CN108952308A - The installation method of communication shaft tower on slope - Google Patents

The installation method of communication shaft tower on slope Download PDF

Info

Publication number
CN108952308A
CN108952308A CN201810893498.7A CN201810893498A CN108952308A CN 108952308 A CN108952308 A CN 108952308A CN 201810893498 A CN201810893498 A CN 201810893498A CN 108952308 A CN108952308 A CN 108952308A
Authority
CN
China
Prior art keywords
pit
pieces
support rod
shaft tower
impeller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810893498.7A
Other languages
Chinese (zh)
Inventor
秦阔
章跃军
姚云龙
张佚伦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaxin Consulting Co Ltd
Original Assignee
Huaxin Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaxin Consulting Co Ltd filed Critical Huaxin Consulting Co Ltd
Priority to CN201810893498.7A priority Critical patent/CN108952308A/en
Publication of CN108952308A publication Critical patent/CN108952308A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • E04H12/344Arrangements for lifting tower sections for placing additional sections under them

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a kind of installation methods of the communication shaft tower on slope, include the following steps: the pit for excavating circular in cross-section on the slope, the casting concrete layer on pit bottom surface;The cylinder of casting concrete in the middle part of pit;The support rod for communicating shaft tower is sling using tool, makes support rod state in a vertical shape, support rod bottom is fixedly connected with cylinder upper end;3 supporting elements evenly distributed in the circumferential direction in pit;The casting concrete between pit side wall and cylinder makes concrete full of pit;3 hounds are installed in support rod lower part, 3 hound lower ends are equipped with connecting plate, are equipped with bolt hole on 3 pieces of connecting plates;The present invention has stability good, and at low cost, light weight, high temperature resistant, anti-corrosion are anti-aging, non-maintaining, easy carrying, good in economic efficiency feature.

Description

The installation method of communication shaft tower on slope
Technical field
The present invention relates to technical field of communication equipment, on the slope low more particularly, to a kind of construction cost, stability is good Elastic shaft tower installation method.
Background technique
Communication shaft tower used today mainly uses steel to make, and steel structure performance is stable, product is mature, becomes communication pole The preferred material of tower production, but steel there are weight big, difficults, it is perishable the disadvantages of, for construction in high mountain, rock Shaft tower under the scenes such as area is small can be used in matter, and cost can be increase accordingly, and stability is poor.
Summary of the invention
Goal of the invention of the invention be in order to overcome the shortcomings of that communication shaft tower in the prior art is at high cost, stability is poor, Provide the installation method of the elastic shaft tower on the slope that a kind of construction cost is low, stability is good.
To achieve the goals above, the invention adopts the following technical scheme:
A kind of installation method of communication shaft tower on slope, includes the following steps:
(1-1) excavates the pit of circular in cross-section on the slope, the casting concrete layer on pit bottom surface;
(1-2) in the middle part of pit casting concrete cylinder;
(1-3) is sling the support rod for communicating shaft tower using tool, makes support rod state in a vertical shape, by support rod bottom with Cylinder upper end is fixedly connected;
(1-4) 3 supporting elements evenly distributed in the circumferential direction in pit;
(1-5) casting concrete between pit side wall and cylinder makes concrete full of pit;
(1-6) installs 3 hounds in support rod lower part, and 3 hound lower ends are equipped with connecting plate, on 3 pieces of connecting plates It is equipped with bolt hole;
3 screw rods are each passed through 3 bolts hole by (1-7), are shaken 3 screw rod upper ends of impact with jump bit, are made 3 spiral shells Bar moves gradually downward;
Each screw rod lower part is all provided with fluted, and the shaft in groove is connect with two pieces of impeller;
After corresponding supporting element struts two pieces of impeller of each screw rod, the rotation to the left and right respectively of two pieces of impeller lower parts It opens;
(1-8) screws on nut on 3 bolts after the concrete in pit solidifies.
The present invention is not only suitble to the installation communication shaft tower on the biggish hillside of the ratio of slope, is also suitble to pacify on flat ground Dress communication shaft tower;After the concrete in pit solidifies, rotation is opened to the left and right respectively for two pieces of impeller lower parts of each screw rod, To which 3 hounds and the coagulation soil stabilization in pit be fixed, it is ensured that the stability of shaft tower is communicated,
Preferably, the flange that the support rod bottom is equipped with steel bushing and connect with steel bushing lower end, flange passes through swollen Swollen screw is fixedly connected with cylinder upper end.
Preferably, the supporting element includes bottom plate and riser set on the bottom plate.
Preferably, two pieces of impeller are rectangle, two pieces of blade lower parts are trapezoidal, when two pieces of impeller are closed, two pieces The v-shaped opening that Open Side Down is formed in the middle part of impeller lower end, two pieces of impeller are equipped with groove, are equipped with aluminium in groove and fetter ring.
Preferably, the support rod is made of polyurethane glass fibrous composite.
The present invention using polyurethane glass fibrous composite production support club body, using section steel manufacture hound etc. its Its component is reliably connected with composite material shaft, realizes lightweight, high-strength advanced composite material (ACM) answering on communication shaft tower With the moulding for increasing communication shaft tower selects, and is suitable for housing roof, high mountain mountain top, rocky ground etc. and builds scene, supplements Communicate diversity of the shaft tower on material selection and moulding.
Polyurethane glass fibrous composite has light weight, high slight, high temperature resistant, anti-corrosion anti-aging, non-maintaining, easily remove The advantages that fortune, can be used for a variety of harsh environments such as high mountain, rock geology.Using such new material support rod, it is convenient to make, and exempts from In maintenance, certain economic benefit can be reached.
It is connect preferably, 3 hounds pass through anchor ear with support rod.
Therefore, it is good that the invention has the following beneficial effects: stability, and at low cost, light weight, high temperature resistant, anti-corrosion are anti-aging, Non-maintaining, easy carrying, it is good in economic efficiency.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of pit of the invention;
Fig. 2 is a kind of front view of supporting element and screw rod of the invention;
Fig. 3 is a kind of side view of supporting element and screw rod of the invention;
Fig. 4 is a kind of structural schematic diagram of support rod of the invention.
In figure: pit 1, cylinder 2, support rod 3, supporting element 4, hound 5, screw rod 6, steel bushing 31, flange 32, bottom plate 41, riser 42, connecting plate 51, impeller 61, nut 62, v-shaped opening 63.
Specific embodiment
The present invention will be further described with reference to the accompanying drawings and detailed description.
A kind of installation method of communication shaft tower on slope, includes the following steps:
(1-1) excavates the pit 1 as shown in Figure 1 of circular in cross-section on the slope, casts on pit bottom surface mixed Solidifying soil layer;
(1-2) in the middle part of pit casting concrete cylinder 2;
(1-3) is sling the support rod 3 as shown in Figure 4 for communicating shaft tower using tool, makes support rod state in a vertical shape, will Support rod bottom is fixedly connected with cylinder upper end;
(1-4) as shown in Figure 1, Figure 2, Figure 3 shows, 3 supporting elements 4 evenly distributed in the circumferential direction in pit;3 supports The bottom plate of part passes through expansion bolt and connect with bottom surface.
(1-5) casting concrete between pit side wall and cylinder makes concrete full of pit;
(1-6) is as shown in figure 4, be equipped with connecting plate in support rod lower part installation 3 hounds, 5,3 hound lower ends Bolt hole is equipped on 51,3 pieces of connecting plates;
3 screw rods 6 are each passed through 3 bolts hole by (1-7), are shaken 3 screw rod upper ends of impact with jump bit, are made 3 spiral shells Bar moves gradually downward;
As shown in Figure 2 and Figure 3, each screw rod lower part is all provided with fluted, and the shaft in groove connects with two pieces of impeller 61 It connects;
After corresponding supporting element struts two pieces of impeller of each screw rod, the rotation to the left and right respectively of two pieces of impeller lower parts It opens;
(1-8) screws on nut 62 on 3 bolts after the concrete in pit solidifies.
As shown in figure 4, the flange 32 that support rod bottom is equipped with steel bushing 31 and connect with steel bushing lower end, flange passes through swollen Swollen screw is fixedly connected with cylinder upper end.
As shown in Figure 2 and Figure 3, supporting element includes bottom plate 41 and riser set on the bottom plate 42.Two pieces of impeller are in rectangular Shape, two pieces of blade lower parts are trapezoidal, when two pieces of impeller are closed, form the v-shaped opening that Open Side Down in the middle part of two pieces of impeller lower ends 63, two pieces of impeller are equipped with groove, are equipped with aluminium in groove and fetter ring 64.Before two pieces of impeller are contacted with corresponding supporting element, Aluminium constraint ring plays the role of preventing two pieces of impeller from opening, and after the riser of supporting element is inserted between two pieces of impeller, aluminium fetters ring It is broken.
Support rod is made of polyurethane glass fibrous composite.3 hounds pass through anchor ear and connect with support rod.
It should be understood that this embodiment is only used to illustrate the invention but not to limit the scope of the invention.In addition, it should also be understood that, After having read the content of the invention lectured, those skilled in the art can make various modifications or changes to the present invention, these etc. Valence form is also fallen within the scope of the appended claims of the present application.

Claims (6)

1. a kind of installation method of the communication shaft tower on slope, characterized in that include the following steps:
(1-1) excavates the pit (1) of circular in cross-section, the casting concrete layer on pit bottom surface on the slope;
(1-2) in the middle part of pit casting concrete cylinder (2);
(1-3) is sling the support rod (3) for communicating shaft tower using tool, and support rod state in a vertical shape is made, by support rod bottom with Cylinder upper end is fixedly connected;
(1-4) 3 supporting elements (4) evenly distributed in the circumferential direction in pit;
(1-5) casting concrete between pit side wall and cylinder makes concrete full of pit;
(1-6) installs 3 hounds (5) in support rod lower part, and 3 hound lower ends are equipped with connecting plate (51), 3 pieces of connecting plates On be equipped with bolt hole;
3 screw rods (6) are each passed through 3 bolts hole by (1-7), are shaken 3 screw rod upper ends of impact with jump bit, are made 3 screw rods It moves gradually downward;
Each screw rod lower part is all provided with fluted, and the shaft in groove is connect with two pieces of impeller (61);
After corresponding supporting element struts two pieces of impeller of each screw rod, rotation is opened to the left and right respectively for two pieces of impeller lower parts;
(1-8) screws on nut (62) after the concrete in pit solidifies on 3 bolts.
2. the installation method of the communication shaft tower on slope according to claim 1, characterized in that the support rod bottom is set The flange (32) for having steel bushing (31) and connecting with steel bushing lower end, flange are fixedly connected by swell fixture with cylinder upper end.
3. the installation method of the communication shaft tower on slope according to claim 1, characterized in that the supporting element includes bottom Plate (41) and riser set on the bottom plate (42).
4. the installation method of the communication shaft tower on slope according to claim 1, characterized in that two pieces of impeller are in rectangular Shape, two pieces of blade lower parts are trapezoidal, when two pieces of impeller are closed, form the v-shaped opening that Open Side Down in the middle part of two pieces of impeller lower ends (63), two pieces of impeller are equipped with groove, are equipped with aluminium constraint ring (64) in groove.
5. the installation method of the communication shaft tower on slope according to claim 1, characterized in that the support rod is using poly- Urethane glass fiber compound material is made.
6. the installation method of the communication shaft tower on slope described according to claim 1 or 2 or 3 or 4 or 5, characterized in that 3 Hound passes through anchor ear and connect with support rod.
CN201810893498.7A 2018-08-02 2018-08-02 The installation method of communication shaft tower on slope Pending CN108952308A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810893498.7A CN108952308A (en) 2018-08-02 2018-08-02 The installation method of communication shaft tower on slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810893498.7A CN108952308A (en) 2018-08-02 2018-08-02 The installation method of communication shaft tower on slope

Publications (1)

Publication Number Publication Date
CN108952308A true CN108952308A (en) 2018-12-07

Family

ID=64468162

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810893498.7A Pending CN108952308A (en) 2018-08-02 2018-08-02 The installation method of communication shaft tower on slope

Country Status (1)

Country Link
CN (1) CN108952308A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1362989A (en) * 1970-10-26 1974-08-14 Fischer Artur Wall plug
CN2844543Y (en) * 2005-08-15 2006-12-06 武汉武大巨成加固实业有限公司 Fast butt anchoring bolt for installing concrete
CN201661108U (en) * 2010-03-18 2010-12-01 湖南省通信建设有限公司 Inclined support for fixing self-supporting holding pole
CN202768570U (en) * 2011-08-02 2013-03-06 裴春光 Shearing type expansion bolt
CN106121343A (en) * 2016-08-25 2016-11-16 无锡市同腾复合材料有限公司 Compound polyurethane material electric pole and installation method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1362989A (en) * 1970-10-26 1974-08-14 Fischer Artur Wall plug
CN2844543Y (en) * 2005-08-15 2006-12-06 武汉武大巨成加固实业有限公司 Fast butt anchoring bolt for installing concrete
CN201661108U (en) * 2010-03-18 2010-12-01 湖南省通信建设有限公司 Inclined support for fixing self-supporting holding pole
CN202768570U (en) * 2011-08-02 2013-03-06 裴春光 Shearing type expansion bolt
CN106121343A (en) * 2016-08-25 2016-11-16 无锡市同腾复合材料有限公司 Compound polyurethane material electric pole and installation method thereof

Similar Documents

Publication Publication Date Title
CN208844756U (en) A kind of assembled arthitecutral structure
CN104975744A (en) Power transmission wireless equipment
CN103510727B (en) Man-made ski system
CN209082697U (en) A kind of large-scale disjunctor steel construction that shock resistance is strong
CN108952308A (en) The installation method of communication shaft tower on slope
CN106592456A (en) Railway line subsidiary facilities and mounting method thereof
CN207260727U (en) A kind of combined type power transmission steel pipe tower
CN105780966B (en) Rapid template system for on-site spraying and building wall
CN208266890U (en) The safeguard structure of hydraulic and hydroelectric engineering side slope
CN206369009U (en) A kind of natural gas line supporting construction
CN202830960U (en) Intelligent intermittent bailing type pumping unit steel structure foundations
CN201443218U (en) Antitheft stayguy
CN203947637U (en) A kind of syndeton of Glass Rib
CN107654106A (en) Electric power pylon column foot replacing options
CN208088266U (en) There is the simple wellhead structure of support
CN209099571U (en) A kind of villa exterior wall insulated structure
CN107732813A (en) A kind of communications cable walks line trenches
CN207261175U (en) A kind of duplicate protection formula wind turbine tower
CN206800452U (en) A kind of assembled pipe gallery support of industrialized production
CN105347758A (en) Pole shock-resistant mechanism of
CN107217903B (en) One kind controlling the departing electric pole of lower casing based on rope
CN206255129U (en) A kind of motorcycle pedal attachment structure
CN205530248U (en) Retrieve anchor rope device of uninstalling outward
CN201198667Y (en) Novel resin composite material single tube tower
CN104705264A (en) Environmentally-friendly fishing weight easy to dismantle and fishing tool

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181207