CN108914862B - Highway construction is with watering dust device - Google Patents

Highway construction is with watering dust device Download PDF

Info

Publication number
CN108914862B
CN108914862B CN201810695159.8A CN201810695159A CN108914862B CN 108914862 B CN108914862 B CN 108914862B CN 201810695159 A CN201810695159 A CN 201810695159A CN 108914862 B CN108914862 B CN 108914862B
Authority
CN
China
Prior art keywords
water
bolts
pipe
bolt
electromagnetic valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810695159.8A
Other languages
Chinese (zh)
Other versions
CN108914862A (en
Inventor
王利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangzhou Tianda Construction Group Co., Ltd
Original Assignee
Yangzhou Tianda Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangzhou Tianda Construction Group Co Ltd filed Critical Yangzhou Tianda Construction Group Co Ltd
Priority to CN201810695159.8A priority Critical patent/CN108914862B/en
Publication of CN108914862A publication Critical patent/CN108914862A/en
Application granted granted Critical
Publication of CN108914862B publication Critical patent/CN108914862B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01HSTREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
    • E01H3/00Applying liquids to roads or like surfaces, e.g. for dust control; Stationary flushing devices
    • E01H3/02Mobile apparatus, e.g. watering-vehicles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D47/00Separating dispersed particles from gases, air or vapours by liquid as separating agent
    • B01D47/06Spray cleaning

Abstract

The invention belongs to the technical field of highway construction, and particularly relates to a watering and dust-settling device for highway construction, which aims at solving the problem of small spraying range of a watering device for highway construction. The invention is provided with a hydraulic oil cylinder, an installation platform and an atomization nozzle, in the highway construction, a high-pressure water pump presses water in a water storage tank into a three-way pipe through a water suction pipe, a processor controls a first electromagnetic valve and a second electromagnetic valve to open, the high-pressure nozzle and the atomization nozzle are used for respectively spraying dust fall on a road surface and in the air, a blowing fan can blow water mist to a long distance, the processor controls the hydraulic oil cylinder to drive the installation platform to lift, the height of a water cannon can be adjusted, and the dust fall range is expanded.

Description

Highway construction is with watering dust device
Technical Field
The invention relates to the technical field of highway construction, in particular to a watering and dust-settling device for highway construction.
Background
The highway engineering refers to the work of investigation, measurement, design, construction, maintenance, management and the like of a highway structure. The highway engineering structure includes: high-quality engineering of roadbeds, pavements, bridges, culverts, tunnels, drainage systems, safety protection facilities, greening and traffic monitoring facilities, and houses, workshops and other service facilities for construction, maintenance and monitoring needs to have good design and depend on the quality of construction to a greater extent. In construction, materials, machines and operations are the main links for ensuring the product quality. All construction must be strictly adhered to each construction specification. The first is material preparation, including checking material variety, specification, quantity, stacking place, supply and storage work, etc.; second, the construction machines, including the preparation and repair work of the variety, model, quantity; and thirdly, the operation is carefully carried out, and the next procedure can be carried out after each procedure is finished and qualified through inspection. After all the procedures are finished, the product can be delivered and used after being checked and accepted.
Along with the modern construction, more and more traffic roads are being improved and constructed, in the road construction process, because the weather is dry, construction machinery is more, can produce great dust, and constructor inhales the dust for a long time and is harmful to health, and traditional spray truck is bulky, and is inconvenient to use to the job site that part area is less.
Disclosure of Invention
Based on the technical problems of simple design structure and small spraying range of the water sprinkling and dust falling device for highway construction, the invention provides the water sprinkling and dust falling device for highway construction.
The invention provides a watering dust-settling device for road construction, which comprises a base, wherein four corners of the bottom of the base are connected with an electric push rod machine through bolts, one side of the top of the base is connected with a supporting leg through bolts, the top of the supporting leg is connected with a hydraulic oil cylinder through bolts, a piston rod of the hydraulic oil cylinder is connected with an installation platform through bolts, the top of the piston rod of the hydraulic oil cylinder is connected with a triangular support frame through bolts, the top of the installation platform is connected with two supporting rods which are symmetrically distributed around the central axis of the installation platform through bolts, the top of each supporting rod is provided with a first through hole, a water cannon is connected inside the first through hole through a rotating shaft, the other side of the top of the base is connected with a water storage tank through bolts, one side of the, the outer wall of the control box is connected with control buttons which are distributed equidistantly through bolts, and the inside of the control box is connected with a processor through bolts.
Preferably, four the bottom of electric putter machine has the support column through bolted connection, and the bottom of support column has anti-skidding rubber pad through bolted connection, the bottom of base has four universal wheels that the equidistance distributes through bolted connection.
Preferably, the triangular support frame is stably connected with the mounting platform through bolts.
Preferably, there is the warning light top one side of storage water tank through bolted connection, and the top of storage water tank is connected with the inlet tube through the cutting ferrule, there is sealed lid at the top of inlet tube through threaded connection, there is the string inside of storage water tank through bolted connection, the one end bolt of string has the liquid level inductor, the delivery port has been seted up to one side bottom of storage water tank, and the one end of delivery port has outlet valve through the pipe connection, the second through-hole has been seted up to the opposite side outer wall bottom of storage water tank, and the inside flange joint that passes through of second through-hole has the pipe that absorbs water, the warning light passes through the switch with.
Preferably, one side of the water suction pipe is connected with a filter barrel through a bolt, the other side of the water suction pipe is connected with a high-pressure water pump through a clamping sleeve, one side of the high-pressure water pump is connected with a three-way pipe through a clamping sleeve, one end of the three-way pipe is connected with a first electromagnetic valve through a clamping sleeve, the other end of the three-way pipe is connected with a second electromagnetic valve through a clamping sleeve, one side of the second electromagnetic valve is connected with the high-pressure water pipe through a clamping sleeve, the two sides of the high-pressure water pipe are connected with diagonal draw bars through bolts, and the high-pressure.
Preferably, the top of the first electromagnetic valve is connected with a high-pressure hose through a clamping sleeve, one end of the high-pressure hose extending inside the water cannon is connected with a circular high-pressure water pipe through a clamping sleeve, third through holes distributed equidistantly are formed in the outer wall of the circular high-pressure water pipe, and the inner wall of each third through hole is connected with atomizing nozzles distributed equidistantly through threads.
Preferably, one side of the base is connected with two push-pull handles which are symmetrically distributed about the central axis of the base through bolts, one ends of the push-pull handles are connected with a cross rod through bolts, and the outer wall of the cross rod is sleeved with an anti-skid rubber sleeve.
Preferably, one side of the water cannon is connected with a fan supporting frame through a bolt, one side of the fan supporting frame is connected with a blowing fan through a bolt, and the blowing fan is connected with the processor through a switch.
Preferably, the processor is connected with the display screen, the control button, the first electromagnetic valve and the second electromagnetic valve through wires, is connected with the liquid level sensor through signal wires, and is connected with the hydraulic oil cylinder and the electric push rod machine through switches.
Preferably, the bottom of the diagonal draw bar is connected with a transverse pipe through a bolt, the middle of the transverse pipe is connected with a high-pressure water pipe through a clamping sleeve, and the bottom of the transverse pipe is connected with high-pressure nozzles distributed at equal intervals through bolts.
The beneficial effects of the invention are as follows:
1. the invention provides a water sprinkling and dust falling device for highway construction, which is provided with a hydraulic oil cylinder, an installation platform, a support rod, a water cannon and an atomizing nozzle, wherein in the highway construction, a high-pressure water pump presses water in a water storage tank into a three-way pipe through a water suction pipe, a processor controls a first electromagnetic valve and a second electromagnetic valve to be opened, the high-pressure nozzle and the atomizing nozzle are used for sprinkling dust falling on a road surface and in the air respectively, a blowing fan can blow water mist to a long distance, the processor controls the hydraulic oil cylinder to drive the installation platform to lift, the height of the water cannon can be adjusted, and the dust falling range is expanded.
2. According to the watering dust-settling device for road construction, the liquid level inside the water storage tank can be displayed on the display screen through the arranged liquid level sensor and the control box, when the liquid level of the water storage tank is too low, the liquid level sensor transmits information to the processor through the signal wire, and the processor controls the alarm lamp to be started to give an early warning so that a worker can add water in time.
3. The water sprinkling and dust falling device for highway construction is provided with the universal wheels, the electric push rod machine, the supporting columns and the anti-skid rubber pads, the universal wheels are driven to move by applying stress to the push-pull handles, when the push-pull handles reach the designated positions, the processor controls the electric push rod machine to drive the supporting columns to stretch, the anti-skid rubber pads are arranged at the bottoms of the supporting columns, so that the friction force between the anti-skid rubber pads and the ground can be increased, and the stability of the device is improved.
Drawings
Fig. 1 is a schematic structural view of a water sprinkling and dust settling device for road construction, which is provided by the invention;
FIG. 2 is a schematic structural view of a water cannon of the water sprinkling and dust falling device for highway construction, which is provided by the invention;
FIG. 3 is a schematic structural view of a control box of the water sprinkling and dust settling device for highway construction, which is provided by the invention;
FIG. 4 is a schematic view of a high-pressure water pipe structure of a water sprinkling and dust settling device for highway construction, which is provided by the invention;
fig. 5 is a schematic view of a circular high-pressure water pipe structure of the water sprinkling and dust settling device for highway construction.
In the figure: 1 supporting leg, 2 hydraulic oil cylinders, 3 triangular supports, 4 mounting platforms, 5 high-pressure hoses, 6 liquid level sensors, 7 warning lamps, 8 strings, 9 water storage tanks, 10 water inlet pipes, 11 sealing covers, 12 control boxes, 13 cross rods, 14 anti-skidding rubber sleeves, 15 water outlets, 16 push-pull handles, 17 filter barrels, 18 water suction pipes, 19 high-pressure water pumps, 20 first electromagnetic valves, 21 three-way pipes, 22 second electromagnetic valves, 23 universal wheels, 24 anti-skidding rubber pads, 25 supporting columns, 26 electric push rod machines, 27 bases, 28 high-pressure water pipes, 29 diagonal draw bars, 30 transverse pipes, 31 high-pressure nozzles, 32 supporting rods, 33 water cannons, 34 blowing fans, 35 atomizing nozzles, 36 circular high-pressure water pipes, 37 control buttons, 38 display screens, 39 processors and 40 fan support frames.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1-5, a watering dust-settling device for road construction comprises a base 27, four corners of the bottom of the base 27 are connected with electric push rod machines 26 through bolts, one side of the top of the base 27 is connected with a supporting leg 1 through bolts, the top of the supporting leg 1 is connected with a hydraulic cylinder 2 through bolts, a piston rod of the hydraulic cylinder 2 is connected with a mounting platform 4 through bolts, the top of the piston rod of the hydraulic cylinder 2 is connected with a triangular support frame 3 through bolts, the top of the mounting platform 4 is connected with two supporting rods 32 which are symmetrically distributed about the axis of the mounting platform 4 through bolts, the top of the supporting rod 32 is provided with a first through hole, a water cannon 33 is connected inside the first through hole through a rotating shaft, the other side of the top of the base 27 is connected with a water storage tank 9 through bolts, one side of the water, control buttons 37 are bolted to the outer wall of the control box 12 and are equidistantly spaced, and a processor 39 is bolted to the interior of the control box 12.
In the invention, the bottoms of four electric push rod machines 26 are connected with supporting columns 25 through bolts, the bottoms of the supporting columns 25 are connected with anti-skid rubber pads 24 through bolts, the bottom of a base 27 is connected with four universal wheels 23 which are distributed equidistantly through bolts, a triangular supporting frame 3 is stably connected with a mounting platform 4 through bolts, one side of the top of a water storage tank 9 is connected with an alarm lamp 7 through bolts, the top of the water storage tank 9 is connected with a water inlet pipe 10 through a clamping sleeve, the top of the water inlet pipe 10 is connected with a sealing cover 11 through threads, the inside of the water storage tank 9 is connected with a string 8 through bolts, one end of the string 8 is bolted with a liquid level sensor 6, the bottom of one side of the water storage tank 9 is provided with a water outlet 15, one end of the water outlet 15 is connected with a water outlet valve through a pipeline, the alarm lamp 7 is connected with the processor 39 through a switch, one side of the water suction pipe 18 is connected with the filter barrel 17 through a bolt, the other side of the water suction pipe 18 is connected with the high-pressure water pump 19 through a sleeve, one side of the high-pressure water pump 19 is connected with the three-way pipe 21 through a sleeve, one end of the three-way pipe 21 is connected with the first electromagnetic valve 20 through a sleeve, the other end of the three-way pipe 21 is connected with the second electromagnetic valve 22 through a sleeve, one side of the second electromagnetic valve 22 is connected with the high-pressure water pipe 28 through a sleeve, two sides of the high-pressure water pipe 28 are connected with the diagonal draw bar 29 through bolts, the high-pressure water pump 19 is connected with the processor 39 through a switch, the top of the first electromagnetic valve 20 is connected with the high-pressure hose 5 through a sleeve, one end of the high-pressure hose 5, and the inner wall of the third through hole is connected with atomizing nozzles 35 which are distributed equidistantly through threads, one side of the base 27 is connected with two push-pull handles 16 which are distributed symmetrically about the central axis of the base 27 through bolts, one end of each push-pull handle 16 is connected with a cross rod 13 through a bolt, the outer wall of each cross rod 13 is sleeved with an anti-skidding rubber sleeve 14, one side of each water cannon 33 is connected with a fan support frame 40 through a bolt, one side of each fan support frame 40 is connected with a blowing fan 34 through a bolt, the blowing fan 34 is connected with a processor 39 through a switch, the processor 39 is connected with a display screen 38, a control button 37, a first electromagnetic valve 20 and a second electromagnetic valve 22 through wires, the processor 39 is connected with the liquid level sensor 6 through a signal wire, the processor 39 is connected with the hydraulic oil cylinder 2 and the electric push rod 26 through switches, the bottom of the diagonal draw bar 29 is connected with a transverse pipe 30 through, the bottom of the cross tube 30 is connected with high pressure nozzles 31 distributed equidistantly through bolts.
When in use, in road construction, the high pressure water pump 19 presses water in the water storage tank 9 into the three-way pipe 21 through the water suction pipe 18, the processor 39 with the model of ARM9TEMIDE controls the first electromagnetic valve and the second electromagnetic valve to be opened, the high pressure nozzle 31 and the atomizing nozzle 35 are used for respectively spraying dust fall on the road surface and in the air, the blowing fan 34 can blow water mist to a longer distance, the processor 39 controls the hydraulic oil cylinder 2 to drive the installation platform 4 to lift, the height of the water cannon 33 can be adjusted, the dust fall range is enlarged, the universal wheel 23 is driven to move by applying stress on the push-pull handle 16, when the specified position is reached, the processor 39 controls the electric push rod machine 26 to drive the support column 25 to stretch, the anti-skid rubber pad 24 is arranged at the bottom of the support column 25 to increase the friction force with the ground, the stability of the device is improved, the liquid level in the water storage tank 9 can, when the liquid level of storage water tank 9 was crossed lowly, liquid level inductor 6 passed through the signal line with information transfer to treater 39, and treater 39 control warning light 7 starts and carries out the early warning, and the staff of being convenient for in time adds water.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (6)

1. The watering dust-settling device for the road construction comprises a base (27) and is characterized in that four corners of the bottom of the base (27) are connected with an electric push rod machine (26) through bolts, one side of the top of the base (27) is connected with a supporting leg (1) through bolts, the top of the supporting leg (1) is connected with a hydraulic oil cylinder (2) through bolts, a piston rod of the hydraulic oil cylinder (2) is connected with a mounting platform (4) through bolts, the top of the piston rod of the hydraulic oil cylinder (2) is connected with a triangular support frame (3) through bolts, the top of the mounting platform (4) is connected with two supporting rods (32) which are symmetrically distributed about the axis of the mounting platform (4) through bolts, a first through hole is formed in the top of each supporting rod (32), a water cannon (33) is connected to the inside of the first through hole through a rotating shaft, one side of the water storage tank (9) is connected with a control box (12) through a bolt, one side of the control box (12) is connected with a display screen (38) through a bolt, the outer wall of the control box (12) is connected with control buttons (37) which are distributed at equal intervals through bolts, and the inside of the control box (12) is connected with a processor (39) through a bolt;
the water level control device is characterized in that an alarm lamp (7) is connected to one side of the top of the water storage tank (9) through a bolt, the top of the water storage tank (9) is connected with a water inlet pipe (10) through a clamping sleeve, the top of the water inlet pipe (10) is connected with a sealing cover (11) through a thread, the inside of the water storage tank (9) is connected with a string (8) through a bolt, one end of the string (8) is bolted with a liquid level sensor (6), a water outlet (15) is formed in the bottom of one side of the water storage tank (9), one end of the water outlet (15) is connected with a water outlet valve through a pipeline, a second through hole is formed in the bottom of the outer wall of the other side of the water storage tank (9), a water suction pipe (18;
one side of the water suction pipe (18) is connected with a filter barrel (17) through a bolt, the other side of the water suction pipe (18) is connected with a high-pressure water pump (19) through a clamping sleeve, one side of the high-pressure water pump (19) is connected with a three-way pipe (21) through a clamping sleeve, one end of the three-way pipe (21) is connected with a first electromagnetic valve (20) through a clamping sleeve, the other end of the three-way pipe (21) is connected with a second electromagnetic valve (22) through a clamping sleeve, one side of the second electromagnetic valve (22) is connected with a high-pressure water pipe (28) through a clamping sleeve, two sides of the high-pressure water pipe (28) are connected with diagonal draw bars (29) through bolts, and the high-;
the top of the first electromagnetic valve (20) is connected with a high-pressure hose (5) through a clamping sleeve, one end of the high-pressure hose (5) extending inside the water cannon (33) is connected with a circular high-pressure water pipe (36) through a clamping sleeve, third through holes distributed at equal intervals are formed in the outer wall of the circular high-pressure water pipe (36), and the inner wall of each third through hole is connected with atomizing nozzles (35) distributed at equal intervals through threads;
the bottom of the diagonal draw bar (29) is connected with a transverse pipe (30) through a bolt, the middle of the transverse pipe (30) is connected with the high-pressure water pipe (28) through a clamping sleeve, and the bottom of the transverse pipe (30) is connected with high-pressure spray heads (31) which are distributed equidistantly through bolts.
2. The watering and dust-settling device for road construction according to claim 1, wherein the bottoms of the four electric pushing rod machines (26) are connected with supporting columns (25) through bolts, the bottoms of the supporting columns (25) are connected with anti-skidding rubber pads (24) through bolts, and the bottom of the base (27) is connected with four universal wheels (23) which are distributed at equal intervals through bolts.
3. The watering and dust-settling device for road construction according to claim 1, wherein the triangular support frame (3) is stably connected with the mounting platform (4) through bolts.
4. The watering and dust-settling device for the road construction according to claim 1, wherein one side of the base (27) is connected with two push-pull handles (16) which are symmetrically distributed about the central axis of the base (27) through bolts, one end of each push-pull handle (16) is connected with a cross rod (13) through a bolt, and an anti-skid rubber sleeve (14) is sleeved on the outer wall of each cross rod (13).
5. The watering and dust-settling device for road construction according to claim 1, wherein a fan support frame (40) is connected to one side of the water cannon (33) through a bolt, a blowing fan (34) is connected to one side of the fan support frame (40) through a bolt, and the blowing fan (34) is connected with the processor (39) through a switch.
6. The watering and dust-settling device for the road construction according to claim 1, wherein the processor (39) is connected with the display screen (38), the control button (37), the first electromagnetic valve (20) and the second electromagnetic valve (22) through wires, the processor (39) is connected with the liquid level sensor (6) through a signal line, and the processor (39) is connected with the hydraulic oil cylinder (2) and the electric push rod machine (26) through switches.
CN201810695159.8A 2018-06-29 2018-06-29 Highway construction is with watering dust device Active CN108914862B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810695159.8A CN108914862B (en) 2018-06-29 2018-06-29 Highway construction is with watering dust device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810695159.8A CN108914862B (en) 2018-06-29 2018-06-29 Highway construction is with watering dust device

Publications (2)

Publication Number Publication Date
CN108914862A CN108914862A (en) 2018-11-30
CN108914862B true CN108914862B (en) 2020-01-24

Family

ID=64423055

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810695159.8A Active CN108914862B (en) 2018-06-29 2018-06-29 Highway construction is with watering dust device

Country Status (1)

Country Link
CN (1) CN108914862B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610395A (en) * 2018-12-06 2019-04-12 陈雷 Use depositing dust machine to a kind of construction of hydro project
CN112057990A (en) * 2018-12-14 2020-12-11 杭州电子科技大学 Construction site dust device for building site
CN109621593A (en) * 2018-12-20 2019-04-16 董立志 A kind of working device for reducing dust of interior architecture
CN110193435A (en) * 2019-06-05 2019-09-03 中旭建设集团有限公司 A kind of constructing tunnel dust suppression device by water spray
CN110820661A (en) * 2019-11-30 2020-02-21 重庆建筑工程职业学院 Construction site dust control equipment
CN111589252A (en) * 2020-06-05 2020-08-28 湖南城市学院 Dust fall equipment for building engineering
CN113430981A (en) * 2021-06-29 2021-09-24 徐州山美环保科技发展有限公司 Water-saving watering device for construction

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20150109967A (en) * 2014-03-21 2015-10-02 김관국 Roads equipped with a filter crusher
CN206346775U (en) * 2016-10-15 2017-07-21 中铁四局集团有限公司 A kind of movable tunnel construction atomizing de-dusting apparatus
CN107034830A (en) * 2017-04-06 2017-08-11 孝感市奇思妙想文化传媒有限公司 It is a kind of can convenient cleaning roads traffic indication board spray truck
CN107081030A (en) * 2017-05-21 2017-08-22 成都蒲江珂贤科技有限公司 A kind of watering and lowering dust on building site subtracts haze system
CN207342414U (en) * 2017-10-23 2018-05-11 四川建筑职业技术学院 A kind of architectural engineering dust-extraction unit
CN108035297A (en) * 2017-12-28 2018-05-15 徐建才 A kind of intelligentized environmental project spraying device
CN207392108U (en) * 2017-10-23 2018-05-22 赵中用 A kind of garden garbage processing unit easy to remove

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20150109967A (en) * 2014-03-21 2015-10-02 김관국 Roads equipped with a filter crusher
CN206346775U (en) * 2016-10-15 2017-07-21 中铁四局集团有限公司 A kind of movable tunnel construction atomizing de-dusting apparatus
CN107034830A (en) * 2017-04-06 2017-08-11 孝感市奇思妙想文化传媒有限公司 It is a kind of can convenient cleaning roads traffic indication board spray truck
CN107081030A (en) * 2017-05-21 2017-08-22 成都蒲江珂贤科技有限公司 A kind of watering and lowering dust on building site subtracts haze system
CN207342414U (en) * 2017-10-23 2018-05-11 四川建筑职业技术学院 A kind of architectural engineering dust-extraction unit
CN207392108U (en) * 2017-10-23 2018-05-22 赵中用 A kind of garden garbage processing unit easy to remove
CN108035297A (en) * 2017-12-28 2018-05-15 徐建才 A kind of intelligentized environmental project spraying device

Also Published As

Publication number Publication date
CN108914862A (en) 2018-11-30

Similar Documents

Publication Publication Date Title
CN108914862B (en) Highway construction is with watering dust device
CN107029909A (en) A kind of construction site ground device for reducing dust
CN206118907U (en) Pesticide sprayer
CN109619077B (en) Pesticide sprayer
CN209576130U (en) A kind of efficient device for reducing dust in construction site
CN108082491A (en) A kind of plant protection unmanned plane for spraying insecticide
CN108496759B (en) Road green belt watering device
CN207582273U (en) A kind of compact road identifies air brushing mobile platform
CN209768712U (en) Self-propelled four-wheel pesticide sprayer
CN112916264A (en) Intelligent zinc-aluminum alloy spraying anti-corrosion robot
CN107034830A (en) It is a kind of can convenient cleaning roads traffic indication board spray truck
CN209040857U (en) Tunnel maintenance vehicle
CN218643291U (en) Watering dust fall equipment
CN207244516U (en) A kind of more nozzle washers of high pressure
CN207211044U (en) A kind of urban environmental protection operation sprinkling truck
CN108432728A (en) A kind of air-blast atomizing machine for planting fruit trees
CN220326609U (en) Mechanical arm device for green planting and spraying of separation belt
CN208924872U (en) A kind of terrace project terrace watering device
CN214437585U (en) Spraying device capable of moving, stretching and carrying out large-area dust fall
CN206473951U (en) A kind of construction site tower crane spray system
CN206334470U (en) A kind of novel building building site dust arrester
CN220027410U (en) Hand-push type fog gun machine device
CN206721786U (en) A kind of engineering road cleaning plant
CN109260864A (en) A kind of urban construction dust falling device being easily installed
CN108684645A (en) A kind of telescopic wind of self-propelled spraying machine send spray bar

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20191230

Address after: 211400 No.8, Tianda Road, Bali industrial concentration zone, Maji Town, Yizheng City, Yangzhou City, Jiangsu Province

Applicant after: Yangzhou Tianda Construction Group Co., Ltd

Address before: 210000 No. 8 Jingshan Road, Gaochun Economic Development Zone, Nanjing City, Jiangsu Province

Applicant before: Nanjing otsin Engineering Technology Co., Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant