CN108952216A - A kind of form for construction engineering support device - Google Patents

A kind of form for construction engineering support device Download PDF

Info

Publication number
CN108952216A
CN108952216A CN201811024766.8A CN201811024766A CN108952216A CN 108952216 A CN108952216 A CN 108952216A CN 201811024766 A CN201811024766 A CN 201811024766A CN 108952216 A CN108952216 A CN 108952216A
Authority
CN
China
Prior art keywords
plate
support
construction engineering
support device
fixedly welded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811024766.8A
Other languages
Chinese (zh)
Inventor
章以峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anji Mingsheng Construction Engineering Co Ltd
Original Assignee
Anji Mingsheng Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anji Mingsheng Construction Engineering Co Ltd filed Critical Anji Mingsheng Construction Engineering Co Ltd
Priority to CN201811024766.8A priority Critical patent/CN108952216A/en
Publication of CN108952216A publication Critical patent/CN108952216A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • E04G25/04Shores or struts; Chocks telescopic

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention belongs to building engineering equipment technical fields, specially a kind of form for construction engineering support device, including bottom plate, pedestal is fixedly welded on the bottom plate, the surface of the pedestal is successively arranged two connectors up and down, driving screw rod is equipped between two connectors, the outside screw of the driving screw rod is arranged with symmetrically arranged two movable blocks, two movable blocks are rotatably connected to support rod between two connectors respectively, top solder is consolidated at the top of one in two connectors and pedestal, axle sleeve is fixedly welded on another connector, the inside of the axle sleeve is equipped with support column and is bolted to connection, the upper end of the support column is arranged with support plate and adjusting block.Structure of the invention is stablized, easy to operate, is easily installed and dismantles, and reduces to the technical requirements of staff, can save a large amount of time and efforts of staff, to shorten or duration in advance, improves construction labor productivity.

Description

A kind of form for construction engineering support device
Technical field
The present invention relates to building engineering equipment technical field more particularly to a kind of form for construction engineering support devices.
Background technique
Construction time in whole building life is very short, but its influence to environment is very big, to resource and the energy Consumption be also very to concentrate.It is called in response to the green construction of the Ministry of Construction, in actual product in use, realizing as far as possible The repeatability of more numbers utilizes.Early-dismantling formwork system is poured for concrete, concrete steel building or structures Support system comprising scaffold and template forms casting beams by the top plate of support column and concrete beam and board form assembly Or the end template of plate.When beam or plate it is concrete curing to a certain degree when, the dismounting to template is realized by Zao Chai mechanism, is poured Build when beam or plate are continued by the top plate of support column and supported to concrete strength as defined in specification to remove completely.The template early torn open is used In turning layer or transition, to shorten or duration in advance, construction labor productivity is improved, while template input quantity can be reduced, Reduce construction cost.
In the prior art, support construction is torn open there are many early, still, the composed structure that existing morning tears support construction open is complicated, Installation procedure is more, high to the skill requirement of construction personnel.In the actual implementation process, how simply and easily to realize early to part It tears the dismounting of supporting element open, and is able to maintain and the concrete roof that not fully achieved demoulding condition is effectively supported, become early and tear construction open Difficult point in the process.
Therefore, the existing technology needs to be improved and developed.
The information disclosed in the background technology section is intended only to increase the understanding to general background of the invention, without answering When being considered as recognizing or imply that the information constitutes the prior art already known to those of ordinary skill in the art in any form.
Summary of the invention
1. technical problems to be solved
The purpose of the present invention is to solve mould plate supporting device in the prior art structure is complicated installation and operational sequence it is more Problem, while, claim for eot higher to installing and dismounting worker's technical requirements are unfavorable for the prefabricated work effect with later period disassembly of template The raising of rate, and a kind of form for construction engineering support device proposed.
2. technical solution
To achieve the goals above, present invention employs following technical solutions:
A kind of form for construction engineering support device, including bottom plate are fixedly welded with pedestal on the bottom plate, and the pedestal is just Top is successively arranged two connectors up and down, and driving screw rod, the outside of the driving screw rod are equipped between two connectors Two movable blocks that thread bush is provided symmetrically, two movable blocks are rotatably connected to branch between two connectors respectively Top solder is consolidated at the top of strut, one in two connectors and pedestal, is fixedly welded with axle sleeve on another connector, The inside of the axle sleeve is equipped with support column and is bolted to connection, and the upper end of the support column is arranged with support plate and adjusting Block, the inner rotation of the support plate are connected with limit plate, and the limit plate is set in the outside of support column and consolidates with adjusting block It is fixed to connect, it is fixedly welded with support tube at the top of the support plate, is fixedly welded with supporting plate at the top of the support tube.
Preferably, the supporting plate is equipped with groove, and the inside of the groove is equipped with backing plate, and the surface of the backing plate is equipped with Stripper plate is connected between the stripper plate and backing plate by guide pillars and bushes, and the outer sheath of guide post is equipped with spring.
Preferably, rubber pad is fixedly installed at the top of the stripper plate.
Preferably, iron hoop is fixedly welded with by several steel columns on the adjusting block.
Preferably, the outside fixing sleeve of the iron hoop is equipped with sponges cover, and the outside that sponges cover is searched by Soviet Union is equipped with anti-skid chequer.
Preferably, several stiffening plates, the upper and lower ends point of the stiffening plate are fixedly welded on the outside of the support tube It is not fixedly welded with supporting plate and support plate.
Preferably, one end of the driving screw rod is fixedly welded with adjusting ring.
Preferably, annular groove is equipped between the support plate and adjusting block, the internal slide of the annular groove is connected with multiple steel Pearl.
3. beneficial effect
Compared with the prior art, the present invention has the advantages that
1, structure of the invention is stablized, and easy to operate, design is scientific and reasonable, is easily installed and dismantles, and reduces the skill to staff Art requirement, can save a large amount of time and efforts of staff, to shorten or duration in advance, improve construction labour production Rate.
2, with short production cycle, low manufacture cost, anti-seismic performance is good, and the service life is received in the use for improving support device, is conducive to back It receives and reuses, while template input quantity can be reduced, reduce construction cost.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of form for construction engineering support device proposed by the present invention;
Fig. 2 is the cross-sectional view of mould plate supporting device;
Fig. 3 is the partial enlargement diagram in Fig. 2 at A.
In figure: 1- rubber pad, 2- spring, 3- backing plate, 4- supporting plate, 5- iron hoop, 6- steel column, 7- support column, 8- drive screw rod, 9- stripper plate, 10- guide sleeve, 11- guide post, 12- stiffening plate, 13- sponges cover, 14- axle sleeve, 15- bolt, 16- connector, 17- branch Strut, 18- movable block, 19- adjust ring, 20- pedestal, 21- bottom plate, 22- support plate, 23- support tube, 24- limit plate, 25- steel Pearl, 26- adjusting block.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
In the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" be based on the orientation or positional relationship shown in the drawings, merely to Convenient for description the present invention and simplify description, rather than the device or element of indication or suggestion meaning must have a particular orientation, It is constructed and operated in a specific orientation, therefore is not considered as limiting the invention.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition Concrete meaning in invention.
Referring to Fig.1-3, a kind of form for construction engineering support device, including bottom plate 21 are fixedly welded with bottom on bottom plate 21 Seat 20, the surface of pedestal 20 are successively arranged two connectors 16 up and down, driving screw rod 8 are equipped between two connectors 16, is driven The outside screw of dynamic screw rod 8 is arranged with symmetrically arranged two movable blocks 18, two movable blocks 18 respectively with two connectors 16 Between be rotatably connected to support rod 17, to constitute lifting adjusting structure, the top of one in two connectors 16 and pedestal 20 Portion consolidates top solder, and axle sleeve 14 is fixedly welded on another connector 16, and the inside of axle sleeve 14 is equipped with support column 7 and passes through bolt 15 are fixedly connected, and the upper end of support column 7 is arranged with support plate 22 and adjusting block 26, and the inner rotation of support plate 22 is connected with limit Plate 24, limit plate 24 are set in the outside of support column 7 and are fixedly connected with adjusting block 26, and the top of support plate 22 is fixedly welded with Support tube 23, the top of support tube 23 are fixedly welded with supporting plate 4, to constitute the support construction of template.
In the present invention, supporting plate 4 is equipped with groove, and the inside of groove is equipped with backing plate 3, and the surface of backing plate 3 is equipped with stripper plate 9, it is connected between stripper plate 9 and backing plate 3 by guide post 11 and guide sleeve 10, and the outer sheath of guide post 11 is equipped with spring 2, stripper plate 9 Top be fixedly installed rubber pad 1, using when supporting weak structure, have the function of centainly supporting and buffering, guarantor Protection unit and stability is improved, is fixedly welded with iron hoop 5, the outside fixing sleeve of iron hoop 5 by several steel columns 6 on adjusting block 26 Equipped with sponges cover 13, the outside that sponges cover 13 is searched by Soviet Union is equipped with anti-skid chequer, and to facilitate rotation adjusting block 26, use is more convenient, The outside of support tube 23 is fixedly welded with several stiffening plates 12, the upper and lower ends of stiffening plate 12 respectively with supporting plate 4 and support plate 22 are fixedly welded, and to improve support strength, prolong the service life, one end of driving screw rod 8, which is fixedly welded with, adjusts ring 19, uses To facilitate worker to adjust support support device height by tool, annular groove is equipped between support plate 22 and adjusting block 26, annular groove Internal slide is connected with multiple steel balls 25, and to reduce the frictional force between support plate 22 and adjusting block 26, sliding friction is turned Turn to the rolling friction of steel ball 25.
Support device: when template installs and uses the support device, being placed on the underface of supporting point by working principle, will Reinforcement rod or spanner insertion adjust ring 19 inside, rotate driving screw rod 8, make two movable blocks 18 driving screw rod 18 on to Centre is mobile, and axle sleeve 14 is pushed to the adjusting block 26 of the support upper end upwards of support column 7, thus make support plate 22 push supporting plate 4 to Upper support shuttering bottom, and be subject to carry out device to guarantee that support device has compression template not topple over for fixation Locking fine tuning holds iron hoop 5 and rotates adjusting block 25, rotates adjusting block 26 on 7 threaded upper ends of support column and push up support Plate 22 squeezes supporting plate 4 to template plate tighter, guarantees the reliable and stable of support device.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (8)

1. a kind of form for construction engineering support device, including bottom plate (21), which is characterized in that fixed weldering on the bottom plate (21) It is connected to pedestal (20), the surface of the pedestal (20) is successively arranged two connectors (16), two connectors up and down (16) driving screw rod (8) is equipped between, the outside screw of driving screw rod (8) is arranged with symmetrically arranged two movable blocks (18), two movable blocks (18) are rotatably connected to support rod (17) between two connectors (16) respectively, described in two Top solder is consolidated at the top of one in connector (16) and pedestal (20), is fixedly welded with axle sleeve on another connector (16) (14), the inside of the axle sleeve (14) is equipped with support column (7) and is fixedly connected by bolt (15), the support column (7) it is upper End cap is equipped with support plate (22) and adjusting block (26), and the inner rotation of the support plate (22) is connected with limit plate (24), described Limit plate (24) is set in the outside of support column (7) and is fixedly connected with adjusting block (26), and the top of the support plate (22) is solid Surely it is welded with support tube (23), is fixedly welded with supporting plate (4) at the top of the support tube (23).
2. a kind of form for construction engineering support device according to claim 1, which is characterized in that on the supporting plate (4) Equipped with groove, the inside of the groove is equipped with backing plate (3), and the surface of the backing plate (3) is equipped with stripper plate (9), the extruding It is connected between plate (9) and backing plate (3) by guide post (11) and guide sleeve (10), and the outer sheath of guide post (11) is equipped with spring (2).
3. a kind of form for construction engineering support device according to claim 2, which is characterized in that the stripper plate (9) Top be fixedly installed rubber pad (1).
4. a kind of form for construction engineering support device according to claim 1, which is characterized in that the adjusting block (26) It is upper to be fixedly welded with iron hoop (5) by several steel columns (6).
5. a kind of form for construction engineering support device according to claim 4, which is characterized in that the iron hoop (5) Outside fixing sleeve is equipped with sponges cover (13), and the outside that sponges cover (13) is searched by Soviet Union is equipped with anti-skid chequer.
6. a kind of form for construction engineering support device according to claim 1, which is characterized in that the support tube (23) Outside be fixedly welded with several stiffening plates (12), the upper and lower ends of the stiffening plate (12) respectively with supporting plate (4) and support Plate (22) is fixedly welded.
7. a kind of form for construction engineering support device according to claim 1, which is characterized in that the driving screw rod (8) one end, which is fixedly welded with, adjusts ring (19).
8. a kind of form for construction engineering support device according to claim 1, which is characterized in that the support plate (22) Annular groove is equipped between adjusting block (26), the internal slide of the annular groove is connected with multiple steel balls (25).
CN201811024766.8A 2018-09-04 2018-09-04 A kind of form for construction engineering support device Pending CN108952216A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811024766.8A CN108952216A (en) 2018-09-04 2018-09-04 A kind of form for construction engineering support device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811024766.8A CN108952216A (en) 2018-09-04 2018-09-04 A kind of form for construction engineering support device

Publications (1)

Publication Number Publication Date
CN108952216A true CN108952216A (en) 2018-12-07

Family

ID=64476020

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811024766.8A Pending CN108952216A (en) 2018-09-04 2018-09-04 A kind of form for construction engineering support device

Country Status (1)

Country Link
CN (1) CN108952216A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110094049A (en) * 2019-05-06 2019-08-06 安徽企服工程技术有限公司 Support is quickly early torn in a kind of architectural engineering open
CN111424979A (en) * 2020-04-02 2020-07-17 闻建忠 Connecting and supporting structure for building template
CN115929079A (en) * 2022-10-25 2023-04-07 中铁广州工程局集团有限公司 Ultrahigh temporary support column connecting structure and mounting and dismounting process

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE7708148U1 (en) * 1976-04-27 1977-08-18 Acrow-Engineers Ltd., London FASTENING DEVICE FOR CONSTRUCTION SUBSTRUCTION
CN2185771Y (en) * 1993-08-13 1994-12-21 阎友光 Adjustable strut early dismounting device for casting reinforced concrete mould plate
CA2112722A1 (en) * 1993-12-31 1995-07-01 Joseph A. Skouras Lifting and Shoring Jack Assembly
CN1427122A (en) * 2001-12-17 2003-07-02 有限会社三光 Cutter for round cutting to pave and cutting method thereof
DE102010027890A1 (en) * 2010-04-16 2011-12-01 Harsco Infrastructure Services Gmbh Multi-piece sleeve-like connecting element for attaching stiffeners on inner tube of e.g. vertical pipes, has stiffeners uniformly arranged in specific distance at specific angle around connecting element
CN105040971A (en) * 2015-08-07 2015-11-11 福建工程学院 Early-dismantling levelling jacking for concrete structure formwork
CN208907317U (en) * 2018-09-04 2019-05-28 安吉铭盛建设工程有限公司 A kind of form for construction engineering support device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE7708148U1 (en) * 1976-04-27 1977-08-18 Acrow-Engineers Ltd., London FASTENING DEVICE FOR CONSTRUCTION SUBSTRUCTION
CN2185771Y (en) * 1993-08-13 1994-12-21 阎友光 Adjustable strut early dismounting device for casting reinforced concrete mould plate
CA2112722A1 (en) * 1993-12-31 1995-07-01 Joseph A. Skouras Lifting and Shoring Jack Assembly
CN1427122A (en) * 2001-12-17 2003-07-02 有限会社三光 Cutter for round cutting to pave and cutting method thereof
DE102010027890A1 (en) * 2010-04-16 2011-12-01 Harsco Infrastructure Services Gmbh Multi-piece sleeve-like connecting element for attaching stiffeners on inner tube of e.g. vertical pipes, has stiffeners uniformly arranged in specific distance at specific angle around connecting element
CN105040971A (en) * 2015-08-07 2015-11-11 福建工程学院 Early-dismantling levelling jacking for concrete structure formwork
CN208907317U (en) * 2018-09-04 2019-05-28 安吉铭盛建设工程有限公司 A kind of form for construction engineering support device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110094049A (en) * 2019-05-06 2019-08-06 安徽企服工程技术有限公司 Support is quickly early torn in a kind of architectural engineering open
CN110094049B (en) * 2019-05-06 2020-12-11 安徽省华腾农业科技有限公司经开区分公司 Quick early-dismantling support for constructional engineering
CN111424979A (en) * 2020-04-02 2020-07-17 闻建忠 Connecting and supporting structure for building template
CN111424979B (en) * 2020-04-02 2021-08-24 桐乡市诺创信息科技有限公司 Connecting and supporting structure for building template
CN115929079A (en) * 2022-10-25 2023-04-07 中铁广州工程局集团有限公司 Ultrahigh temporary support column connecting structure and mounting and dismounting process

Similar Documents

Publication Publication Date Title
CN208907317U (en) A kind of form for construction engineering support device
CN108952216A (en) A kind of form for construction engineering support device
CN110397289A (en) A kind of comprehensive setting up girder stood in house capital and have automatic traveling function
CN100542944C (en) The method of lowering overweight structure by connecting two jacks in series
CN209195066U (en) A kind of adjustable steel lid boom support
CN201817772U (en) Slewing device for turning bridge erecting equipment
CN217325056U (en) Self-stabilizing device for building single pier column cantilever bent cap by core-piercing rod method
CN212376321U (en) Building structure reinforcing apparatus
CN211006352U (en) Pier stud template reinforced structure
CN210439163U (en) Diagonal joist supporting structure applicable to assembly and disassembly of continuous beam
CN210563401U (en) Formwork system of large-section large-load beam
CN210917735U (en) Supporting jig frame structure for large-span prestressed inhaul cable structure
CN208219443U (en) A kind of bridge pier bracing means
CN206428592U (en) A kind of prestressed stretch-draw support
CN216893561U (en) Pipe truss high altitude makeup is gone up chord and is supported
CN112878672A (en) External prestress loading device of positioning beam template system
CN216239369U (en) Adjustable support structure for civil engineering building
CN213063628U (en) Multifunctional coal mine tunneling and supporting tool
CN109577371A (en) The assembled piping lane of pile wall interaction
CN214462572U (en) Support frame for concrete construction
CN214574101U (en) Lattice column connecting structure for tower crane foundation for building construction
CN204825646U (en) Cast -in -place section formwork support structure of iron road bridge panel
CN215759559U (en) Prefabricated frame post roof beam structure convenient to aggregate erection
CN211647300U (en) Variable movable support frame structure of striding
CN216689812U (en) Connecting structure of steel structure column and beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination