CN108952754A - A kind of lining-up construction joint anticracking bridging arrangement and construction method - Google Patents

A kind of lining-up construction joint anticracking bridging arrangement and construction method Download PDF

Info

Publication number
CN108952754A
CN108952754A CN201811059873.4A CN201811059873A CN108952754A CN 108952754 A CN108952754 A CN 108952754A CN 201811059873 A CN201811059873 A CN 201811059873A CN 108952754 A CN108952754 A CN 108952754A
Authority
CN
China
Prior art keywords
lining
trolley
master module
supporting table
rubber strip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811059873.4A
Other languages
Chinese (zh)
Inventor
耿开亮
李明
王钰琦
李毅
杨兴家
何小庆
钟占巍
薛蕴柯
李挺
彭志军
环仕红
何复生
钟万波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Erju 1st Engineering Co Ltd
Original Assignee
China Railway Erju 1st Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Erju 1st Engineering Co Ltd filed Critical China Railway Erju 1st Engineering Co Ltd
Priority to CN201811059873.4A priority Critical patent/CN108952754A/en
Publication of CN108952754A publication Critical patent/CN108952754A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/003Linings or provisions thereon, specially adapted for traffic tunnels, e.g. with built-in cleaning devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor

Abstract

The present invention provides a kind of lining-up construction joint anticracking bridging arrangement and construction method, including lining-up trolley master module, the tail portion of lining-up trolley master module is fixed with supporting table, the upper surface of supporting table is parallel with the upper surface of lining-up trolley master module, and the upper surface of supporting table is lower than the upper surface of lining-up trolley master module, rubber strip is equipped on the upper surface of supporting table, and the thickness of rubber strip is greater than the difference in height between supporting table and lining-up trolley master module upper surface.It is overlapped firmly with to solve existing tunnel lining-up construction joint and easily leads at construction joint generation crack, traffic safety is seriously threatened after coming into operation, trolley upper end master module overlaps firmly with casting concrete, lap-joint's leakiness, it is also easy to produce spillage, and hard overlap joint will cause the problems such as trolley upper end master module deforms, lap-joint is caused to generate faulting of slab ends.Belong to railway tunnel especially Railway Tunnel construction field.

Description

A kind of lining-up construction joint anticracking bridging arrangement and construction method
Technical field
The present invention relates to a kind of lining-up construction joint anticracking bridging arrangement and lining-up construction joint lapping construction methods, belong to railway Tunnel especially Railway Tunnel construction field.
Background technique
In today that national economic development flourishes, high-speed railway has become the important pushing hands promoted economic development, High-speed railway traffic also has become the important mode of transportation of national trip.Essential group as high-speed railway of Tunnel Engineering At part, occurs many lining cutting chip off-falling phenomenons in recent years, high risk is brought to the safe operation of high-speed railway.
Currently, Tunnel Second Lining, which is all made of hydraulic lining trolley, pours completion, there is following operating condition in the construction process:
1, it is provided at the vertical, horizontal construction joint between secondary lining, between secondary lining and inverted arch parapet circumferential and vertical The buried rubber fastening band in, according to lining cutting inside edge 200mm, after being centrally located, embedment front and back each 150mm of lining cutting paragraph, in Buried rubber fastening band cuts the lining cutting at construction joint, weakens to lining cutting globality at construction joint.
2, after the completion of upper group of secondary lining concreting, lining trolley demoulding is just completed after about 18~20h, through live strong Degree verifying, lining concrete intensity about 5~7Mpa when demoulding, concrete strength be not high.
3, after the lining of the following group two trolley is in place, rigid overlap joint, the lap of splice about 100mm, to prevent from applying are taken with upper group of lining cutting Spillage in casting process at work seam often takes the pressure for increasing hydraulic cylinder, makes lining trolley upper group of lining cutting closely connected as far as possible, In the case where upper group of strength of lining be not high, constantly pressurization will cause group concrete at construction joint and be crushed, and form crescent Crack after coming into operation, under the effect of the power brought by train high-speed cruising Repeated Compression air, is cut by crescent crack Concrete there can possibly be formed chip off-falling, jeopardize traffic safety.
Summary of the invention
It is an object of the invention to: a kind of lining-up construction joint anticracking bridging arrangement and construction method are provided, it is existing to solve Lining-up construction joint in tunnel overlaps firmly easily leads to generation crack at construction joint, and traffic safety, trolley are seriously threatened after coming into operation Upper end master module overlaps firmly with casting concrete, lap-joint's leakiness, is also easy to produce spillage, and hard overlap joint will cause trolley upper end The problems such as master module deforms, and lap-joint is caused to generate faulting of slab ends.
To solve the above problems, such a lining-up construction joint anticracking bridging arrangement of proposed adoption, including lining-up trolley main mould Plate, the tail portion of lining-up trolley master module are fixed with supporting table, the upper surface of supporting table and the upper surface phase of lining-up trolley master module In parallel, and the upper surface of supporting table is lower than the upper surface of lining-up trolley master module, is equipped with rubber strip on the upper surface of supporting table, And the thickness of rubber strip is greater than the difference in height between supporting table and lining-up trolley master module upper surface.
In aforementioned lining-up trolley, the width of the rubber strip is 100-150mm, with a thickness of 40-60mm;
In aforementioned lining-up trolley, the upper surface of supporting table is set in the horizontal direction with the upper surface of lining-up trolley master module It sets, and there are the difference in height of 20mm between the upper surface of supporting table and the upper surface of lining-up trolley master module, the rubber strip is With a thickness of the rectangular rubber item of 40mm, the compressible amount of rubber strip is at least the 50% of rubber strip thickness;
In aforementioned lining-up trolley, the supporting table is that the design radian circumferential direction along lining-up trolley master module tail portion welds installation Angle steel or channel steel, one end of supporting table is fixedly welded on the tail portion of lining-up trolley master module, is provided on the downside of supporting table tiltedly Support, one end of diagonal brace are fixedly welded on the other end of the supporting table, and the other end of diagonal brace is also fixedly welded on lining-up trolley master The tail portion of template;
The present invention also provides a kind of lining-up construction joint anticracking lapping construction methods, and the specific method is as follows:
When tunnel lining-up is constructed, mobile lining-up trolley makes lining-up trolley master module be moved to the underface of the following group lining-up, rubber Adhesive tape is located at the underface of upper group of lining-up, slowly jacks lining-up trolley hydraulic cylinder, rubber strip and lining-up trolley master module are gradually Rising, rubber strip is first in contact with upper group of lining-up, then continues to jack, until lining-up trolley master module rises to design position, At this point, rubber strip is compressed, and closely overlaps with the lower end of upper group of lining-up, that is, realizes and handled with the soft overlap joint of upper group of lining-up, institute Stating group lining-up is the upper group of secondary lining-up concrete poured, and the following group lining-up is the secondary lining-up coagulation of the following group to be poured Soil.
In the above method, when tunnel lining-up is constructed, lining-up trolley is moved first, so that between upper group of lining-up and the following group lining-up The side flush of construction joint and lining-up trolley master module;
Preferably, two side lower part of trolley and the overlap joint of inverted arch parapet are also constructed according to the method described above.
Compared with prior art, advantage of the present invention is as follows:
1, it is handled using soft overlap joint, lining trolley is effectively avoided effectively to evade platform with the direct overlap joint of casting concrete Vehicle Leading Edge Deformation avoids that faulting of slab ends occurs, meanwhile, it can also be effectively prevent the generation in crescent crack, deposited when eliminating high-speed rail operation Security risk, guarantee high-speed rail operation security;
2, it after compressible rubber strip is compressed, is closely overlapped with the upper group of concrete poured, construction can be effectively controlled Seam is in spillage in casting process, it is ensured that construction joint does not occur honeycomb or chip off-falling, guarantees closely knit at construction joint;
3, compressible rubber strip is reusable, low in cost.
Detailed description of the invention
Fig. 1 is the schematic view of the front view before lining-up trolley of the present invention is in place;
Fig. 2 is the schematic view of the front view after lining-up trolley of the present invention is in place, at this point, the decrement of rubber strip is 50%.
Wherein, the expression of appended drawing reference 1 lining-up trolley master module, 2 expression supporting tables, 3 expression rubber strips, 4 expression diagonal braces, 5 Lining-up is organized in expression, 6 indicate the following group lining-up, buried rubber fastening band in 7 expressions.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, the present invention is made into one below in conjunction with attached drawing The detailed description of step, it should be understood that described herein specific examples are only used to explain the present invention, is not used to limit this hair It is bright.
Embodiment
Referring to Figures 1 and 2, the present embodiment provides a kind of lining-up construction joint anticracking bridging arrangements, including lining-up trolley main mould Plate 1, the tail portion of lining-up trolley master module 1 are fixed with supporting table 2, and supporting table 2 is the design arc along 1 tail portion of lining-up trolley master module The angle steel or channel steel of the circumferential welding installation of degree, one end of supporting table 2 is fixedly welded on the tail portion of lining-up trolley master module 1, bottom According to the steel plate reinforcement of 100cm spacing welding t=10mm, specifically, the downside of supporting table 2 is provided with diagonal brace 4, and the one of diagonal brace 4 End is fixedly welded on the other end of the supporting table 2, and the other end of diagonal brace 4 is also fixedly welded on the tail of lining-up trolley master module 1 Portion, the upper surface of supporting table 2 and the upper surface of lining-up trolley master module 1 are horizontally disposed, and the upper surface of supporting table 2 Lower than the upper surface 20mm of lining-up trolley master module 1, rubber strip 3 is equipped on the upper surface of supporting table 2, rubber strip 3 is width For 100-150mm, with a thickness of the rectangular rubber item of 40mm, the compressible amount of rubber strip is at least the 50% of rubber strip thickness.
Carrying out lining-up construction joint anticracking using above-mentioned lining-up trolley, overlapped that construction method is as follows:
When tunnel lining-up is constructed, mobile lining-up trolley makes lining-up trolley master module 1 be moved to the underface of the following group lining-up, Rubber strip 3 is located at the underface of upper group of lining-up, the side of construction joint and lining-up trolley master module 1 between upper group of lining-up and the following group lining-up Face flush slowly jacks lining-up trolley hydraulic cylinder, and rubber strip 3 and lining-up trolley master module 1 are gradually increasing, and rubber strip 3 is first It is in contact with upper group of lining-up, then continues to jack, until lining-up trolley master module 1 rises to design position (lining-up trolley main mould The lower end surface flush of 1 upper surface of plate and the following group lining-up design position), at this point, rubber strip 3 is compressed, and with upper group of lining-up Lower end closely overlaps, that is, realizes and handle with the soft overlap joint of upper group of lining-up, the upper group of lining-up is the upper group of secondary lining-up poured Concrete, the following group lining-up are the secondary lining-up concrete of the following group to be poured, the overlap joint of trolley two side lower parts and inverted arch parapet Also it constructs according to the method described above.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (7)

1. a kind of lining-up construction joint anticracking bridging arrangement, including lining-up trolley master module (1), it is characterised in that: lining-up trolley master The tail portion of template (1) is fixed with supporting table (2), and the upper surface of supporting table (2) is equal with the upper surface of lining-up trolley master module (1) Row, and the upper surface of supporting table (2) is lower than the upper surface of lining-up trolley master module (1), is equipped on the upper surface of supporting table (2) Rubber strip (3), and the thickness of rubber strip (3) is greater than the height between supporting table (2) and lining-up trolley master module (1) upper surface Difference.
2. a kind of lining-up construction joint anticracking bridging arrangement according to claim 1, it is characterised in that: the rubber strip (3) Width is 100-150mm, with a thickness of 40-60mm.
3. a kind of lining-up construction joint anticracking bridging arrangement according to claim 1, it is characterised in that: the supporting table (2) is Along the angle steel or channel steel of the design radian circumferential direction welding installation of lining-up trolley master module (1) tail portion, one end welding of supporting table (2) It is fixed on the tail portion of lining-up trolley master module (1), is provided on the downside of supporting table (2) diagonal brace (4), one end welding of diagonal brace (4) It is fixed on the other end of the supporting table (2), the other end of diagonal brace (4) is also fixedly welded on the tail of lining-up trolley master module (1) Portion.
4. a kind of lining-up construction joint anticracking bridging arrangement according to claim 2, it is characterised in that: the upper end of supporting table (2) Face and the upper surface of lining-up trolley master module (1) are horizontally disposed, and the upper surface of supporting table (2) and lining-up trolley master There are the difference in height of 20mm between the upper surface of template (1), the rubber strip (3) is the rectangular rubber item with a thickness of 40mm, rubber The compressible amount of adhesive tape is at least the 50% of rubber strip thickness.
5. carrying out lining-up construction joint anticracking overlapped construction method using lining-up trolley any in claim 1-4, feature exists In the specific method is as follows:
When tunnel lining-up is constructed, mobile lining-up trolley makes lining-up trolley master module (1) be moved to the underface of the following group lining-up, rubber Adhesive tape (3) is located at the underface of upper group of lining-up, slowly jacks lining-up trolley hydraulic cylinder, rubber strip (3) and lining-up trolley main mould Plate (1) is gradually increasing, and rubber strip (3) is first in contact with upper group of lining-up, then continues to jack, until lining-up trolley master module (1) Design position is risen to, at this point, rubber strip (3) is compressed, and closely overlaps with the lower end of upper group of lining-up, that is, is realized and upper group of block The soft overlap joint processing of lining, the upper group of lining-up are the upper group of secondary lining-up concrete poured, and the following group lining-up is wait pour The secondary lining-up concrete of the following group.
6. method according to claim 5, it is characterised in that: when tunnel lining-up is constructed, lining-up trolley is moved first, so that on The side flush of construction joint and lining-up trolley master module (1) between group lining-up and the following group lining-up, then slowly jacks lining-up platform Vehicle hydraulic cylinder.
7. method according to claim 5, it is characterised in that: the overlap joint of two side lower part of trolley and inverted arch parapet is also according to above-mentioned Method is constructed.
CN201811059873.4A 2018-09-12 2018-09-12 A kind of lining-up construction joint anticracking bridging arrangement and construction method Pending CN108952754A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811059873.4A CN108952754A (en) 2018-09-12 2018-09-12 A kind of lining-up construction joint anticracking bridging arrangement and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811059873.4A CN108952754A (en) 2018-09-12 2018-09-12 A kind of lining-up construction joint anticracking bridging arrangement and construction method

Publications (1)

Publication Number Publication Date
CN108952754A true CN108952754A (en) 2018-12-07

Family

ID=64476413

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811059873.4A Pending CN108952754A (en) 2018-09-12 2018-09-12 A kind of lining-up construction joint anticracking bridging arrangement and construction method

Country Status (1)

Country Link
CN (1) CN108952754A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114251110A (en) * 2021-12-30 2022-03-29 中铁十九局集团第六工程有限公司 Cast lining lapping device, tunnel lining trolley and tunnel construction method
CN114941258A (en) * 2022-06-23 2022-08-26 中铁十八局集团有限公司 Anti-cracking construction method for concrete track bed slab of CRTS I type double-block ballastless track of high-speed railway tunnel

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205778915U (en) * 2016-05-25 2016-12-07 中国水利水电第十四工程局有限公司 A kind of soft bridging arrangement of concrete lining trolley
CN206513379U (en) * 2017-02-18 2017-09-22 中铁华铁工程设计集团有限公司 Lining construction reserves the Tunnel Second Lining formwork jumbo of V-groove structure
CN107448216A (en) * 2017-09-25 2017-12-08 中铁十七局集团第工程有限公司 A kind of tunnel trolley seaming die anti-crack device
CN207554074U (en) * 2017-12-20 2018-06-29 中铁五局集团第二工程有限责任公司 A kind of soft bridging arrangement of tunnel lining trolley
CN208734341U (en) * 2018-09-12 2019-04-12 中铁二局第一工程有限公司 A kind of lining-up construction joint anticracking bridging arrangement

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205778915U (en) * 2016-05-25 2016-12-07 中国水利水电第十四工程局有限公司 A kind of soft bridging arrangement of concrete lining trolley
CN206513379U (en) * 2017-02-18 2017-09-22 中铁华铁工程设计集团有限公司 Lining construction reserves the Tunnel Second Lining formwork jumbo of V-groove structure
CN107448216A (en) * 2017-09-25 2017-12-08 中铁十七局集团第工程有限公司 A kind of tunnel trolley seaming die anti-crack device
CN207554074U (en) * 2017-12-20 2018-06-29 中铁五局集团第二工程有限责任公司 A kind of soft bridging arrangement of tunnel lining trolley
CN208734341U (en) * 2018-09-12 2019-04-12 中铁二局第一工程有限公司 A kind of lining-up construction joint anticracking bridging arrangement

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114251110A (en) * 2021-12-30 2022-03-29 中铁十九局集团第六工程有限公司 Cast lining lapping device, tunnel lining trolley and tunnel construction method
CN114941258A (en) * 2022-06-23 2022-08-26 中铁十八局集团有限公司 Anti-cracking construction method for concrete track bed slab of CRTS I type double-block ballastless track of high-speed railway tunnel
CN114941258B (en) * 2022-06-23 2023-05-23 中铁十八局集团有限公司 Anti-cracking construction method for CRTS I type double-block ballastless track concrete track slab of high-speed railway tunnel

Similar Documents

Publication Publication Date Title
CN106087757B (en) A high position in box beam erection falls beam construction method
CN102152392B (en) Hydraulic device for moulding board of precast beam
CN108952754A (en) A kind of lining-up construction joint anticracking bridging arrangement and construction method
CN105134253A (en) Tunnel inverted arch combined integrated template and method for concreting construction
CN208105050U (en) A kind of wet seam construction formwork of bridge
CN102926504B (en) Construction method of steel and concrete overlapped beam combined part
CN202658532U (en) Bridge wet joint construction template
CN208734341U (en) A kind of lining-up construction joint anticracking bridging arrangement
CN110029674A (en) A kind of bracing demolition and basement construction method for deep basal pit
CN202132071U (en) Filling and sealing mould for roadway slope expansion for pillarless mining for fully mechanized sublevel caving face
CN105134250A (en) Support disassembly-free and direct lining method for weak surrounding rock subway station
CN104452825A (en) Post-cast strip replacing supporting structure used for disassembling building envelope support
CN203821878U (en) Integral horizontal moving device for building with foundation
CN205115970U (en) Cement concrete way face mould board and braced system in way engineering of airport field
CN212985234U (en) Soft overlap joint device of tunnel lining
CN218116062U (en) Fabricated support formwork for fluid casting
CN212130509U (en) Slurry leakage prevention structure for template tail of tunnel secondary lining trolley
CN205243526U (en) Two hinge ear structure tunnel secondary lining end mould construction installation equipment
CN114294019A (en) Cast lining lapping device, tunnel lining trolley and tunnel construction method
CN109355987A (en) Groove-shape rail bending track device and method
CN205399216U (en) Mould is demolishd in step to ballastless track precast box girder end mould
CN212105895U (en) Additional member adapted to curved and straight line tunnel for preventing lining joint from staggering and leaking slurry
CN107554692B (en) A kind of method for loading of ship side structure body
CN104153386B (en) Pile foundation support table periphery facade bed course tool-type punching block and construction method thereof
CN207582971U (en) Pump line bearing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination