CN108918390A CN201810908804.XA CN201810908804A CN108918390A CN 108918390 A CN108918390 A CN 108918390A CN 201810908804 A CN201810908804 A CN 201810908804A CN 108918390 A CN108918390 A CN 108918390A
Authority
CN
China
Prior art keywords
mud
pressure
drainage
mud film
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810908804.XA
Other languages
Chinese (zh)
Other versions
CN108918390B (en
Inventor
朱伟
王超
钱勇进
王璐
徐超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201810908804.XA priority Critical patent/CN108918390B/en
Publication of CN108918390A publication Critical patent/CN108918390A/en
Application granted granted Critical
Publication of CN108918390B publication Critical patent/CN108918390B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N15/00Investigating characteristics of particles; Investigating permeability, pore-volume or surface-area of porous materials
    • G01N15/08Investigating permeability, pore-volume, or surface area of porous materials
    • G01N15/082Investigating permeability by forcing a fluid through a sample
    • G01N15/0826Investigating permeability by forcing a fluid through a sample and measuring fluid flow rate, i.e. permeation rate or pressure change
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M3/00Investigating fluid-tightness of structures
    • G01M3/02Investigating fluid-tightness of structures by using fluid or vacuum
    • G01M3/26Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/24Earth materials

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Chemical & Material Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Engineering & Computer Science (AREA)
  • Dispersion Chemistry (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Food Science & Technology (AREA)
  • Medicinal Chemistry (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

The present invention relates to the device and method of a kind of mud film forming and measurement mud film amounts of consolidation, air inflow, described device includes:One cylindrical pressure room, the top of cylindrical pressure room are equipped with top cover that is openable or closing cylindrical pressure room, and top cover is equipped with the air inlet being connected with air pressure feeding mechanism, and the bottom of cylindrical pressure room is equipped with drainage hole;Drainage measuring device is connected by drainage pipeline with the drainage hole;The top that the indoor cylinder bottom of cylindrical pressure is located at drainage hole is equipped with the filter medium for simulated formation.The present invention for simulating the process of slurry penetration film forming in slurry shield excavation face indoors, and the consolidation and air inlet phenomenon that generate during holding one's breath to mud film carry out quantitative measurment respectively, evaluate to mud film quality.

Description

The device and method of mud film forming and measurement mud film amounts of consolidation, air inflow
Technical field
The present invention relates to underground engineering fields, and mud film amounts of consolidation, air inflow are formed a film and measured more particularly to a kind of mud Device and its test method.
Background technique
With the development of China's economy and scientific and technological level, subway tunnel, seepage tunnel and the large-scale construction for getting over the tunnel Jiang Hai Thriving, the problems such as shield machine is commonly encountered cutterhead molding, tool wear in the tunneling process of underground, needs to shut down and open the cabin The characteristics of operation such as maintenance, maintenance of frequently opening the cabin is China's shield tunnel construction.It is with pressure open the cabin technique due to it is applied widely, at Open the cabin method of the characteristics of this is low, short time limit as mainstream.Technique with pressure of opening the cabin is permeated in excavation face using mud forms mud Film maintains air pressure and the soil water pressure at excavation face both ends.The relationship between quality of mud film applied into the life security of cabin personnel with shield Work is gone on smoothly, and the air-tightness of mud infiltration in the earth formation and mud film is simulated by laboratory test, with construction site into Row assessment guidance, it is great to engineering significance.
With increasingly becoming larger for edpth of tunnel, the pressure of mud film two sides accordingly becomes larger, and mud film generates apparent consolidation draining Phenomenon, and then influence the air inlet of mud film;Mud film is as porous media simultaneously, and air inlet does not occur then can effectively hold one's breath for a long time, mud The inlet air conditions and charge volume of film have important references meaning to engineering.
Summary of the invention
Goal of the invention:To supply the deficiencies in the prior art, the present invention proposes mud film forming and measurement mud film amounts of consolidation, air inlet The device and its test method of amount, not only analog mud permeates the process of film forming to the device in the earth formation, but also can test mud The air-tightness of film, it is most important that the consolidation draining amount that mud film occurs during holding one's breath is tested with air inflow.
In order to achieve the above technical purposes, the technical solution adopted by the present invention is that:
A kind of device of mud film forming and measurement mud film amounts of consolidation, air inflow, including:
One cylindrical pressure room, the top of cylindrical pressure room are equipped with top cover that is openable or closing cylindrical pressure room, and top cover is equipped with The bottom of the air inlet being connected with air pressure feeding mechanism, cylindrical pressure room is equipped with drainage hole;
Drainage measuring device is connected by drainage pipeline with the drainage hole, and drainage pipeline is equipped with water discharging valve;
The top that the indoor cylinder bottom of cylindrical pressure is located at drainage hole is equipped with the filter medium for simulated formation, and the filtering is situated between Matter includes:
Steel wire and the several layers geotextile layer being layed on steel wire;
The barrel of cylindrical pressure room bottom side is equipped with the side opening of exhaust.
The cylindrical pressure room includes:
Test cylinder:For the organic glass tubular structure of upper and lower opening, test cylinder top and bottom end respectively with flange seal Connection;
One top cover is arranged on the flange of test cylinder top, and the two sides of top cover are upper and lower by screw rod fastener and test cylinder The flange at both ends is fixedly connected, and the contact surface of the flange of top cover and test cylinder top is equipped with sealing ring;
One pedestal is connected to the flange base of the test cylinder lower end, the contact surface of pedestal and the flange of test cylinder bottom end It is equipped with the concaveconvex structure of sealing, chassis interior is equipped with the drainage hole, and drainage hole passes through pipeline and drainage measuring device Connection.
Base upper surface is equipped with groove, is followed successively by steel wire and geotextiles from below to up on groove.
The air pressure feeding mechanism is air compressor, and air compressor passes through admission line and cylindrical pressure ceiling portion Air inlet is connected, and admission line is equipped with pressure regulator valve and air intake valve.
The drainage measuring device includes electronic balance and the steel ladle that is set on electronic balance, described to be filled with water Bucket is equipped with the hole being connected with drainpipe described in the bottom of cylindrical pressure room.
Thickness, the moisture content of a kind of device forming a film and measure mud film amounts of consolidation, air inflow using the mud to mud film The method being measured, includes the following steps:
1) it is laid with geotextiles on steel wire, replaces stratum using equivalent geotextiles, is determined and selected by stratum effective aperture Geotextiles mesh number;
2) bottom drain holes of cylindrical pressure room are connected into water injection equipment, the filtering on bottom analog stratum into cylindrical pressure room Reversely water filling is saturated in medium, after saturation, is removed water injection equipment, is closed water discharging valve, opens cylindrical pressure ceiling portion later Top cover, the injection testing mud into cylindrical pressure room are close by the top for testing cylinder by top cover after test mud injection Envelope;
3) air pressure feeding mechanism is opened, pressure, the pressure root of application are applied to the indoor test mud of cylindrical pressure by air pressure It is determined according to the subsurface pressure condition in Practical Project, makes to test mud to the infiltration of geotextiles direction, after a period of time, test mud Mud film is formed in Geotextile, opens ring flange lid, the laitance above mud film is sucked out with ear washing bulb, exposes mud film, by mud Film takes out, and measures thickness with graduated scale, moisture content is surveyed in drying;
During the forming of mud film, water is toward flowing in drainage measuring device, per passing through drainage measuring device after a period of time Primary to the quality record of drainage, pressure constantly increases, and drainage amount is being constantly increasing, and records drainage amount as scale using pressure and increases Big process obtains the drainage variation in test slurry penetration film forming procedure.
A kind of device being formed a film and measured mud film amounts of consolidation, air inflow using the mud is to mud film during holding one's breath The method that consolidation, air inflow are measured, includes the following steps:
A) it is laid with geotextiles on steel wire, replaces stratum using equivalent geotextiles, is determined and selected by stratum effective aperture Geotextiles mesh number;
B) bottom drain holes of cylindrical pressure room are connected into water injection equipment, the filtering on bottom analog stratum into cylindrical pressure room Reversely water filling is saturated in medium, after saturation, is removed water injection equipment, is closed water discharging valve, opens cylindrical pressure ceiling portion later Top cover, the injection testing mud into cylindrical pressure room are close by the top for testing cylinder by top cover after test mud injection Envelope;
C) air pressure feeding mechanism is opened, pressure, the pressure root of application are applied to the indoor test mud of cylindrical pressure by air pressure It is determined according to the subsurface pressure condition in Practical Project, makes to test mud to the infiltration of geotextiles direction, after a period of time, test mud Mud film is formed in Geotextile, opens ring flange lid, the laitance above mud film is sucked out with ear washing bulb, exposes mud film;
D) consolidation test:To step c)After mud film is formed, hermetically sealable film is fitted on the inner wall of cylindrical pressure room, opens gas Feeding mechanism is pressed, face pressure is converted by air pressure and applies pressure to mud film, water is toward flowing in drainage measuring device, per after a period of time Primary by quality record of the drainage measuring device to drainage, pressure constantly increases, and drainage amount is being constantly increasing, with pressure The process that drainage amount increases is recorded for scale, when air pressure reaches P value, is obtained due to the filter that mud membrane pores volume reduces and generates Water, referred to as " consolidation drainage amount ";
e)Air-tight Test:To step c)After mud film is formed, air pressure feeding mechanism is opened, pressure, water are applied to mud film by air pressure It is flowed in toward drainage measuring device, per, the pressure primary to the quality record of drainage by drainage measuring device after a period of time Constantly increase, it is the process that scale records the increase of drainage amount using pressure that drainage amount, which is being constantly increasing, when air pressure reaches and step d)In same pressure value P when, obtain reducing due to mud membrane pores volume and air enter the drainage amount of mud membrane pores displacement, claim For " drainage amount of holding one's breath ";
F) by step e)What Air-tight Test obtained hold one's breath, and drainage amount subtracts step d)The consolidation drainage amount that consolidation test obtains is The drainage amount that mud film is generated due to air inlet is also the volume of air into mud film.
Hermetically sealable film in step d) is a tubular hermetically sealable film, the smooth closing in one end of tubular hermetically sealable film, the other end Opening, described smooth one end of tubular hermetically sealable film are bonded with mud film, and membranous wall is bonded with the inner wall of cylindrical pressure room, passes through tubular pressure Additional air is discharged in the side opening of power room bottom.
Step d)Part of the middle hermetically sealable film beyond test cylinder is counter to bind round on cylindrical pressure ceiling end, and will by top cover Anti- hoop portion divides pinch seal.
Beneficial effects of the present invention:Mud seeps in the simple and easy simulation stratum of mud film formation device energy provided by the invention The process to form a film thoroughly, and consolidation of mud film during holding one's breath, air inlet can be tested, the mud film process of holding one's breath is goed deep into The research carefully seen effectively assesses mud film quality of holding one's breath with this, and relevant test method provided by the invention is simply easy Row, it is scientific and effective.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of device in the present invention;
Wherein, 1, air compressor;2, pressure regulator valve;3, air inlet pipe;4, intake valve;5, top cover;6, flange A;7, cylinder is tested;8, Side opening;9, flange B;10, pedestal;11, drain valve;12, hermetically sealable film;13, electronic balance;14, computer;15, geotextiles;15, Steel wire;
Fig. 2 is test cylinder sectional view when carrying out consolidation test;
Fig. 3 is base vertical view;
Fig. 4 is test principle figure of the invention.
Specific embodiment
Combined with specific embodiments below, the present invention is furture elucidated, it should be understood that these embodiments are merely to illustrate the present invention Rather than limit the scope of the invention, after the present invention has been read, those skilled in the art are to various equivalences of the invention The modification of form falls within the application range as defined in the appended claims.
Those skilled in the art of the present technique are appreciated that unless otherwise defined, all terms used herein(Including technology art Language and scientific term)With meaning identical with the general understanding of those of ordinary skill in fields of the present invention.Should also Understand, those terms such as defined in the general dictionary, which should be understood that, to be had and the meaning in the context of the prior art The consistent meaning of justice, and unless defined as here, it will not be explained in an idealized or overly formal meaning.
The meaning of heretofore described "and/or" refers to that the case where respective individualism or both exists simultaneously wraps Including including.
The meaning of heretofore described " inside and outside " refers to relative to equipment itself, the side inside sensing equipment To in, on the contrary is outer.
When the meaning of heretofore described " left and right " refers to reader's face attached drawing, the left side of reader is a left side, The right of reader is the right side.
The meaning of heretofore described " connection " can be between component be directly connected to be also possible to pass through between component Other components are indirectly connected with.
The device of mud film forming and measurement mud film amounts of consolidation, air inflow as shown in Figure 1, including pressure feeding mechanism, examination Test cylinder, drainage measuring device.The flange connecting with top cover is flange A, and the flange connecting with pedestal is flange B, the test Cylinder is nested between flange A, flange B and is fixed by screw pre-tightening, there is sealing between flange and the barrel for having test cylinder Rubber pad.Described flange A, B and top cover are passed through and are connected by 4 screw rods, and there are rubber pad in flange A and top cover contact position;Institute It states flange B and pedestal and is passed through and connected by another group of 4 screw rods, have rubber pad at flange B and base contacts.
Intake valve on the top cover is bolted with air inlet pipe by rotation, and the PU that the air inlet pipe is internal diameter 4mm is managed.
Pressure feeding mechanism is sequentially connected and is constituted by air compressor 1, pressure regulator valve 2, air inlet pipe 3;It is organic for testing cylinder Glass tubular construction, 7 internal diameter 12cm of lucite cylinder, high 14cm, wall thickness 1cm are nested between flange A6 and flange B9, and lead to Screw pre-tightening is crossed to fix.
Lucite cylinder side wall sets side opening 8, for discharging the mud on mud film and the discharge when being bonded hermetically sealable film 12 Air between film and organic glass barrel.
Top cover 5 is connect by bolt with the flange A6 of cylinder side, and intake valve 4 is set on top cover 5, logical with pressure feeding mechanism The connection of air inlet pipe 3 is crossed, tubular hermetically sealable film 12 identical with cylinder inboard wall diameter is fitted in test cylinder 7 by openable top cover 5 It is interior, hermetically sealable film 12 be tubular hermetically sealable film, diameter 12cm, the smooth closing in one end of tubular hermetically sealable film, another end opening, no Part of the open end of ventilated membrane beyond test shell flange A6 is counter to bind round on flange, if the purpose of hermetically sealable film 12 is by pressure The air pressure that feeding mechanism provides is converted into face pressure, makes mud film discharging consolidation.
Pedestal is connect by bolt with the flange B9 of the cylinder other side, and pedestal 10 is equipped with groove, and groove depth 3mm, there are 4 Groove, square crossing distribution are followed successively by two layers of steel wire, geotextiles on groove from below to up, steel wire screen distance 1mm, recessed The effect of slot and steel wire is reserved water passage, while backing material of the steel wire as geotextiles, and geotextiles are as mud The filter medium of infiltration is used for simulated formation;There are apertures for bottom portion of groove, are the entrance of chassis interior drainage channel, draining is logical Road is connected with the drain valve 11 of base side.Drainage measuring device includes the electronic balance 12 that precision is 0.01g, is mounted with and day The computer 13 of the flat logging software to match.
As the preferred embodiment of experimental rig of the present invention, the base groove depth 3mm, there are 4 grooves, square crossings point Cloth, it is the entrance of chassis interior drainage channel, aperture and channel diameter 4mm that there are apertures for bottom portion of groove.
As the preferred embodiment of experimental rig of the present invention, the steel wire screen distance 1mm.
As the preferred embodiment of experimental rig of the present invention, the hermetically sealable film is tubular hermetically sealable film, diameter 12cm, tubular The smooth closing in one end of hermetically sealable film, another end opening.
As the preferred embodiment of experimental rig of the present invention, the pressure feeding mechanism includes air compressor and air pressure The connected pressure control unit of contracting machine, the air inlet pipe are connected with pressure control unit.
Thickness, the moisture content of a kind of device forming a film and measure mud film amounts of consolidation, air inflow using the mud to mud film The method being measured, includes the following steps:
A) it is laid with geotextiles on steel wire, replaces stratum using equivalent geotextiles, is determined and selected by stratum effective aperture Geotextiles mesh number;
B) bottom drain holes of cylindrical pressure room are connected into water injection equipment, the filtering on bottom analog stratum into cylindrical pressure room Reversely water filling is saturated in medium, after saturation, is removed water injection equipment, is closed water discharging valve, opens cylindrical pressure ceiling portion later Top cover, the injection testing mud into cylindrical pressure room are close by the top for testing cylinder by top cover after test mud injection Envelope;
C) air pressure feeding mechanism is opened, pressure, the pressure root of application are applied to the indoor test mud of cylindrical pressure by air pressure It is determined according to the subsurface pressure condition in Practical Project, makes to test mud to the infiltration of geotextiles direction, after a period of time, test mud Mud film is formed in Geotextile, opens ring flange lid, the laitance above mud film is sucked out with ear washing bulb, exposes mud film, in mud During film shapes, water is toward flowing in drainage measuring device, per after a period of time by drainage measuring device to drainage Quality record is primary, and pressure constantly increases, and drainage amount is being constantly increasing, and records the mistake that drainage amount increases by scale of pressure Journey obtains the drainage variation in test slurry penetration film forming procedure;
And infiltration film forming after mud film thickness, moisture content, specifically mud film is taken out, with graduated scale measure thickness, drying Survey moisture content.
A kind of device being formed a film and measured mud film amounts of consolidation, air inflow using the mud is to mud film during holding one's breath The method that consolidation, air inflow are measured, includes the following steps:
A) it is laid with geotextiles on steel wire, replaces stratum using equivalent geotextiles, is determined and selected by stratum effective aperture Geotextiles mesh number;
B) bottom drain holes of cylindrical pressure room are connected into water injection equipment, the filtering on bottom analog stratum into cylindrical pressure room Reversely water filling is saturated in medium, after saturation, is removed water injection equipment, is closed water discharging valve, opens cylindrical pressure ceiling portion later Top cover, the injection testing mud into cylindrical pressure room are close by the top for testing cylinder by top cover after test mud injection Envelope;
C) air pressure feeding mechanism is opened, pressure, the pressure root of application are applied to the indoor test mud of cylindrical pressure by air pressure It is determined according to the subsurface pressure condition in Practical Project, makes to test mud to the infiltration of geotextiles direction, after a period of time, test mud Mud film is formed in Geotextile, opens ring flange lid, the laitance above mud film is sucked out with ear washing bulb, exposes mud film;
D) consolidation test:To step c)After mud film is formed, hermetically sealable film is fitted on the inner wall of cylindrical pressure room, opens gas Feeding mechanism is pressed, face pressure is converted by air pressure and applies pressure to mud film, water is toward flowing in drainage measuring device, per after a period of time Primary by quality record of the drainage measuring device to drainage, pressure constantly increases, and drainage amount is being constantly increasing, with pressure The process that drainage amount increases is recorded for scale, when air pressure reaches P value, is obtained due to the filter that mud membrane pores volume reduces and generates Water, referred to as " consolidation drainage amount ";
e)Air-tight Test:To step c)After mud film is formed, air pressure feeding mechanism is opened, pressure, water are applied to mud film by air pressure It is flowed in toward drainage measuring device, per, the pressure primary to the quality record of drainage by drainage measuring device after a period of time Constantly increase, it is the process that scale records the increase of drainage amount using pressure that drainage amount, which is being constantly increasing, when air pressure reaches and step d)In same pressure value P when, obtain reducing due to mud membrane pores volume and air enter the drainage amount of mud membrane pores displacement, claim For " drainage amount of holding one's breath ";
F) by step e)What Air-tight Test obtained hold one's breath, and drainage amount subtracts step d)The consolidation drainage amount that consolidation test obtains is The drainage amount that mud film is generated due to air inlet is also the volume of air into mud film.
As the preferred embodiment of test method of the present invention, the hermetically sealable film in step d) is a tubular hermetically sealable film, described The smooth one end of tubular hermetically sealable film is bonded with mud film, and membranous wall is bonded with the inner wall of cylindrical pressure room, passes through cylindrical pressure room bottom Side opening be discharged additional air.
As the preferred embodiment of test method of the present invention, step d)Part of the middle hermetically sealable film beyond test cylinder is counter to bind round On cylindrical pressure ceiling end, and divide anti-hoop portion to pinch seal by top cover.
Test principle of the invention is:
In the gentle pressure of face pressure different variations can occur for mud film.It is then consolidated by face pressure, mud film meeting drainage, this part water is Reduced by pore volume and is extruded.It is divided into two processes if by air pressure, when pressure ratio is lesser, due to pore water The presence of surface tension, air will enter hole originally, but squeeze motionless, and at this moment, mud film is equivalent to by face pressure, is only occurred solid Knot;When air pressure is sufficiently large, consolidation is still occurring, but air pressure overcomes surface tension, and pore water is pushed away to the inside Dynamic, drainage amount is reduced by pore volume to be formed with air displacement two parts.
The pressuring method of two experiments is the same, the drainage amount when reaching same pressure of Air-tight Test and consolidation test Subtract each other, when difference occurs in the two, illustrates that mud film enters air(For example, pressure, in 100kpa, the two difference is 0, increase to When 110kPa, the two difference is not 0, then enter air), pressure when air overcomes surface tension to enter hole is exactly air inlet Value.

Claims (9)

1. the device of a kind of mud film forming and measurement mud film amounts of consolidation, air inflow, which is characterized in that including:
One cylindrical pressure room, the top of cylindrical pressure room are equipped with top cover that is openable or closing cylindrical pressure room, and top cover is equipped with The bottom of the air inlet being connected with air pressure feeding mechanism, cylindrical pressure room is equipped with drainage hole;
Drainage measuring device is connected by drainage pipeline with the drainage hole, and drainage pipeline is equipped with water discharging valve;
The top that the indoor cylinder bottom of cylindrical pressure is located at drainage hole is equipped with the filter medium for simulated formation, and the filtering is situated between Matter includes:
Steel wire and the several layers geotextile layer being layed on steel wire;
The barrel of cylindrical pressure room bottom side is equipped with the side opening of exhaust.
2. the device of mud film forming according to claim 1 and measurement mud film amounts of consolidation, air inflow, which is characterized in that institute Stating cylindrical pressure room includes:
Test cylinder:For the organic glass tubular structure of upper and lower opening, test cylinder top and bottom end respectively with flange seal Connection;
One top cover is arranged on the flange of test cylinder top, and the two sides of top cover are upper and lower by screw rod fastener and test cylinder The flange at both ends is fixedly connected, and the contact surface of the flange of top cover and test cylinder top is equipped with sealing ring;
One pedestal is connected to the flange base of the test cylinder lower end, the contact surface of pedestal and the flange of test cylinder bottom end It is equipped with the concaveconvex structure of sealing, chassis interior is equipped with the drainage hole, and drainage hole passes through pipeline and drainage measuring device Connection.
3. the device of mud film forming according to claim 2 and measurement mud film amounts of consolidation, air inflow, which is characterized in that bottom Seat upper surface is equipped with groove, is followed successively by steel wire and geotextiles from below to up on groove.
4. the device of mud film forming according to claim 1 and measurement mud film amounts of consolidation, air inflow, which is characterized in that institute Stating air pressure feeding mechanism is air compressor, and air compressor passes through the air inlet phase of admission line and cylindrical pressure ceiling portion Even, admission line is equipped with pressure regulator valve and air intake valve.
5. the device of mud film forming according to claim 1 and measurement mud film amounts of consolidation, air inflow, which is characterized in that institute State the steel ladle that drainage measuring device includes electronic balance and is set on electronic balance, the steel ladle be equipped with The connected hole of drainpipe described in the bottom of cylindrical pressure room.
6. a kind of device pair using such as the mud film forming any in claim 1 ~ 5 and measurement mud film amounts of consolidation, air inflow The method that thickness, the moisture content of mud film are measured, which is characterized in that include the following steps:
1) it is laid with geotextiles on steel wire, replaces stratum using equivalent geotextiles, is determined and selected by stratum effective aperture Geotextiles mesh number;
2) bottom drain holes of cylindrical pressure room are connected into water injection equipment, the filtering on bottom analog stratum into cylindrical pressure room Reversely water filling is saturated in medium, after saturation, is removed water injection equipment, is closed water discharging valve, opens cylindrical pressure ceiling portion later Top cover, the injection testing mud into cylindrical pressure room are close by the top for testing cylinder by top cover after test mud injection Envelope;
3) air pressure feeding mechanism is opened, pressure, the pressure root of application are applied to the indoor test mud of cylindrical pressure by air pressure It is determined according to the subsurface pressure condition in Practical Project, makes to test mud to the infiltration of geotextiles direction, after a period of time, test mud Mud film is formed in Geotextile, opens ring flange lid, the laitance above mud film is sucked out with ear washing bulb, exposes mud film, by mud Film takes out, and measures thickness with graduated scale, moisture content is surveyed in drying;
During the forming of mud film, water is toward flowing in drainage measuring device, per passing through drainage measuring device after a period of time Primary to the quality record of drainage, pressure constantly increases, and drainage amount is being constantly increasing, and records drainage amount as scale using pressure and increases Big process obtains the drainage variation in test slurry penetration film forming procedure.
7. a kind of device pair using such as the mud film forming any in claim 1 ~ 5 and measurement mud film amounts of consolidation, air inflow The method that consolidation, air inflow of the mud film during holding one's breath are measured, which is characterized in that include the following steps:
A) it is laid with geotextiles on steel wire, replaces stratum using equivalent geotextiles, is determined and selected by stratum effective aperture Geotextiles mesh number;
B) bottom drain holes of cylindrical pressure room are connected into water injection equipment, the filtering on bottom analog stratum into cylindrical pressure room Reversely water filling is saturated in medium, after saturation, is removed water injection equipment, is closed water discharging valve, opens cylindrical pressure ceiling portion later Top cover, the injection testing mud into cylindrical pressure room are close by the top for testing cylinder by top cover after test mud injection Envelope;
C) air pressure feeding mechanism is opened, pressure, the pressure root of application are applied to the indoor test mud of cylindrical pressure by air pressure It is determined according to the subsurface pressure condition in Practical Project, makes to test mud to the infiltration of geotextiles direction, after a period of time, test mud Mud film is formed in Geotextile, opens ring flange lid, the laitance above mud film is sucked out with ear washing bulb, exposes mud film;
D) consolidation test:To step c)After mud film is formed, hermetically sealable film is fitted on the inner wall of cylindrical pressure room, opens gas Feeding mechanism is pressed, face pressure is converted by air pressure and applies pressure to mud film, water is toward flowing in drainage measuring device, per after a period of time Primary by quality record of the drainage measuring device to drainage, pressure constantly increases, and drainage amount is being constantly increasing, with pressure The process that drainage amount increases is recorded for scale, when air pressure reaches P value, is obtained due to the filter that mud membrane pores volume reduces and generates Water, referred to as " consolidation drainage amount ";
e)Air-tight Test:To step c)After mud film is formed, air pressure feeding mechanism is opened, pressure, water are applied to mud film by air pressure It is flowed in toward drainage measuring device, per, the pressure primary to the quality record of drainage by drainage measuring device after a period of time Constantly increase, it is the process that scale records the increase of drainage amount using pressure that drainage amount, which is being constantly increasing, when air pressure reaches and step d)In same pressure value P when, obtain reducing due to mud membrane pores volume and air enter the drainage amount of mud membrane pores displacement, claim For " drainage amount of holding one's breath ";
F) by step e)What Air-tight Test obtained hold one's breath, and drainage amount subtracts step d)The consolidation drainage amount that consolidation test obtains is The drainage amount that mud film is generated due to air inlet is also the volume of air into mud film.
8. according to claim 7 mud film forming and measurement mud film amounts of consolidation, air inflow device to mud film in the process of holding one's breath In consolidation, the method that is measured of air inflow, it is characterised in that:Hermetically sealable film in step d) is a tubular hermetically sealable film, The smooth closing in one end of tubular hermetically sealable film, another end opening, described smooth one end of tubular hermetically sealable film are bonded with mud film, membranous wall It is bonded with the inner wall of cylindrical pressure room, additional air is discharged by the side opening of cylindrical pressure room bottom.
9. according to claim 7 mud film forming and measurement mud film amounts of consolidation, air inflow device to mud film in the process of holding one's breath In consolidation, the method that is measured of air inflow, it is characterised in that:Step d)Part of the middle hermetically sealable film beyond test cylinder is anti- Hoop divides anti-hoop portion to pinch seal on cylindrical pressure ceiling end, and through top cover.
CN201810908804.XA 2018-08-10 2018-08-10 Device and method for forming mud film and measuring consolidation amount and air inflow of mud film Active CN108918390B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810908804.XA CN108918390B (en) 2018-08-10 2018-08-10 Device and method for forming mud film and measuring consolidation amount and air inflow of mud film

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810908804.XA CN108918390B (en) 2018-08-10 2018-08-10 Device and method for forming mud film and measuring consolidation amount and air inflow of mud film

Publications (2)

Publication Number Publication Date
CN108918390A true CN108918390A (en) 2018-11-30
CN108918390B CN108918390B (en) 2023-11-07

Family

ID=64404312

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810908804.XA Active CN108918390B (en) 2018-08-10 2018-08-10 Device and method for forming mud film and measuring consolidation amount and air inflow of mud film

Country Status (1)

Country Link
CN (1) CN108918390B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109975514A (en) * 2019-04-02 2019-07-05 中山大学 A kind of fully transparent experimental rig that the lower mud film forming of high pressure effect is held one's breath
CN110044712A (en) * 2019-04-17 2019-07-23 河海大学 A kind of the calm the anger shield mud film of consolidation process of consideration is held one's breath the measurement method of value and amounts of consolidation
CN111521528A (en) * 2020-03-25 2020-08-11 中交二航武汉港湾新材料有限公司 Slurry shield mud film quality evaluation method
CN112683746A (en) * 2020-12-04 2021-04-20 山东大学 Device and method for measuring effective stress conversion rate of slurry film forming
CN113640192A (en) * 2021-08-16 2021-11-12 天津大学 Visual penetration test device and method for simulating muddy water construction

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002205099A (en) * 2001-01-10 2002-07-23 Japan Steel & Tube Constr Co Ltd Sludge treatment equipment and sludge treatment method
CN102183622A (en) * 2011-01-28 2011-09-14 中国科学院地质与地球物理研究所 Novel unsaturated soil high-pressure consolidation test device
CN103455667A (en) * 2013-08-20 2013-12-18 天津大学 Numerical simulation method for controlling confined aquifer seawater invasion through inflation process
CN103967499A (en) * 2014-04-21 2014-08-06 河海大学 Excavation face supporting method for shield tunneling machine to open chamber under pressure
CN104121023A (en) * 2014-07-02 2014-10-29 中交隧道工程局有限公司 Method and device for testing leakage stopping value of excavation face mud film in bulk breaking by slurry shield with pressure
JP2016160735A (en) * 2015-03-05 2016-09-05 株式会社アルファシビルエンジニアリング Machine inside earth removal processing system in underground excavation boring machine
US20160356685A1 (en) * 2015-06-03 2016-12-08 Ramesh Chandra Gupta Test Device For Determining Three-Dimensional Consolidation Properties Of Soils
CN106645582A (en) * 2016-12-29 2017-05-10 中国人民解放军63926部队 Test apparatus for simulating stratum uplift in grouting process and test method of test apparatus
CN108061696A (en) * 2017-11-29 2018-05-22 河海大学 A kind of device and method of indoor test mud film infiltration coefficient

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002205099A (en) * 2001-01-10 2002-07-23 Japan Steel & Tube Constr Co Ltd Sludge treatment equipment and sludge treatment method
CN102183622A (en) * 2011-01-28 2011-09-14 中国科学院地质与地球物理研究所 Novel unsaturated soil high-pressure consolidation test device
CN103455667A (en) * 2013-08-20 2013-12-18 天津大学 Numerical simulation method for controlling confined aquifer seawater invasion through inflation process
CN103967499A (en) * 2014-04-21 2014-08-06 河海大学 Excavation face supporting method for shield tunneling machine to open chamber under pressure
CN104121023A (en) * 2014-07-02 2014-10-29 中交隧道工程局有限公司 Method and device for testing leakage stopping value of excavation face mud film in bulk breaking by slurry shield with pressure
JP2016160735A (en) * 2015-03-05 2016-09-05 株式会社アルファシビルエンジニアリング Machine inside earth removal processing system in underground excavation boring machine
US20160356685A1 (en) * 2015-06-03 2016-12-08 Ramesh Chandra Gupta Test Device For Determining Three-Dimensional Consolidation Properties Of Soils
CN106645582A (en) * 2016-12-29 2017-05-10 中国人民解放军63926部队 Test apparatus for simulating stratum uplift in grouting process and test method of test apparatus
CN108061696A (en) * 2017-11-29 2018-05-22 河海大学 A kind of device and method of indoor test mud film infiltration coefficient

Non-Patent Citations (7)

* Cited by examiner, † Cited by third party
Title
FANLU MIN: "Filter cake formation for slurry shield tunneling in highly permeable sand", 《2013 ELSEVIER》, pages 423 - 430 *
FANLUMIN: "Test Study on Airtight Capability of Filter Cakes for Slurry Shield and Its Application in a Case", 《ADVANCES IN MATERIALS SCIENCE AND ENGINEERING》, pages 1 - 9 *
夏志刚;: "浅埋富水全断面砂层盾构施工渣土改良初步研究", 四川建材, no. 03, pages 134 - 136 *
姜腾;夏鹏举;闵凡路;: "泥浆性质对泥水盾构泥膜闭气性影响试验研究", 现代隧道技术, no. 02, pages 140 - 146 *
康辉平: "深厚淤泥堤基施工期加荷控制和安全测控", 水利科技, no. 02, pages 24 - 27 *
张宁: "泥水盾构带压开舱时泥膜性质对其闭气性的影响研究", 《现代隧道技术》, pages 62 - 67 *
张宁;朱伟;闵凡路;徐静波;: "泥水盾构带压开舱时泥膜的微观孔隙及渗透性研究", 岩土工程学报, no. 03, pages 113 - 118 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109975514A (en) * 2019-04-02 2019-07-05 中山大学 A kind of fully transparent experimental rig that the lower mud film forming of high pressure effect is held one's breath
CN110044712A (en) * 2019-04-17 2019-07-23 河海大学 A kind of the calm the anger shield mud film of consolidation process of consideration is held one's breath the measurement method of value and amounts of consolidation
CN111521528A (en) * 2020-03-25 2020-08-11 中交二航武汉港湾新材料有限公司 Slurry shield mud film quality evaluation method
CN111521528B (en) * 2020-03-25 2022-11-08 中交二航武汉港湾新材料有限公司 Slurry shield mud film quality evaluation method
CN112683746A (en) * 2020-12-04 2021-04-20 山东大学 Device and method for measuring effective stress conversion rate of slurry film forming
CN112683746B (en) * 2020-12-04 2022-08-02 山东大学 Device and method for measuring effective stress conversion rate of slurry film forming
CN113640192A (en) * 2021-08-16 2021-11-12 天津大学 Visual penetration test device and method for simulating muddy water construction

Also Published As

Publication number Publication date
CN108918390B (en) 2023-11-07

Similar Documents

Publication Publication Date Title
CN108918390A (en) The device and method of mud film forming and measurement mud film amounts of consolidation, air inflow
US11047789B2 (en) Irregular rock sample high-pressure permeation device with adjustable flow direction and test method thereof
CN105334142B (en) A kind of experimental provision formed for simulating shield mud film
CN105527384B (en) A kind of grouting simulation test device and its test method
CN205483943U (en) Experimental device for mud dipes stratum formation sludge -biofilm among simulation slurry shield
CN106768840B (en) Device and method for simulating sand carrying of running water under seepage-vibration effect
CN104677803B (en) Often, varying head is combined pervasion test device
CN106769747B (en) The experimental rig and its test method that soil body inflation resistance is seeped
CN106525526B (en) A kind of measuring method of the high pressure water injection of raw coal containing gas and radial gas permeation rate
CN103926182B (en) Permeability coefficient test method and test device under normal pressure
CN110297076A (en) A kind of three-dimensional visible osmotic grouting model test apparatus and method
CN105866337A (en) Device and method for testing slurry shield excavation surface mud film formation and mud film air tightness under high pressure
CN107271340B (en) For simulating the experimental provision of the vertical Micro blazed-grating of oil-gas reservoir lighter hydrocarbons
CN109342150A (en) A kind of experimental rig and method for gassiness soil sample consolidation test and permeability test
CN110018097A (en) The two-way seepage through soil mass experimental rig and test method of the detachable sample preparation sampling of multilayer
CN107421874A (en) A kind of horizontal seepage flow test device and its application method
CN105891084A (en) Detachable mud film formation and mud film airtightness testing device and method
CN111337650A (en) Multifunctional test device for researching underground engineering soil body seepage failure mechanism
CN102645395A (en) Diaphragm wall permeability tester
CN209327074U (en) A kind of experimental rig for gassiness soil sample consolidation test and permeability test
CN208547560U (en) The device of mud film forming and measurement mud film amounts of consolidation, air inflow
CN102419298A (en) Seepage device for slurry of coarse grained soil
CN110208493A (en) Pore expansion theory experimental rig and its test method
CN114324113A (en) Test device and method for measuring permeability coefficient and permeability path of soil-structure interface
CN205593991U (en) High pressure is slurry shield excavation face mud film forming and sludge -biofilm air tightness testing device down

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant