CN108952117A - Fit up universal stand, paving structure and house decoration package assembly - Google Patents

Fit up universal stand, paving structure and house decoration package assembly Download PDF

Info

Publication number
CN108952117A
CN108952117A CN201710368589.4A CN201710368589A CN108952117A CN 108952117 A CN108952117 A CN 108952117A CN 201710368589 A CN201710368589 A CN 201710368589A CN 108952117 A CN108952117 A CN 108952117A
Authority
CN
China
Prior art keywords
finishing
universal stand
finishing universal
outer rim
main material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710368589.4A
Other languages
Chinese (zh)
Inventor
张引强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710368589.4A priority Critical patent/CN108952117A/en
Publication of CN108952117A publication Critical patent/CN108952117A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/20Implements for finishing work on buildings for laying flooring
    • E04F21/22Implements for finishing work on buildings for laying flooring of single elements, e.g. flooring cramps ; flexible webs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/18Implements for finishing work on buildings for setting wall or ceiling slabs or plates
    • E04F21/1838Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements
    • E04F21/1844Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements by applying them one by one
    • E04F21/185Temporary edge support brackets

Abstract

A kind of finishing universal stand, paving structure and house decoration package assembly, wherein finishing universal stand includes: multiple first beams, multiple second beams, and first beam and second beam are arranged in a crossed manner;Around first beam and the second beam outer rim, the both ends of first beam, second beam both ends connect with the outer rim;The outer rim, first beam and second beam surround finishing main material mounting portion.Using finishing universal stand of the invention by wall, floor tile, floor heating, wall facing, furred ceiling and top surface facing, indoor and outdoor wall body decoration and reconstruction of existing building etc., existing building can be kept the temperature and Decorative Construction is integrated, to building inner, external wall reducing energy consumption and decorative lamination integration construction, decoration construction efficiency is greatly promoted;Worker's technology degree of dependence is reduced, finishing precision is improved, makes entire fitting-up construction standardization, modularization.

Description

Fit up universal stand, paving structure and house decoration package assembly
Technical field
The present invention relates to decoration technology fields, and in particular to a kind of finishing universal stand, paving structure and house decoration assembling Structure.
Background technique
Existing finishing field, it is ensured that good decoration quality relies on decoration worker's technology high, finishing low precision, simultaneously Low efficiency.For example, need to first guarantee ground level during the tiling of ground, it is affixed on ground after mortar is then spread on ceramic tile Face.If decoration worker's misoperation, it is possible to beauty cannot be influenced in same plane after causing all ceramic tiles to be bonded.Separately Outside, it during tiling, needs to be affixed on ground again after each ceramic tile is spread mortar, until it is paved with ground, decoration worker's operation Time is long, and at high cost.Similar situation is also present in the installation of other finishing main materials, such as ground facing, top surface facing, wall Facial ornament surface construction etc..
Summary of the invention
Problems solved by the invention is that existing decoration efficiency is low, is required decoration worker high.
To solve the above problems, the present invention provides a kind of finishing universal stand, comprising: multiple first beams, multiple second beams, institute It states the first beam and second beam is arranged in a crossed manner;
Around the outer rim of first beam and the second beam, the both ends of first beam, the both ends of second beam and institute State outer rim connection;
The outer rim, first beam and second beam surround finishing main material mounting portion.
Optionally, the outer rim is in quadrangle, and multiple first beams are along first direction interval and are arranged in parallel, multiple Second beam is spaced and is arranged in parallel in a second direction, and the first direction is perpendicular to the second direction.
Optionally, first beam and second beam are arranged in a crossed manner and formed after connecting respectively with the outer rim multiple Through-hole, at least partly described through hole are equipped with bottom plate, and the bottom plate is equipped at least one sub-aperture.
Optionally, the through-hole is rounded, square, rectangle, polygon, triangle, diamond shape are one of, the son Hole is rounded, square, rectangle, polygon, triangle, diamond shape are one of.
Optionally, first beam is equipped with multiple along first direction extension and spaced first slot, institute The second beam is stated equipped with multiple along second direction extension and spaced second slot.
Optionally, first beam is used to be fixedly connected with portion to be fitted up with the part of the second beam juxtaposition.
Optionally, the part of the juxtaposition is additionally provided with threaded hole, for installing bolt with by the finishing universal stand It is fixed on in finishing portion.
Optionally, the outer profile of the outer rim is equipped with slot or plug connector, for splicing different finishing universal stands.
Optionally, the cross section of first beam and second beam is U-shaped.
Optionally, the opening of first beam and second beam direction portion to be fitted up.
The present invention also provides a kind of paving structures, comprising: multiple finishing universal stands described in any of the above embodiments, adjacent dress It repairs in universal stand, the outer rim of one of them is equipped with slot, and another outer rim is equipped with plug connector, the slot and the grafting The splicing of adjacent finishing universal stand is realized in part connection.
Optionally, floor or ceramic tile or wall facing or furred ceiling facing are installed on the finishing main material mounting portion.
The present invention also provides a kind of house decoration package assemblies, comprising:
Portion to be fitted up;
Finishing universal stand described in any of the above embodiments, the finishing universal stand are fixed on the portion to be fitted up;
Main material is fitted up, is installed on the finishing main material mounting portion of the finishing universal stand.
Optionally, the portion to be fitted up includes: wall or ground or top surface.
Optionally, the finishing main material includes: floor or ceramic tile or wooden facing, top surface facing.
Compared with prior art, technical solution of the present invention has the advantage that
For the present invention using finishing universal stand, finishing universal stand includes multiple first beams and multiple second beams, the first beam and the Two beams are arranged in a crossed manner and surround finishing main material mounting portion with outer rim.And first beam and the second beam it is arranged in a crossed manner and respectively and outside Multiple through-holes are formed after frame connection.Decoration worker will fit up it is general be placed on it is to be installed repair portion, portion to be fitted up can be wall or Ground or top surface.Finishing main material is installed on the finishing main material mounting portion of finishing universal stand.For example, in finishing main material mounting portion Upper installation ceramic tile, finishing main material mounting portion supports ceramic tile, then mortar or other companies are poured in the through-hole between ceramic tile and ground Material is connect, after mortar or the solidification of other connecting materials, ceramic tile can be fixed, decoration worker no longer needs to spread each ceramic tile Ground is affixed on after mortar again, greatly improves the operating efficiency of decoration worker.
Detailed description of the invention
Fig. 1 is the top view of first embodiment of the invention finishing universal stand;
Fig. 2 is the perspective view of first embodiment of the invention finishing universal stand;
Fig. 3 is the installation site relational graph of present invention finishing universal stand and portion to be fitted up, and is simply illustrated in figure wait fit up Portion and bolt;
Fig. 4 is the structural schematic diagram of installation and decoration main material on present invention finishing universal stand, also shows immovable fixture in figure The fixed part of the plug connector of main material;
Fig. 5 is side view of the present invention for the plug connector of immovable fixture main material;
Fig. 6 is the top view of second embodiment of the invention finishing universal stand.
Specific embodiment
To make the above purposes, features and advantages of the invention more obvious and understandable, with reference to the accompanying drawing to the present invention Specific embodiment be described in detail.
In the prior art, the installation and decoration main material on to finishing portion, for example, installing ceramic tile on the wall in house.If wall Body is uneven, and the ceramic tile installed is whole also uneven, influences beauty;To guarantee installed ceramic tile generally in same As soon as plane, very high to the installation level requirement of decoration worker.In addition, needing to spread each ceramic tile during tiling Wall is affixed on after mortar again, until being paved with entire wall, decoration worker's operating time is long, and at high cost.Similar situation is also deposited It is the base materials such as the installation, such as floor, plasterboard, woodwork plate of other finishing main materials.
First embodiment
With reference to Fig. 1 and Fig. 2, the present invention provides a kind of finishing universal stand 10, for promoting decoration worker to finishing portion The efficiency of installation and decoration main material.Simultaneously, it is ensured that use the finishing universal stand 10 of the invention installation and decoration on to finishing portion After main material, it is ensured that all finishing main materials are in same plane.Finishing universal stand 10 of the invention includes: multiple first beams 12, multiple second beams 13, the first beam 12 and the second beam 13 are arranged in a crossed manner;And the outer rim around the first beam 12 and the second beam 13 11, the both ends of 12 extending direction of the first beam, the both ends of 13 extending direction of the second beam are connect with outer rim 11.
The shape of first beam 12 and the second beam 13 with no restrictions, in the present embodiment, the first beam 12 and the second beam 13 it is transversal Face is U-shaped, the opening direction portion to be fitted up of the first beam 12 and the second beam 13, and the opening of the first beam 12 and the second beam 13 is also possible to Backwards to portion to be fitted up.In other embodiments, the cross section of the first beam and the second beam is in quadrangle or circle.
Outer rim 11, the first beam 12 and the second beam 13 of finishing universal stand 10 surround finishing main material mounting portion.Wherein, it fits up Main material mounting portion includes: to be total to by the part-structure of the part-structure of outer rim 11, the part-structure of the first beam 12 and the second beam 13 With the part that surrounds, as shown in figure 1 shown in a-quadrant and B area;And only by the portion of the part-structure of the first beam 12 and the second beam 13 The separation structure part arranged in a crossed manner surrounded, as shown in figure 1 shown in the region C.
It should be noted that finishing main material mounting portion is not merely part shown in a-quadrant in Fig. 1, B area and the region C, The remaining region surrounded by outer rim 11, the first beam 12 and the second beam 13 can be finishing main material mounting portion.Fit up main material installation It is mountable in portion to have floor or ceramic tile or wall facing or the other finishing materials of wooden facing or top surface facing etc..
With continued reference to Fig. 2 and Fig. 3, the first beam 12 and the second beam 13 are arranged in a crossed manner and formed after connecting respectively with outer rim 11 Multiple through-holes 14.Show 9 through-holes 14 in Fig. 2, greater number of first beam 12 and the second beam 13 is arranged in a crossed manner and the outside and Frame 11 can form greater number of through-hole 14 after connecting.Decoration worker is fixed on portion 60 to be fitted up for universal stand 10 is fitted up, to Finishing portion 60 can be wall or ground or top surface.On finishing main material mounting portion after installation and decoration main material 30, outer rim 11, the Main material 30 is fitted up in support jointly for one beam 12 and the second beam 13, alternatively, the first beam 12 and the second beam 13 support finishing main material 30 jointly. For example, installing ceramic tile on finishing main material mounting portion, then it is poured mortar in the through-hole 14 between ceramic tile and ground, it is solidifying to mortar Gu after, ceramic tile can be fixed, decoration worker no longer needs to be affixed on ground again after each ceramic tile is spread mortar so that ceramic tile is integrated Change construction, greatly improves the operating efficiency of decoration worker.
Furthermore it is also possible to which wall, floor tile, floor heating, wall facing, furred ceiling and top surface are adornd using finishing universal stand of the invention Face, indoor and outdoor wall body decoration and reconstruction of existing building etc., can keep the temperature existing building and Decorative Construction is integrated, to building Inner, external wall reducing energy consumption and decorative lamination integration construction, decoration construction efficiency greatly promote;Worker's technology degree of dependence is reduced, Finishing precision is improved, entire fitting-up construction standardization, modularization are made.
With reference to Fig. 1 and as shown in connection with fig. 3, in the present embodiment, the part 17 of 13 juxtaposition of the first beam 12 and the second beam is used It is fixedly connected in portion 60 to be fitted up.It is additionally provided with threaded hole 17a in 17 region of the part of juxtaposition, is also set in portion 60 to be fitted up There is and fit up the corresponding threaded hole of threaded hole 17a (not shown go out) on universal stand 10, can will be fitted up by bolt 50 general Frame 10 is fixed in portion 60 to be fitted up.It is shown in Fig. 3, portion 60 to be fitted up is the wall extended along the vertical direction in house, but should 60 surface irregularity of portion to be fitted up, so that 60 opposed vertical direction of portion to be fitted up is tilted.
If at this point, guarantee that all bolts 50 being installed in portion 60 to be fitted up are parallel, and perpendicular to vertical direction, that After finishing universal stand 10 of the invention is connect with bolt 50, due to the finishing outer rim 11 of universal stand 10, the first beam 12 and the Two beams 13 are in same plane, then, finishing universal stand 10 just extends along the vertical direction.To be mounted on finishing universal stand 10 On finishing main material be also at same perpendicular, it appears it is beautiful.Similarly, for horizontally extending but relatively horizontal orientation Inclined portion 60 to be fitted up, using finishing universal stand 10 of the invention it is also ensured that being mounted on finishing universal stand 10 Finishing main material is in same level, it appears beautiful.It is not high to the installation level requirement of decoration worker, and finishing effect can be improved Rate.
It should be noted that the shape of outer rim 11 of the invention is with no restrictions, quadrangle or triangle etc. can be.With reference to Fig. 1, in the present embodiment, outer rim 11 is square.Two the first beams 12 and two the second beams 13 are shown in Fig. 1, other In embodiment, can there are greater number of first beam and the second beam.Two the first beams 12 are along first direction (X-direction institute in Fig. 1 Show) it is spaced and is arranged in parallel, two the second beams 13 are spaced (in Fig. 1 shown in Y-direction) in a second direction and are arranged in parallel, first party To perpendicular to second direction.
Wherein, with reference to Fig. 1 and Fig. 2, the first beam 12 and the second beam 13 is arranged in a crossed manner and shape after connecting respectively with outer rim 11 At multiple through-holes 14.With no restrictions, in the present embodiment, through-hole 14 is square to the shape of through-hole 14, the corresponding to through-hole 14 The size of one beam 12, the second beam 13 and outer rim 11 is all the same.In other embodiments, through-hole 14 be circle, it is rectangle, polygon Shape, triangle, diamond shape are one of.It, can be with installation and decoration main material 30, in Fig. 4 at through-hole 14 in the present embodiment with reference to Fig. 4 It shows and is mounted with four finishing main materials 30 on finishing universal stand 10, it is logical that finishing main material 30 covers four fitted up on universal stand 10 Hole 14 can be all through-holes 14 and be covered by finishing main material 30.
Finishing main material 30 can be ceramic tile, but be not limited to ceramic tile, can also be other finishing materials.Existing ceramic tile is just Rectangular, after through-hole 14 is designed to square, institute's finishing main material 30 to be mounted can be matched, is realized quickly general in finishing Installation and decoration main material 30 on frame 10, and finishing universal stand 10 can support finishing main material 30 well.For example, the size of ceramic tile is advised Lattice are 300mm × 300mm, 300mm × 450mm, 300mm × 600mm, 600mm × 600mm etc., then the length (figure of through-hole 14 In 1 shown in L) it is 300mm;The ceramic tile of corresponding different dimensions, the quantity for the through-hole 14 that ceramic tile is covered are also different.
For example, the dimensions of the ceramic tile of selection is 300mm × 300mm, then, each ceramic tile covers a through-hole 14; If the dimensions of the ceramic tile of selection is 300mm × 600mm, then, each ceramic tile covers two through-holes 14;If the ceramic tile of selection Dimensions be 600mm × 600mm, then, each ceramic tile covers four through-holes 14.
In other embodiments, can according to ceramic tile to be mounted dimensions design through-hole 14 length L, with The dimensions of ceramic tile matches.
With continued reference to 1, in the present embodiment, the first beam 12 is equipped with multiple extend in a first direction and spaced first Slot 15 shows in Fig. 1 and sets that there are two the first slots 15 on corresponding first beam 12 of each through-hole 14, in other embodiments may be used To there is greater number of first slot.Second beam 13 is equipped with multiple extension and spaced second slots in a second direction It shows each by being set on corresponding second beam 13 there are two the second slot 16 in 16, Fig. 1, can have in other embodiments more Second slot of multi-quantity.
With reference to Fig. 4, due to will be installed finishing main material 30 on finishing universal stand 10, two adjacent finishing main materials 30 are mounted on After fitting up universal stand 10, the first slot 15 and the second slot 16 are between two adjacent finishing main materials 30;With reference to Fig. 5, Fig. 5 institute The plug connector 40 shown includes plug division 42 and fixed part 41, and the plug division 42 of plug connector 40 is inserted in the first slot 15 and second and inserts In slot 16, meanwhile, the fixed part 41 of plug connector 40 is covered in adjacent finishing main material 30, will be fitted up main material 30 and is fixed on dress It repairs on universal stand 10.
The plug division 42 of plug connector 40 and the first slot 15 and the second slot 16 can be interference fit, it is ensured that grafting Portion 42 will not be pulled out easily when being inserted in after the first slot 15 and the second slot 16 without external force;Main material to be fitted up 30 with to Mortar is poured in through-hole 14 after finishing portion 60 is fixedly connected, such as between finishing main material 30 and portion to be fitted up 60, mortar is solidifying Main material 30 to be fitted up can be fixed in portion 60 to be fitted up after Gu, at this point, again by plug connector 40 from the first slot 15 and second It is extracted in slot 16.
It should be noted that the material of finishing universal stand 10 is flexible material in the present embodiment, it can be plastics and be also possible to Metal and other plastic materials.According to the size in portion to be fitted up, can intercept in this way the finishing universal stand 10 of corresponding size with For installation and decoration main material, so that finishing is more convenient.
Second embodiment
With reference to Fig. 6, the present embodiment and first embodiment the difference is that: all through holes are equipped with bottom plate 20, Bottom plate 20 is equipped with multiple sub-aperture 21, and sub-aperture 21 is rounded.In other embodiments, sub-aperture can square, rectangle, more Side shape, triangle, diamond shape are one of.In addition, in other embodiments, bottom plate can be only equipped at partial through holes.In addition, One sub-aperture can be only set on each bottom plate.
3rd embodiment
With reference to Fig. 1, the outer profile for fitting up the outer rim 11 of universal stand 10 is equipped with slot 18 or plug connector 19, for splicing not Same finishing universal stand 10.Specifically, the present embodiment also provides a kind of paving structure, comprising: dress described in above-described embodiment Repair universal stand 10, in adjacent finishing universal stand 10, the outer rim 11 of one of them is equipped with slot 18, and another outer rim 11 is set There is plug connector 19, slot 18 and plug connector 19 connect, and realize the splicing of adjacent finishing universal stand 10.By splicing different number Finishing universal stand 10 meet the decoration requirements in various sizes of portion to be fitted up.
Fourth embodiment
With reference to Fig. 3, the present embodiment also provides a kind of house decoration package assembly, comprising:
Portion 60 to be fitted up;
Finishing universal stand 10 described in above-described embodiment, finishing universal stand 10 are fixed on portion 60 to be fitted up;
Main material (not shown go out) is fitted up, is installed on the finishing main material mounting portion of finishing universal stand 10.
Although present disclosure is as above, present invention is not limited to this.Anyone skilled in the art are not departing from this It in the spirit and scope of invention, can make various changes or modifications, therefore protection scope of the present invention should be with claim institute Subject to the range of restriction.

Claims (15)

1. a kind of finishing universal stand characterized by comprising
Multiple first beams, multiple second beams, first beam and second beam are arranged in a crossed manner;
Around the outer rim of first beam and the second beam, the both ends of first beam, the both ends of second beam and described outer Frame connection;
The outer rim, first beam and second beam surround finishing main material mounting portion.
2. as described in claim 1 finishing universal stand, which is characterized in that the outer rim be in quadrangle, multiple described first Beam is along first direction interval and is arranged in parallel, and multiple second beams are spaced and are arranged in parallel in a second direction, the first party To perpendicular to the second direction.
3. finishing universal stand as claimed in claim 2, which is characterized in that first beam and second beam are arranged in a crossed manner simultaneously Multiple through-holes are formed after connecting respectively with the outer rim, at least partly described through hole is equipped with bottom plate, and the bottom plate is equipped with At least one sub-aperture.
4. finishing universal stand as claimed in claim 3, which is characterized in that the through-hole is rounded, square, rectangle, more Side shape, triangle, diamond shape are one of, the sub-aperture is rounded, square, rectangle, polygon, triangle, diamond shape wherein It is a kind of.
5. finishing universal stand as claimed in claim 3, which is characterized in that first beam is equipped with multiple along the first party To extension and spaced first slot, second beam is equipped with multiple along second direction extension and spaced Second slot.
6. finishing universal stand as described in claim 1, which is characterized in that first beam and the second beam juxtaposition Part is used to be fixedly connected with portion to be fitted up.
7. finishing universal stand as claimed in claim 6, which is characterized in that the part of the juxtaposition is additionally provided with threaded hole, For installing bolt being fixed on the finishing universal stand to finishing portion.
8. finishing universal stand as described in claim 1, which is characterized in that the outer profile of the outer rim is equipped with slot or grafting Part, for splicing different finishing universal stands.
9. finishing universal stand as described in claim 1, which is characterized in that the cross section of first beam and second beam is in It is U-shaped.
10. finishing universal stand as claimed in claim 9, which is characterized in that the opening court of first beam and second beam To portion to be fitted up.
11. a kind of paving structure characterized by comprising multiple described in any item finishing universal stands of claim 1-10, phase In adjacent finishing universal stand, the outer rim of one of them is equipped with slot, and another outer rim is equipped with plug connector, the slot and institute Plug connector connection is stated, realizes the splicing of adjacent finishing universal stand.
12. paving structure as claimed in claim 11, which is characterized in that be equipped on the finishing main material mounting portion floor or Ceramic tile or wall facing or furred ceiling facing.
13. a kind of house decoration package assembly characterized by comprising
Portion to be fitted up;
The described in any item finishing universal stands of claim 1-10, the finishing universal stand are fixed on the portion to be fitted up;
Main material is fitted up, is installed on the finishing main material mounting portion of the finishing universal stand.
14. house decoration package assembly as claimed in claim 13, which is characterized in that the portion to be fitted up includes:
Wall or ground or top surface.
15. house decoration package assembly as claimed in claim 13, which is characterized in that the finishing main material includes:
Floor or ceramic tile or wooden facing, top surface facing.
CN201710368589.4A 2017-05-23 2017-05-23 Fit up universal stand, paving structure and house decoration package assembly Pending CN108952117A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710368589.4A CN108952117A (en) 2017-05-23 2017-05-23 Fit up universal stand, paving structure and house decoration package assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710368589.4A CN108952117A (en) 2017-05-23 2017-05-23 Fit up universal stand, paving structure and house decoration package assembly

Publications (1)

Publication Number Publication Date
CN108952117A true CN108952117A (en) 2018-12-07

Family

ID=64462454

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710368589.4A Pending CN108952117A (en) 2017-05-23 2017-05-23 Fit up universal stand, paving structure and house decoration package assembly

Country Status (1)

Country Link
CN (1) CN108952117A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112554462A (en) * 2020-12-04 2021-03-26 浙江金辰建设有限公司 Indoor roof decoration structure and construction method thereof

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2852932A (en) * 1957-03-26 1958-09-23 Us Ceramic Tile Company Tile and grouting assembly
DE1908769U (en) * 1963-04-30 1965-01-21 Peter Lammerich DEVICE FOR FORMING A TILE PANEL.
US3775856A (en) * 1971-08-11 1973-12-04 H Schmidt Tile setting template
US5459938A (en) * 1994-05-05 1995-10-24 Knight; William F. Guide for brick laying
US5832619A (en) * 1996-10-07 1998-11-10 Volkema, Jr.; Charles L. Adjustable tile installation tool and method of use
GB0210028D0 (en) * 2002-05-02 2002-06-12 Ray Fisher Construction Ltd Apparatus for use in tiling
EP2330261A1 (en) * 2009-12-07 2011-06-08 Meint Lingel Tile adjustment device
CN202380699U (en) * 2011-11-29 2012-08-15 中国建筑第七工程局有限公司 Ceramic tile pasting tool
CN104264952A (en) * 2014-10-16 2015-01-07 吕国兵 Brick paving technology of exterior wall brick and brick paving template
CN105484478A (en) * 2015-12-31 2016-04-13 浙江亚厦装饰股份有限公司 Tile paving device, facing assembly and tile paving method
US9322186B1 (en) * 2015-02-10 2016-04-26 Jason Chang Leveling spacer system for panel members
CN206800945U (en) * 2017-05-23 2017-12-26 张引强 Fit up universal stand, paving structure and house decoration package assembly

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2852932A (en) * 1957-03-26 1958-09-23 Us Ceramic Tile Company Tile and grouting assembly
DE1908769U (en) * 1963-04-30 1965-01-21 Peter Lammerich DEVICE FOR FORMING A TILE PANEL.
US3775856A (en) * 1971-08-11 1973-12-04 H Schmidt Tile setting template
US5459938A (en) * 1994-05-05 1995-10-24 Knight; William F. Guide for brick laying
US5832619A (en) * 1996-10-07 1998-11-10 Volkema, Jr.; Charles L. Adjustable tile installation tool and method of use
GB0210028D0 (en) * 2002-05-02 2002-06-12 Ray Fisher Construction Ltd Apparatus for use in tiling
EP2330261A1 (en) * 2009-12-07 2011-06-08 Meint Lingel Tile adjustment device
CN202380699U (en) * 2011-11-29 2012-08-15 中国建筑第七工程局有限公司 Ceramic tile pasting tool
CN104264952A (en) * 2014-10-16 2015-01-07 吕国兵 Brick paving technology of exterior wall brick and brick paving template
US9322186B1 (en) * 2015-02-10 2016-04-26 Jason Chang Leveling spacer system for panel members
CN105484478A (en) * 2015-12-31 2016-04-13 浙江亚厦装饰股份有限公司 Tile paving device, facing assembly and tile paving method
CN206800945U (en) * 2017-05-23 2017-12-26 张引强 Fit up universal stand, paving structure and house decoration package assembly

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112554462A (en) * 2020-12-04 2021-03-26 浙江金辰建设有限公司 Indoor roof decoration structure and construction method thereof

Similar Documents

Publication Publication Date Title
US9637933B2 (en) Systems and methods for installing cladding panels
KR101611595B1 (en) Rail-type installation structure of aluminum composite panels
WO2013190400A1 (en) A modular panel for the composition of ventilated floors or walls
CN108316606A (en) A kind of ground overhead system and its installation method
KR102034184B1 (en) Method for constructing finish insulation panels of building
US4698945A (en) Panel assembly and a method of installing same
US7975443B2 (en) Precast prestress raised access floor construction
CN108952117A (en) Fit up universal stand, paving structure and house decoration package assembly
JP2014190063A (en) Construction structure of heat insulation panel
CN206800945U (en) Fit up universal stand, paving structure and house decoration package assembly
CN207974457U (en) A kind of ground overhead system
CN209227838U (en) A kind of Quick Release assembly type structural sheeting
KR101964426B1 (en) Constructing member
KR20190002389U (en) Prefabricated panels for dry heating
CN211114252U (en) Wall and lower margin module
CN211817189U (en) House layout system and wall
CN210117889U (en) Wall surface curved surface parquet aluminum plate assembled mounting system
KR101377647B1 (en) Building exterior materials combined device
CN219909776U (en) Terrazzo parquet unit seamless splicing design structure
CN214034525U (en) Assembled indoor space decoration panel
CN210828155U (en) Vertical hanging piece
CN208267304U (en) Plate support construction
CN211229333U (en) Floor heat preservation device and floor heating assembly
CN212715578U (en) Curtain wall laying structure
CN209924361U (en) Combined layer base frame

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181207

WD01 Invention patent application deemed withdrawn after publication