CN108918823A - 隧道突水突泥洞内涌泥淤积长度的预测方法 - Google Patents

隧道突水突泥洞内涌泥淤积长度的预测方法 Download PDF

Info

Publication number
CN108918823A
CN108918823A CN201810622302.0A CN201810622302A CN108918823A CN 108918823 A CN108918823 A CN 108918823A CN 201810622302 A CN201810622302 A CN 201810622302A CN 108918823 A CN108918823 A CN 108918823A
Authority
CN
China
Prior art keywords
mud
water
prominent
level
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810622302.0A
Other languages
English (en)
Other versions
CN108918823B (zh
Inventor
常方强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaqiao University
Original Assignee
Huaqiao University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaqiao University filed Critical Huaqiao University
Priority to CN201810622302.0A priority Critical patent/CN108918823B/zh
Publication of CN108918823A publication Critical patent/CN108918823A/zh
Application granted granted Critical
Publication of CN108918823B publication Critical patent/CN108918823B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/24Earth materials

Abstract

本发明提供了一种隧道突水突泥洞内涌泥淤积长度的预测方法,包括计算出土体的天然重度γ和水下饱和重度γsat、测量及计算地下水位埋深z1和地下水位至隧道拱顶的距离z2、量测出突水突泥溃口形状和尺寸得到其横截面积A、测得不排水抗剪强度cu等七个步骤;应用本技术方案使用简便、流程性强且结果可靠,能够有效防范突水突泥灾害。

Description

隧道突水突泥洞内涌泥淤积长度的预测方法
技术领域
本发明涉及一种的领域,具体是指一种隧道突水突泥洞内涌泥淤积长度的 预测方法。
背景技术
随着交通基础设施建设的发展及需要,人们对地下空间的开发和利用也越 来越重视,隧道建设便是其中的重要组成部分,它拥有克服地形高程的影响, 改善路线,缩短里程,提高车速,节省时间,减少用地,疏导交通等优点,从 而得到迅猛的发展。然而隧道工程往往穿越各种类型的地质条件,当遇到溶洞、 暗河、断层破碎带等特殊构造或复杂不良地质体时,处于不利应力场、渗流场、 温度场环境中,极易产生涌水、突泥、塌方、岩爆等地质灾害。其中,涌水甚 至突泥就是隧道工程中最具危害性的灾害之一。
隧道突水突泥往往造成严重后果,导致人员伤亡、机械设备淹没、地表塌 陷等,如圆梁山隧道最高水压为4.6MPa,最大涌水量达7.2×104m3/h,圆梁山 隧道灾害共造成9人死亡的严重后果;象山隧道最大水压为3MPa,虽无人员伤 亡,但是突水突泥造成的地表沉陷给隧址区附近居住的正常生活造成了极大的 不便。突泥相对突水来说,其密度更大,破坏性更高,对于某一潜在突水突泥 的隧道,能够预测出突泥发生时,其淤积的长度,对于突泥灾害的防治具有重 要意义。迄今为止,尚未见到有关突泥淤积长度的预测方法。
发明内容
本发明的目的在于克服上述现有技术中的不足,提供一种隧道突水突泥洞 内涌泥淤积长度的预测方法,使用简便、流程性强且结果可靠,能够有效防范 突水突泥灾害。
为了解决上述技术问题,本发明提供了一种隧道突水突泥洞内涌泥淤积长 度的预测方法,包括以下步骤:
步骤一,通过钻探钻孔取样,分别在破碎带内地下水位以上和地下水位以 下取典型原状土,并测试所述典型原状土的密度ρ、含水量ω和比重ds,然后 计算出土体的天然重度γ和水下饱和重度γsat
其中,γ=ρg,g为重力加速度;
步骤二,通过钻探钻孔,测量出破碎带内地下水位至地面的高度,即地下 水位埋深z1;然后根据地下水位高程h1和隧道拱顶高程h2,计算出地下水位至 隧道拱顶的距离z2;其中,z2=h1-h2
步骤三,量测出突水突泥溃口形状和尺寸,得到其横截面积A,然后计算 出突水突泥溃口的等效直径
步骤四,利用十字板剪切仪,将十字板头插入到破碎带土体内,测量出其 不排水抗剪强度cu;或利用钻机在破碎带内取典型原状土,运回实验室进行三 轴不排水抗剪强度剪切实验,测得其不排水抗剪强度cu
步骤五,根据下式计算突水突泥溃口处的突泥压力U,
步骤六,在实验室里制作涌泥与洞壁模型,进行大型直接剪切试验,设定 法向应力为零,分别测量出剪切破坏时的推力T和剪切破坏面积B,进一步确 定出侧摩阻力τ,τ=T/B;
步骤七,确定出涌泥淤积长度L,L=U/τ。
相较于现有技术,本发明的技术方案具备以下有益效果:
本发明提供了一种隧道突水突泥洞内涌泥淤积长度的预测方法,能够便捷 有效地预测突泥淤积长度,在突泥发生时,其淤积的长度对于突泥灾害的防治 具有重要意义,本方法使用简便,流程性强,结果可靠。
具体实施方式
下文结合具体实施方式对本发明做进一步说明。
一种隧道突水突泥洞内涌泥淤积长度的预测方法,其特征在于包括以下步 骤:
步骤一,通过钻探钻孔取样,分别在破碎带内地下水位以上和地下水位以 下取典型原状土,并测试所述典型原状土的密度ρ、含水量ω和比重ds,然后 计算出土体的天然重度γ和水下饱和重度γsat
其中,γ=ρg,g为重力加速度;
步骤二,通过钻探钻孔,测量出破碎带内地下水位至地面的高度,即地下 水位埋深z1;然后根据地下水位高程h1和隧道拱顶高程h2,计算出地下水位至 隧道拱顶的距离z2;其中,z2=h1-h2
步骤三,量测出突水突泥溃口形状和尺寸,可以在Auto-CAD软件里绘制 出其边界形状,利用软件自带的面积测量功能,得到其横截面积A,然后计算 出突水突泥溃口的等效直径
步骤四,利用十字板剪切仪,将十字板头插入到破碎带土体内,测量出其 不排水抗剪强度cu;或利用钻机在破碎带内取典型原状土,运回实验室进行三 轴不排水抗剪强度剪切实验,测得其不排水抗剪强度cu
步骤五,根据下式计算突水突泥溃口处的突泥压力U,
步骤六,确定出涌泥与隧道洞壁之间的侧摩阻力τ;
在实验室里制作涌泥与洞壁模型,进行大型直接剪切试验,设定法向应力 为零,分别测量出剪切破坏时的推力T和剪切破坏面积B,进一步确定出侧摩 阻力τ,τ=T/B;
步骤七,确定出涌泥淤积长度L,L=U/τ。
以下介绍利用上述方法具体如何预测突泥淤积长度:
某隧道开挖施工期间,隧道进口掌子面(DK93+715)在DK93+703处施工 完成止浆墙后进行超前钻探,钻至25m时出现突水,持续到7d后出现突泥, 该次突泥总量约5000m3,突水时峰值涌水量约3000m3/h,4小时后稳定为100 m3左右。洞内发生突水突泥后,地表出现直径约30m、深约20m的陷坑。突水 突泥处隧道埋深约177m,处于花岗岩与石英砂岩接触带,为全风化地层。
经过前期钻探取样室内土工试验结果,隧道破碎带内土体的天然重度γ为 18kN/m3,水下饱和重度γsat为20kN/m3;经测量,地下水位至地面的高度z1为20m, 地下水位至隧道拱顶的距离z2为157m,该隧道突水突泥溃口基本呈圆形,溃口 等效直径d为1.0m;取土测试,得到破碎带内土体为残积土,呈饱和状态,强 度较低,其不排水抗剪强度cu为30.0kPa,涌泥涌出后,进入隧道内不断向前 涌出,涌泥与隧道洞壁之间的侧摩阻力τ为11kPa。
经计算,突水突泥溃口处的突泥压力U为2960kPa,涌泥淤积长度L为269m, 与现场实测265m比较接近,表明本发明提供的预测方法比较可靠。
以上所述,仅为本发明较佳的具体实施方式,但本发明的设计构思并不局 限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,利用此 构思对本发明进行非实质性的改动,均属于侵犯本发明保护范围的行为。

Claims (1)

1.一种隧道突水突泥洞内涌泥淤积长度的预测方法,其特征在于包括以下步骤:
步骤一,通过钻探钻孔取样,分别在破碎带内地下水位以上和地下水位以下取典型原状土,并测试所述典型原状土的密度ρ、含水量ω和比重ds,然后计算出土体的天然重度γ和水下饱和重度γsat
其中,γ=ρg,g为重力加速度;
步骤二,通过钻探钻孔,测量出破碎带内地下水位至地面的高度,即地下水位埋深z1;然后根据地下水位高程h1和隧道拱顶高程h2,计算出地下水位至隧道拱顶的距离z2;其中,z2=h1-h2
步骤三,量测出突水突泥溃口形状和尺寸,得到其横截面积A,然后计算出突水突泥溃口的等效直径
步骤四,利用十字板剪切仪,将十字板头插入到破碎带土体内,测量出其不排水抗剪强度cu;或利用钻机在破碎带内取典型原状土,运回实验室进行三轴不排水抗剪强度剪切实验,测得其不排水抗剪强度cu
步骤五,根据下式计算突水突泥溃口处的突泥压力U,
步骤六,在实验室里制作涌泥与洞壁模型,进行大型直接剪切试验,设定法向应力为零,分别测量出剪切破坏时的推力T和剪切破坏面积B,进一步确定出侧摩阻力τ,τ=T/B;
步骤七,确定出涌泥淤积长度L,L=U/τ。
CN201810622302.0A 2018-06-15 2018-06-15 隧道突水突泥洞内涌泥淤积长度的预测方法 Active CN108918823B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810622302.0A CN108918823B (zh) 2018-06-15 2018-06-15 隧道突水突泥洞内涌泥淤积长度的预测方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810622302.0A CN108918823B (zh) 2018-06-15 2018-06-15 隧道突水突泥洞内涌泥淤积长度的预测方法

Publications (2)

Publication Number Publication Date
CN108918823A true CN108918823A (zh) 2018-11-30
CN108918823B CN108918823B (zh) 2020-10-09

Family

ID=64421411

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810622302.0A Active CN108918823B (zh) 2018-06-15 2018-06-15 隧道突水突泥洞内涌泥淤积长度的预测方法

Country Status (1)

Country Link
CN (1) CN108918823B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111828090A (zh) * 2020-07-29 2020-10-27 济南城建集团有限公司 一种隧道涌泥清淤反压回填厚度的确定方法
CN112345385A (zh) * 2020-10-30 2021-02-09 华侨大学 一种地下水位下降导致的岩溶土洞安全性预测方法
WO2021244674A1 (zh) * 2020-08-06 2021-12-09 中铁九局集团有限公司 一种地铁破碎带帷幕注浆后安全性判定方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001323775A (ja) * 2000-05-15 2001-11-22 Kyowa Exeo Corp 高深度排泥システム
CN103914620A (zh) * 2014-03-31 2014-07-09 成都理工大学 一种计算断层破裂带裂缝张开空间分布的方法
CN106567719A (zh) * 2016-10-20 2017-04-19 上海交通大学 一种砂土岩溶地层盾构隧道注浆安全溶洞距离的确定方法
CN107462935A (zh) * 2017-08-11 2017-12-12 北京市政建设集团有限责任公司 一种隧道穿越富水糜凌岩带突水突泥灾害预测方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001323775A (ja) * 2000-05-15 2001-11-22 Kyowa Exeo Corp 高深度排泥システム
CN103914620A (zh) * 2014-03-31 2014-07-09 成都理工大学 一种计算断层破裂带裂缝张开空间分布的方法
CN106567719A (zh) * 2016-10-20 2017-04-19 上海交通大学 一种砂土岩溶地层盾构隧道注浆安全溶洞距离的确定方法
CN107462935A (zh) * 2017-08-11 2017-12-12 北京市政建设集团有限责任公司 一种隧道穿越富水糜凌岩带突水突泥灾害预测方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨子汉等: "不同饱和度下破碎软岩隧道掌子面破坏范围上限分析", 《中南大学学报(自然科学版)》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111828090A (zh) * 2020-07-29 2020-10-27 济南城建集团有限公司 一种隧道涌泥清淤反压回填厚度的确定方法
WO2021244674A1 (zh) * 2020-08-06 2021-12-09 中铁九局集团有限公司 一种地铁破碎带帷幕注浆后安全性判定方法
CN112345385A (zh) * 2020-10-30 2021-02-09 华侨大学 一种地下水位下降导致的岩溶土洞安全性预测方法
CN112345385B (zh) * 2020-10-30 2022-05-03 华侨大学 一种地下水位下降导致的岩溶土洞安全性预测方法

Also Published As

Publication number Publication date
CN108918823B (zh) 2020-10-09

Similar Documents

Publication Publication Date Title
CN103293560B (zh) 一种采动三向应力场的测试方法
CN102561330B (zh) 人工挖孔桩与钢管混凝土柱一体化的施工方法
Hu et al. In-situ monitoring platform and preliminary analysis of monitoring data of Majiagou landslide with stabilizing piles
Yan et al. Drainage controls on the Donglingxing landslide (China) induced by rainfall and fluctuation in reservoir water levels
CN108918823A (zh) 隧道突水突泥洞内涌泥淤积长度的预测方法
CN109440794A (zh) 一种适用于浅埋地铁盾构施工隧道岩溶的精细处置方法
Masset et al. Quantitative hydraulic analysis of pre-drillings and inflows to the Gotthard Base Tunnel (Sedrun Lot, Switzerland)
Dong et al. Delineation of leakage pathways in an earth and rockfill dam using multi-tracer tests
CN106320393A (zh) 一种软土地区地下连续墙渗漏检测方法
Abdeltawab Karst limestone foundation geotechnical problems, detection and treatment: Case studies from Egypt and Saudi Arabia
Al-Fares et al. Evaluation of the leakage origin in Abu Baara earthen dam using electrical resistivity tomography, northwestern Syria
Andrade Intervention of Electrical Resistance Tomography (ERT) in resolving hydrological problems of a semi arid granite terrain of Southern India
CN108868777A (zh) 一种隧道不良地质围岩综合探治施工方法
Abdeltawab Karst limestone geohazards in Egypt and Saudi Arabia
Taha Effectiveness of horizontal drains in improving slope stability: a case study of landslide event in Putra Jaya Precinct 9, Malaysia
Su et al. Comprehensive investigation of water-conducting channels in near-sea limestone mines using microtremor survey, electrical resistivity tomography, and tracer tests: a case study in Beihai City, China
CN109583047A (zh) 一种隧道突水突泥地表塌陷形成时间的预测方法
Wang et al. Height measurement of the water-conducting fracture zone based on stress monitoring
CN108343431A (zh) 一种基岩裂隙地下水系统流网探究方法
Ma et al. Advanced geological detection for tunneling in karst area
CN107966733B (zh) 一种用于大孔隙率巨型松散体岩堆与基岩交接面综合地质勘探的方法
Markiewicz et al. The use of self-potential surveys in geotechnical investigations
YOKOYAMA et al. A review of groundwater observation methods for slow-moving landslide
CN108918824A (zh) 隧道突水突泥围岩冲击压力预测方法
Zhang et al. Detection and evaluation of crack development near the fault zone under the influence of coal mining

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant