CN108914967A - The template mounting structure and method of pond antiseep - Google Patents

The template mounting structure and method of pond antiseep Download PDF

Info

Publication number
CN108914967A
CN108914967A CN201810959454.XA CN201810959454A CN108914967A CN 108914967 A CN108914967 A CN 108914967A CN 201810959454 A CN201810959454 A CN 201810959454A CN 108914967 A CN108914967 A CN 108914967A
Authority
CN
China
Prior art keywords
pond
main joist
template
double
pool wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810959454.XA
Other languages
Chinese (zh)
Inventor
王代发
辛曙光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201810959454.XA priority Critical patent/CN108914967A/en
Publication of CN108914967A publication Critical patent/CN108914967A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0007Production methods using a mold

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The present invention relates to a kind of template mounting structure of pond antiseep and methods.Including template, template closes pool wall by lateral main joist and vertical secondary joist, pool wall two sides are respectively arranged with supporting rod, it is fixedly connected between supporting rod by the connecting rod of upper end, supporting rod lower end is fixed on pond baseboard, corresponding transverse direction main joist is arranged at intervals with multiple cross bars up and down in supporting rod, and the relatively transverse main joist one end of cross bar is connected with the lead screw for pressing lateral main joist by helicitic texture, is supported reinforcing to template by pressing lateral main joist.The present invention is using pool wall rod piece supported on both sides as stressed member, both ends are fixed, lateral cross bar is arranged according to a fixed spacing in centre, cross bar cooperation lead screw is supported the lateral main joist of its pond wall moulding board system to reinforce and holds out against and play the role of split bolt bar, split bolt bar is eliminated, to reduce the generation for avoiding being easy leakage phenomenon at split bolt.

Description

The template mounting structure and method of pond antiseep
Technical field
The present invention relates to metallurgical construction technical field, the template mounting structure of specifically a kind of pond antiseep and side Method.
Background technique
In metallurgical construction field, various reinforced concrete water ponds are often met(Such as each pond of water treatment system, pump house Deng), whether superstructure, underground structure or semi-underground structure, the also whether leakage in superstructure pond or underground Water infilters pond, is all troubling thing, and what is often met at present is also the pool wall of pool formwork erection most generallyd use Method, which is mainly worn split bolt and is welded with, connects steel plate water-stopping sheet mode, that is, 50 × 50 × 3mm is welded among split bolt (Or it is circular)Steel plate waterstop strip, two ends add rubber washer form again, however this mode welding steel sealing piece works Amount is big, welding is not in place, and split bolt material disposably puts into, cannot reuse, waste material, and more important is after infiltration Deal with very trouble, not only it is at high cost, repair cumbersome, also resulting in bad reputation influences etc., leaks by statistics Reason is mainly other than the factors such as concrete vibrating leakiness, not in place, formwork edge joint imprecision, spillage cause, mainly Be steel plate waterstop strip welding not densification, water micro gap between split bolt and concrete slowly seeps(Thoroughly)Enter, Therefore to thoroughly solve pool wall of pool leakage problems first is that disposably by pool wall of pool pouring molding, however reality is often difficult to Accomplish;Two be exactly to cancel to drawing water-proof bolt.
Summary of the invention
Present invention seek to address that the above problem, the template for the pond antiseep for drawing water-proof bolt is pacified to provide a kind of nothing Assembling structure and method.
The present invention solves described problem, the technical solution adopted is that:
A kind of template mounting structure of pond antiseep, including template, template pass through lateral main joist and vertical secondary joist to pond Wall is closed, and pool wall two sides are respectively arranged with supporting rod, is fixedly connected between supporting rod by the connecting rod of upper end, branch Strut member lower end is fixed on pond baseboard, and corresponding transverse direction main joist is arranged at intervals with multiple cross bars up and down in supporting rod, horizontal The relatively transverse main joist one end of bar is connected with the lead screw for pressing lateral main joist by helicitic texture, laterally main by press Keel are supported reinforcing to template in turn.
Preferably, the lower end that each lateral main joist is corresponded on vertical secondary joist is respectively arranged with bracket, prevents lateral master Keel glide.
Preferably, lateral main joist is wooden flute or double-row steel pipe, and bracket is the lumps of wood, and the lumps of wood is fixed on vertical time by iron nail On keel.
Preferably, be provided on pond baseboard with supporting rod cooperation earth anchor or hole, supporting rod by with earth anchor It connects or is plugged in hole and then be fixed on pond baseboard.
Preferably, supporting rod is double-pole scaffold, and cross bar is by fastener fixing on double-pole scaffold.
A kind of Formwork Installation Method of pond antiseep, includes the following steps:
The first step:On pond baseboard and the cushion cap of pool wall surrounding or or anti-floating bottom plate carry out normal construction, in pool wall of pool two sides The reserved two rows of earth anchors of uniform intervals or hole, the fixation device as double-pole scaffold;
Second step:Set up double-pole scaffold respectively inside and outside pool wall, the lower end of double-pole scaffold by being connect with earth anchor or Person is plugged in hole and then is fixed on pond baseboard;
Third step:Pool wall reinforcing bar is normally bound and the installation of embedded part, casing;
4th step:Form for seal is carried out to pool wall, the locking of installation and lateral main joist including vertical secondary joist is laterally main Keel use wooden flute or double-row steel pipe, to prevent lateral main joist from gliding, interval setting bracket, bracket on vertical secondary joist Positioned at the lower end of lateral main joist, for holding lateral main joist;
5th step:The transverse direction for as requested fastening the cross bar that lead screw is connected with by helicitic texture press, compression template body is main Then cross bar is fixedly connected by keel with fastener with the steel pipe of the double-pole scaffold of pool wall two sides, upper end connecting rod is by pool wall Inside and outside double-pole scaffold be connected and fixed, formed integrated support system;
6th step:The two-way necessary horizontal and vertical bearing diagonal of setting on double-pole scaffold;
7th step:Lead screw by the way that cross bar front end is arranged in is adjusted the lateral main joist of its pond wall moulding board system, supports With hold out against;
8th step:Carry out pool wall concrete pour and the work such as the dismounting of subsequent template frame body.
Preferably, in the first step, earth anchor is using in bar dowel or steel pipe the insertion pond baseboard of diameter of phi 25mm or more 200mm, leak outside 100mm;Or the diameter of reserved 100mm depth is more bigger by one than the main rod piece of double-pole scaffold on pond baseboard The hole of point.
The present invention by adopting the above technical scheme, compared with prior art, the feature protruded is:
1. material is saved without to steel plate waterstop strip shank of bolt is drawn in concrete-pool-wall, it is environmentally protective.
2. in concrete is wrapped in reinforcing bar, thoroughly having prevented the small channel of water infiltration, having avoided leak stopping reparation from now on Work.
3. saving the workload of a large amount of human weld's split bolt steel plate waterstop strips.
4. do not have to again carry out split bolt bar two ends rubber washer dismounting, with waterproof material block and bolt rod end Head surface antirust treatment, surface is smooth, and impression quality is good.
5. on the shorter wall of thin-walled wall, height and the region application effect of rich groundwater is more significant.
6. being not limited to pond, it may extend to other fields such as the higher underground pipe gallery of level of ground water, foundation pit wall.
Detailed description of the invention
Fig. 1 is the template mounting structure schematic view of facade structure of pond antiseep in the prior art;
Fig. 2 is split bolt structural schematic diagram in the prior art;
Fig. 3 is schematic view of facade structure of the embodiment of the present invention;
In figure:Concrete cushion 1;Pond baseboard 2;Pool wall 3;Earth anchor or hole 4;Double-pole scaffold 5;Bearing diagonal 6;Laterally main dragon Bone 7;Lead screw 8;Steel plate waterstop strip 9;Vertical secondary joist 10;Template 11;Split bolt bar 12;Connecting rod 13;Cross bar 14;Bracket 15。
Specific embodiment:
Below with reference to embodiment, the invention will be further described, and purpose, which is only that, more fully understands the content of present invention, therefore, institute The example of act is not intended to limit protection scope of the present invention.
Referring to Fig. 1, Fig. 2, in the prior art, the lateral main joist in form bracing system passes through split bolt bar through walls 12 are welded with that connect steel plate waterstop strip 9 fixed.
Referring to Fig. 3, the template mounting structure of pond antiseep of the invention, including template 11, template 11 pass through laterally main Keel 7 and vertical secondary joist 10 close pool wall 3, and 3 two sides of pool wall are respectively arranged with supporting rod, lead between supporting rod The connecting rod 13 for crossing upper end is fixedly connected, and supporting rod lower end is fixed on pond baseboard 2, and concrete floor 2 is arranged in concrete On bed course 1, corresponding about 7 main joist of transverse direction is arranged at intervals with multiple cross bars 14, the relatively transverse main dragon of cross bar 14 in supporting rod 7 one end of bone is connected with the lead screw 8 for pressing lateral main joist 7 by helicitic texture, right by pressing lateral main joist 7 Template 11 is supported reinforcing.
The lower end that each lateral main joist 7 is corresponded on vertical secondary joist 10 is respectively arranged with bracket 15, prevents laterally main dragon Bone 7 glides.
Lateral main joist 7 is wooden flute or double-row steel pipe, and bracket 15 is the lumps of wood, and the lumps of wood is fixed on vertical secondary joist by iron nail On 10.
Be provided with the earth anchor or hole 4 with supporting rod cooperation on pond baseboard 2, supporting rod by being connect with earth anchor or It is plugged in hole and then is fixed on pond baseboard 2.
Supporting rod is double-pole scaffold 5, and cross bar 14 is by fastener fixing 5 on double-pole scaffold.
The Formwork Installation Method of pond antiseep, includes the following steps:
The first step:On pond baseboard 2 and the cushion cap of 3 surrounding of pool wall or anti-floating bottom plate carry out normal construction, in 3 two sides of pool wall of pool The reserved two rows of earth anchors of uniform intervals or hole 4, as the fixation device of double-pole scaffold 5, earth anchor uses diameter of phi 25mm or more Bar dowel or steel pipe insertion pond baseboard in 200mm, leak outside 100mm;Or 100mm depth is reserved on pond baseboard 2 The diameter hole more bigger than the main rod piece of double-pole scaffold 5.
Second step:Set up double-pole scaffold 5 respectively inside and outside pool wall 3, the lower end of double-pole scaffold 5 by with earth anchor It connects or is plugged in hole and then be fixed on pond baseboard 2.
Third step:3 reinforcing bar of pool wall is normally bound and the installation of embedded part, casing.
4th step:Template 11 is carried out to pool wall 3 to close, installation and lateral main joist 7 including vertical secondary joist 10 Locking, lateral main joist 7 use wooden flute or double-row steel pipe, to prevent lateral main joist 7 from gliding, on vertical secondary joist 10 between Every setting bracket 15, bracket 15 is located at the lower end of lateral main joist 7, and for holding lateral main joist 7, bracket 15 uses flitch, It is fixed on vertical secondary joist 10 with iron nail.
5th step:The cross bar 14 that lead screw 8 is connected with by helicitic texture press, compression template body are fastened as requested Then cross bar 14 is fixedly connected by lateral main joist 7 with fastener with the steel pipe of the double-pole scaffold 5 of 3 two sides of pool wall, upper end connects Double-pole scaffold 5 inside and outside pool wall 3 is connected and fixed by extension bar 13, forms integrated support system.
6th step:The two-way necessary horizontal and vertical bearing diagonal 6 of setting on double-pole scaffold 5.
7th step:Lead screw 8 by the way that 14 front end of cross bar is arranged in adjusts the lateral main joist 7 of its pond wall moulding board system It is whole, support and hold out against.
8th step:Carry out 3 concrete of pool wall pour and the work such as the dismounting of 11 frame body of subsequent template.
Extruding holds out against a spacing and calculates determination according to related wall stress condition.
The present invention using the fixed structural member of the upper and lower ends with some strength and rigidity as main stress system, Several concentration supporting points are set on main rod piece, its wall form system is squeezed by adjustable concentration supporting point It holds out against, rather than takes to locking mode is drawn, nothing is to water-proof bolt bar 12 is drawn in structure wall, and concrete is framework of steel reinforcement whole In closing is wrapped in, water is thoroughly prevented and has passed through the channel approach that penetrates into of split bolt bar 12, and surface of wall does not leave pair Draw shank of bolt 12 at block scar, using 3 two sides double-pole scaffold 5 of pool wall as stressed member, both ends are fixed, centre according to The lateral cross bar 14 of one fixed spacing setting, cross bar 14 cooperate lead screw 8 to be supported the lateral main joist 7 of its pond wall moulding board system Reinforcing holds out against and plays the role of split bolt bar 12, eliminates split bolt bar 12, avoids split bolt bar 12 to reduce Locate the generation for being easy leakage phenomenon, concrete-pool-wall 3 is interior without split bolt bar 12 and steel plate waterstop strip 9, saves material, green ring It protects, in concrete is wrapped in reinforcing bar, has thoroughly prevented the small channel of water infiltration, avoided leak stopping repair from now on, saved The workload of about a large amount of human weld's split bolt bars 12 and steel plate waterstop strip 9 does not have to carry out 12 both ends of split bolt bar again Head rubber washer dismounting, with waterproof material block and shank of bolt cross cut end (of a beam) antirust treatment, surface is smooth, and impression quality is good, On the shorter wall of thin-walled wall, height and the region application effect of rich groundwater is more significant, is not limited to pond, It may extend to other fields such as the higher underground pipe gallery of level of ground water, foundation pit wall.
The foregoing is merely preferably feasible embodiment of the invention, not thereby limiting the scope of the invention, It is all to use equivalence changes made by description of the invention and its accompanying drawing content, it is intended to be included within the scope of the present invention.

Claims (7)

1. a kind of template mounting structure of pond antiseep, including template, template passes through lateral main joist and vertical secondary joist pair Pool wall is closed, it is characterised in that:Pool wall two sides are respectively arranged with supporting rod, pass through the connection of upper end between supporting rod Bar is fixedly connected, and supporting rod lower end is fixed on pond baseboard, and corresponding transverse direction main joist is between the upper and lower every setting in supporting rod There are multiple cross bars, the relatively transverse main joist one end of cross bar is connected with the lead screw for pressing lateral main joist by helicitic texture, Reinforcing is supported to template by pressing lateral main joist.
2. the template mounting structure of pond antiseep according to claim 1, it is characterised in that:It is corresponding on vertical secondary joist The lower end of each transverse direction main joist is respectively arranged with bracket.
3. the template mounting structure of pond antiseep according to claim 1, it is characterised in that:Lateral main joist is wooden flute Or double-row steel pipe, bracket are the lumps of wood, the lumps of wood is fixed on vertical secondary joist by iron nail.
4. the template mounting structure of pond antiseep according to claim 1, it is characterised in that:It is provided on pond baseboard With the earth anchor or hole of supporting rod cooperation, supporting rod is fixed on pond and then connecting or being plugged in hole with earth anchor On bottom plate.
5. the template mounting structure of pond antiseep according to claim 1, it is characterised in that:Supporting rod is double foot Hand cradle, cross bar is by fastener fixing on double-pole scaffold.
6. a kind of Formwork Installation Method of pond antiseep, which is characterized in that include the following steps:
The first step:On pond baseboard and the cushion cap of pool wall surrounding or or anti-floating bottom plate carry out normal construction, in pool wall of pool two sides The reserved two rows of earth anchors of uniform intervals or hole, the fixation device as double-pole scaffold;
Second step:Set up double-pole scaffold respectively inside and outside pool wall, the lower end of double-pole scaffold by being connect with earth anchor or Person is plugged in hole and then is fixed on pond baseboard;
Third step:Pool wall reinforcing bar is normally bound and the installation of embedded part, casing;
4th step:Form for seal is carried out to pool wall, the locking of installation and lateral main joist including vertical secondary joist is laterally main Keel use wooden flute or double-row steel pipe, to prevent lateral main joist from gliding, interval setting bracket, bracket on vertical secondary joist Positioned at the lower end of lateral main joist, for holding lateral main joist;
5th step:The transverse direction for as requested fastening the cross bar that lead screw is connected with by helicitic texture press, compression template body is main Then cross bar is fixedly connected by keel with fastener with the steel pipe of the double-pole scaffold of pool wall two sides, upper end connecting rod is by pool wall Inside and outside double-pole scaffold be connected and fixed, formed integrated support system;
6th step:The two-way necessary horizontal and vertical bearing diagonal of setting on double-pole scaffold;
7th step:Lead screw by the way that cross bar front end is arranged in is adjusted the lateral main joist of its pond wall moulding board system, supports With hold out against;
8th step:Carry out pool wall concrete pour and the work such as the dismounting of subsequent template frame body.
7. the Formwork Installation Method of pond antiseep according to claim 6, it is characterised in that:In the first step, earth anchor is adopted With 200mm in bar dowel or steel pipe the insertion pond baseboard of diameter of phi 25mm or more, leak outside 100mm;Or in pond baseboard The diameter of the upper reserved 100mm depth hole more bigger than the main rod piece of double-pole scaffold.
CN201810959454.XA 2018-08-22 2018-08-22 The template mounting structure and method of pond antiseep Pending CN108914967A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810959454.XA CN108914967A (en) 2018-08-22 2018-08-22 The template mounting structure and method of pond antiseep

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810959454.XA CN108914967A (en) 2018-08-22 2018-08-22 The template mounting structure and method of pond antiseep

Publications (1)

Publication Number Publication Date
CN108914967A true CN108914967A (en) 2018-11-30

Family

ID=64405579

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810959454.XA Pending CN108914967A (en) 2018-08-22 2018-08-22 The template mounting structure and method of pond antiseep

Country Status (1)

Country Link
CN (1) CN108914967A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110346263A (en) * 2019-08-09 2019-10-18 王曦 A kind of novel multi-layer impervious testing machine
CN111501988A (en) * 2020-04-29 2020-08-07 中铁四局集团第三建设有限公司 Sewage treatment plant pool body pool wall template and modeling method thereof
CN111549821A (en) * 2020-05-30 2020-08-18 深圳市建工集团股份有限公司 Floor type scaffold erecting method for synchronous construction with basement roof earthwork backfilling
CN111705971A (en) * 2020-06-24 2020-09-25 北京翔鲲水务建设有限公司 Construction method and structure of thin-wall concrete wall of constructed wetland unit pool
CN112012473A (en) * 2020-08-26 2020-12-01 青海玉明金属结构制造有限公司 Integrated steel formwork for wall body of cantilever rib type of sewage pool

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004052462A (en) * 2002-07-23 2004-02-19 Kyoyu Kensetsu:Kk Exterior-wall form construction method for concrete underground structure and concrete underground structure
CN101285343A (en) * 2008-06-06 2008-10-15 南通华汇建筑工程有限公司 Single surface formwork method of steel pipe scaffold support system
CN105220874A (en) * 2015-09-11 2016-01-06 杭州江润科技有限公司 The construction method of basement superelevation exterior wall self-supporting single side formwork system
CN106437145A (en) * 2016-09-18 2017-02-22 江苏南通三建集团股份有限公司 Beam side form strengthening system with no tie bolts
CN107386327A (en) * 2017-08-03 2017-11-24 中铁四局集团第二工程有限公司 U-type groove side wall no pulling rod formwork integrated with barricade and the faced wall being made up of the template
CN208618449U (en) * 2018-08-22 2019-03-19 中国二十二冶集团有限公司 The template mounting structure of pond antiseep

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004052462A (en) * 2002-07-23 2004-02-19 Kyoyu Kensetsu:Kk Exterior-wall form construction method for concrete underground structure and concrete underground structure
CN101285343A (en) * 2008-06-06 2008-10-15 南通华汇建筑工程有限公司 Single surface formwork method of steel pipe scaffold support system
CN105220874A (en) * 2015-09-11 2016-01-06 杭州江润科技有限公司 The construction method of basement superelevation exterior wall self-supporting single side formwork system
CN106437145A (en) * 2016-09-18 2017-02-22 江苏南通三建集团股份有限公司 Beam side form strengthening system with no tie bolts
CN107386327A (en) * 2017-08-03 2017-11-24 中铁四局集团第二工程有限公司 U-type groove side wall no pulling rod formwork integrated with barricade and the faced wall being made up of the template
CN208618449U (en) * 2018-08-22 2019-03-19 中国二十二冶集团有限公司 The template mounting structure of pond antiseep

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
邓志亮等: "污水循环池池壁支模的特殊应用" *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110346263A (en) * 2019-08-09 2019-10-18 王曦 A kind of novel multi-layer impervious testing machine
CN111501988A (en) * 2020-04-29 2020-08-07 中铁四局集团第三建设有限公司 Sewage treatment plant pool body pool wall template and modeling method thereof
CN111501988B (en) * 2020-04-29 2021-05-07 中铁四局集团第三建设有限公司 Sewage treatment plant pool body pool wall template and modeling method thereof
CN111549821A (en) * 2020-05-30 2020-08-18 深圳市建工集团股份有限公司 Floor type scaffold erecting method for synchronous construction with basement roof earthwork backfilling
CN111549821B (en) * 2020-05-30 2021-08-24 深圳市建工集团股份有限公司 Floor type scaffold erecting method for synchronous construction with basement roof earthwork backfilling
CN111705971A (en) * 2020-06-24 2020-09-25 北京翔鲲水务建设有限公司 Construction method and structure of thin-wall concrete wall of constructed wetland unit pool
CN112012473A (en) * 2020-08-26 2020-12-01 青海玉明金属结构制造有限公司 Integrated steel formwork for wall body of cantilever rib type of sewage pool

Similar Documents

Publication Publication Date Title
CN108914967A (en) The template mounting structure and method of pond antiseep
CN205421616U (en) Assemble integral shear force wall with steel pipe concrete edge member
CN108999212A (en) The template construction method of underground concrete pool wall antiseep
CN107893529A (en) Suitable for deep basal pit outer wall of basement PC template systems and its construction method
CN106906841A (en) One kind is used for lateral wall form bracing system construction
CN208618449U (en) The template mounting structure of pond antiseep
CN104746892A (en) Supporting beam wall demolition device and supporting beam wall demolition construction method
CN201225015Y (en) Metallurgy large-scale underground tank construction formwork
CN204282530U (en) Adopt the industrial premises frame construction of prefabricated concrete column structure
CN108643207A (en) Exempt from bottom concrete steel lifted trunk side plate and bottom board connector and its construction method
CN220035215U (en) A hang mould support that is used for bridge main tower mound top to pour
CN208184230U (en) Self-stabilising combined triangular frame single side formwork system
CN110424601A (en) A kind of fabricated construction laminated floor slab concreting anti-floating system and implementation method
CN107882243B (en) A kind of cassette ceiling and construction method of concrete-filled rectangular steel tube waffle beam structure
CN206873942U (en) The anti-side steel bar rod reinforcing member of basement shear wall
CN205024733U (en) Fixing device for advanced water stop
CN206800200U (en) A kind of pier stud capping beam template support meanss
CN214531318U (en) Cast-in-place partition wall template structure
CN212129915U (en) Infilled wall tie beam pouring mold
JP3244319U (en) Hanging wall structure for side wall concrete pour effect
CN103993612B (en) A kind of construction method of underwater concrete cushion cap
CN111809792A (en) Assembled precast concrete wallboard
CN208872587U (en) A kind of reusable wall reversed loading basis
CN112593749A (en) Construction method of anti-seepage concrete of MBBR water treatment process structure
CN216789420U (en) Pump pipe reinforcing device for quantitative pump

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181130

RJ01 Rejection of invention patent application after publication