CN108941689A - A kind of structural metallic materials Preparation equipment - Google Patents
A kind of structural metallic materials Preparation equipment Download PDFInfo
- Publication number
- CN108941689A CN108941689A CN201810858775.0A CN201810858775A CN108941689A CN 108941689 A CN108941689 A CN 108941689A CN 201810858775 A CN201810858775 A CN 201810858775A CN 108941689 A CN108941689 A CN 108941689A
- Authority
- CN
- China
- Prior art keywords
- face
- dovetails
- chamber
- screw rod
- sliding chamber
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23B—TURNING; BORING
- B23B45/00—Hand-held or like portable drilling machines, e.g. drill guns; Equipment therefor
- B23B45/02—Hand-held or like portable drilling machines, e.g. drill guns; Equipment therefor driven by electric power
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23B—TURNING; BORING
- B23B45/00—Hand-held or like portable drilling machines, e.g. drill guns; Equipment therefor
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23B—TURNING; BORING
- B23B47/00—Constructional features of components specially designed for boring or drilling machines; Accessories therefor
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23Q—DETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
- B23Q11/00—Accessories fitted to machine tools for keeping tools or parts of the machine in good working condition or for cooling work; Safety devices specially combined with or arranged in, or specially adapted for use in connection with, machine tools
- B23Q11/0042—Devices for removing chips
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25H—WORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
- B25H1/00—Work benches; Portable stands or supports for positioning portable tools or work to be operated on thereby
- B25H1/0021—Stands, supports or guiding devices for positioning portable tools or for securing them to the work
- B25H1/0035—Extensible supports, e.g. telescopic
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Photovoltaic Devices (AREA)
Abstract
The invention discloses a kind of structural metallic materials Preparation equipments, including moving trolley, the moving trolley top is installed with strut, up and down through equipped with the first sliding chamber in the strut, described first, which slips intracavitary be slidably installed, moves up and down seat, described move up and down is equipped with the second sliding chamber in a bottom end face, described second, which slips intracavitary be slidably installed respectively, the first dovetails and the second dovetails, the second dovetails screw-internal thread fit is equipped with the first screw rod, first screw rod and the first dovetails clearance fit, and the first screw rod left side extending end is rotatably assorted with the described second sliding chamber inner left wall and connect, it is symmetrical above and below in the second dovetails left end face to be equipped with recess cavity, buffer substrate tablet is fixedly installed between the recessed chamber inner sidewall and the first dovetails right end face, it is described recessed It is equipped with third in the second dovetails left end face on the upside of into chamber and slips chamber, the third slips intracavitary be slidably installed and connects block.
Description
Technical field
The present invention relates to alloy door and window processing technique field, specially a kind of structural metallic materials Preparation equipment.
Background technique
In aluminum alloy doors and windows preparation process, it usually needs boring work is carried out in its corner, consequently facilitating aluminium alloy door
The linking of window can generate a large amount of dust when punching to aluminum alloy doors and windows, and the dust is not only to the environment at preparation scene
It pollutes, due to volume extremely small of dust, staff can suck the dust in body, increase staff's
Occupational disease, increases labourer and economic cost, and the punching of conventional alloys door and window relies primarily on worker and holds puncher to be beaten manually
Hole, although this, which is greatly facilitated, conveniently carries out punch operation, the problem is that, in the mistake for carrying out Manual punching
Cheng Zhong, since only manually drill bit is directed at aluminum alloy doors and windows by experience, in punching the hand of people it is easy to appear shake,
To be easy to deflect in hole, this largely effects on alloy door and window preparation quality and preparation speed.
Summary of the invention
It is in the prior art above-mentioned for overcoming the purpose of the present invention is to provide a kind of structural metallic materials Preparation equipment
Defect.
A kind of structural metallic materials Preparation equipment according to the present invention, including moving trolley, the moving trolley top are installed with
Strut, up and down through the first sliding chamber is equipped in the strut, described first, which slips intracavitary be slidably installed, is moved up and down
Seat, described move up and down are equipped with the second sliding chamber in a bottom end face, described second, which slips intracavitary be slidably installed respectively, has
First dovetails and the second dovetails, the second dovetails screw-internal thread fit are equipped with the first screw rod, first spiral shell
Spinner handle and the first dovetails clearance fit, and extending end and the described second sliding chamber left side on the left of first screw rod
Inner wall is rotatably assorted connection, symmetrical above and below in the second dovetails left end face to be equipped with recess cavity, the recessed chamber inner sidewall
Buffer substrate tablet is fixedly installed between the first dovetails right end face, second dovetails on the upside of the recess cavity are left
It is equipped with third in side end face and slips chamber, the third slips intracavitary be slidably installed and connects block, described to connect the fixed peace of block
Mounted in the first dovetails right end face, described move up and down on the right side of the second sliding chamber is equipped with transmission cavity, institute in seat
It states the first screw rod and is rotatably assorted and the part being mounted between the transmission cavity and the second sliding chamber and protrude into the transmission
Intracavitary, extending end is installed with the first taper wheel on the right side of first screw rod, and intermeshing is set on the upside of the first taper wheel
There is the second taper wheel, the second taper wheel top power is fitted with the first electricity favourable turn, and the first electricity favourable turn is fixedly arranged on
In the transmission cavity inner roof wall, the first dovetails bottom end face is installed with shell, and left and right is run through to be equipped with and be worn in the shell
Mouthful, the shell left end face wears that mouth is opposite to be installed with dust-separation pad with described, and the dust-separation pad is interior equipped with dust-proof chamber, described to wear mouth
It is inside installed with support plate, shell right end face bottom is installed with ledge, and it is sliding to be equipped with the 4th in the ledge top end surface
Chamber, the described 4th, which slips intracavitary be slidably installed, allotment frame, and the allotment frame screw-internal thread fit is equipped with the second screw rod,
Extending end power is fitted with the second electricity favourable turn on the right side of second screw rod, and the second electricity favourable turn is fixedly arranged on described the
On the right side of four sliding chambers in inner wall, extending end is rotatably assorted with the described 4th sliding chamber inner left wall on the left of second screw rod
It connects, third electricity favourable turn is installed in the allotment frame left end face, the third electricity favourable turn left-hand end power is fitted with
Coupling Shaft, the Coupling Shaft is through the support plate left and right sides end face and connect with the support plate clearance fit, described turn
Spindle left distal end is installed with device in succession, is equipped with drill bit on the left of the device in succession, is additionally provided with photovoltaic generator on the strut
Structure.
Further technical solution, the outer casing bottom end face are installed with link arm, and the link arm bottom end is installed with collection
Cinder box, the dust collecting box is interior to be equipped with cinder catcher, ash-collecting pipe is equipped in the shell, the ash-collecting pipe runs through the shell left-hand end
Face and bottom end face is flushed with the dust-proof bottom of chamber wall, the ash-collecting pipe through the outer casing bottom end face and with the cinder catcher
Connection, the cinder catcher inner bottom wall is interior to be equipped with tap, is connected to and sets between the tap in the dust collecting box right end face
There is the 5th sliding chamber, the described 5th, which slips intracavitary be slidably installed, hiding block, fixed limited on the left of the hiding block bottom end face
Clamp dog, tap right side inner wall is interior and the confinement block is mating is provided with restricted room, the institute on the right side of the dust collecting box
It states outer casing bottom end face and is installed with mounting rack, left and right is matched through the 6th sliding chamber, the hiding block sliding is equipped in the mounting rack
Conjunction be mounted on the described 6th slip it is intracavitary, left and right, which extends, in the hiding block top end surface is equipped with tooth edge strip, the 6th sliding chamber
Switching chamber is equipped in inner roof wall, intracavitary be rotatably assorted of the switching installs cincture with teeth, the tooth cincture and the tooth edge strip phase
Mutually engagement, and the tooth cincture rear side end power is fitted with the 4th electricity favourable turn, the 4th electricity favourable turn is fixedly arranged on described turn
It connects on rear side of chamber in inner wall.
Further technical solution, the moving trolley top end surface are installed with pneumatic executive item, the pneumatic executive item top
End power is fitted with motion bar, and the motion bar top end is installed with fixed plate, and the fixed plate is fixedly arranged on the branch
A bottom end face is moved up and down described on the left of bar.
Further technical solution, the photovoltaic power generation mechanism include the photovoltaic for being fixedly mounted on the strut top end surface
Plate, the moving trolley top are installed with battery, and the battery and the photovoltaic panel are electrically connected.
The beneficial effects of the present invention are: this is filled by moving trolley first when needing to aluminum alloy doors and windows drilling processing
The aluminum alloy doors and windows side for being moved to and needing to punch is set, seat is then moved up and down by the drive of pneumatic executive item and carries out rising-falling tone
Section, makes to move up and down seat and slides up and down along strut, until shell slides into the opposite side for needing punch position, then starts first
Electricity favourable turn drives shell to slide to the left, until dust-separation pad is abutted with aluminum alloy doors and windows, then starts the second electricity favourable turn and drives drill bit
It is moved to the left, meanwhile, starting third electricity favourable turn drill bit rotation can drill to aluminum alloy doors and windows, drill generated powder
Dirt can be fallen into cinder catcher by ash-collecting pipe, and when the dust in cinder catcher fills up, the 4th electricity favourable turn of starting drives hiding block to the right
Sliding opening tap, dust can be discharged from tap, and dust is completed while punching is protruded into automatic control to realize
Collection work improves working efficiency and improves working environment, and energy lift adjustment meets the punching demand of different height, together
When, by the setting of buffer substrate tablet, the cushion effect of shell is effectively reduced, increases stability in use and service life, is worthy to be popularized
It uses.
Detailed description of the invention
Fig. 1 is overall structure diagram inside a kind of structural metallic materials Preparation equipment of the invention;
Fig. 2 is the partial enlargement structural representation in Fig. 1;
Fig. 3 is enlarged structure schematic diagram at A in Fig. 2.
Specific embodiment
Below with reference to Fig. 1-3, the present invention is described in detail.
Referring to Fig.1-3, a kind of structural metallic materials Preparation equipment of embodiment according to the present invention, including moving trolley 100,
100 top of moving trolley is installed with strut 103, up and down through being equipped with the first sliding chamber 117 in the strut 103, described the
It is slidably installed in one sliding chamber 117 and moves up and down seat 118, described move up and down is equipped with second in 118 bottom end face of seat
Chamber 114 is slipped, being slidably installed respectively in the second sliding chamber 114 has the first dovetails 112 and the second dovetails
108,108 screw-internal thread fit of the second dovetails is equipped with the first screw rod 113, first screw rod 113 and described the
One dovetails, 112 clearance fit, and in first screw rod, 113 left side extending end and the described second sliding 114 left side of chamber
Wall is rotatably assorted connection, symmetrical above and below in 108 left end face of the second dovetails to be equipped with recess cavity 116, the recess cavity 116
Buffer substrate tablet 115 is fixedly installed between inner sidewall and 112 right end face of the first dovetails, 116 upside of recess cavity
It is equipped with third in second dovetails, 108 left end face and slips chamber 109, the third is slipped to be slidably installed in chamber 109
Block 111 is connected, the block 111 that connects is fixedly mounted on 112 right end face of the first dovetails, the second sliding chamber
Described move up and down on 114 right sides is equipped with transmission cavity 104 in seat 118, first screw rod 113 be rotatably assorted be mounted on it is described
It part between transmission cavity 104 and the second sliding chamber 114 and protrudes into the transmission cavity 104, first screw rod 113
Right side extending end is installed with the first taper wheel 105, and intermeshing is equipped with the second taper wheel on the upside of the first taper wheel 105
106, the 106 top power of the second taper wheel is fitted with the first electricity favourable turn 107, and the first electricity favourable turn 107 is fixedly arranged on
In 104 inner roof wall of transmission cavity, 112 bottom end face of the first dovetails is installed with shell 119, a left side in the shell 119
Mouth 128 is worn through being equipped in the right side, 119 left end face of shell and it is described wear that mouth 128 is opposite to be installed with dust-separation pad 132, it is described every
Dust-proof chamber 136 is equipped in dirt pad 132, described wear is installed with support plate 129 in mouth 128, the 119 right end face bottom of shell is solid
Equipped with ledge 123, the 4th sliding chamber 121 is equipped in 123 top end surface of ledge, sliding is matched in the 4th sliding chamber 121
Conjunction is equipped with allotment frame 125, and 125 screw-internal thread fit of allotment frame is equipped with the second screw rod 122, second screw rod
122 right side extending end power are fitted with the second electricity favourable turn 124, and it is sliding that the second electricity favourable turn 124 is fixedly arranged on the described 4th
It connects in 121 right side inner wall of chamber, the 122 left side extending end of the second screw rod and the described 4th sliding 121 inner left wall of chamber turn
It is dynamic to be cooperatively connected, third electricity favourable turn 126,126 left-hand ends of the third electricity favourable turn are installed in 125 left end face of allotment frame
Power is fitted with Coupling Shaft 127, the Coupling Shaft 127 through 129 left and right sides end face of support plate and with the branch
The connection of 129 clearance fit of board, 127 left distal end of Coupling Shaft are installed with device 131 in succession, pacify on the left of the device in succession 131
Equipped with drill bit 133, photovoltaic power generation mechanism is additionally provided on the strut 103.
Valuably or illustratively, 119 bottom end face of shell is installed with link arm 135,135 bottom end of link arm
It is installed with dust collecting box 141, cinder catcher 142 is equipped in the dust collecting box 141, ash-collecting pipe 134 is equipped in the shell 119, it is described
Ash-collecting pipe 134 is through 119 left end face of shell and bottom end face is flushed with dust-proof 136 bottom wall of chamber, the ash-collecting pipe
134 run through 119 bottom end face of shell and are connected to the cinder catcher 142, and discharge is equipped in 142 inner bottom wall of cinder catcher
Hole 144 is connected in 141 right end face of dust collecting box equipped with the 5th sliding chamber 146 the tap 144 between, and described the
Being slidably installed in five sliding chambers 146 has hiding block 147, is installed with confinement block 143, institute on the left of 147 bottom end face of hiding block
State in 144 right side inner wall of tap with the confinement block 143 is mating is provided with restricted room 145,141 right side of dust collecting box
119 bottom end face of the shell be installed with mounting rack 154, left and right is through being equipped with the 6th sliding chamber in the mounting rack 154
148, the hiding block 147 is slidably installed in the described 6th sliding chamber 148, left and right is prolonged in 147 top end surface of hiding block
It stretches and is equipped with tooth edge strip 149, switching chamber 152 is equipped in the 6th sliding 148 inner roof wall of chamber, rotation is matched in the switching chamber 152
It closes and cincture 151 with teeth is installed, the tooth cincture 151 is intermeshed with the tooth edge strip 149, and 151 rear side end of tooth cincture
Power is fitted with the 4th electricity favourable turn 153, and the 4th electricity favourable turn 153 is fixedly arranged in the 152 rear side inner wall of switching chamber, from
And dust is collected automatically and convenient dust is discharged.
Valuably or illustratively, 100 top end surface of moving trolley is installed with pneumatic executive item 101, described pneumatically to hold
101 top power of row part is fitted with motion bar 102, and 102 top end of motion bar is installed with fixed plate 110, described
Fixed plate 110 is fixedly arranged on the described of 103 left side of strut and moves up and down 118 bottom end face of seat, to automatically control on described
118 lift adjustment of lower mobile base.
Valuably or illustratively, the photovoltaic power generation mechanism includes being fixedly mounted on 103 top end surface of strut
Photovoltaic panel 202,100 top of moving trolley are installed with battery 201, and the battery 201 electrically connects with the photovoltaic panel 202
It connects, is used consequently facilitating the electric elements in the present apparatus are powered.
When needing to aluminum alloy doors and windows drilling processing, the present apparatus is moved to by moving trolley 100 needs to punch first
Aluminum alloy doors and windows side, then by pneumatic executive item 101 drive move up and down seat 118 carry out lift adjustment, make to move down
Dynamic seat 118 is slided up and down along strut 103, until shell 119 slides into the opposite side for needing punch position, then starts the first electricity
107 drive shell 119 of favourable turn slides to the left, until dust-separation pad 132 is abutted with aluminum alloy doors and windows, then starts the second electricity favourable turn
124 drive drill bits 133 are moved to the left, meanwhile, starting third electricity favourable turn 126 drill bits 133 rotation can carry out aluminum alloy doors and windows
Drilling, the generated dust that drills can be fallen into cinder catcher 142 by ash-collecting pipe 134, when the dust in cinder catcher 142 fills up
When, the 4th electricity favourable turn 153 of starting drives hiding block 147, and sliding opening tap 144, dust can be arranged from tap 144 to the right
Out.
The beneficial effects of the present invention are: this is filled by moving trolley first when needing to aluminum alloy doors and windows drilling processing
The aluminum alloy doors and windows side for being moved to and needing to punch is set, seat is then moved up and down by the drive of pneumatic executive item and carries out rising-falling tone
Section, makes to move up and down seat and slides up and down along strut, until shell slides into the opposite side for needing punch position, then starts first
Electricity favourable turn drives shell to slide to the left, until dust-separation pad is abutted with aluminum alloy doors and windows, then starts the second electricity favourable turn and drives drill bit
It is moved to the left, meanwhile, starting third electricity favourable turn drill bit rotation can drill to aluminum alloy doors and windows, drill generated powder
Dirt can be fallen into cinder catcher by ash-collecting pipe, and when the dust in cinder catcher fills up, the 4th electricity favourable turn of starting drives hiding block to the right
Sliding opening tap, dust can be discharged from tap, and dust is completed while punching is protruded into automatic control to realize
Collection work improves working efficiency and improves working environment, and energy lift adjustment meets the punching demand of different height, together
When, by the setting of buffer substrate tablet, the cushion effect of shell is effectively reduced, increases stability in use and service life, is worthy to be popularized
It uses.
Those skilled in the art can define, can in the case of not departing from overall spirit of the invention and design
To make the various modifications for above embodiments.It falls within the scope of protection of the present invention.Protection scheme of the invention
It is subject to claims appended hereto.
Claims (4)
1. a kind of structural metallic materials Preparation equipment, including moving trolley, it is characterised in that: the moving trolley top is installed with branch
Bar, up and down through the first sliding chamber is equipped in the strut, described first, which slips intracavitary be slidably installed, moves up and down seat,
Described move up and down is equipped with the second sliding chamber in a bottom end face, described second, which slips intracavitary be slidably installed respectively, first
Dovetails and the second dovetails, the second dovetails screw-internal thread fit are equipped with the first screw rod, first screw rod
With the first dovetails clearance fit, and extending end and the described second sliding chamber inner left wall on the left of first screw rod
Be rotatably assorted connection, symmetrical above and below in the second dovetails left end face to be equipped with recess cavity, the recessed chamber inner sidewall and institute
It states and is fixedly installed with buffer substrate tablet between the first dovetails right end face, the second dovetails left-hand end on the upside of the recess cavity
It is equipped with third in face and slips chamber, the third slips intracavitary be slidably installed and connects block, and the block that connects is fixedly mounted on
The first dovetails right end face, described move up and down on the right side of the second sliding chamber are equipped with transmission cavity in seat, and described the
One screw rod, which is rotatably assorted, the part being mounted between the transmission cavity and the second sliding chamber and to be protruded into the transmission cavity,
Extending end is installed with the first taper wheel on the right side of first screw rod, and intermeshing is equipped with second on the upside of the first taper wheel
Taper wheel, the second taper wheel top power are fitted with the first electricity favourable turn, and the first electricity favourable turn is fixedly arranged on the biography
In defeated intracavitary roof, the first dovetails bottom end face is installed with shell, and left and right, which is run through to be equipped with, in the shell wears mouth, described
Shell left end face wears that mouth is opposite to be installed with dust-separation pad with described, is equipped with dust-proof chamber in the dust-separation pad, it is described wear it is fixed in mouth
There is support plate, shell right end face bottom is installed with ledge, and the 4th sliding chamber is equipped in the ledge top end surface, described
4th, which slips intracavitary be slidably installed, allotment frame, and the allotment frame screw-internal thread fit is equipped with the second screw rod, and described
Extending end power is fitted with the second electricity favourable turn on the right side of two screw rods, and it is sliding that the second electricity favourable turn is fixedly arranged on the described 4th
Extending end is rotatably assorted with the described 4th sliding chamber inner left wall on the right side of chamber in inner wall, on the left of second screw rod connect,
Third electricity favourable turn is installed in the allotment frame left end face, the third electricity favourable turn left-hand end power is fitted with switching
Axis, the Coupling Shaft is through the support plate left and right sides end face and connect with the support plate clearance fit, the Coupling Shaft
Left distal end is installed with device in succession, is equipped with drill bit on the left of the device in succession, photovoltaic power generation mechanism is additionally provided on the strut.
2. a kind of structural metallic materials Preparation equipment according to claim 1, it is characterised in that: the outer casing bottom end face
It is installed with link arm, the link arm bottom end is installed with dust collecting box, cinder catcher is equipped in the dust collecting box, is equipped in the shell
Ash-collecting pipe, the ash-collecting pipe is through the shell left end face and bottom end face is flushed with the dust-proof bottom of chamber wall, the collection ash
Pipe is connected to through the outer casing bottom end face and with the cinder catcher, and tap, the collection are equipped in the cinder catcher inner bottom wall
It is connected between the tap in cinder box right end face and is equipped with the 5th sliding chamber, the described 5th slips intracavitary be slidably installed
Have a hiding block, confinement block be installed on the left of the hiding block bottom end face, on the right side of the tap in inner wall with the confinement block grafting
It is equipped with restricted room, the outer casing bottom end face on the right side of the dust collecting box is installed with mounting rack, a left side in the mounting rack
The right side through be equipped with the 6th sliding chamber, the hiding block be slidably installed slipped the described 6th it is intracavitary, the hiding block top end surface
Interior left and right, which extends, is equipped with tooth edge strip, and the described 6th slips in intracavitary roof equipped with switching chamber, the intracavitary peace that is rotatably assorted of switching
Equipped with tooth cincture, the tooth cincture and the tooth edge strip are intermeshed, and the tooth cincture rear side end power is fitted with the
Four electricity favourable turns, the 4th electricity favourable turn are fixedly arranged on rear side of the switching chamber in inner wall.
3. a kind of structural metallic materials Preparation equipment according to claim 1, it is characterised in that: the moving trolley top end
Face is installed with pneumatic executive item, and the pneumatic executive item top power is fitted with motion bar, the motion bar top end
It is installed with fixed plate, what the fixed plate was fixedly arranged on the left of the strut described moves up and down a bottom end face.
4. a kind of structural metallic materials Preparation equipment according to claim 1, it is characterised in that: the photovoltaic power generation mechanism
Photovoltaic panel including being fixedly mounted on the strut top end surface, the moving trolley top are installed with battery, the battery
It is electrically connected with the photovoltaic panel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810858775.0A CN108941689A (en) | 2018-07-31 | 2018-07-31 | A kind of structural metallic materials Preparation equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810858775.0A CN108941689A (en) | 2018-07-31 | 2018-07-31 | A kind of structural metallic materials Preparation equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108941689A true CN108941689A (en) | 2018-12-07 |
Family
ID=64466446
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810858775.0A Pending CN108941689A (en) | 2018-07-31 | 2018-07-31 | A kind of structural metallic materials Preparation equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108941689A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111347077A (en) * | 2020-04-27 | 2020-06-30 | 福清市利恒科技有限公司 | Over-and-under type automatic drilling machine |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3114720A1 (en) * | 1981-04-11 | 1982-10-28 | Licentia Patent-Verwaltungs-Gmbh, 6000 Frankfurt | Work stand |
CN204770786U (en) * | 2015-07-23 | 2015-11-18 | 福州创杰机械有限公司 | Six main shafts bore boring combined machine tool |
CN204868135U (en) * | 2015-05-13 | 2015-12-16 | 铀兴科技股份有限公司 | Six-shaft boring and milling machine |
CN207508350U (en) * | 2017-11-13 | 2018-06-19 | 刘伟 | A kind of dust-proof perforating device of lift metope |
CN207521746U (en) * | 2017-10-24 | 2018-06-22 | 徐州海伦哲专用车辆股份有限公司 | A kind of novel chassis crossbeam drilling tool |
-
2018
- 2018-07-31 CN CN201810858775.0A patent/CN108941689A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3114720A1 (en) * | 1981-04-11 | 1982-10-28 | Licentia Patent-Verwaltungs-Gmbh, 6000 Frankfurt | Work stand |
CN204868135U (en) * | 2015-05-13 | 2015-12-16 | 铀兴科技股份有限公司 | Six-shaft boring and milling machine |
CN204770786U (en) * | 2015-07-23 | 2015-11-18 | 福州创杰机械有限公司 | Six main shafts bore boring combined machine tool |
CN207521746U (en) * | 2017-10-24 | 2018-06-22 | 徐州海伦哲专用车辆股份有限公司 | A kind of novel chassis crossbeam drilling tool |
CN207508350U (en) * | 2017-11-13 | 2018-06-19 | 刘伟 | A kind of dust-proof perforating device of lift metope |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111347077A (en) * | 2020-04-27 | 2020-06-30 | 福清市利恒科技有限公司 | Over-and-under type automatic drilling machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205996662U (en) | A kind of Hardware fitting processing drilling machine with automatic dedusting function | |
CN207508767U (en) | A kind of drilling equipment for being used to process handware | |
CN110254092A (en) | A kind of dust-proof blackboard eraser | |
CN108941689A (en) | A kind of structural metallic materials Preparation equipment | |
CN208303930U (en) | A kind of drilling machine with cleaning agency | |
CN108994337A (en) | A kind of aluminum alloy door-window corner connection method | |
CN109014297A (en) | A kind of corner connection method of novel aluminum alloy door and window | |
CN109047819A (en) | A kind of medical facilities producing unit | |
CN109014967A (en) | A kind of convenient and fast aluminum alloy door-window corner connection method | |
CN208289532U (en) | A kind of square pile end plate production scrap collecting mechanism of drilling machine | |
CN208232330U (en) | A kind of 3D printer that can be cleared up automatically | |
CN108889982A (en) | A kind of novel Crosscut production line for metal sheet materials | |
CN215200949U (en) | Scrap iron recovery device for machining | |
CN211777187U (en) | Drilling equipment for construction | |
CN108972030A (en) | A kind of fixed mechanism of novel revolving door | |
CN212671555U (en) | Drilling machine for geotechnical engineering | |
CN208020371U (en) | A kind of cabinet processing damping device | |
CN108907876A (en) | A kind of protection cabinet process equipment | |
CN210357522U (en) | Barley flour mill | |
CN108889983A (en) | A kind of Crosscut production line for metal sheet materials | |
CN109049154A (en) | Equipment for manufacturing photo frame | |
CN108943429A (en) | A kind of novel building robot | |
CN108818765A (en) | Novel photo album generation method and terminal | |
CN109227732A (en) | A kind of novel anti-theft packing case | |
CN109108335A (en) | Photo album generating method and terminal |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181207 |
|
RJ01 | Rejection of invention patent application after publication |