CN108931386A - Large-size stainless steel groove tank filling water test method under hot environment - Google Patents
Large-size stainless steel groove tank filling water test method under hot environment Download PDFInfo
- Publication number
- CN108931386A CN108931386A CN201710390103.7A CN201710390103A CN108931386A CN 108931386 A CN108931386 A CN 108931386A CN 201710390103 A CN201710390103 A CN 201710390103A CN 108931386 A CN108931386 A CN 108931386A
- Authority
- CN
- China
- Prior art keywords
- tank
- stainless steel
- test
- water
- filling water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01M—TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- G01M99/00—Subject matter not provided for in other groups of this subclass
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01M—TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- G01M3/00—Investigating fluid-tightness of structures
- G01M3/02—Investigating fluid-tightness of structures by using fluid or vacuum
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)
Abstract
A kind of large-size stainless steel groove tank filling water test method under hot environment after stainless steel groove tank is built, carries out filling water test, it is characterised in that include the following steps:A, before filling water test, all attachmentes and other components with tank body welding should all complete, b, water examination, c, tank body foundation settlement detection, the intensity and leak test of d, tank skin, e, the fixed intensity and leak test pushed up.Large-size stainless steel groove tank filling water test method, which has to construct to stainless steel groove tank, under hot environment of the invention proposes the filling water test step of complete set, tank bottom tightness can be monitored, intensity, stability and the tightness of tank bottom intensity and tightness and fixed top, ensure the advantages of 2 ten thousand stere stainless steel groove tank filling water test result of Saudi Arabia meets Unite States Standard and Saudi Arabia SABIC standard requirements.
Description
Technical field
The present invention relates to a kind of groove tank filling water tests, specifically, being that large-size stainless steel groove tank is filled under a kind of hot environment
Water test method.
Background technique
The large-size stainless steel groove tank project of 2 ten thousand stere of Saudi Arabia is located on the sandy soil of Persian Gulf seashore, and construction environment dust storm is big,
Hot weather is long, and air humidity is big, and construction operation difficulty is big.Stainless steel groove tank filling water test is the routine in a groove tank production
Way.But the consigner of this engineering project proposes Saudi Arabia SABIC and U.S.'s ASME standard, proposes large-scale under high temperature environment
The specific requirement of stainless steel groove tank filling water test must be set up higher, severeer technical safety measure reply as the side of undertaking the construction of
The filling water test of large-size stainless steel groove tank under external hot environment.
Summary of the invention
The purpose of the present invention is to propose large-size stainless steel groove tank filling water test side under a kind of safe and reliable hot environment
Method.
To achieve the above object, the technical solution of the invention is as follows:
A kind of large-size stainless steel groove tank filling water test method under hot environment, 2 ten thousand stere of stainless steel sink tank volume, groove tank diameter
The high 24.55m of 38m, groove tank, tank skin high 19.1m after stainless steel groove tank is built, carry out filling water test, it is characterised in that including
Following steps:
A, before filling water test, all attachmentes and other and tank body welding component should all complete;All and leak test
Related weld seam, must not brushing paint;
B, water examination
Filling water test must carry out chloride ion, chloride, pH value with water and detect, it is necessary to meet code requirement;
C, tank body foundation settlement is tested
It should reinforce tank body foundation settlement survey in filling water test, if the sedimentation not allowed occurs for tank body basis, water-filling should be stopped, to
After processing, it can continue to test;During water-filling and water-discharging, loophole should be opened, and tank body basis must not be made to soak;Tank body base
Observation point is set by design requirement in tank skin lower part in plinth settling test, it is desirable that any tank body circumference differential settlement 13mm or entirety
50mm is settled, should report owner, and stop water-filling, it is to be processed;
D, the intensity and leak test of tank skin
After being filled to design highest liquid level and keeping for 24 hours, make the intensity and leak test of tank skin, it is tank skin ne-leakage, without exception
It is deformed into qualification;If keeping liquid level 300mm lower than leakage, and repaired in strict accordance with welding procedure it was found that should discharge water when infiltration
It mends;
E, the intensity and leak test on fixed top
So that tank headspace is filled air and boost to test pressure, tank deck deformation without exception, weld seam ne-leakage is qualification;Fixed top
Intensity and leak test after, should make to communicate with atmosphere inside groove tank immediately, be restored to normal pressure.
Large-size stainless steel groove tank filling water test method can also use technical measures below under hot environment of the invention
To further realize.
Method above-mentioned, wherein the length of the repairing is no less than 50mm, same position number of rewelding is no more than two
It is secondary.
Method above-mentioned, wherein the intensity on the fixed top and leak test are causing the weather of high temperature variation not
Preferably carry out.
Method above-mentioned, wherein the filling water test is clean fresh water with water, water quality need to test, and water temperature is not less than 5
℃。
After adopting the above technical scheme, under hot environment of the invention large-size stainless steel groove tank filling water test method have with
Lower advantage:
1, the filling water test step that complete set is proposed to stainless steel groove tank anti-corrosion, can monitor tank bottom tightness, tank bottom intensity
And intensity, stability and the tightness of tightness and fixed top;
2, perfect anticorrosive quality guarantee system is established, it is mutual using Unite States Standard and Saudi Arabia SABIC standard in the construction process
In conjunction with the check criteria being complementary to one another again, a series of experiments and the observations such as the settlement observation of stainless steel sink tank base are carried out, is ensured
2 ten thousand stere stainless steel groove tank filling water test result of Saudi Arabia meets design specification requirement.
Specific embodiment
The present invention is further illustrated below by way of specific embodiment.
Embodiment 1
Large-size stainless steel groove tank filling water test method under hot environment of the invention, 2 ten thousand stere of stainless steel sink tank volume, groove tank
The high 24.55m of diameter 38m, groove tank, tank skin high 19.1m after stainless steel groove tank is built, carry out filling water test, including following step
Suddenly:
A, before filling water test, all attachmentes and other and tank body welding component should all complete;All and leak test
Related weld seam, must not brushing paint;The filling water test is clean fresh water with water, and water temperature is not less than 5 DEG C.
B, water examination
Filling water test, which must carry out chloride ion, chloride, pH value with water, to be detected, it is necessary to meet code requirement.
C, tank body foundation settlement is tested
It should reinforce tank body foundation settlement survey in filling water test, if the sedimentation not allowed occurs for tank body basis, water-filling should be stopped, to
After processing, it can continue to test;During water-filling and water-discharging, loophole should be opened, and tank body basis must not be made to soak;Tank body base
Observation point is set by design requirement in tank skin lower part in plinth settling test, it is desirable that any tank body circumference differential settlement 13mm or entirety
50mm is settled, should report owner, and stop water-filling, it is to be processed.
D, the intensity and leak test of tank skin
After being filled to design highest liquid level and keeping for 24 hours, make the intensity and leak test of tank skin, it is tank skin ne-leakage, without exception
It is deformed into qualification;If keeping liquid level 300mm lower than leakage, and repaired in strict accordance with welding procedure it was found that should discharge water when infiltration
It mends;The length of the repairing is no less than 50mm, and same position number of rewelding is no more than twice.
E, the intensity and leak test on fixed top
So that tank headspace is filled air and boost to test pressure, tank deck deformation without exception, weld seam ne-leakage is qualification;Fixed top
Intensity and leak test after, should make to communicate with atmosphere inside groove tank immediately, be restored to normal pressure;The intensity on the fixed top and
Leak test should not be carried out in the weather for causing high temperature to change.
The present invention has substantive distinguishing features and significant technological progress, large-size stainless steel groove tank under hot environment of the invention
Filling water test method proposes the groove tank filling water test step of complete set, formulates practicable construction management measure, establishment peace
Complete reliable stainless steel groove tank water-filling construction technology, is allowed to meet Saudi Arabia SABIC and U.S.'s ASME standard.High temperature ring of the invention
The construction filling water test method of large-size stainless steel groove tank is used in 2 ten thousand stere stainless steel groove tank engineering of Saudi Arabia under border, effect
Significantly, it has been widely recognized.
Above embodiments are used for illustrative purposes only, rather than limitation of the present invention, the technology people in relation to technical field
Member, without departing from the spirit and scope of the present invention, can also make various transformation or variation.Therefore, all equivalent
Technical solution also should belong to scope of the invention, should be limited by each claim.
Claims (4)
1. a kind of large-size stainless steel groove tank filling water test method under hot environment, 2 ten thousand stere of stainless steel sink tank volume, groove tank are straight
The high 24.55m of diameter 38m, groove tank, tank skin high 19.1m after stainless steel groove tank is built, carry out filling water test, it is characterised in that packet
Include following steps:
A, before filling water test, all attachmentes and other and tank body welding component should all complete;All and leak test
Related weld seam, must not brushing paint;
B, test water must carry out chloride ion, chloride, pH value inspection;
C, tank body foundation settlement survey should be reinforced in filling water test, if the sedimentation not allowed occurs for tank body basis, water-filling should be stopped,
After to be processed, it can continue to test;During water-filling and water-discharging, loophole should be opened, and tank body basis must not be made to soak;Tank body
Observation point is set by design requirement in tank skin lower part in foundation settlement test, it is desirable that any tank body circumference differential settlement 13mm or whole
Body settles 50mm, should report owner, and stop water-filling, to be processed;
D, the intensity and leak test of tank skin
After being filled to design highest liquid level and keeping for 24 hours, make the intensity and leak test of tank skin, it is tank skin ne-leakage, without exception
It is deformed into qualification;If keeping liquid level 300mm lower than leakage, and repaired in strict accordance with welding procedure it was found that should discharge water when infiltration
It mends;
E, the intensity and leak test on fixed top
So that tank headspace is filled air and boost to test pressure, tank deck deformation without exception, weld seam ne-leakage is qualification;Fixed top
Intensity and leak test after, should make to communicate with atmosphere inside groove tank immediately, be restored to normal pressure.
2. large-size stainless steel groove tank filling water test method under hot environment as described in claim 1, which is characterized in that described to repair
The length of benefit is no less than 50mm, and same position number of rewelding is no more than twice.
3. large-size stainless steel groove tank filling water test method under hot environment as described in claim 1, which is characterized in that described solid
Surely the intensity and leak test pushed up should not be carried out in the weather for causing high temperature to change.
4. large-size stainless steel groove tank filling water test method under hot environment as described in claim 1, which is characterized in that described to fill
Water test is clean fresh water with water, and water temperature is not less than 5 DEG C.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710390103.7A CN108931386A (en) | 2017-05-27 | 2017-05-27 | Large-size stainless steel groove tank filling water test method under hot environment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710390103.7A CN108931386A (en) | 2017-05-27 | 2017-05-27 | Large-size stainless steel groove tank filling water test method under hot environment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108931386A true CN108931386A (en) | 2018-12-04 |
Family
ID=64450738
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710390103.7A Pending CN108931386A (en) | 2017-05-27 | 2017-05-27 | Large-size stainless steel groove tank filling water test method under hot environment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108931386A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7500592B1 (en) * | 2005-06-24 | 2009-03-10 | Davor Petricio Yaksic | Storage tank construction |
CN103692095A (en) * | 2013-12-11 | 2014-04-02 | 中国化学工程第四建设有限公司 | Installation and construction method for large-scale single-disc type outer floating top storage tank |
CN104060873A (en) * | 2014-06-30 | 2014-09-24 | 成都高普石油工程技术有限公司 | Vertical storage tank prefabricating installing construction method |
CN104843357A (en) * | 2014-02-17 | 2015-08-19 | 五冶集团上海有限公司 | Tank of benzene hydrogenation engineering and manufacturing and mounting method thereof |
CN105290573A (en) * | 2014-06-17 | 2016-02-03 | 中石化南京工程有限公司 | Welding method of medium-sized storage tank of 1000m<3>00Cr14Ni14Si4 steel |
CN106119090A (en) * | 2016-06-23 | 2016-11-16 | 乐山力朴能源环保科技有限公司 | A kind of anaerobic digestor being applied in bionethanation system |
-
2017
- 2017-05-27 CN CN201710390103.7A patent/CN108931386A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7500592B1 (en) * | 2005-06-24 | 2009-03-10 | Davor Petricio Yaksic | Storage tank construction |
CN103692095A (en) * | 2013-12-11 | 2014-04-02 | 中国化学工程第四建设有限公司 | Installation and construction method for large-scale single-disc type outer floating top storage tank |
CN104843357A (en) * | 2014-02-17 | 2015-08-19 | 五冶集团上海有限公司 | Tank of benzene hydrogenation engineering and manufacturing and mounting method thereof |
CN105290573A (en) * | 2014-06-17 | 2016-02-03 | 中石化南京工程有限公司 | Welding method of medium-sized storage tank of 1000m<3>00Cr14Ni14Si4 steel |
CN104060873A (en) * | 2014-06-30 | 2014-09-24 | 成都高普石油工程技术有限公司 | Vertical storage tank prefabricating installing construction method |
CN106119090A (en) * | 2016-06-23 | 2016-11-16 | 乐山力朴能源环保科技有限公司 | A kind of anaerobic digestor being applied in bionethanation system |
Non-Patent Citations (1)
Title |
---|
何利民、高祁: "《大型油气储运设施施工》", 31 July 2007 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105699194A (en) | Pressure vessel pressure-tight test and airtight test examination method | |
Fernández et al. | Fatigue performance of grade R4 and R5 mooring chains in seawater | |
CN104048105A (en) | Low pressure pipeline mounting process used in 300m<2> sintering low temperature waste heat power generation system | |
DE102005008308B4 (en) | Method for leak detection on leak-proof linings of tanks and containers or the like | |
CN108931386A (en) | Large-size stainless steel groove tank filling water test method under hot environment | |
Kim | Fracture analysis of tube boiler for physical explosion accident | |
Kodikara et al. | Lessons learned from large-diameter pipe failure case studies | |
CN105081705B (en) | The preparation method of high pressure nitrogen spheric holder | |
RU2516766C1 (en) | Method to recover bearing capacity of pipeline | |
CN104854390B (en) | Reduce the internal mechanical stresses improved method of pipeline welding regional stress corrosion cracking | |
KR101910473B1 (en) | Localized leak detection apparatus for the metal containment vessel of nuclear power | |
CN209741787U (en) | Hydropower station diversion penstock grouting plugging structure | |
CN110490493A (en) | A kind of Safety Assessment Methods of austenitic stainless steel pressure vessels containing defect based on partial safety factor | |
Nishinoiri et al. | Inner pressure/bending creep test on circumferentially welded large diameter pipe of Grade 91 steel: creep damage mechanism and applicability of NDE | |
Rao et al. | In-fabrication and pre-service care on stainless steel pressure vessels | |
Shao et al. | Fitness for Service Assessment of a Packed Column Subjected to Fire Damage | |
CN104344983A (en) | Pit defect preparation device for pipeline | |
JP2000002638A (en) | Method for water pressure testing of steel pipe | |
Shannon et al. | Lessons learnt on pipe failure mechanisms from observation of exhumed cast iron pipes | |
JP5392876B1 (en) | Concrete silo damage inspection method | |
KR20170000920U (en) | watertight test apparatus providing prevention expansion deformation of pipe assembly | |
CN110672151B (en) | Evaluation method for pipeline repairing effect by using epoxy steel sleeve | |
RU2378558C1 (en) | Method for prevention of pipeline destruction in zones of mechanical stress concentration | |
RU2638121C1 (en) | Method for preventing stress corrosion cracking in underground pipelines | |
CN106285137B (en) | The remodeling method of embed-type single layer steel liquid storage structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181204 |
|
RJ01 | Rejection of invention patent application after publication |