CN108921412A - 一种基于模拟智能的项目可行性评估系统 - Google Patents

一种基于模拟智能的项目可行性评估系统 Download PDF

Info

Publication number
CN108921412A
CN108921412A CN201810653889.1A CN201810653889A CN108921412A CN 108921412 A CN108921412 A CN 108921412A CN 201810653889 A CN201810653889 A CN 201810653889A CN 108921412 A CN108921412 A CN 108921412A
Authority
CN
China
Prior art keywords
construction
simulation
building
assessment system
project
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810653889.1A
Other languages
English (en)
Other versions
CN108921412B (zh
Inventor
胡敏
姜晨晖
顾卿灵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shipbuilding NDRI Engineering Co Ltd
Original Assignee
China Shipbuilding NDRI Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shipbuilding NDRI Engineering Co Ltd filed Critical China Shipbuilding NDRI Engineering Co Ltd
Priority to CN201810653889.1A priority Critical patent/CN108921412B/zh
Publication of CN108921412A publication Critical patent/CN108921412A/zh
Application granted granted Critical
Publication of CN108921412B publication Critical patent/CN108921412B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Abstract

本发明提供了一种基于模拟智能的项目可行性评估系统,其特征在于:通过对目标建筑施工方案以及各类性能的模拟结果,来评价该建筑的工程难度、后期运维成本及相关的评价目标。本评估平台主要利用建筑信息模型,并对其进行分析后,模拟出真实环境下的各类数据后,对该项目的可行性进行评估。从而能根据该评估结果,预先的来进行不当施工或建设构件的修正。

Description

一种基于模拟智能的项目可行性评估系统
技术领域
本发明涉及工程项目的管理系统领域,具体地,涉及一种基于模拟智能的项目可行性评估系统。
背景技术
目前国内勘察设计行业正在研究行业的发展趋势和如何发展,向着提升企业研发能力、创新能力、协同工作能力、知识管理能力的工程公司方向发展,运用互联网+创新模式及先进的技术手段和先进的管理方法开展业务转型与发展。
工程项目建设是一个从概念设计、到详细设计、再到施工深化设计、直至施工实施。这一过程既是一个传统的建设过程,又是一个可以运用新技术、新方法、新模式的创新过程,也是企业一种创新能力打造的过程。
国外发达国家,以设计为龙头的大型工程公司,他们都建立了技术(或研发)工作平台,为项目在技术和管理二个方面提供着指导作用,他们有先进的仿真与分析技术,有完整文档管理体系和工程数据库,有专业协同工作的平台,以及良好的社会信息化网络资源。但是,尚未能有一种通过模拟的工程进展等的方式来对工程的可行性进行评估的方案。
发明内容
本发明旨在克服现有技术中的缺陷,提供一种基于模拟智能的方式来对目标开展的工程项目进行可信性评估的方法和系统。
本发明提供了一种基于模拟智能的项目可行性评估系统,其特征在于,通过如下步骤进行:
S1:对目标建筑施工方案以及各类性能进行仿真模拟;
S2:通过模拟的方式,获得施工方案上存在的难点,以及相关的各类涉及建筑性能的指标;
S3:根据S2的结论,对该建筑的工程难度、后期运维成本及相关的内容进行评估;
S4:根据评估的结果,判断该项目是否存在可行性;
如判断结果为“可行”,即、输出正向的判断结果;
如判断结果为“不可行”,即、输出反向的判断结果。
进一步地,本发明提供的一种基于模拟智能的项目可行性评估系统,还具有这样的特点:即、在S2中,施工方案上存在的难点基于施工方案是否符合施工标准,和/或施工方案是否有参考例进行。
进一步地,本发明提供的一种基于模拟智能的项目可行性评估系统,还具有这样的特点:即、上述可行性评估系统还包括知识管理模块;
上述施工标准、施工方案的参考例均记载于知识管理模块中。
进一步地,本发明提供的一种基于模拟智能的项目可行性评估系统,还具有这样的特点:即、在S4中的判断基于施工标准和/或预设的成本进行。
进一步地,本发明提供的一种基于模拟智能的项目可行性评估系统,还具有这样的特点:即、在S4中,输出反向判断结果后,同步输出判断的依据和对照表;
上述对照表列明了每项,超出标准范围的项目,其具体的偏离信息。
进一步地,本发明提供的一种基于模拟智能的项目可行性评估系统,还具有这样的特点:即、在S4中,还输出参考修正案;
上述参考修正案,根据偏离信息进行修正措施的建议。
进一步地,本发明提供的一种基于模拟智能的项目可行性评估系统,还具有这样的特点:即、上述仿真模拟包括施工方案仿真模拟单元、建筑能耗模拟单元、空调负荷模拟计算单元、日照模拟单元、采光模拟单元、数值风洞模拟单元;
其中,上述施工方案仿真模拟单元的工作流程如下所示:
S1、根据施工要求和施工标准及其相关规定规则,对施工进展中的各类专业构件进行施工信息的标注;
上述施工信息包括施工时间及相关信息;
S2、将各类专业构件,根据施工时间进行依次排序后,进行归类和展示;
S2、根据施工进展,依次筛选出具有相同施工信息的构件,并选中;
S3、挂接相应的信息后,进行施工阶段的仿真模拟;
上述建筑能耗模拟单元包括如下工作流程:
S1:预测和模拟目标建筑全年逐时的各类能源使用量;
S2:根据分段价格表,计算出全年的能耗费用;
上述空调负荷模拟计算单元包括如下工作流程:
S1:通过建筑信息模型中的功能区间的布局,获取空调布局/功率/使用面积及相关信息;
S2:根据空调布局/功率/使用面积及相关信息,计算空调负荷;
上述日照模拟单元包括如下工作流程:
S1:通过建筑信息模型,来获取目标建筑中的窗户及相关透光构件的布局;
S2:根据目标建筑所在地的日照和温度情况,获得各窗户及相关透光构件能使建筑的局部获得的日照情况和日照时长;
上述采光模拟单元包括如下工作流程:
S1:通过建筑信息模型,来获取目标建筑中的窗户及相关透光构件的布局;
S2:根据目标建筑所在地的白昼分布情况,获得各窗户及相关透光构件所在位置的,自然阳光对室内相关平面高度上的照度分析及亮度情况;
上述数值风洞模拟单元包括如下工作流程:
S1:利用建筑体量模型,完成前期几何建模工作;
S2:通过建筑外轮廓的表面分割功能,满足计算流体力学后处理中建筑分层、分块进行细化统计的要求。
进一步地,本发明提供的一种基于模拟智能的项目可行性评估系统,还具有这样的特点:即、上述S1的具体操作方法为:根据建筑信息模型中的各建筑功能区间的设置,硬件设置,以及围护结构热工性能来进行各类能源使用量的预测和模拟。
进一步地,本发明提供的一种基于模拟智能的项目可行性评估系统,还具有这样的特点:即、根据日照或采光的模拟结果,进行各窗户及相关透光构件的遮阳构件的模拟。
本发明的作用和效果:
本模拟评估平台主要利用建筑信息模型的专业信息进一步提高相关工作的效率,对于建筑设计不同专业之间、设计单位和施工单位之间的信息传导有显著的提高作用,各类模型的信息复用率有所增强。该模拟评估平台针对各类建筑性能模拟的分析需求,主要包括:施工方案仿真、建筑能耗模拟、空调负荷计算、日照模拟、采光模拟、数值风洞等不同方面。通过对上述各数据和方案的模拟,能够获得本项目的成本和施工时间是否能达到预期,同时还能够通过对能耗、日照等数据的模拟,来获得该项目的各结构或硬件等的构件是否能符合建设目标和建设标准。
具体实施方式
在本实施例提出的一种基于模拟智能的项目可行性评估系统,是通过对目标建筑施工方案以及各类性能的模拟结果,来评价该建筑的工程难度、后期运维成本及相关的评价目标,根据上述模拟出的结果,从而获得该目标项目成本能耗等信息,进而对该项目的可行性进行评估。
本实施例提供的项目可行性评估系统,通过如下步骤进行:
S1:对目标建筑施工方案以及各类性能进行仿真模拟;
S2:通过上述S1模拟的方式,获得施工方案上存在的难点,以及相关的各类涉及建筑性能的指标;
该仿真模拟的结果,通过施工方案仿真模拟、建筑能耗模拟、空调负荷模拟计算、日照模拟、采光模拟、数值风洞模拟来获得。
具体地,在本实施例中,提出的施工方案模拟是一种4D仿真,各类专业构件根据施工时间的序列依次展现。在基于建筑信息模型的工作方式下,可以通过高效的筛选功能,将具有相同施工信息的构件一次性选中,并挂接上相应的信息,从而控制其在4D仿真中的施工顺序。这种工作模式,较之传统方法,有效利用了设计阶段的建筑信息模型构件,使得施工阶段能够快速完成相应模拟,为施工方案决策提供直观的三维模型支持。
建筑能耗模拟主要预测一座楼宇全年8760逐时的各类能源使用量,并根据分段价格表,计算出全年的能耗费用。通过读取建筑信息模型中的房间设置,围护结构热工性能(如墙体传热系数K、玻璃遮阳系数SC等),能耗软件能够快速进行建模,避免过往二维设计与模拟分析完全割裂的状况,一方面提高了工作人员的效率,另一方面也降低了能耗分析单独建模从而造成错误的可能性。
空调负荷计算同样能够利用建筑信息模型的房间、空调分区信息,使得暖通专业充分利用建筑专业建模的信息,从而快速获得空调负荷,为专业系统设计与设备选型提供计算依据。这种工作方式,在提高信息系复用率的同时,也是专业间达到信息共享层面协同作业的一种方式,杜绝了以往专业间由于沟通不畅从而无法保持信息一致的情况。
日照模拟仿真主要用于优化建筑在大寒日等不利条件下窗户获得日照时长的能力,是前期方案设计时的重要考量因素。在信息模型的工作方式下,日照软件能够利用建筑体量模型进行相关的仿真计算,从而快速获得多方案对比,为建筑专业方案决策提供数据支撑。
采光模拟主要关注自然阳光对室内相关平面高度上的照度分析是否满足符合规范要求,同时又要避免由于亮度由于悬殊而造成眩光的不利影响。目前,利用信息模型的房间和窗户信息,并附加各个建筑面的光学性能,就能够分析任意时刻下室内规定高度的照度分布,并通过调整遮阳措施,综合权衡全年室内照度和得热量的情况下,获得较优化的遮阳方案。
数值风洞可以利用建筑体量模型,快速完成前期几何建模工作,并通过建筑外轮廓的表面分割功能,满足计算流体力学后处理中建筑分层、分块进行细化统计的要求。这样可使得建筑物受到的风受力分析,建筑物附近的室外风环境等仿真工作能够进一步提高工作效率。
S3:根据S2的结论,对该建筑的工程难度、后期运维成本及相关的内容,参考施工标准、施工方案的参考例进行评估;例如:在评估过程中发现,某部分的结构建造无任何施工标准和历史相关案例参考时,进行标注。
还例如,该建筑的建造时间/成本远超预期值,进行标注等等。
S4:根据评估的结果,基于施工标准和/或预设的成本判断该项目是否存在可行性;
如判断结果为“可行”,即、输出正向的判断结果;
如判断结果为“不可行”,即、输出反向的判断结果。
在S4中,输出反向判断结果后,同步输出判断的依据和对照表;
该对照表列明了每项,超出标准范围的项目,其具体的偏离信息。
例如:能耗高于同类建筑,上升幅度为56%;
施工预估时间超出设计值,超出时间为12个月等等类似的评价信息。

Claims (9)

1.一种基于模拟智能的项目可行性评估系统,其特征在于,通过如下步骤进行:
S1:对目标建筑施工方案以及各类性能进行仿真模拟;
S2:通过模拟的方式,获得施工方案上存在的难点,以及相关的各类涉及建筑性能的指标;
S3:根据S2的结论,对该建筑的工程难度、后期运维成本及相关的内容进行评估;
S4:根据评估的结果,判断该项目是否存在可行性;
如判断结果为“可行”,即、输出正向的判断结果;
如判断结果为“不可行”,即、输出反向的判断结果。
2.如权利要求1所述的一种基于模拟智能的项目可行性评估系统,其特征在于:在S2中,施工方案上存在的难点基于施工方案是否符合施工标准,和/或施工方案是否有参考例进行。
3.如权利要求2所述的一种基于模拟智能的项目可行性评估系统,其特征在于:所述可行性评估系统还包括知识管理模块;
所述施工标准、施工方案的参考例均记载于知识管理模块中。
4.如权利要求1所述的一种基于模拟智能的项目可行性评估系统,其特征在于:在S4中的判断基于施工标准和/或预设的成本进行。
5.如权利要求1所述的一种基于模拟智能的项目可行性评估系统,其特征在于:在S4中,输出反向判断结果后,同步输出判断的依据和对照表;所述对照表列明了每项,超出标准范围的项目,其具体的偏离信息。
6.如权利要求4所述的一种基于模拟智能的项目可行性评估系统,其特征在于:在S4中,还输出参考修正案;
所述参考修正案,根据偏离信息进行修正措施的建议。
7.如权利要求1所述的一种基于模拟智能的项目可行性评估系统,其特征在于:所述仿真模拟包括施工方案仿真模拟单元、建筑能耗模拟单元、空调负荷模拟计算单元、日照模拟单元、采光模拟单元、数值风洞模拟单元;
其中,所述施工方案仿真模拟单元的工作流程如下所示:
S1、根据施工要求和施工标准及其相关规定规则,对施工进展中的各类专业构件进行施工信息的标注;
所述施工信息包括施工时间及相关信息;
S2、将各类专业构件,根据施工时间进行依次排序后,进行归类和展示;
S2、根据施工进展,依次筛选出具有相同施工信息的构件,并选中;
S3、挂接相应的信息后,进行施工阶段的仿真模拟;
所述建筑能耗模拟单元包括如下工作流程:
S1:预测和模拟目标建筑全年逐时的各类能源使用量;
S2:根据分段价格表,计算出全年的能耗费用;
所述空调负荷模拟计算单元包括如下工作流程:
S1:通过建筑信息模型中的功能区间的布局,获取空调布局/功率/使用面积及相关信息;
S2:根据空调布局/功率/使用面积及相关信息,计算空调负荷;所述日照模拟单元包括如下工作流程:
S1:通过建筑信息模型,来获取目标建筑中的窗户及相关透光构件的布局;
S2:根据目标建筑所在地的日照和温度情况,获得各窗户及相关透光构件能使建筑的局部获得的日照情况和日照时长;
所述采光模拟单元包括如下工作流程:
S1:通过建筑信息模型,来获取目标建筑中的窗户及相关透光构件的布局;
S2:根据目标建筑所在地的白昼分布情况,获得各窗户及相关透光构件所在位置的,自然阳光对室内相关平面高度上的照度分析及亮度情况;
所述数值风洞模拟单元包括如下工作流程:
S1:利用建筑体量模型,完成前期几何建模工作;
S2:通过建筑外轮廓的表面分割功能,满足计算流体力学后处理中建筑分层、分块进行细化统计的要求。
8.如权利要求7所述的一种基于模拟智能的项目可行性评估系统,其特征在于:所述S1的具体操作方法为:根据建筑信息模型中的各建筑功能区间的设置,硬件设置,以及围护结构热工性能来进行各类能源使用量的预测和模拟。
9.如权利要求7所述的一种基于模拟智能的项目可行性评估系统,其特征在于:根据日照或采光的模拟结果,进行各窗户及相关透光构件的遮阳构件的模拟。
CN201810653889.1A 2018-06-22 2018-06-22 一种基于模拟智能的项目可行性评估系统 Active CN108921412B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810653889.1A CN108921412B (zh) 2018-06-22 2018-06-22 一种基于模拟智能的项目可行性评估系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810653889.1A CN108921412B (zh) 2018-06-22 2018-06-22 一种基于模拟智能的项目可行性评估系统

Publications (2)

Publication Number Publication Date
CN108921412A true CN108921412A (zh) 2018-11-30
CN108921412B CN108921412B (zh) 2021-12-24

Family

ID=64420885

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810653889.1A Active CN108921412B (zh) 2018-06-22 2018-06-22 一种基于模拟智能的项目可行性评估系统

Country Status (1)

Country Link
CN (1) CN108921412B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110083586A (zh) * 2019-03-21 2019-08-02 大连海事大学 一种辅助能量桩设计的能量桩知识库系统及其构建方法
CN110443508A (zh) * 2019-08-07 2019-11-12 山东贵望电子科技有限公司 一种电力工程管理系统
CN111861244A (zh) * 2020-07-28 2020-10-30 东南大学 一种针对建筑多环境性能指标模拟的参数化模型构建方法
CN113554202A (zh) * 2020-04-24 2021-10-26 广东博智林机器人有限公司 建筑控制方法、装置及相关系统
CN115422777A (zh) * 2022-10-08 2022-12-02 广州鑫广源电力设计有限公司 一种电力设计项目的可行性分析方法及系统
CN115456414A (zh) * 2022-09-16 2022-12-09 广筑数字科技(深圳)有限公司 一种基于建筑工程的可行性方案智能分析方法及装置

Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101901284A (zh) * 2010-07-09 2010-12-01 上海理工大学 一种对既有建筑进行节能改造的数值化分析方法
CN101908086A (zh) * 2010-07-09 2010-12-08 上海理工大学 一种对建筑室内风环境进行数字化动态模拟的分析方法
US20110246155A1 (en) * 2010-03-30 2011-10-06 Aide Audra Fitch Computer-Readable Medium And Systems For Applying Multiple Impact Factors
US20130158728A1 (en) * 2011-12-20 2013-06-20 Electronics And Telecommunications Research Institute Apparatus and method for saving energy in building based on ontology
CN103455676A (zh) * 2013-09-04 2013-12-18 重庆建工住宅建设有限公司 一种利用流体力学模拟室内热环境的方法
CN104077653A (zh) * 2014-06-25 2014-10-01 上海市建筑科学研究院(集团)有限公司 基于bim的建筑施工监管方法
CN104133938A (zh) * 2014-07-01 2014-11-05 哈尔滨工业大学 一种基于采暖能耗考虑的严寒地区办公建筑外窗几何参数优化方法
CN104834778A (zh) * 2015-05-04 2015-08-12 北京工业大学 一种地铁站通风空调系统的控制参数优化方法
CN104951350A (zh) * 2014-03-27 2015-09-30 上海交通大学 航天产品总装工艺仿真分析方法
CN105022867A (zh) * 2015-07-02 2015-11-04 北京国电通网络技术有限公司 一种基于建筑信息模型的光伏设备自动铺设方法
CN105302937A (zh) * 2015-09-15 2016-02-03 中国十七冶集团有限公司 一种基于bim系统冬冷夏热地区住宅群的施工设计方法
US20160210877A1 (en) * 2015-01-21 2016-07-21 Dalton Young Systems and devices for training and assessment of football players
CN105825351A (zh) * 2016-04-22 2016-08-03 国网浙江省电力公司经济技术研究院 一种输电工程造价的后评估和风险管控方法
CN106202723A (zh) * 2016-07-10 2016-12-07 北京工业大学 一种bim地铁施工方法
CN106245838A (zh) * 2016-08-25 2016-12-21 中建四局第建筑工程有限公司 一种基于bim技术辅助椭圆采光顶模块化施工的方法
CN106295900A (zh) * 2016-08-19 2017-01-04 中节能(常州)城市节能研究院有限公司 一种城市智慧能源管理系统
CN107066661A (zh) * 2016-12-29 2017-08-18 天津市建筑设计院 基于bim技术和模拟仿真技术的绿色建筑设计方法
CN107515991A (zh) * 2017-09-06 2017-12-26 北京市金龙腾装饰股份有限公司 一种基于bim技术的户型全装修模拟展示方法及展示系统
CN107526885A (zh) * 2017-08-18 2017-12-29 中国建筑第八工程局有限公司 一种基于bim技术的房屋采光口优化排布方法

Patent Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110246155A1 (en) * 2010-03-30 2011-10-06 Aide Audra Fitch Computer-Readable Medium And Systems For Applying Multiple Impact Factors
CN101901284A (zh) * 2010-07-09 2010-12-01 上海理工大学 一种对既有建筑进行节能改造的数值化分析方法
CN101908086A (zh) * 2010-07-09 2010-12-08 上海理工大学 一种对建筑室内风环境进行数字化动态模拟的分析方法
US20130158728A1 (en) * 2011-12-20 2013-06-20 Electronics And Telecommunications Research Institute Apparatus and method for saving energy in building based on ontology
CN103455676A (zh) * 2013-09-04 2013-12-18 重庆建工住宅建设有限公司 一种利用流体力学模拟室内热环境的方法
CN104951350A (zh) * 2014-03-27 2015-09-30 上海交通大学 航天产品总装工艺仿真分析方法
CN104077653A (zh) * 2014-06-25 2014-10-01 上海市建筑科学研究院(集团)有限公司 基于bim的建筑施工监管方法
CN104133938A (zh) * 2014-07-01 2014-11-05 哈尔滨工业大学 一种基于采暖能耗考虑的严寒地区办公建筑外窗几何参数优化方法
US20160210877A1 (en) * 2015-01-21 2016-07-21 Dalton Young Systems and devices for training and assessment of football players
CN104834778A (zh) * 2015-05-04 2015-08-12 北京工业大学 一种地铁站通风空调系统的控制参数优化方法
CN105022867A (zh) * 2015-07-02 2015-11-04 北京国电通网络技术有限公司 一种基于建筑信息模型的光伏设备自动铺设方法
CN105302937A (zh) * 2015-09-15 2016-02-03 中国十七冶集团有限公司 一种基于bim系统冬冷夏热地区住宅群的施工设计方法
CN105825351A (zh) * 2016-04-22 2016-08-03 国网浙江省电力公司经济技术研究院 一种输电工程造价的后评估和风险管控方法
CN106202723A (zh) * 2016-07-10 2016-12-07 北京工业大学 一种bim地铁施工方法
CN106295900A (zh) * 2016-08-19 2017-01-04 中节能(常州)城市节能研究院有限公司 一种城市智慧能源管理系统
CN106245838A (zh) * 2016-08-25 2016-12-21 中建四局第建筑工程有限公司 一种基于bim技术辅助椭圆采光顶模块化施工的方法
CN107066661A (zh) * 2016-12-29 2017-08-18 天津市建筑设计院 基于bim技术和模拟仿真技术的绿色建筑设计方法
CN107526885A (zh) * 2017-08-18 2017-12-29 中国建筑第八工程局有限公司 一种基于bim技术的房屋采光口优化排布方法
CN107515991A (zh) * 2017-09-06 2017-12-26 北京市金龙腾装饰股份有限公司 一种基于bim技术的户型全装修模拟展示方法及展示系统

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李峥嵘等: "夏季遮阳对建筑制冷照明能耗的影响", 《同济大学学报(自然科学版)》 *
谷永新等: "BIM在建筑能耗模拟方面的应用", 《中国建设信息》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110083586A (zh) * 2019-03-21 2019-08-02 大连海事大学 一种辅助能量桩设计的能量桩知识库系统及其构建方法
CN110083586B (zh) * 2019-03-21 2022-04-08 大连海事大学 一种辅助能量桩设计的能量桩知识库系统及其构建方法
CN110443508A (zh) * 2019-08-07 2019-11-12 山东贵望电子科技有限公司 一种电力工程管理系统
CN113554202A (zh) * 2020-04-24 2021-10-26 广东博智林机器人有限公司 建筑控制方法、装置及相关系统
CN111861244A (zh) * 2020-07-28 2020-10-30 东南大学 一种针对建筑多环境性能指标模拟的参数化模型构建方法
CN115456414A (zh) * 2022-09-16 2022-12-09 广筑数字科技(深圳)有限公司 一种基于建筑工程的可行性方案智能分析方法及装置
CN115422777A (zh) * 2022-10-08 2022-12-02 广州鑫广源电力设计有限公司 一种电力设计项目的可行性分析方法及系统

Also Published As

Publication number Publication date
CN108921412B (zh) 2021-12-24

Similar Documents

Publication Publication Date Title
CN108921412A (zh) 一种基于模拟智能的项目可行性评估系统
Zanni et al. Towards a BIM-enabled sustainable building design process: roles, responsibilities, and requirements
Kheiri A review on optimization methods applied in energy-efficient building geometry and envelope design
Hong et al. Commercial building energy saver: An energy retrofit analysis toolkit
Hong et al. CityBES: A web-based platform to support city-scale building energy efficiency
Alwan et al. Rapid LEED evaluation performed with BIM based sustainability analysis on a virtual construction project
Baird Energy performance buildings
Al-Homoud Computer-aided building energy analysis techniques
Hien et al. The use of performance-based simulation tools for building design and evaluation—a Singapore perspective
Egwunatum et al. Optimizing energy consumption in building designs using building information model (BIM)
Zoure et al. Implementing natural ventilation and daylighting strategies for thermal comfort and energy efficiency in office buildings in Burkina Faso
Ellis et al. Automated multivariate optimization tool for energy analysis
Bamdad Masouleh Building energy optimisation using machine learning and metaheuristic algorithms
Donn Simulation in the service of design-asking the right questions
Drury Browne Crawley IV Building performance simulation: a tool for policymaking
Alsharif A review on the challenges of BIM-based BEM automated application in AEC industry
Toutou A Parametric Approach for Achieving Optimum Residential Building Performance in Hot Arid Zone
Dawood et al. Development of a visual whole life-cycle energy assessment framework for built environment
CN108614446A (zh) 一种应用于工程领域的生产线数字化仿真分析系统
Hitchcock Advancing lighting and daylighting simulation: the transition from analysis to design aid tools
Heiselberg Integrated building design
Issa et al. Use of building information models in simulations
Singh et al. R&D and Implementation Outcomes from the US-India Bilateral Center for Building Energy Research and Development Program
Marroquin et al. Performative parametric design of radiation responsive screens
Kaklauskas et al. Multiple-criteria analysis of life cycle of energy-efficient built environment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant