CN108942103A CN201810864798.2A CN201810864798A CN108942103A CN 108942103 A CN108942103 A CN 108942103A CN 201810864798 A CN201810864798 A CN 201810864798A CN 108942103 A CN108942103 A CN 108942103A
Authority
CN
China
Prior art keywords
steel band
coiled tubing
welding
steel
manufacturing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810864798.2A
Other languages
Chinese (zh)
Other versions
CN108942103B (en
Inventor
段建良
上官丰收
张书军
董健
刘祥
张雅丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinda (tangshan Branch) Petroleum Equipment Co Ltd
HEBEI HUATONG WIRES AND CABLES GROUP CO Ltd
Shinda Tangshan Creative Oil and Gas Equipment Co Ltd
Original Assignee
Xinda (tangshan Branch) Petroleum Equipment Co Ltd
HEBEI HUATONG WIRES AND CABLES GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinda (tangshan Branch) Petroleum Equipment Co Ltd, HEBEI HUATONG WIRES AND CABLES GROUP CO Ltd filed Critical Xinda (tangshan Branch) Petroleum Equipment Co Ltd
Priority to CN201810864798.2A priority Critical patent/CN108942103B/en
Publication of CN108942103A publication Critical patent/CN108942103A/en
Application granted granted Critical
Publication of CN108942103B publication Critical patent/CN108942103B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)

Abstract

This application involves a kind of manufacturing methods of Nickel-Based Steel coiled tubing, the percentage composition of each component are as follows: Ni:40-45%, Cr:20-23%, Mo:2-3%, Cu:1.8-2.8%, Mn≤1.0%, Al≤0.2%, S≤0.02%, Ti:0.7-1.0%, C≤0.04%, Si≤0.45%, remaining is Fe and inevitable impurity.Short disk steel band is connected to specified rice number the following steps are included: welding steel band, detection damage by manufacturing method, steel band is supplied using tape supply device, the steel band of supply is cleaned by cleaning device, and steel band passes through rolling device and pipe forming apparatus, laser welding and heating, finishing and winding.The application is improved from the component and production technology of the steel band for forming coiled tubing, for many aspects such as carrying device, welding methods, so that not only intensity is high but also also improves the corrosion-resistant problem of coiled tubing for the coiled tubing produced.

Description

A kind of manufacturing method of Nickel-Based Steel coiled tubing
Technical field
The present invention relates to a kind of manufacturing methods of Nickel-Based Steel coiled tubing, the technical field suitable for petroleum works.
Background technique
Nickel-base alloy refers to has higher intensity and certain antioxidant anticorrosive ability etc. comprehensive under 650-1000 DEG C of high temperature Close a kind of alloy of performance.Refractoloy is subdivided into according to main performance, abros, nickel-base antiwear alloy, Ni-based Precise Alloy and Ni-based marmem etc..The main alloy element of abros is copper, chromium, molybdenum, is had good Good comprehensive performance, is resistant to various acid corrosions and stress corrosion.Abros is mainly for the manufacture of petroleum, chemical industry, electric power Etc. various corrosion-resistant environment components.
Coiled tubing (coiled tubing), also known as coiled tubing, a roll are myriametre, can replace conventional oil pipe Carry out many operations.Continuous oil pipe operation equipment has the characteristics that Operating Pressure, continuously removes, and equipment volume is small, duty cycle Fastly, at low cost.Twentieth century nineties, the development that coiled tubing technology is advanced by leaps and bounds.Continuous oil pipe operation dress It sets and has been known as " omnipotent working rig ", be widely used in the operations such as oil gas field well workover, drilling well, complete well, well logging, run through oil gas and opened The overall process adopted.The operating environment of coiled tubing determines that it will face serious corrosion-resistant problem, especially in ground environment Corrosion of the bronsted lowry acids and bases bronsted lowry metal to coiled tubing.Do not occur abros being used to prepare coiled tubing in the prior art Precedent, be on the one hand the technology prejudice of this field, i.e., this field not someone expect can use abros preparation connect Continuous oil pipe;It on the other hand is the limitation of manufacturing process, i.e. this field not it is proposed that can be used for preparing nickle-base corrosion-resisting conjunction The technique of golden coiled tubing.
Therefore, how to research and develop the Nickel-Based Steel coiled tubing that a kind of intensity is higher, corrosion resistance is more excellent is this Field technical problem urgently to be resolved.
Summary of the invention
The present invention is intended to provide a kind of manufacturing method of Nickel-Based Steel coiled tubing, the Ni-based conjunction manufactured in the method Golden steel coiled tubing not only has very strong mechanical strength, but also there is very high stress corrosion resistant to rupture performance.
This application involves a kind of manufacturing methods of Nickel-Based Steel coiled tubing, comprising the following steps:
(1) steel band is welded, to form the steel tape of required length;
(2) use New Hardness Testing Device, to after welding welding position and thermoinduction area detected with ensure steel band without Damage;
(3) short disk steel band is connected to specified rice number, is stored by take-off reel and is transported;
(4) by straightener and transport mechanism, uncoiling aligning is carried out to above-mentioned steel band, steel band is supplied using tape supply device;
(5) steel band supplied is cleaned by cleaning device, to remove the impurity on surface;
(6) steel band passes through rolling device, to generate preliminary deformation, convenient for forming the shape of coiled tubing;Then make steel Band passes through pipe forming apparatus, to form the shape of coiled tubing;
(7) butt welding of coiled tubing together and is polished using laser welding;
(8) 2-3min is kept the temperature to tubing at 1000 ± 20 DEG C using Muffle furnace;
(9) finishing and non-destructive testing, coating protective film, winding are carried out to coiled tubing.
Wherein, the percentage composition of each component are as follows: Ni:40-45%, Cr:20-23%, Mo:2-3%, Cu:1.8-2.8%, Mn≤1.0%, Al≤0.2%, S≤0.02%, Ti:0.7-1.0%, C≤0.04%, Si≤0.45%, remaining is for Fe and not Evitable impurity;
The manufacturing method of the steel band are as follows: first, said components are put into vacuum induction according to corresponding mass percent It is smelted in smelting furnace and is cast into slab;Second, it is carried out solution treatment 3 hours at being 1090 DEG C in temperature, it is air-cooled;Third, It is carried out transition processing 6 hours at 1020 DEG C, it is air-cooled;4th, it is carried out first time ageing treatment 24 hours at 800 DEG C, it is air-cooled;? It is carried out at 750 DEG C second of ageing treatment 12 hours, it is air-cooled;5th, by heating of plate blank to 1130 DEG C, soaking time is 15 points/ Millimeter, depending on the thickness of slab, 15 passage of roughing, mill speed is 8 meter per seconds;6th, finishing temperature control range is 920 DEG C, 8 passage of finish rolling, mill speed is 2.5 meter per seconds, and the width of steel band after rolling is 118.3mm, with a thickness of 3.2mm;7th, it is empty It is batched after being cooled to room temperature.
Preferably, steel band is welded using plate plate butt-joint process, welding method uses argon arc welding, the argon gas stream of back-protective gas Amount is 1-2L/min, and the argon flow of nozzle guard gas is 8-12L/min, and welding current is 90 ± 10A, speed of welding 1mm/ S, groove use type I groove, and to interface gaps≤0.1mm, electrode spacing 2mm, electrode angle is 10 °;The size of tungsten electrode is φ 2.4mm, the diameter of nozzle are 6.5mm.
Preferably, alkaline degreaser is placed in the cleaning device, the alkalinity degreaser is by sodium hydroxide, carbonic acid Sodium, sodium metasilicate and water are made, and the mass fraction of each component is respectively sodium hydroxide 0.7%, sodium carbonate 8%, sodium metasilicate 3.5%, Remaining is water, and the temperature of degreaser is maintained at 85 ± 5 DEG C in skimming processes.
Preferably, the power of the laser welding is 7000 ± 500w, and speed of welding is 2.6 ± 0.2m/min, and focal length is 232mm, defocusing amount are -3.2-0mm, and protection air-flow amount is 0.5-1.5m outside fusion area3/ h, protection air-flow amount 0.5- behind molten bath 1.5m3/ h, interior protection flow are 2.0-2.5m3/ h, protection gas type are argon gas.
Preferably, the tape supply device is horizontal tape supply device, including horizontal take-off reel and band storing device, steel band are put by level Tep reel is supplied to band storing device through straightened structure.
The application passes through the Anticorrosive Character of Nickel-Based Steel itself, reaches the anticorrosive function of coiled tubing, so that anti-sulphur etc. Grade reaches FF grades;Improve the saline-alkaline corrosion-resistant of coiled tubing.In addition, the nickel-base alloy Steel material high temperature resistant of the application, it can It is on active service under 550 DEG C of environment, there is outstanding anticorrosion stress-resistant cracking performance, resistance to spot corrosion and crevice corrosion behavior, anti-oxidant With non-oxidizable hot acid performance.
Detailed description of the invention
Fig. 1 shows a kind of horizontal tape supply device of continuous ribbon supply of the application.
Fig. 2 shows the perspective view of the horizontal take-off reel of the horizontal tape supply device of the application.
Fig. 3 shows the top view of the horizontal take-off reel of the horizontal tape supply device of the application.
Fig. 4 shows the side view of the horizontal take-off reel of the horizontal tape supply device of the application.
Fig. 5 shows the structural schematic diagram of the horizontal take-off reel members of the application.
Fig. 6 shows the detailed schematic of drive system.
Fig. 7 shows the perspective view of band storing device.
Fig. 8 shows the top view of band storing device.
Fig. 9 shows the detail view of band storing device.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction with attached drawing to the present invention Embodiment be described in detail.It should be noted that in the absence of conflict, in the embodiment and embodiment in the application Feature can mutual any combination.
According to the Nickel-Based Steel coiled tubing of the application, the percentage composition of each component are as follows: Ni:40-45%, Cr:20- 23%, Mo:2-3%, Cu:1.8-2.8%, Mn≤1.0%, Al≤0.2%, S≤0.02%, Ti:0.7-1.0%, C≤ 0.04%, Si≤0.45%, remaining is Fe and inevitable impurity.
It is added to copper and molybdenum in the Nickel-Based Steel of the application, all there is antiacid and alkali metal under oxidation and reducing environment Corrosive nature.Nickelic composition makes alloy have effective resisting stress corrosion cracking.Corrosion resistance in various media is all very It is good, such as sulfuric acid, phosphoric acid, nitric acid, hydrochloric acid and organic acid, alkali metal such as sodium hydroxide and potassium hydroxide solution.Using the application's Nickel-Based Steel, which prepares coiled tubing, precedent in industry, and the breakthrough application of such material is meeting intensity Meanwhile also ensuring resistance to corrosion, it is a kind of completely new coiled tubing material, it is inclined overcomes technology existing in the prior art See.
Method for manufacturing the steel band of coiled tubing is prepared using above-mentioned Nickel-Based Steel are as follows: first, by said components It is put into vacuum induction smelting furnace according to corresponding mass percent and smelts and be cast into slab;Second, it is 1090 DEG C in temperature Lower progress solution treatment 3 hours, it is air-cooled;Third carries out transition processing 6 hours at 1020 DEG C, air-cooled;4th, at 800 DEG C It carries out first time ageing treatment 24 hours, it is air-cooled;It is carried out at 750 DEG C second of ageing treatment 12 hours, it is air-cooled;5th, it will Heating of plate blank is to 1130 DEG C, and soaking time is 15 points/millimeter, depending on the thickness of slab, 15 passage of roughing, mill speed 8 Meter per second;6th, finishing temperature control range is 920 DEG C, 8 passage of finish rolling, and mill speed is 2.5 meter per seconds, the steel band after rolling Width is 118.3mm, with a thickness of 3.2mm;7th, it is batched after being air-cooled to room temperature.
According to the manufacturing method of the Nickel-Based Steel coiled tubing of the application, comprising the following steps:
(1) steel band is welded using plate plate butt-joint process, to form the steel tape of required length;
Using inert gas-shielded arc welding, steel band is set to be in welding position by two-sided welding fishplate bar equipment, welding machine need to only lead to Left and right welding is crossed, can be completed two-sided multi-pass welding, surfacing, reinforcement is small.Weld seam is reduced using 55 ° of gusset plate docking It burns angle phenomenon, avoid stress concentration, Cheng Guanhou uniform force.Plate plate butt welding equipment be it is well known in the prior art, This is repeated no more.
Welding method uses argon arc welding, and the argon flow of back-protective gas is 1-2L/min, the argon gas stream of nozzle guard gas Amount be 8-12L/min, welding current be 90 ± 10A, speed of welding 1mm/s, groove use type I groove, to interface gaps≤ 0.1mm, electrode spacing 2mm, electrode angle are 10 °;The size of tungsten electrode is φ 2.4mm, and the diameter of nozzle is 6.5mm.Welding Before, spot welding in advance is carried out to wedge angle position, prevents from shrinking the crackle generated, low speed welding is selected in welding process, slows down molten bath Cooling velocity guarantees gas concentration.
(2) use supersonic hardness detection device, to after welding welding position and thermoinduction area detected to ensure Steel band is not damaged;Such as X-ray can be selected to carry out nondestructive inspection.
(3) short disk steel band is connected to specified rice number, is stored by take-off reel and is transported, guarantee to hold in production process Continuous supply steel band.
(4) by straightener and transport mechanism, uncoiling aligning is carried out to above-mentioned steel band, steel is supplied using horizontal tape supply device Band;
It should be noted that being in the prior art typically all to carry out ribbon supply using vertical ribbon supply mechanism, i.e. steel belt disk is all It is placed in the reel plane perpendicular to ground.Resulting problem is to need for steel belt disk to be raised to vertical state, operation It is very inconvenient, and storage and transport are also very inconvenient.On the other hand, ribbon supply is carried out using feed reel in the prior art When, after a whole disk steel band supply finishes, needs to suspend the production of coiled tubing, be put into next disk steel band with setting apart Ribbon supply just can guarantee continuing for production in this way.It causes in ribbon supply and pauses as a result,.
Ribbon supply mechanism in the application is the horizontal tape supply device of continuous ribbon supply, greatly facilitates the supply and fortune of steel band It is defeated, it operates also very convenient.Steel band is divided into the external cache area and internal direct-furnish area for reversely being stored up by arcuate and being connected with mode, It can be controlled separately its rotation, steel band be first stored in external cache area, then again for internally direct-furnish area.This Sample, even if the continuous production for meeting coiled tubing to tuber ribbon supply will not be stopped when horizontal take-off reel stops working It is required that.Horizontal tape supply device about the application will be described in greater detail below.
(5) band storing device is placed on to the upstream of coiled tubing manufacture system, continuously and uninterruptedly supplies steel band to tuber.
As described above, reversely storing up band mode by using arcuate using the horizontal tape supply device of the application, making steel band always Outermost in band storing device prevents the generation of lock-up condition.
(6) steel band supplied is cleaned by cleaning device, to remove the impurity on surface.
Alkaline degreaser can be placed in cleaning device, the alkalinity degreaser is by sodium hydroxide, sodium carbonate, sodium metasilicate It being made with water, the mass fraction of each component is respectively sodium hydroxide 0.7%, sodium carbonate 8%, sodium metasilicate 3.5%, remaining is water, The temperature of degreaser is maintained at 85 ± 5 DEG C in skimming processes.
(7) steel band passes through rolling device, to generate preliminary deformation, convenient for forming the shape of coiled tubing;Then make steel Band passes through pipe forming apparatus, to form the shape of coiled tubing.
Specific rolling device and pipe forming apparatus have been described in Chinese patent application 201610004312.9, herein It repeats no more.
(8) using laser welding by the butt welding of coiled tubing together.
Welding laser power is 7000 ± 500w, and speed of welding is 2.6 ± 0.2m/min, focal length 232mm, defocusing amount For -3.2-0mm, protection air-flow amount is 0.5-1.5m outside fusion area3/ h, protection air-flow amount 0.5-1.5m behind molten bath3/ h, interior protection Flow is 2.0-2.5m3/ h, protection gas type are argon gas.
Laser welding makes weld seam relatively narrow, and heat affected area is small, and weld size precision is high, naturally without inner burr, overcomes often With the inner burr problem of coiled tubing, latus rectum is increased, the intimate rounding off of inner surface can carry out complex job.
(9) by external three groups of grinding heads, external burr is modified, and is achieved the effect that and outer surface smoother transition;Just Walk full circle, fixed tubing position.
(10) 2-3min is kept the temperature to tubing at 1000 ± 20 DEG C using Muffle furnace.
(11) by the finishing to coiled tubing, size is made to reach prescribed limit, it is ensured that roundness meets the requirements, and to even Continuous oil pipe carries out non-destructive testing, to determine without internal injury.
(12) dimensional measurement is carried out to homogeneous tube, to outer tube wall coating protective film, and by using winding displacement and automatic equipment into Row winding.
The horizontal tape supply device of the continuous ribbon supply of the application, including horizontal take-off reel 1 and storage are described below in conjunction with attached drawing Band device 2, steel band are supplied to band storing device 2 through straightened structure 3 by horizontal take-off reel 1, and the structure of horizontal take-off reel 1 and band storing device 2 exists It is described in detail in following explanation.The whole steel band coiled is placed on horizontal take-off reel 1, band storing device 2 divides for external cache area 21 and internal direct-furnish area 22.Steel band in external cache area 21 and internal direct-furnish area 22 can be controlled separately it and move into and lay out, and two Ribbon supply is carried out in such a way that arcuate reversely stores up band 23 between person, not only ensure that continuous ribbon supply, but also prevents steel band deadlock phenomenon Generation.Steel band is finally confessed from the inside in internal direct-furnish area 22 to the production line of coiled tubing.
As in Figure 2-4, wherein respectively illustrate the perspective view of the horizontal take-off reel 1 of the horizontal tape supply device of the application, Top view and side view.As shown, horizontal take-off reel includes bracket 10, horizontal rotating disc 11, centring sleeve 12, pan brake component 13 and band brake component 14, bracket 10 plays the role of the entire take-off reel of support, and the steel belt disk spooled is placed on horizontal rotating disc On 11, the centre circle nested domain of steel belt disk is on centring sleeve 12.Pan brake component 13 passes through the week of clamp horizontal turntable 11 Side generates braking effect, for braking when needing to make horizontal rotating disc reduction of speed to it.Band brake component 14 can be set There are two, steel belt disk force is clamped from both sides, prevents steel band from scattering.
As shown in figure 3, pan brake component 13 includes the first brake bar 131, the first brake rocker arm 132 and brake(-holder) block 133, First brake bar 131 can be hydraulic stem or electric control lever, and the first brake bar 131 and the first brake rocker arm 132 are rotatable Ground is arranged on the base, such as can be on bracket 10 or be set up directly on ground.Brake(-holder) block 133 and the first brake rocker arm 132 hinged settings.When the elongation of the first brake bar 131, it will push the first brake rocker arm 132 and moved to the direction of horizontal rotating disc 11 It is dynamic, so that brake(-holder) block 133 be made to abut to the side of horizontal rotating disc 11, generate braking effect.Similarly, band brake component 14 wraps The second brake bar 141, the second brake rocker arm 142 and brake roller 143 are included, the second brake bar 141 can be hydraulic stem or electric control Lever, the second brake bar 141 and the second brake rocker arm 142 are rotatably arranged on pedestal, such as can be on bracket 10 Or it is set up directly on ground.The end of the second brake rocker arm 142 is arranged in brake roller 143.When the second brake bar 141 extends When, it will push the second brake rocker arm 142 to the movement of the center position of horizontal rotating disc 11, so that brake roller 143 be made to abut to steel band The outside of disk generates braking effect.
As shown in figure 5, which show the structural schematic diagrams of the horizontal take-off reel members of the application.Drive system packet Include Power Component 19, clutch 15, power transmitting mechanism 191, bevel pinion 16, auger ring gear 17 and rotary sleeve 18.It is dynamic Power component 19 drives bevel pinion 16 to rotate by clutch 15 and power transmitting mechanism 191, bevel pinion 16 and auger annular Gear 17 engages, so that auger ring gear 17 be driven to rotate in the horizontal plane.As shown in figure 5, auger ring gear 17 is fixed It is connected to the periphery of rotary sleeve 18, centring sleeve 12 is fixed to the center of rotary sleeve 18, so that auger ring gear 17 It is able to drive rotary sleeve 18 and centring sleeve 12 rotates in the horizontal plane, steel belt disk rotation is driven, so that steel band be confessed.Such as Fig. 6 Shown, which show the detailed schematics of drive system.Power transmitting mechanism 191 includes hollow beam barrel 192 and retaining ring 193, beam barrel 192 is fixed on transmission shaft by bearing 194, and the outside of transmission shaft is arranged in retaining ring 193, prevents sundries from entering it It is internal.Preferably, the top of centring sleeve 12 is equipped with the fan-shaped alar part 121 of four be spaced apart, so as to flexibly compressed, To adapt to the nuance of steel belt disk inner hollow diameter.
As shown in Figure 1, straightened structure 3 includes niproll 31, driver 32 and guide roller 33, steel band process is oppositely arranged Stress when niproll 31 and align, driver 32 drives niproll 31 to rotate, and steel band after aligning is oppositely arranged by multiple rows of Guide roller 33 is led to band storing device 2.
As Figure 7-9, the perspective view, top view and detail view of band storing device 2 are respectively illustrated.Band storing device 2 includes pedestal 28, external disk 24, inner disc 25 and jackshaft 29, external disk 24 and inner disc 25 are arranged on pedestal 28, pass through jackshaft 29 and pedestal 28 It is fixedly connected.External disk 24 includes external disk wheel stand 243 and outer ring seat 244, and the outer of outer ring seat 244 is arranged in external disk wheel stand 243 Week.Outer rotating roller 241 is arranged radially in outer ring seat 244, and outer guide wheel roller 242 is built up in vertically on external disk wheel stand 243.It is interior Disk 25 includes inner disc wheel stand 253 and interior ring seat 254, and the central area of interior ring seat 254 is arranged in inner disc wheel stand 253.Interior turn Dynamic roller 251 is arranged radially in interior ring seat 254, and inner guide pulley roller 252 is built up in vertically on inner disc wheel stand 253.Such as Fig. 9 institute Show, the top of inner disc wheel stand 253 is equipped with groove, and interior rotating disk 27 is arranged inside.When installation, interior ring seat 254 is attached to outer In ring seat 244, then it is installed on pedestal 28 by jackshaft 29.External disk wheel stand 243 is installed on the periphery of outer ring seat 244, And radially mounted multiple outer rotating rollers 241, while multiple outer guide wheel rollers 242 being installed on external disk wheel stand 243.In interior ring seat Inner disc wheel stand 253, and radially mounted multiple interior rotating rollers 251 are installed in 254 central area, while in inner disc wheel stand Multiple inner guide pulley rollers 252 are installed on 253.Finally, the rotary shaft of interior rotating disk 27 is mounted in inner disc wheel stand 253, inward turning Turntable 27 can rotate about axis rotation.Wherein, outer rotating roller 241 is inclined outwardly, such as 3-10 degree;Interior rotating roller 251 is lean-in Tiltedly, such as 3-10 degree.Outer rotating roller 241 and interior rotating roller 251 can respectively drive rotation.
Illustrate the course of work of the band storing device 2 of the application below with reference to Fig. 1,7 and 8.Steel after the aligning of straightened structure 3 Band enters external disk 24 first along outer guide wheel roller 242, and the steel belt disk being located in external cache area 21 is formed in external disk 24.By Rotation can be respectively driven in outer rotating roller 241 and interior rotating roller 251, it is possible to first outer rotating roller 241 be driven to rotate, by steel Band, which is constantly wrapped in external disk 24, forms external steel belt disk.Simultaneously as outer rotating roller 241 is inclined outwardly, steel belt disk is certainly Outer guide wheel roller 242 can be slided under recast, form close external cache disk.Between external cache area 21 and internal direct-furnish area 22 Steel band in such a way that arcuate reversely stores up band 23 be connected.Similarly, since interior rotating roller 251 slopes inwardly, internal direct-furnish area 22 Inner guide pulley roller 252 can be slided under Gravitative Loads, form closely internal direct-furnish disk.The leading-out terminal of steel band is then from interior rotating roller 251 inside feeds to tuber along the surface of interior rotating disk 27.Preferably, interior rotating disk 27 can have inclined surfaces, Track is confessed with meet steel band.
The tape supply device formed in the application by using horizontal take-off reel and band storing device realizes horizontally continuous confession Band solves the problems, such as the complicated for operation, high to operating space requirement of vertical ribbon supply mode, poor accuracy in the prior art.Together When by designing novel band storing device, steel band is divided into the steel band in the external cache area for reversely storing up by arcuate and connecting with mode Steel belt disk in disk and internal direct-furnish area, can be controlled separately its rotation, steel band is first stored in external cache area, Then again for internally direct-furnish area.Even if in this way, will not stop when horizontal take-off reel stops working to tuber ribbon supply, Meet the continuous production requirement of coiled tubing.
As described above, the present invention provides a kind of manufacturing method of Nickel-Based Steel coiled tubing, from formation coiled tubing Steel band component and production technology, improved for many aspects such as carrying device, welding methods so that the company produced Not only intensity is high but also also improves the corrosion-resistant problem of coiled tubing for continuous oil pipe.Pass through Nickel-Based Steel self-preserving characteristic Reach the anticorrosive function of coiled tubing, so that anti-sulphur grade reaches FF grades;Improve the saline-alkaline corrosion-resistant of coiled tubing.Separately Outside, the nickel-base alloy Steel material high temperature resistant of the application, can be on active service under 550 DEG C of environment, crack with outstanding anticorrosion stress-resistant Performance, resistance to spot corrosion and crevice corrosion behavior, anti-oxidant and non-oxidizable hot acid performance.
Although disclosed herein embodiment it is as above, the content is only to facilitate understanding the present invention and adopting Embodiment is not intended to limit the invention.Any those skilled in the art to which this invention pertains are not departing from this Under the premise of the disclosed spirit and scope of invention, any modification and change can be made in the implementing form and in details, But scope of patent protection of the invention, still should be subject to the scope of the claims as defined in the appended claims.

Claims (6)

1. a kind of manufacturing method of Nickel-Based Steel coiled tubing, which comprises the following steps:
(1) steel band is welded, to form the steel tape of required length;
(2) use New Hardness Testing Device, to after welding welding position and thermoinduction area detected to ensure that steel band is not damaged;
(3) short disk steel band is connected to specified rice number, is stored by take-off reel and is transported;
(4) by straightener and transport mechanism, uncoiling aligning is carried out to above-mentioned steel band, steel band is supplied using tape supply device;
(5) steel band supplied is cleaned by cleaning device, to remove the impurity on surface;
(6) steel band passes through rolling device, to generate preliminary deformation, convenient for forming the shape of coiled tubing;Then pass through steel band Pipe forming apparatus is crossed, to form the shape of coiled tubing;
(7) butt welding of coiled tubing together and is polished using laser welding;
(8) 2-3min is kept the temperature to tubing at 1000 ± 20 DEG C using Muffle furnace;
(9) finishing and non-destructive testing, coating protective film, winding are carried out to coiled tubing.
2. the manufacturing method according to claim 1, which is characterized in that each component of the Nickel-Based Steel coiled tubing Percentage composition are as follows: Ni:40-45%, Cr:20-23%, Mo:2-3%, Cu:1.8-2.8%, Mn≤1.0%, Al≤0.2%, S ≤ 0.02%, Ti:0.7-1.0%, C≤0.04%, Si≤0.45%, remaining is Fe and inevitable impurity;
The manufacturing method of the steel band are as follows: first, said components are smelted according to corresponding mass percent investment vacuum induction It is smelted in furnace and is cast into slab;Second, it is carried out solution treatment 3 hours at being 1090 DEG C in temperature, it is air-cooled;Third, 1020 It is carried out transition processing 6 hours at DEG C, it is air-cooled;4th, it is carried out first time ageing treatment 24 hours at 800 DEG C, it is air-cooled;750 It is carried out at DEG C second of ageing treatment 12 hours, it is air-cooled;5th, by heating of plate blank to 1130 DEG C, soaking time is 15 points/milli Rice, depending on the thickness of slab, 15 passage of roughing, mill speed is 8 meter per seconds;6th, finishing temperature control range is 920 DEG C, 8 passage of finish rolling, mill speed are 2.5 meter per seconds, and the width of steel band after rolling is 118.3mm, with a thickness of 3.2mm;7th, it is air-cooled It is batched after to room temperature.
3. manufacturing method according to claim 1 or 2, which is characterized in that weld steel band, welding using plate plate butt-joint process Method uses argon arc welding, and the argon flow of back-protective gas is 1-2L/min, and the argon flow of nozzle guard gas is 8-12L/ Min, welding current are 90 ± 10A, and speed of welding 1mm/s, groove uses type I groove, to interface gaps≤0.1mm, electrode Spacing is 2mm, and electrode angle is 10 °;The size of tungsten electrode is φ 2.4mm, and the diameter of nozzle is 6.5mm.
4. manufacturing method according to claim 1 or 2, which is characterized in that be placed with alkaline degreasing in the cleaning device Liquid, the alkalinity degreaser are made of sodium hydroxide, sodium carbonate, sodium metasilicate and water, and the mass fraction of each component is respectively hydrogen-oxygen Change sodium 0.7%, sodium carbonate 8%, sodium metasilicate 3.5%, remaining is water, and the temperature of degreaser is maintained at 85 ± 5 DEG C in skimming processes.
5. manufacturing method according to claim 1 or 2, which is characterized in that the power of the laser welding be 7000 ± 500w, speed of welding are 2.6 ± 0.2m/min, and focal length 232mm, defocusing amount is -3.2-0mm, protection air-flow amount outside fusion area For 0.5-1.5m3/ h, protection air-flow amount 0.5-1.5m behind molten bath3/ h, interior protection flow are 2.0-2.5m3/ h, protection gas type are Argon gas.
6. manufacturing method according to claim 1 or 2, which is characterized in that the tape supply device is horizontal tape supply device, packet Horizontal take-off reel and band storing device are included, steel band is supplied to band storing device through straightened structure by horizontal take-off reel.
CN201810864798.2A 2018-08-01 2018-08-01 Manufacturing method of nickel-based alloy steel coiled tubing Active CN108942103B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810864798.2A CN108942103B (en) 2018-08-01 2018-08-01 Manufacturing method of nickel-based alloy steel coiled tubing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810864798.2A CN108942103B (en) 2018-08-01 2018-08-01 Manufacturing method of nickel-based alloy steel coiled tubing

Publications (2)

Publication Number Publication Date
CN108942103A true CN108942103A (en) 2018-12-07
CN108942103B CN108942103B (en) 2020-05-12

Family

ID=64465235

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810864798.2A Active CN108942103B (en) 2018-08-01 2018-08-01 Manufacturing method of nickel-based alloy steel coiled tubing

Country Status (1)

Country Link
CN (1) CN108942103B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3405228A (en) * 1965-08-11 1968-10-08 Gen Cable Corp Folded, laminated electrical cable sheath having abutting edges of one lamination unwelded
CN102994809A (en) * 2012-12-04 2013-03-27 西安热工研究院有限公司 High-strength and corrosion-resistant nickel-iron-chromium-based high-temperature alloy and preparation method for same
CN103484782A (en) * 2013-09-16 2014-01-01 天津钢管集团股份有限公司 Method for manufacturing large-aperture high-strength gathering and transportation seamless steel tube for environment with high content of hydrogen sulfide
CN104353973A (en) * 2014-11-13 2015-02-18 江苏省常熟环通实业有限公司 Preparation method of austenitic stainless steel pipe
CN104451427A (en) * 2014-12-11 2015-03-25 宝鸡石油钢管有限责任公司 Continuous oil pipe without welding defects and manufacturing method
CN105478524A (en) * 2016-01-06 2016-04-13 河北华通线缆集团股份有限公司 Method for manufacturing duplex stainless steel coiled tubing
CN207174908U (en) * 2017-09-19 2018-04-03 张家港勇邦管业有限公司 Strip coil of strip stock shelf

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3405228A (en) * 1965-08-11 1968-10-08 Gen Cable Corp Folded, laminated electrical cable sheath having abutting edges of one lamination unwelded
CN102994809A (en) * 2012-12-04 2013-03-27 西安热工研究院有限公司 High-strength and corrosion-resistant nickel-iron-chromium-based high-temperature alloy and preparation method for same
CN103484782A (en) * 2013-09-16 2014-01-01 天津钢管集团股份有限公司 Method for manufacturing large-aperture high-strength gathering and transportation seamless steel tube for environment with high content of hydrogen sulfide
CN104353973A (en) * 2014-11-13 2015-02-18 江苏省常熟环通实业有限公司 Preparation method of austenitic stainless steel pipe
CN104451427A (en) * 2014-12-11 2015-03-25 宝鸡石油钢管有限责任公司 Continuous oil pipe without welding defects and manufacturing method
CN105478524A (en) * 2016-01-06 2016-04-13 河北华通线缆集团股份有限公司 Method for manufacturing duplex stainless steel coiled tubing
CN207174908U (en) * 2017-09-19 2018-04-03 张家港勇邦管业有限公司 Strip coil of strip stock shelf

Also Published As

Publication number Publication date
CN108942103B (en) 2020-05-12

Similar Documents

Publication Publication Date Title
US6880220B2 (en) Method of manufacturing cold worked, high strength seamless CRA PIPE
CN104816076B (en) A kind of pipe pipe butt weld technologies for steel method of continuous pipe
CN104858555A (en) Pressure pipeline welding process
CN107598351B (en) Large-area plasma surfacing method for outer circle of Stellite cobalt-based alloy
CN104741741A (en) Automatic tube butt joint all-position TIG welding technology for coiled tubing
CN105209209A (en) Friction spot welding and friction seam welding
CN101913013B (en) Process for assembling and welding middle-hard teeth surface welded gear
CN102581062B (en) Method for producing seamless titanium and titanium alloy welded pipe
CN112894087B (en) Tube plate nickel-based alloy double-tungsten-electrode single-hot-wire automatic tungsten electrode argon arc welding surfacing process
CN103600204B (en) A kind of manufacture method of agitating friction brazed aluminum alloy combined wheels
CN108526662A (en) A kind of Ni-based multiple tube X grooves of heavy caliber exempt from back side argon filling welding method
CN108942102A (en) A kind of manufacturing method of super-duplex stainless steel coiled tubing
US20180229327A1 (en) Method for creating clad structures using resistance seam welding
CN108500559A (en) A kind of manufacturing method of super large caliber heavy wall X80 steel-grade spiral submerged welded pipe
CN103240571A (en) Aluminum and aluminum alloy spiral pipe forming stirring friction welding method
CN108942103A (en) A kind of manufacturing method of Nickel-Based Steel coiled tubing
CN115815746A (en) Hanging type self-feedback temperature control surfacing equipment and process method
CN102500886A (en) High-strength nickel-iron-chromium alloy and chromium-nickel stainless steel plate welding method and application to preparation of polysilicon cold hydrogenation reactors
CN111390339B (en) Welding process of high-purity ferrite stainless steel heat exchanger
CN108861739B (en) Horizontal tape supply device for continuous tape supply
CN102941399B (en) Gas-shielded welding method for pearlite heat-resistant steel structural members
JP6054533B2 (en) System for the production of clad materials using resistance seam welding
CN111299753A (en) Welding method for new and old furnace tubes
CN218946601U (en) Hanging type self-feedback temperature control surfacing equipment
JPS62267079A (en) Roll automatic build-up welding method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A kind of manufacturing method of nickel-based alloy steel coiled tubing

Effective date of registration: 20220816

Granted publication date: 20200512

Pledgee: TANGSHAN BANK Co.,Ltd.

Pledgor: HEBEI HUATONG WIRES AND CABLES GROUP Co.,Ltd.|SHINDA(TangShan) CREATIVE OIL&GAS EQUIPMENT Co.,Ltd.

Registration number: Y2022990000532

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20231204

Granted publication date: 20200512

Pledgee: TANGSHAN BANK Co.,Ltd.

Pledgor: HEBEI HUATONG WIRES AND CABLES GROUP Co.,Ltd.|SHINDA(TangShan) CREATIVE OIL&GAS EQUIPMENT Co.,Ltd.

Registration number: Y2022990000532