixed in second oscillating rod one end, and third fixed block and the second cover board are engaged by clamping;Second oscillating rod is fixed far from third One end of block is connect by the first elastic component with installs case.
Preferably, elevating mechanism includes hollow pipe, slide bar, pull rod, the 4th fixed block, the second elastic component, pulling plate and inserts Bar;Hollow pipe is fixed on rear side of installs case;Slide bar is slidably connected with hollow pipe, and third fixing groove is offered on slide bar;Pull rod It is fixed at the top of slide bar;4th fixed block is fixed on rear side of installs case, and offers through-hole on the 4th fixed block;Inserted link one end is passed through Reach through hole and the inserting of third fixing groove cooperate;Pulling plate is fixed in the one end of inserted link far from slide bar, and pulling plate passes through the second elastic component It is connect with the 4th fixed block.
Preferably, clamp system further includes having foam-rubber cushion;First clamping plate and first clamping plate are connected with foam-rubber cushion.
Preferably, which further includes having cloth bag and rubber stopper;Multiple cloth bags are successively fixed in Second cover board, rubber stopper are placed in cloth bag, and rubber stopper and test tube inserting cooperate.
(3) beneficial effect
Invention achieves sampling tool can be stored, so that sampling tool is hardly damaged, while the examination after sampling can be protected Pipe sample mitigates the effect of intensity of workers, by the fixed universal wheel of the first fixed mechanism, so that staff is adopting During sample, installs case will not be moved, and sampling tool and fetching tool be stored by placement mechanism, so that sampling tool It will not be damaged during pick-and-place, drive the first placing frame to remove by mobile mechanism, move into installs case, so that installs case exists In mobile process, the first placing frame will not be moved, while but also the first placing frame will not skid off installs case, pass through folder The clamping of tight mechanism controls test tube unclasps, so that test tube does not fall out damage to installs case in the process of moving, while but also Test tube will not run-off the straight cause the liquid inside test tube to be poured out, fixed by the second fixed mechanism, unclamp the second cover board so that Sampling tool in installs case and the test tube equipped with sewage will not skid off installs case, be gone up and down by elevating mechanism, so that work people Member can more easily pull installs case mobile.
Detailed description of the invention
Fig. 1 is the first schematic view of the front view of the invention.
Fig. 2 is the enlarged structure schematic diagram of A in Fig. 1 of the present invention.
Fig. 3 is backsight structural representation of the invention.
Fig. 4 is the schematic view of the front view of the first fixed mechanism of the invention.
Fig. 5 is the schematic view of the front view of placement mechanism of the present invention.
Fig. 6 is the schematic view of the front view of mobile mechanism of the present invention.
Fig. 7 is the first overlooking structure diagram of clamp system of the present invention.
Fig. 8 is the enlarged structure schematic diagram of B in Fig. 7 of the present invention.
Fig. 9 is the overlooking structure diagram of the second fixed mechanism of the invention.
Figure 10 is the backsight structural representation of elevating mechanism of the present invention.
Figure 11 is the enlarged structure schematic diagram of C in Fig. 9 of the present invention.
Figure 12 is second of overlooking structure diagram of clamp system of the present invention.
Figure 13 is second of schematic view of the front view of the invention.
The label in accompanying drawing is: 1- universal wheel, the first fixed mechanism of 2-, the first fixing groove of 21-, 22- first connecting rod, The first oscillating rod of 23-, the first fixed block of 24-, the second fixed block of 25-, the second fixing groove of 26-, 3- installs case, 4- placement mechanism, The first sliding rail of 41-, the first sliding block of 42-, the second placing frame of 43-, 44- sampling tank, 45- first partition, 46- support rod, 47- amount Cylinder, 48- second partition, 49- placement bucket, 410- placement ring, 411- hairbrush, the first threaded hole of 412-, the first wing bolt of 413-, The 5th pull ring of 414-, the first magnet of 5-, 6- mobile mechanism, the second sliding rail of 61-, 62- mounting plate, the second sliding block of 63-, 64- second Threaded hole, the second wing bolt of 65-, 7- clamp system, 71- connecting plate, 72- third sliding rail, 73- third sliding block, 74- first are pressed from both sides Plate, 75- second clamping plate, 76- fixed plate, 77- third threaded hole, 78- third wing bolt, 79- foam-rubber cushion, the fixed machine of 8- second Structure, 81- third fixed block, the second oscillating rod of 82-, the second connecting rod of 83-, the first elastic component of 84-, the first pull ring of 9-, 10- second Pull ring, the first cover board of 11-, 12- support base, 13- hinge, 14- placing groove, the first placing frame of 15-, 16- third pull ring, 17- Two cover boards, the second magnet of 18-, the 4th pull ring of 19-, 20- test tube, 21- fixture block, 22- card slot, 23- elevating mechanism, 231- are hollow Pipe, 232- third fixing groove, 233- slide bar, 234- pull rod, the 4th fixed block of 235-, the second elastic component of 236-, 237- through-hole, 238- pulling plate, 239- inserted link, 27- cloth bag, 28- rubber stopper.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of sewage treatment sampling tool case includes as shown in figures 1-13 universal wheel 1, the first fixed mechanism 2, peace Vanning 3, placement mechanism 4, the first magnet 5, mobile mechanism 6, clamp system 7, the second fixed mechanism 8, the first pull ring 9, second are drawn Ring 10, the first cover board 11, support base 12, hinge 13, the first placing frame 15, third pull ring 16, the second cover board 17, the second magnet 18, the 4th pull ring 19, fixture block 21 and elevating mechanism 23;Support base 12 is fixed in 3 bottom of installs case, universal wheel 1 along the vertical direction It is fixed in 12 bottom of support base;First fixed mechanism 2 is fixed in 12 side of support base, and the output end of the first fixed mechanism 2 with The inserting cooperation of universal wheel 1;Placement mechanism 4 is fixed in bottom in installs case 3;Mobile mechanism 6 is fixed in installs case 3, and is located at 4 top of placement mechanism;First placing frame 15 is fixed in the output end of mobile mechanism 6, and bottom offers in the first placing frame 15 Placing groove 14;Third pull ring 16 is fixed in the first placing frame 15, and clamp system 7 is fixed in the first placing frame 15;First cover board 11 one end and 15 top of the first placing frame are hinged, and fixture block 21 is fixed in the other end of the first cover board 11;First placing frame 15 opens up There is card slot 22, and card slot 22 and the inserting of fixture block 21 cooperate;Second pull ring 10 is fixed in 11 top of the first cover board, and the first pull ring 9 is solid It is connected to 3 top of installs case, 17 side of the second cover board is hinged by hinge 13 and installs case 3, and the 4th pull ring 19 is fixed in the second lid Plate 17, the first magnet 5 are fixed in installs case 3;Second magnet 18 is fixed in the second cover board 17, and the second magnet 18 and the first magnet 5 match;Second fixed mechanism 8 is fixed in side of the installs case 3 far from the second cover board 17, and the output of the second fixed mechanism 8 End is engaged by clamping with the second cover board 17;Elevating mechanism 23 is fixed in 3 rear side of installs case.
When needing to sample sewage, control elevating mechanism 23 is operated, so that staff passes through elevator Structure 23 draws installs case 3 to specified position, etc. after installs cases 3 reach designated position, control the first fixed mechanism 2 running, from And fix universal wheel 1, so that staff's installs case 3 during sampling will not move, control first Fixed mechanism 2 operates, so that the second cover board 17 be unclamped, then the second cover board 17 is rotated counterclockwise 90 degree, so that second Cover board 17 leaves installs case 3, and control placement mechanism 4 operates, so that sampling tool is taken out, so that staff can be by putting The sampling tool in mechanism 4 is set to acquire sewage, after waiting sewage to be collected, control mobile mechanism 6 is operated, so that work people First placing frame 15 is removed installs case 3 by third pull ring 16 by member, then by the second pull ring 10 that first cover board 11 is clockwise 90 degree of rotation, so that the first cover board 11 leaves the first placing frame 15, staff takes out test tube 20 out of first placing frame 15, and The sewage being collected is poured into test tube 20, then the test tube 20 equipped with sewage is passed through into clamp system 7 and is placed into placing groove 14 In, control clamp system 7 operates, so that test tube 20 be fixed, prevents installs case 3 in the process of moving, and test tube 20 tilts Sewage is caused to be lost, after waiting test tubes 20 to clamp, the first cover board 11 of control rotates counterclockwise 90 degree, so that the first placing frame 15 be covered Firmly, then by the second cover board 17 90 degree are rotated clockwise, so that on the first magnet 5 and installs case 3 on the second cover board 17 Two magnet, 18 phase attracts, and then the second cover board 17 is fixed in installs case 3, then controls the running of the second fixed mechanism 8, thus into Second cover board 17 is fixed in installs case 3 by one step, so that the sampling tool in installs case 3 will not skid off.
Further, the first fixed mechanism 2 includes first connecting rod 22, the first oscillating rod 23, the first fixed block 24 and Two fixed blocks 25;Universal wheel 1 offers the second fixing groove 26, and 12 side of support base offers the first fixing groove 21;First connection Bar 22 is fixed in 12 side of support base, and is located at 21 lower section of the first fixing groove;First oscillating rod, 23 top and first connecting rod 22 Hingedly;Second fixed block 25 is fixed in the first oscillating rod 23 close to the side of universal wheel 1, and the second fixed block 25 and second is fixed The inserting cooperation of slot 26;First fixed block 24 is fixed in the first side of the oscillating rod 23 far from universal wheel 1, and the first fixed block 24 with The inserting cooperation of first fixing groove 21;So the first oscillating rod 23 of control rotates counterclockwise 180 degree when universal wheel 1 to be unclamped, from And drive the second fixed block 25 to be moved to the left and leave the second fixing groove 26, and then unclamp universal wheel 1, while unclamping universal wheel 1 First oscillating rod 23 drives the first fixed block 24 to be moved in the first fixing groove 21, so that the first oscillating rod 23 is fixed on support On seat 12, when universal wheel 1 to be fixed, the first oscillating rod of control 23 is inverse to rotate clockwise 180 degree, to drive the first fixed block 24 move away the first fixing groove 21, while it is fixed by universal wheel 1 in the second fixing groove 26 to drive the second fixed block 25 to be moved to Firmly, the fixation of universal wheel 1 so controlled by the first fixed mechanism 2, unclamped, so that staff installs during sampling Case 3 will not move.
Further, placement mechanism 4 includes the first sliding rail 41, the first sliding block 42, the second placing frame 43, sampling tank 44, One partition 45, graduated cylinder 47, second partition 48, places bucket 49, places ring 410, hairbrush 411, the first wing bolt support rod 46 413 and the 5th pull ring 414;First sliding rail 41 is fixed in bottom in installs case 3, and the second placing frame 43 passes through the first sliding block 42 and the One sliding rail 41 is slidably connected, and installs case 3 offers the first threaded hole 412 far from the side of the second cover board 17;First wing bolt 413 are spirally connected with the first threaded hole 412, and the first wing bolt 413 is matched with the second placing frame 43;First partition 45 and second Partition 48 is fixed in bottom in the second placing frame 43 along the vertical direction;Sampling tank 44 is placed in bottom in the second placing frame 43, And it is isolated by first partition 45;Support rod 46 is fixed in bottom in the second placing frame 43 along the vertical direction, and is located at the Between one partition 45 and second partition 48;Graduated cylinder 47 is buckled on support rod 46;For holding the placement bucket 49 of bottled cleaning agent It is fixed in bottom in the second placing frame 43, and between second partition 48 and the second placing frame 43;It places ring 410 and is fixed in the Close to the inner sidewall of second partition 48, hairbrush 411 passes through to be placed ring 410 and is placed in the second placing frame 43 two placing frames 43, and the Five pull rings 414 are fixed in the second placing frame 43;So the first wing bolt of control 413 is clockwise when sampling tool to be taken out Rotation so that the first wing bolt 413 leaves the second placing frame 43, and then unclamps the second placing frame 43, is passing through the 5th Pull ring 414 toward pull-out outside installs case 3, adopts the second placing frame 43 so that staff be facilitated to take out sampling tank 44, graduated cylinder 47 etc. Collection tool after waiting acquisitions, takes out hairbrush 411 and is timely cleaned to sampling tool, conveniently reuse, wait and cleaned Sampling tool is placed into the second placing frame 43 by Bi Hou, then by the 5th pull ring 414 by the second placing frame 43 toward installs case 3 Interior promotion, then the first wing bolt 413 is rotated counterclockwise, so that the first wing bolt 413 turns to the second placing frame 43 is inconsistent with the second placing frame 43, and then fixes the second placing frame 43, so stores sampling tool by placement mechanism 4 and takes Tool is put, so that sampling tool will not damage during pick-and-place.
Further, mobile mechanism 6 includes the second sliding rail 61, mounting plate 62, the second sliding block 63 and the second wing bolt 65; Mounting plate 62 is fixed in the horizontal direction in installs case 3, and the second sliding rail 61 is fixed in 62 top of mounting plate, and the first placing frame 15 is logical It crosses the first sliding block 42 to be slidably connected with the first sliding rail 41, installs case 3 offers the second threaded hole far from one end of the second cover board 17 64;Second wing bolt 65 is spirally connected with the second threaded hole 64, and the second wing bolt 65 is matched with the first placing frame 15;So When that will be collected sewage and be poured into test tube 20, the second wing bolt 65 is rotated clockwise, so that the second butterfly Bolt 65 leaves the first placing frame 15, and then unclamps the first placing frame 15, and staff is passed through the first placing frame 15 Second sliding block 63 removes installs case 3 along 61 track of the second sliding rail, and then staff is facilitated to take out examination from the first placing frame 15 Test tube 20 is put into the first placing frame 15 by pipe 20 after sewage is poured into test tube 20, then the first placing frame 15 is passed through Second sliding block 63 is moved into installs case 3 along 61 track of the second sliding rail, and the second wing bolt 65 of control rotates counterclockwise, so that the Two wing bolts 65 turn to the first placing frame 15 and the first placing frame 15 is inconsistent, and then fix the first placing frame 15, so It drives the first placing frame 15 to remove by mobile mechanism 6, move into installs case 3, so that installs case 3 is in the process of moving, first Placing frame 15 will not move, while but also the first placing frame 15 will not skid off installs case 3.
Further, clamp system 7 includes connecting plate 71, third sliding rail 72, third sliding block 73, first clamping plate 74, second Clamping plate 75, fixed plate 76 and third wing bolt 78;Two sides are connected with connecting plate 71 in first placing frame 15;Second clamping plate 75, third sliding rail 72 is fixed in side of the connecting plate 71 far from the first placing frame 15, and second clamping plate 75 is located at third sliding rail 72 rear side;First clamping plate 74 is slidably connected by third sliding block 73 with third sliding rail 72;Fixed plate 76 is fixed in third sliding block 73 sides far from second clamping plate 75, and third threaded hole 77 is offered in fixed plate 76;Third wing bolt 78 and third spiral shell Pit 77 is spirally connected;So the test tube 20 clamped will be needed to be placed into first clamping plate 74 and second clamping plate when test tube 20 to be clamped Between 75, control first clamping plate 74 is mobile toward 75 direction of second clamping plate, to pass through the matching of first clamping plate 74 and second clamping plate 75 Conjunction test tube 20 is clamped, wait test tubes 20 clamp after, rotate clockwise third wing bolt 78 be moved into third sliding rail 72 with Third sliding rail 72 is inconsistent, to prevent first clamping plate 74 from secondary movement occurs, when test tube 20 to be unclamped, rotates counterclockwise Three wing bolts 78 are away from 72 surface of third sliding rail, then control past separate 75 direction of the second clamping plate movement of first clamping plate 74, To unclamp test tube 20, the clamping of test tube 20 is so controlled by clamp system 7, is unclasped, so that installs case 3 is in mobile process Middle test tube 20 does not fall out damage, while but also test tube 20 will not run-off the straight cause the liquid of 20 the inside of test tube to be poured out.
Further, the second fixed mechanism 8 includes third fixed block 81, the second oscillating rod 82, the second connecting rod 83 and One elastic component 84;Second connecting rod 83 is fixed in side of the installs case 3 far from the second cover board 17, the connection of the second oscillating rod 82 second Bar 83 is hinged;Third fixed block 81 is fixed in 82 one end of the second oscillating rod, and third fixed block 81 is matched with the clamping of the second cover board 17 It closes;The one end of second oscillating rod 82 far from third fixed block 81 is connect by the first elastic component 84 with installs case 3;So when wanting pine When opening the second cover board 17, the second oscillating rod 82 is depressed toward 3 direction of installs case, the first elastic component 84 is compressed, rotated counterclockwise Second oscillating rod 82 drives third fixed block 81 to move right, so that the second cover board 17 is unclamped, when to fix the second cover board 17, The second oscillating rod 82 is unclamped, at this time due to the effect of 84 elastic force of the first elastic component so that the second oscillating rod 82 rotates clockwise, from And third fixed block 81 is driven to be moved to the left, so that the second cover board 17 be fixed, so fixed by the second fixed mechanism 8, The second cover board 17 is unclamped, so that the sampling tool in installs case 3 and the test tube 20 sampled will not skid off installs case 3.
Further, elevating mechanism 23 includes hollow pipe 231, slide bar 233, pull rod 234, the 4th fixed block 235, the second bullet Property part 236, pulling plate 238 and inserted link 239;Hollow pipe 231 is fixed in 3 rear side of installs case;Slide bar 233 and the sliding of hollow pipe 231 connect It connects, and offers third fixing groove 232 on slide bar 233;Pull rod 234 is fixed in 233 top of slide bar;4th fixed block 235 is affixed In 3 rear side of installs case, and through-hole 237 is offered on the 4th fixed block 235;239 one end of inserted link is fixed through through-hole 237 with third The inserting cooperation of slot 232;Pulling plate 238 is fixed in the one end of inserted link 239 far from slide bar 233, and pulling plate 238 passes through the second elastic component 236 connect with the 4th fixed block 235;So pulling pulling plate 238 to the left when installs case 3 to be driven is mobile, inserted to drive Bar 239, which is moved to the left, removes the release slide bar 233 of third fixing groove 232, and the second elastic component 236 is stretched, then pull rod 234 is upward Or pull downward on, so that it is elevated to specified height, unclamp again pulling plate 238, at this time due to the work of 236 elastic force of the second elastic component With so that pulling plate 238 moves right, so that inserted link 239 be driven to move right into third fixing groove 232, and then by slide bar 233 It fixes, is so gone up and down by elevating mechanism 23, staff is enabled more easily to pull installs case 3 mobile.
Further, clamp system 7 further includes having foam-rubber cushion 79;First clamping plate 74 and second clamping plate 75 are connected with foam-rubber cushion 79;It is quick-fried that foam-rubber cushion 79 press from both sides first clamping plate 74 and second clamping plate 75 will not by test tube 20 when clamping test tube 20, into one Step protects test tube 20.
Further, which further includes having cloth bag 27 and rubber stopper 28;Multiple cloth bags 27 are successively It is fixed in the second cover board 17, rubber stopper 28 is placed in cloth bag 27, and rubber stopper 28 and the inserting of test tube 20 cooperate;So working as test tube 20 When being provided with the sewage being collected, rubber stopper 28 is taken out from cloth bag 27, then rubber stopper 28 is filled in test tube 20, thus will examination Pipe 20 seals, and then prevents test tube 20 in the process of moving, and the sewage in test tube 20 will not flow out, at the same time from cloth bag 27 Middle taking-up pen and self-stick notes, the information of sewage is write on self-stick notes, and is attached on 20 wall of test tube, to prevent work people Member forgets the sewage content in test tube 20.
The preferred embodiment of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously Limitations on the scope of the patent of the present invention therefore cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair Bright protection scope.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (9)

1. a kind of sewage treatment sampling tool case, which is characterized in that include universal wheel (1), the first fixed mechanism (2), peace Vanning (3), placement mechanism (4), the first magnet (5), mobile mechanism (6), clamp system (7), the second fixed mechanism (8), first Pull ring (9), the second pull ring (10), the first cover board (11), support base (12), hinge (13), the first placing frame (15), third pull ring (16), the second cover board (17), the second magnet (18), the 4th pull ring (19), fixture block (21) and elevating mechanism (23);Support base (12) It is fixed in installs case (3) bottom along the vertical direction, universal wheel (1) is fixed in support base (12) bottom;First fixed mechanism (2) is solid It is connected to support base (12) side, and the output end of the first fixed mechanism (2) and universal wheel (1) inserting cooperate;Placement mechanism (4) is solid It is connected to installs case (3) interior bottom;Mobile mechanism (6) is fixed in installs case (3), and is located above placement mechanism (4);First puts The output end that frame (15) is fixed in mobile mechanism (6) is set, and the first placing frame (15) interior bottom offers placing groove (14);Third Pull ring (16) is fixed in the first placing frame (15), and clamp system (7) is fixed in the first placing frame (15);First cover board (11) one End and the first placing frame (15) top are hinged, and fixture block (21) is fixed in the other end of the first cover board (11);First placing frame (15) It offers card slot (22), and card slot (22) and fixture block (21) inserting cooperate;Second pull ring (10) is fixed in the first cover board (11) top Portion, the first pull ring (9) are fixed at the top of installs case (3), and the second cover board (17) side is cut with scissors by hinge (13) and installs case (3) It connects, the 4th pull ring (19) is fixed in the second cover board (17), and the first magnet (5) is fixed in installs case (3);Second magnet (18) is affixed In the second cover board (17), and the second magnet (18) is matched with the first magnet (5);Second fixed mechanism (8) is fixed in installs case (3) far from the side of the second cover board (17), and the output end of the second fixed mechanism (8) and the second cover board (17) are engaged by clamping;It rises Descending mechanism (23) is fixed on rear side of installs case (3).
2. a kind of sewage treatment sampling tool case according to claim 1, which is characterized in that the first fixed mechanism (2) It include first connecting rod (22), the first oscillating rod (23), the first fixed block (24) and the second fixed block (25);Universal wheel (1) It offers the second fixing groove (26), support base (12) side offers the first fixing groove (21);First connecting rod (22) is fixed in Support base (12) side, and be located at below the first fixing groove (21);It is cut with scissors at the top of first oscillating rod (23) with first connecting rod (22) It connects;Second fixed block (25) is fixed in the side of the first oscillating rod (23) close to universal wheel (1), and the second fixed block (25) and the Two fixing grooves (26) inserting cooperation;First fixed block (24) is fixed in the side of the first oscillating rod (23) far from universal wheel (1), and First fixed block (24) and the first fixing groove (21) inserting cooperate.
3. a kind of sewage treatment sampling tool case according to claim 2, which is characterized in that placement mechanism (4) includes There are the first sliding rail (41), the first sliding block (42), the second placing frame (43), sampling tank (44), first partition (45), support rod (46), graduated cylinder (47), second partition (48), placement bucket (49), placement ring (410), hairbrush (411), the first wing bolt (413) With the 5th pull ring (414);First sliding rail (41) is fixed in installs case (3) interior bottom, and the second placing frame (43) passes through the first sliding block (42) it is slidably connected with the first sliding rail (41), installs case (3) offers the first threaded hole far from the side of the second cover board (17) (412);First wing bolt (413) is spirally connected with the first threaded hole (412), and the first wing bolt (413) and the second placing frame (43) it matches;First partition (45) and second partition (48) are fixed in the second placing frame (43) interior bottom along the vertical direction; Sampling tank (44) is placed in the second placing frame (43) interior bottom, and is isolated by first partition (45);Support rod (46) edge Vertical direction is fixed in the second placing frame (43) interior bottom, and between first partition (45) and second partition (48);Graduated cylinder (47) back-off is on support rod (46);Placement bucket (49) for holding bottled cleaning agent is fixed in the second placing frame (43) interior bottom Portion, and between second partition (48) and the second placing frame (43);It is close that placement ring (410) is fixed in the second placing frame (43) The inner sidewall of second partition (48), hairbrush (411) pass through placement ring (410) and are placed in the second placing frame (43), the 5th pull ring (414) the second placing frame (43) are fixed in.
4. a kind of sewage treatment sampling tool case according to claim 3, which is characterized in that mobile mechanism (6) includes There are the second sliding rail (61), mounting plate (62), the second sliding block (63) and the second wing bolt (65);Mounting plate (62) is in the horizontal direction It is fixed in installs case (3), the second sliding rail (61) is fixed at the top of mounting plate (62), and the first placing frame (15) passes through the first sliding block (42) it is slidably connected with the first sliding rail (41), installs case (3) offers the second threaded hole far from the one end of the second cover board (17) (64);Second wing bolt (65) is spirally connected with the second threaded hole (64), and the second wing bolt (65) and the first placing frame (15) It matches.
5. a kind of sewage treatment sampling tool case according to claim 4, which is characterized in that clamp system (7) includes Have connecting plate (71), third sliding rail (72), third sliding block (73), first clamping plate (74), second clamping plate (75), fixed plate (76) and Third wing bolt (78);First placing frame (15) interior two sides are connected with connecting plate (71);Second clamping plate (75), third sliding rail (72) it is fixed in the side of connecting plate (71) far from the first placing frame (15), and second clamping plate (75) is located at third sliding rail (72) Rear side;First clamping plate (74) is slidably connected by third sliding block (73) with third sliding rail (72);Fixed plate (76) is fixed in Side of three sliding blocks (73) far from second clamping plate (75), and third threaded hole (77) are offered in fixed plate (76);Third butterfly Bolt (78) is spirally connected with third threaded hole (77).
6. a kind of sewage treatment sampling tool case according to claim 5, which is characterized in that the second fixed mechanism (8) It include third fixed block (81), the second oscillating rod (82), the second connecting rod (83) and the first elastic component (84);Second connecting rod (83) it is fixed in the side of installs case (3) far from the second cover board (17), (82) second connecting rod (83) of the second oscillating rod is hinged;The Three fixed blocks (81) are fixed in the second oscillating rod (82) one end, and third fixed block (81) and the second cover board (17) are engaged by clamping; The one end of second oscillating rod (82) far from third fixed block (81) is connect by the first elastic component (84) with installs case (3).
7. a kind of sewage treatment sampling tool case according to claim 6, which is characterized in that elevating mechanism (23) includes Have hollow pipe (231), slide bar (233), pull rod (234), the 4th fixed block (235), the second elastic component (236), pulling plate (238) and Inserted link (239);Hollow pipe (231) is fixed on rear side of installs case (3);Slide bar (233) is slidably connected with hollow pipe (231), and sliding Third fixing groove (232) are offered on bar (233);Pull rod (234) is fixed at the top of slide bar (233);4th fixed block (235) is solid It is connected on rear side of installs case (3), and offers through-hole (237) on the 4th fixed block (235);Through-hole is run through in inserted link (239) one end (237) cooperate with third fixing groove (232) inserting;Pulling plate (238) is fixed in the one end of inserted link (239) far from slide bar (233), and Pulling plate (238) is connect by the second elastic component (236) with the 4th fixed block (235).
8. a kind of sewage treatment sampling tool case according to claim 7, which is characterized in that clamp system (7) also wraps Foam-rubber cushion (79) are included;First clamping plate (74) and first clamping plate (74) are connected with foam-rubber cushion (79).
9. a kind of sewage treatment sampling tool case according to claim 8, which is characterized in that sewage treatment sampling Tool box further includes having cloth bag (27) and rubber stopper (28);Multiple cloth bags (27) are successively fixed in the second cover board (17), rubber stopper (28) it is placed in cloth bag (27), rubber stopper (28) and test tube (20) inserting cooperate.
CN201810590779.5A 2018-06-09 2018-06-09 A kind of sewage treatment sampling tool case Pending CN108956201A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810590779.5A CN108956201A (en) 2018-06-09 2018-06-09 A kind of sewage treatment sampling tool case

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810590779.5A CN108956201A (en) 2018-06-09 2018-06-09 A kind of sewage treatment sampling tool case

Publications (1)

Publication Number Publication Date
CN108956201A true CN108956201A (en) 2018-12-07

Family

ID=64488164

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810590779.5A Pending CN108956201A (en) 2018-06-09 2018-06-09 A kind of sewage treatment sampling tool case

Country Status (1)

Country Link
CN (1) CN108956201A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111774390A (en) * 2020-07-31 2020-10-16 张灿奎 Sewage collector

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007240423A (en) * 2006-03-10 2007-09-20 Teiji Takezaki Tool kit for collecting, storing, holding and transferring common infectious disease examining material for the human being and living organism, and collection accumulation system for common infectious disease data
CN201724839U (en) * 2010-03-22 2011-01-26 杨扬 Special portable and moving tool box for sampling water
CN102156060A (en) * 2010-12-25 2011-08-17 山东电力集团公司枣庄供电公司 Portable liquid sampling box
CN202170697U (en) * 2011-07-13 2012-03-21 李桂森 Hinge
CN206249199U (en) * 2016-12-03 2017-06-13 郑州科技学院 A kind of computer cabinet for being easy to repair
CN206552465U (en) * 2017-01-18 2017-10-13 广州市青靓电子科技有限公司 A kind of damping type chemical apparatuses storage bin
CN206795775U (en) * 2017-06-18 2017-12-26 李修来 A kind of multifunction power power network instrument stores servicing unit
CN207169812U (en) * 2017-08-10 2018-04-03 林国 A kind of clinical laboratory inspection dust-proof storing unit of test tube
CN207181559U (en) * 2017-09-15 2018-04-03 东莞市光纪光电科技有限公司 A kind of test box of electrodeless transformer

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007240423A (en) * 2006-03-10 2007-09-20 Teiji Takezaki Tool kit for collecting, storing, holding and transferring common infectious disease examining material for the human being and living organism, and collection accumulation system for common infectious disease data
CN201724839U (en) * 2010-03-22 2011-01-26 杨扬 Special portable and moving tool box for sampling water
CN102156060A (en) * 2010-12-25 2011-08-17 山东电力集团公司枣庄供电公司 Portable liquid sampling box
CN202170697U (en) * 2011-07-13 2012-03-21 李桂森 Hinge
CN206249199U (en) * 2016-12-03 2017-06-13 郑州科技学院 A kind of computer cabinet for being easy to repair
CN206552465U (en) * 2017-01-18 2017-10-13 广州市青靓电子科技有限公司 A kind of damping type chemical apparatuses storage bin
CN206795775U (en) * 2017-06-18 2017-12-26 李修来 A kind of multifunction power power network instrument stores servicing unit
CN207169812U (en) * 2017-08-10 2018-04-03 林国 A kind of clinical laboratory inspection dust-proof storing unit of test tube
CN207181559U (en) * 2017-09-15 2018-04-03 东莞市光纪光电科技有限公司 A kind of test box of electrodeless transformer

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111774390A (en) * 2020-07-31 2020-10-16 张灿奎 Sewage collector

Similar Documents

Publication Publication Date Title
CN114047346A (en) Pretreatment module of in-vitro automatic detection system for body fluid sample
CN108956201A (en) A kind of sewage treatment sampling tool case
CN208476613U (en) A kind of Multifunctional water sampler convenient for storage container
CN110736850A (en) kinds of urine detecting instrument
CN213222248U (en) Blood strorage device is used in medical treatment physical examination
CN112362400A (en) Water sampling device for environmental protection technology development
CN208420453U (en) Sample absorbing device is used in specific protein analysis
CN113654848B (en) Petrochemical industry sewage sampling collector
CN108275447A (en) A kind of lumps of wood withdrawing device for building
CN214650530U (en) Blood collection tube storing and taking device with automatic sorting function
CN208399192U (en) A kind of sewage treatment sampling apparatus
CN209117423U (en) A kind of Research of Environmental Sciences's water sample acquisition device
CN210613762U (en) A workstation device for chemistry is synthesized and is examined
CN208334380U (en) A kind of efficient medical urine detector
CN206229404U (en) A kind of replaceable laboratory table of desktop
CN219077810U (en) Vertical specimen barrel
CN219142819U (en) Portable water quality detection device
CN220773064U (en) Oil quality observer for oil tank
CN214051691U (en) Hematology specialty nursing is with sample test tube storage box
CN217561425U (en) Portable fluorescence detection device
CN220263579U (en) Case is placed with preventing falling down to waste water sampling detects
CN219400216U (en) Automatic pipetting device
CN218978995U (en) Urine collection sampling test tube
CN219838866U (en) Nucleic acid detection sample storage device
CN217443276U (en) Be used for solution to prepare titration analysis detection device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181207