CN108931356A - 一种拆坝对坝后细粒沉积物侵蚀影响装置及侵蚀量计算方法 - Google Patents

一种拆坝对坝后细粒沉积物侵蚀影响装置及侵蚀量计算方法 Download PDF

Info

Publication number
CN108931356A
CN108931356A CN201810826546.0A CN201810826546A CN108931356A CN 108931356 A CN108931356 A CN 108931356A CN 201810826546 A CN201810826546 A CN 201810826546A CN 108931356 A CN108931356 A CN 108931356A
Authority
CN
China
Prior art keywords
dam
sink
water
fine
regular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810826546.0A
Other languages
English (en)
Other versions
CN108931356B (zh
Inventor
粟帆
粟一帆
李卫明
刘德富
朱澄浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Three Gorges University CTGU
Original Assignee
China Three Gorges University CTGU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Three Gorges University CTGU filed Critical China Three Gorges University CTGU
Priority to CN201810826546.0A priority Critical patent/CN108931356B/zh
Publication of CN108931356A publication Critical patent/CN108931356A/zh
Application granted granted Critical
Publication of CN108931356B publication Critical patent/CN108931356B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M10/00Hydrodynamic testing; Arrangements in or on ship-testing tanks or water tunnels

Landscapes

  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • General Physics & Mathematics (AREA)
  • Revetment (AREA)

Abstract

一种拆坝对坝后细粒沉积物侵蚀影响装置,包括规则长方形水槽,规则长方形水槽一端设有供水装置,供水装置后方的规则长方形水槽内设置有大坝模型,大坝模型后方的规则长方形水槽内设置有水力学测量仪器,规则长方形水槽下方设置有升降装置,大坝模型与供水装置之间的规则长方形水槽内放置有细粒砂堆积体。本发明提供的一种拆坝对坝后细粒沉积物侵蚀影响装置及侵蚀量计算方法,可以解决现有技术无法实验室评估拆坝影响的问题,能模拟上游大坝拆除后,水库内淤积的细粒砂的侵蚀实验装置及测定侵蚀量的方法,能够在实验室中获取溃坝后的泥沙侵蚀实验数据。

Description

一种拆坝对坝后细粒沉积物侵蚀影响装置及侵蚀量计算方法
技术领域
本发明涉及水力学模型实验设施技术领域,尤其是一种拆坝对坝后细粒沉积物侵蚀影响装置及侵蚀量计算方法。
背景技术
拆坝已经成为了一种重要的河流管理措施,而拆坝后水库中大量淤积的泥沙的侵蚀问题,将成为拆坝与否的决定性因素之一。目前我国已经有多座小型水坝即将达到使用寿命,还有一些病危坝急需处理,且由于我国北方河流多沙的特点,急需一种能够模拟拆坝后的细粒砂侵蚀过程模型,来评估拆坝对下游河道的影响。
发明内容
本发明所要解决的技术问题是提供一种拆坝对坝后细粒沉积物侵蚀影响装置及侵蚀量计算方法,可以解决现有技术无法实验室评估拆坝影响的问题,能模拟上游大坝拆除后,水库内淤积的细粒砂的侵蚀实验装置及测定侵蚀量的方法,能够在实验室中获取溃坝后的泥沙侵蚀实验数据。
为解决上述技术问题,本发明所采用的技术方案是:一种拆坝对坝后细粒沉积物侵蚀影响装置,包括规则长方形水槽,规则长方形水槽一端设有供水装置,供水装置后方的规则长方形水槽内设置有大坝模型,大坝模型后方的规则长方形水槽内设置有水力学测量仪器,规则长方形水槽下方设置有升降装置,大坝模型与供水装置之间的规则长方形水槽内放置有细粒砂堆积体。
水力学测量仪器中,流速仪和悬浮沉积物沉降速度分析仪分别位于细粒砂后的规则长方形水槽的两侧,流速仪的后方设置有测量长尺。
大坝模型为不锈钢模型,通过卡槽设置于规则长方形水槽内。
一种采用上述装置进行侵蚀量计算的方法,该方法包括以下步骤:
步骤1:向大坝模型与供水装置之间的规则长方形水槽内注水直至水莫过细粒砂堆积体上表面;
步骤2:测出供水装置的来水流速,并对规则长方形水槽进行注水,在注水的同时抽出大坝模型模拟拆坝过程;
步骤3:打开流速仪和悬浮沉积物沉降速度分析仪,将水流速度记为V,水深记为H,细沙沉降速率记为vs
步骤4:按照下述公式计算下游水流中悬移质浓度C,其中重力加速度为g
步骤5:基于公式质量m=C×A,由于水槽6为规则立方体,通过水深计算出过水面积A,通过步骤4算出悬移质浓度C,即可得泥沙侵蚀量m。
步骤1中,注水直至水莫过细粒砂堆积体上表面后,将整个装置静置24小时,使水和沙充分接触。
步骤5中,过水面积A由水深乘以水槽宽度得到。
本发明提供的一种拆坝对坝后细粒沉积物侵蚀影响装置及侵蚀量计算方法,有益效果如下:
1、通过调整供水装置的水流的流速,可以模拟不同流速的天然洪水。
2、通过升降装置,达到模拟不同底坡的河床的目的。
3、设置不同水力学测量仪器,可以方便快捷地捕捉到难以获取的拆坝实验数据。
4、安装简单,操作方便,可以广泛应用于拆坝实验当中,对正确认识拆坝对坝后沉积泥沙的侵蚀机理,从而为真实拆坝工程提供理论支撑。
可以解决现有技术无法实验室评估拆坝影响的问题,能模拟上游大坝拆除后,水库内淤积的细粒砂的侵蚀实验装置及测定侵蚀量的方法,能够在实验室中获取溃坝后的泥沙侵蚀实验数据。
附图说明
下面结合附图和实施例对本发明作进一步说明:
图1为本发明装置的俯视图;
图2为本发明装置的竖向剖视图;
图3为本发明装置的升降装置的示意图。
具体实施方式
实施例一
如图1-图3所示,一种拆坝对坝后细粒沉积物侵蚀影响装置,包括规则长方形水槽6,规则长方形水槽6一端设有供水装置1,供水装置1后方的规则长方形水槽6内设置有大坝模型2,大坝模型2后方的规则长方形水槽6内设置有水力学测量仪器,规则长方形水槽6下方设置有升降装置7,大坝模型2与供水装置1之间的规则长方形水槽6内放置有细粒砂堆积体8。
水力学测量仪器中,流速仪3和悬浮沉积物沉降速度分析仪5分别位于细粒砂后的规则长方形水槽6的两侧,流速仪3的后方设置有测量长尺4,测量长尺4用于测量水深。
大坝模型2为不锈钢模型,防止水流及泥沙对挡板造成损坏,通过卡槽设置于规则长方形水槽6内。
流速仪3优选为声学多普勒流速仪(ADV),供水装置1优选为供水龙头,规则长方形水槽6为采用有机玻璃制成的水槽。
升降装置7为嵌套式升降结构。
实施例二
一种采用上述装置进行侵蚀量计算的方法,该方法包括以下步骤:
步骤1:向大坝模型2与供水装置1之间的规则长方形水槽6内注水直至水莫过细粒砂堆积体8上表面;
步骤2:利用量筒、秒表和测量长尺4测量出供水龙头的来水流速,并对规则长方形水槽6进行注水,在注水的同时抽出大坝模型2模拟拆坝过程;
步骤3:打开流速仪3和悬浮沉积物沉降速度分析仪5,将水流速度记为V,水深记为H,细沙沉降速率记为vs
步骤4:按照下述公式计算下游水流中悬移质浓度C,其中重力加速度为g
步骤5:基于公式质量m=C×A,由于水槽6为规则立方体,通过水深计算出过水面积A,通过步骤4算出悬移质浓度C,即可得泥沙侵蚀量m。
步骤1中,注水直至水莫过细粒砂堆积体8上表面后,将整个装置静置24小时,使水和沙充分接触。
步骤5中,过水面积A由水深乘以水槽宽度得到。
上述的实施例仅为本发明的优选技术方案,而不应视为对于本发明的限制,本申请中的实施例及实施例中的特征在不冲突的情况下,可以相互任意组合。本发明的保护范围应以权利要求记载的技术方案,包括权利要求记载的技术方案中技术特征的等同替换方案为保护范围。即在此范围内的等同替换改进,也在本发明的保护范围之内。

Claims (6)

1.一种拆坝对坝后细粒沉积物侵蚀影响装置,包括规则长方形水槽(6),规则长方形水槽(6)一端设有供水装置(1),其特征在于:供水装置(1)后方的规则长方形水槽(6)内设置有大坝模型(2),大坝模型(2)后方的规则长方形水槽(6)内设置有水力学测量仪器,规则长方形水槽(6)下方设置有升降装置(7),大坝模型(2)与供水装置(1)之间的规则长方形水槽(6)内放置有细粒砂堆积体(8)。
2.根据权利要求1所述的一种拆坝对坝后细粒沉积物侵蚀影响装置,其特征在于:水力学测量仪器中,流速仪(3)和悬浮沉积物沉降速度分析仪(5)分别位于细粒砂后的规则长方形水槽(6)的两侧,流速仪(3)的后方设置有测量长尺(4)。
3.根据权利要求1所述的一种拆坝对坝后细粒沉积物侵蚀影响装置,其特征在于:大坝模型(2)为不锈钢模型,通过卡槽设置于规则长方形水槽(6)内。
4.一种采用上述权利要求1-3中任一项所述的装置进行侵蚀量计算的方法,其特征在于该方法包括以下步骤:
步骤1:向大坝模型(2)与供水装置(1)之间的规则长方形水槽(6)内注水直至水莫过细粒砂堆积体(8)上表面;
步骤2:测出供水装置(1)的来水流速,并对规则长方形水槽(6)进行注水,在注水的同时抽出大坝模型(2)模拟拆坝过程;
步骤3:打开流速仪(3)和悬浮沉积物沉降速度分析仪(5),将水流速度记为V,水深记为H,细沙沉降速率记为vs
步骤4:按照下述公式计算下游水流中悬移质浓度C,其中重力加速度为g
步骤5:基于公式质量m=C×A,由于水槽6为规则立方体,通过水深计算出过水面积A,通过步骤4算出悬移质浓度C,即可得泥沙侵蚀量m。
5.根据权利要求4所述的方法,其特征在于:步骤1中,注水直至水莫过细粒砂堆积体(8)上表面后,将整个装置静置24小时,使水和沙充分接触。
6.根据权利要求4所述的方法,其特征在于:步骤5中,过水面积A由水深乘以水槽宽度得到。
CN201810826546.0A 2018-07-25 2018-07-25 一种拆坝对坝后细粒沉积物侵蚀影响装置及侵蚀量计算方法 Active CN108931356B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810826546.0A CN108931356B (zh) 2018-07-25 2018-07-25 一种拆坝对坝后细粒沉积物侵蚀影响装置及侵蚀量计算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810826546.0A CN108931356B (zh) 2018-07-25 2018-07-25 一种拆坝对坝后细粒沉积物侵蚀影响装置及侵蚀量计算方法

Publications (2)

Publication Number Publication Date
CN108931356A true CN108931356A (zh) 2018-12-04
CN108931356B CN108931356B (zh) 2019-07-26

Family

ID=64444633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810826546.0A Active CN108931356B (zh) 2018-07-25 2018-07-25 一种拆坝对坝后细粒沉积物侵蚀影响装置及侵蚀量计算方法

Country Status (1)

Country Link
CN (1) CN108931356B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116086544A (zh) * 2023-02-23 2023-05-09 中国水利水电科学研究院 一种大坝坝面多物理量一体化监测方法及装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1194693A (ja) * 1997-09-24 1999-04-09 Kikai Kenkyu Kk 水理実験装置
CN103091214A (zh) * 2011-10-29 2013-05-08 成都理工大学 坝下渗流实验装置
CN106895953A (zh) * 2017-01-25 2017-06-27 浙江大学 溃坝实验中多种测量仪器的时间同步方法
CN107219061A (zh) * 2017-06-23 2017-09-29 中国石油大学胜利学院 一种多功能沉积水槽实验装置及方法
CN107907299A (zh) * 2017-11-06 2018-04-13 安徽理工大学 适用于瞬时溃坝试验的装置及其运行方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1194693A (ja) * 1997-09-24 1999-04-09 Kikai Kenkyu Kk 水理実験装置
CN103091214A (zh) * 2011-10-29 2013-05-08 成都理工大学 坝下渗流实验装置
CN106895953A (zh) * 2017-01-25 2017-06-27 浙江大学 溃坝实验中多种测量仪器的时间同步方法
CN107219061A (zh) * 2017-06-23 2017-09-29 中国石油大学胜利学院 一种多功能沉积水槽实验装置及方法
CN107907299A (zh) * 2017-11-06 2018-04-13 安徽理工大学 适用于瞬时溃坝试验的装置及其运行方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116086544A (zh) * 2023-02-23 2023-05-09 中国水利水电科学研究院 一种大坝坝面多物理量一体化监测方法及装置
CN116086544B (zh) * 2023-02-23 2023-10-13 中国水利水电科学研究院 一种大坝坝面多物理量一体化监测方法及装置

Also Published As

Publication number Publication date
CN108931356B (zh) 2019-07-26

Similar Documents

Publication Publication Date Title
Rosenberry A seepage meter designed for use in flowing water
Toublanc et al. Formation and structure of the turbidity maximum in the macrotidal Charente estuary (France): Influence of fluvial and tidal forcing
Falconer et al. Numerical modelling of suspended sediment fluxes in estuarine waters
CN113705127A (zh) 尾矿库溃坝风险预估及应急响应方法、装置及电子设备
Imanian et al. Experimental and numerical study of flow over a broad-crested weir under different hydraulic head ratios
CN108931356B (zh) 一种拆坝对坝后细粒沉积物侵蚀影响装置及侵蚀量计算方法
Shaazizov Studies of turbulent flow characteristics of dividing open water streams
Kim H2D morphodynamic model considering wave, current and sediment interaction
CN115034468B (zh) 一种淤泥质海岸丁坝或防波堤拆除后海床冲淤变化预测方法
O'connor et al. A three-dimensional model of suspended particulate sediment transport
Rehman et al. Influence of lateral flow contraction on bed shear stress estimation by using measured turbulent kinetic energy
Wang et al. An ISPH with modified k–ε closure for simulating breaking periodic waves
Abbaspour et al. Effect of buried plates on scour profiles downstream of hydraulic jump in open channels with horizontal and reverse bed slopes
Yu et al. Experimental study on wave-and current-induced scour around an anti-deposition permeable breakwater
CN108827871B (zh) 一种管式泥沙侵蚀试验装置中泥沙表面切应力确定方法
CN115795856B (zh) 一种用于水闸下游流量的监测方法
Lee et al. Scaling issues for laboratory modeling of bridge pier scour
Zhao et al. Experimental study and a physical model on the geomorphic response mechanisms of meandering rivers under progressive sediment reduction
Gong et al. Experimental study on wave attenuation and cross-shore profiles by submerged flexible vegetation
Wang Local scour at submerged weirs
Deng et al. Numerical study of erosion and deposition of sandy beach in presence of breakwater with spill hole
Wang et al. A three-dimensional modeling of the morphological change in the Liaodong Bay
Li Pier streamlining as a bridge local Scour Countermeasure and The Underlying Scour Mechanism
Mohr et al. The variability of marine sediment erodibility with depth: Centimetric scale effects detected from portable erosion flume tests
Wu et al. A depth-averaged 2-D model of non-cohesive dam/levee breach processes

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant