CN108909774A - A kind of light rail train beam wind information collection and method for early warning and system - Google Patents

A kind of light rail train beam wind information collection and method for early warning and system Download PDF

Info

Publication number
CN108909774A
CN108909774A CN201810705547.XA CN201810705547A CN108909774A CN 108909774 A CN108909774 A CN 108909774A CN 201810705547 A CN201810705547 A CN 201810705547A CN 108909774 A CN108909774 A CN 108909774A
Authority
CN
China
Prior art keywords
beam wind
early warning
wind
information
speed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810705547.XA
Other languages
Chinese (zh)
Inventor
胡启洲
李晓菡
岳民
曾爱然
周浩
陈杰
丛子荃
谈敏佳
王荣荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing University of Science and Technology
Original Assignee
Nanjing University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing University of Science and Technology filed Critical Nanjing University of Science and Technology
Priority to CN201810705547.XA priority Critical patent/CN108909774A/en
Publication of CN108909774A publication Critical patent/CN108909774A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L23/00Control, warning or like safety means along the route or between vehicles or trains

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)

Abstract

The present invention provides a kind of light rail beam wind information collection and early warning system, including the acquisition device for beam wind information, current signal/numerical signal conversion device, device, the device for controlling train speed for generating dynamic beam wind calamity source reference threshold, storage device and control device, core of the control module as whole system, on the one hand the operation of aforementioned each device is controlled, on the other hand for being attached realization communication and control with external equipments such as external computer installations.In the present invention, reference threshold for the assessment of beam wind calamity source is using dynamic generation by the way of, and in conjunction with the disaster of history, a situation arises, and is continuously updated account of the history after newest early warning occurs, to compare with historical data, the risk Pre-Evaluation in a certain area is more improved and scientifically considered.The present invention also provides a kind of light railway beam wind information collection and method for early warning.

Description

A kind of light rail train beam wind information collection and method for early warning and system
Technical field
The present invention relates to the technical fields of light railway environmental hazard early warning, in particular to a kind of light railway beam wind Information collection and method for early warning and system.
Background technique
Safety be rail transport this, the light rail train speed of service is fast, and passenger capacity is more, and as urban track traffic, Therefore to efficient public security system, more stringent requirements are proposed.And in the environmental hazard for influencing light rail safe operation, beam wind is one The environmental hazard that kind occurrence frequency is high, harmfulness is big.Therefore, beam wind information is effectively obtained, it is reasonable to carry out to beam wind disaster degree Assessment, more enough safe operations for light rail train provide safeguard.
Currently, the research about light rail safeguard technology both at home and abroad, is presented diversified feature, but overall trend is Towards intelligence, systematization, deeply the direction changed continues to develop.In recent years, the U.S. is according to the related requirement of bill regulations, " Rail Fixed Guide way Systems has been formulated with regard to the rail traffic Potential hazards event of Congress's growing interest;State Safety Oversight ", it is desirable that from the angle of system, respectively from engineering, environment, management, emergency relief etc. in city The safety evaluatio and monitoring running state of reinforcement project in the life cycle managements such as design, construction, the operation of rail transportation projects, With elimination, reduction or mitigate the influence for including technology, environment, artificial or even attack of terrorism etc. to light rail transit operation security.Phase The research of pass is also in development.Domestic many scholars it is also proposed that application safety production theory and method, to city rail The safety evaluatio and recommendation on improvement of traffic progress overall process.And it is concentrated mainly on technology, equipment, specification, system, signal system System, and legal assurance etc..
The disaster prevention system of external rail traffic construction all using center control mode, usual light rail route span compared with Greatly, in in terms of data communication and project cost the considerations of, the disaster prevention system soybean in outer room is for some specific of route The environmental monitoring in place or section, although exposing current light rail disaster prevention system, structure is complicated, can not carry out completely Monitoring, the low disadvantage of monitoring accuracy.Meanwhile existing disaster prevention system is more for high-speed railway, for light rail adaptability It is not strong.
Summary of the invention
Present invention aims at improve a kind of light rail train beam wind information collection and method for early warning, it is intended to realize and arrange light rail Beam wind information along vehicle is acquired and analyzes, and realization gives warning in advance, and improves the travel safety of light rail.
To reach above-mentioned purpose, a kind of light rail beam wind information collection of the present invention and method for early warning, which is characterized in that including with Lower step:
Step 1:Beam wind information collecting device is arranged in Light rail, obtains the beam wind information of its position, including cross Monsoon intensity and wind direction information, and one current signal/numerical signal conversion equipment is transmitted in the form of current signal;
Step 2:Current signal/numerical signal conversion equipment receives aforementioned currents signal, and aforementioned beam wind intensity is converted For corresponding beam wind strength values signal;
Step 3:The reference threshold of dynamic generation beam wind calamity source, i.e., it is in place according to aforementioned beam wind information collecting device institute The history beam wind disaster set a situation arises data and current beam wind strength values signal compare, and determination is currently located route The beam wind disaster reference threshold in area;
Step 4:Judge that the beam wind strength values signal i.e. beam wind intensity that aforementioned beam wind information collecting device currently acquires is believed Whether breath exceeds reference threshold section produced, if it exceeds then start early warning program, otherwise repeatedly abovementioned steps;
Step 5:After early warning starting, the spatial coordinated information where beam wind information collecting device is obtained, to impacted Wiring region carry out Geographic mapping;
Step 6:After positioning successfully, starting control vehicle mode controls the speed in the travelled train in this section of wiring region;
Step 7:Judge whether train speed is controlled, terminates early warning and the cross by this early warning if being controlled The estimated reference threshold of monsoon intensity information is stored in historical data base, otherwise returns to abovementioned steps and reenters early warning program.
Further, under control vehicle mode described in step 6, the speed in the travelled train in this section of wiring region is controlled, Specially:According to different grades of beam wind disaster section, control makes the speed of train be down to preset section;
(1) instantaneous wind speed is 14.0-17.0m/s, then control makes the speed of train operation within 30km/h, is 1 grade Blue early warning;
(2) instantaneous wind speed is 17.0-20.0m/s, then control makes train running speed within 25km/h, is 2 grades of Huang Color early warning;
(3) instantaneous wind speed is 20.0-24.0m/s, then control makes train running speed within 20km/h, is 3 grades of orange Color early warning;
(4) instantaneous wind speed is greater than 24.0m/s, then control makes suspension of service, is 4 grades of red early warning.
Further, the reference threshold of dynamic generation beam wind calamity source described in step 3, specially:
Based on aforementioned history beam wind disaster a situation arises data, beam wind strength information-cross is obtained using clustering algorithm The grade interval distribution of disaster caused by a windstorm evil reference threshold;It is carried out with the current beam wind strength information in beam wind information collecting device position Judgement, determines the grade interval belonging to it;It is referred to using the beam wind disaster of the grade interval belonging to it as current beam wind intensity The reference threshold of situation judgement.
A kind of light rail train beam wind information collection and early warning system, including:It is distributed in the beam wind information collection of Light rail Device robs intensity and beam wind wind direction information for obtaining the crazy of its position, and expresses and transmit in the form of electric current;Electric current Signal/numerical signal conversion equipment is corresponding beam wind intensity for receiving current signal above-mentioned, and by beam wind intensity-conversion Numerical signal;The device of reference threshold for dynamic generation beam wind calamity source is configured to be adopted according to aforementioned beam wind information The history beam wind disaster of acquisition means position a situation arises data and current beam wind strength information compare, and determine current The beam wind disaster reference threshold of place wiring region;The determination device of early warning program starting is configured to be believed according to aforementioned beam wind The beam wind strength information that breath acquisition device currently acquires is beyond reference threshold section generated as a result, determining starting early warning journey Sequence;Positioning device, the spatial coordinated information where beam wind information collecting device for obtaining prediction occurring according to early warning result, Geographic mapping is carried out to impacted high-speed railway route area;For controlling the control vehicle device of train speed, it is set At the speed of the train travelled according to the control of early warning result in impacted light railways area;Storage device is configured to For storing the beam wind strength values signal as acquired in each beam wind information collecting device and identified current The beam wind disaster reference threshold of place wiring region is formed by historical data base, which is to be previously used for dynamic life Historical data is provided at the device of the reference threshold of beam wind calamity source;Control device is arranged for executing to aforementioned beam wind Information collecting device, current signal/numerical signal conversion equipment, for dynamic generation beam wind calamity source reference threshold dress It sets, the determination device of early warning program starting, positioning device, the fortune for controlling vehicle device and storage device for controlling train speed Row, and the corresponding beam wind strength information of this early warning and reference threshold are stored in historical data base.Further embodiment In, the control vehicle device for being previously used for control train speed is configured to according to different grades of beam wind disaster section, and control makes to arrange The speed of vehicle is down to preset section.
By the technical solution invented above it is found that the beneficial effects of the present invention are:
(1) easy for installation, maintenance is simply.The present invention obtains beam wind fluctuation number using air velocity transducer as information monitor According to, using industrial single-chip microcontroller as control centre, analyze the beam wind situation of local environment, utilize wireless transmitter module issue early warning Information realizes the information collection of highway beam wind and the portable exploitation of early warning system, has the characteristics that easy for installation.Meanwhile Since whole device can take distributed laying, the difficulty of maintenance is also reduced.
(2) precision of detection is improved.The solution of the present invention can take acquisition, analysis and the transmission of light rail beam wind information Portable Integrated design, each embodiment are as an independent system form presence, therefore the laying that can be convenient Some other risky place of tool such as tunnel, river, zig zag, can select according to track circuit concrete condition along track Laying precision is selected, the precision of railway security monitoring is improved.
(3) at the comparison threshold value section for determining beam wind calamity source, the next life by the way of dynamic generation reference threshold At in conjunction with the disaster of history, a situation arises, and is continuously updated account of the history after newest early warning generation, thus with history number According to comparison, risk Pre-Evaluation that is more complete and scientifically considering a certain area, so that assessment result is more scientific, reasonable, tool There is more preferably confidence level.
Detailed description of the invention
Attached drawing is not intended to drawn to scale.In the accompanying drawings, identical or nearly identical group each of is shown in each figure It can be indicated by the same numeral at part.For clarity, in each figure, not each component part is labeled. Now, example will be passed through and the embodiments of various aspects of the invention is described in reference to the drawings, wherein:
Fig. 1 is a kind of structural representation of the information collection of light rail train beam wind and method for early warning and system embodiment of the present invention Figure.
Fig. 2 is that a kind of light rail train beam wind information collection of the present invention and method for early warning and the structure of another embodiment of system are shown It is intended to.
Fig. 3 is a kind of implementation process schematic diagram of the information collection of light rail train beam wind and method for early warning and system of the present invention.
Specific embodiment
In order to better understand the technical content of the present invention, special to lift specific embodiment and institute's accompanying drawings is cooperated to be described as follows.
All aspects with reference to the accompanying drawings to describe the present invention in the disclosure.It should be appreciated that a variety of designs presented hereinbefore And embodiment, and describe in more detail below those design and embodiment can in many ways in any one come Implement, this is because conception and embodiment disclosed in this invention are not limited to any embodiment.In addition, disclosed by the invention Some aspects can be used alone, or otherwise any appropriately combined use with disclosed by the invention.
As shown in Figure 1, the present invention proposes a kind of light rail train beam wind information collection and prior-warning device system, including cross Wind information acquisition device 1, current signal/numerical signal conversion equipment 2, for the reference threshold of dynamic generation beam wind calamity source Device 3, early warning program starting determination device 4, positioning device 5, the control vehicle device 6 for controlling train speed, storage dress 7 and control device 10 are set, wherein beam wind information collection 1, current signal/numerical signal dress change 2, for dynamic generation beam wind calamity Evil risk reference threshold device 3, early warning program starting determination device 4, positioning device 5, for controlling train speed Control vehicle device 6, storage device 7 are respectively connected to control vehicle module 10.
Core of the vehicle module 10 as whole system is controlled, the operation of aforementioned each device is on the one hand controlled, is on the other hand used for The external equipments such as external computer installation are attached, with realize communication between whole system and external other equipment and/ Or the operation such as control, debugging.
Beam wind information collecting device 1, is distributed in along light rail, for obtaining the beam wind intensity and wind direction of its position Information, and express and transmit in the form of current signal.The current signal of each 1 testing result of beam wind information collecting device transmits To in corresponding current signal/numerical signal conversion equipment 2.
In the entire system, multiple beam wind information collecting devices 1 above-mentioned are disposed with, can be set according to equidistant intervals It sets, it can also be according to progress emphasis arrangement situations such as emphasis disaster generating region, the historical disaster occurrence frequency of history.Correspondingly, Current signal/numerical signal reforming unit quantity matches with the setting of the beam wind information collecting device 1.
As preferred embodiment, the beam wind information collecting device 1 is sensed by the beam wind wind speed of beam wind intensity The combination of sensor and the wind transducer for detecting beam wind wind direction is to realize the acquisition to beam wind information.,
In this example, current signal/numerical signal converter device 2, for receiving the aforementioned transmission of beam wind information collecting device 1 Current signal, and beam wind strength information is converted into corresponding beam wind strength values signal, in favor of subsequent beam wind disaster hair Raw risk assessment.
As an example, current signal above-mentioned/numerical signal conversion equipment 2 is realized using analog-digital converter.
The device 3 of reference threshold for dynamic generation beam wind calamity source is configured to be adopted according to aforementioned beam wind information The history beam wind disaster of acquisition means position a situation arises data and current beam wind strength information are compared, and are determined current The beam wind disaster reference threshold of place wiring region.
The determination device 4 of early warning program starting, is configured to the cross currently acquired according to aforementioned beam wind information collecting device Monsoon intensity information beyond generated reference threshold area as a result, determine starting early warning program.
Positioning device 5, the space where beam wind information collecting device for obtaining prediction occurring according to early warning result are sat Information is marked, to carry out Geographic mapping to impacted light railways area.
In some optional examples, positioning device 5 can be realized using GPS positioning module, can also be used certainly Locating module based on GLONASS is realized based on the locating module of Beidou BDS.
For controlling the control vehicle device 6 of train speed, it is configured to be controlled according to early warning result in impacted light rail The train speed that road area is travelled.
Storage device 7 is arranged for storage device cross as acquired in each described beam wind information collecting device Monsoon intensity numerical signal and the identified beam wind disaster reference threshold for being currently located wiring region are formed by historical data Library, the historical data base provide historical data to be previously used for the device of the reference threshold of dynamic generation beam wind calamity source;
Control device 10 is arranged for executing to aforementioned beam wind information collecting device 1, current signal/numerical signal turn Changing device 2, for the device 3 of reference threshold of dynamic generation beam wind calamity source, the determination device 4, fixed of early warning program starting Position device 5, the control vehicle device 6 for controlling train speed and the operation of storage device 7, and by the corresponding cross of this early warning Monsoon intensity information and reference threshold are stored in historical data base above-mentioned.
In this example, using scheme above-mentioned, at the comparison threshold value section for determining beam wind calamity source, using dynamic generation The mode of reference threshold generates, and in conjunction with the disaster of history, a situation arises, and is continuously updated and goes through after newest early warning generation History situation, to be compared with historical data, risk Pre-Evaluation that is more complete and scientifically considering a certain area, so that assessment knot Fruit is more scientific, reasonable, has more preferably confidence level.With the accumulation of historical data, the generation of reference threshold will be more scientific Accurately.
Preferably, control device 10 is realized using single-chip microcontroller, more preferably, selects technical grade single-chip microcontroller.
As shown in Figure 1, as preferred mode, aforementioned system further includes:
One wireless communication apparatus 11 is connected to the control device 10, sends beam wind disaster for wireless communication mode and comments Estimate information and light rail train emergency measure information.
Such as, wireless communication apparatus 11 above-mentioned includes wireless transmitting unit and 4G communication interface unit, realizes nothing respectively Line emits data and passes through mobile communication base station transmitting information.
That is, wireless communication apparatus 11 occurs as the correspondence with foreign country device of entire information collection and early warning system in early warning When, beam wind Disaster Assessment information is also sent by wireless communication mode under the control of control and light rail train emergency measure is believed Breath, is such as outwardly sent by wireless transmission antenna in a manner of wireless signal, or by interface of mobile base station with short message Form transmits encoded information and short message, realizes and station host computer terminal, train driving room terminal and passenger's mobile phone end The communication at end.
Station host computer terminal or train driving room host computer terminal can also be by wireless networks to the wireless of whole system Instruction encoding occurs for device 11, and instruction encoding is transferred in control device 10 by wireless communication apparatus 11, wireless communication apparatus 11 The work of other devices is controlled according to designated command.
In the present embodiment, industrial chip microcontroller is can be used in the control 10, and storage device 7 is situated between using non-volatile holographic storage Matter is realized, such as SD card, TF card, mmc card etc..
Preferably, the control vehicle device 6 for being previously used for control train speed is configured to according to different grades of beam wind disaster Range restraint makes train speed be down to preset section.
For example, the relationship between beam wind disaster section and speed control can be configured to:
1) instantaneous wind speed is 14.0-17.0m/s, then control makes the speed of train operation within 30km/h, is 1 grade of indigo plant Color early warning;
2) instantaneous wind speed is 17.0-20.0m/s, then control makes train running speed within 25km/h, is 2 grades of yellow Early warning;
3) instantaneous wind speed is 20.0-24.0m/s, then control makes train running speed within 20km/h, is 3 grades orange Early warning;
4) instantaneous wind speed is greater than 24.0m/s, then control makes suspension of service, is 4 grades of red early warning.
Preferably, the device 3 for being previously used for the reference threshold of dynamic generation beam wind calamity source is configured to according to following Mode realizes the dynamic generation of reference threshold;
Based on aforementioned history beam wind disaster a situation arises data, the beam wind strength information-that is obtained using clustering algorithm The grade interval of beam wind disaster reference threshold is distributed;
Judged with the beam wind strength information that beam wind information collecting device position is current, determines the grade belonging to it Section;And
The reference threshold judged as current beam wind strength conditions is referred to using the beam wind disaster of the grade interval belonging to it.
The whole system of the present embodiment can be placed on portable enclosure interior and be used alone, its advantage is that can be at any time It carries, be placed in different route uses.
It is illustrated in figure 2 the structure principle chart of another embodiment of the present invention information collection of light rail beam wind and prior-warning device, In, the high-speed railway beam wind information collection of the present embodiment and prior-warning device system include each component described in above-mentioned Fig. 1 embodiment, Component or other combination (in the present embodiment, with Fig. 1 embodiment function, shape, position part all the same use same label), The light rail beam wind information collection of the present embodiment and prior-warning device system further include a computer installation connecting with control device 10 20, especially microcomputer processing unit, the computer processor unit 20 include interface unit 21, the operation space of a whole page 22 and instruction Unit 23.
Computer processor unit is connected to control module above-mentioned, which includes interface unit, operation Panel and indicating unit, wherein:
Foregoing control device 10 is connect by the USB interface that aforementioned interface unit 21 provides with computer processor unit 20, Realize the communication between computer processor unit 20 and control device 10;
Operation panel 22 is preferably shown with touch-sensitive display screen, to receive the behaviour to foregoing control device of user's input It instructs;
Indicating unit 23 is to monitor aforementioned beam wind information collecting device, current signal/numerical signal conversion equipment, storage The working condition of device, the determination device of early warning program starting and wireless communication apparatus, such as beam wind information collecting device is No working properly, whether the transmission of the information of wireless communication apparatus normal etc., and characterizes to user, for example, can by indicator light or The form display working condition of text box.
In conjunction with preceding description, the present invention also proposes a kind of light rail beam wind information collection and prior-warning device method, in conjunction with Fig. 3 institute Show, the realization of this method includes:
Beam wind information collecting device is arranged in Light rail, obtains the beam wind information of its position, including beam wind intensity And wind direction information, and one current signal/numerical signal conversion equipment is transmitted in the form of current signal;
Current signal/numerical signal conversion equipment receives aforementioned currents signal, and is corresponding by aforementioned beam wind intensity-conversion Beam wind strength values signal;
Dynamic generation beam wind calamity source takes reference threshold, i.e. going through according to aforementioned beam wind information collecting device position History beam wind disaster a situation arises data and current beam wind strength values signal are compared, and determine and are currently located route area Beam wind reference threshold;
Judge whether is beam wind strength values signal i.e. beam wind strength information that aforementioned beam wind information collecting device currently acquires Beyond the reference threshold section given birth to, if it exceeds then start early warning program, otherwise repeatedly abovementioned steps;
After early warning starting, the spatial coordinated information where beam wind information collecting device is obtained, to impacted route Area carries out Geographic mapping;
After location determination success, starting control vehicle mode is controlled in the sailed train speed in this section of wiring region;
Judge whether train speed is controlled, terminates early warning and the beam wind intensity by this early warning if being controlled Information and reference threshold are stored in historical data base, otherwise return to abovementioned steps and reenter early warning program.
Preferably, preceding method more comprises the steps of:
Beam wind strength values signal acquired in each described beam wind information collecting device is stored in advance and determines The beam wind disaster reference threshold for being currently located wiring region, history of forming database.
Preferably, in preceding method, under the control vehicle mode told, the speed in the travelled train in this section of wiring region is controlled Degree, realization include:
According to different grades of beam wind disaster section, control makes the speed of train be down to preset section.
Preferably, under the control vehicle mode, the speed in the travelled train in this section of wiring region is controlled, realizes packet It includes:
1) instantaneous wind speed is 14.0-17.0m/s, then control makes the speed of train operation within 30km/h, is 1 grade of indigo plant Color early warning;
2) instantaneous wind speed is 17.0-20.0m/s, then control makes train running speed within 25km/h, is 2 grades of yellow Early warning;
3) instantaneous wind speed is 20.0-24.0m/s, then control makes train running speed within 20km/h, is 3 grades orange Early warning;
4) instantaneous wind speed is greater than 24.0m/s, then control makes suspension of service, is 4 grades of red early warning.
Preferably, the reference threshold of the dynamic generation beam wind calamity source of preceding method, specific implementation include:
Based on aforementioned history beam wind disaster a situation arises data, the beam wind strength information-that is obtained using clustering algorithm The grade interval of beam wind disaster reference threshold is distributed;
Judged with the beam wind strength information that beam wind information collecting device position is current, determines the grade belonging to it Section;And
The reference threshold judged as current beam wind strength conditions is referred to using the beam wind disaster of the grade interval belonging to it.
Preferably, preceding method more comprises the steps of:
After starting early warning program, beam wind Disaster Assessment information is also sent by wireless communication mode and light rail emergency is arranged It applies, is such as outwardly sent in a manner of wireless signal by wireless transmission antenna, or by interface of mobile base station with short message Form transmits encoded information and short message, realizes whole with station host computer terminal, train driving room terminal and passenger's mobile phone The communication at end.
Although the present invention has been disclosed above in the preferred embodiment, however, it is not intended to limit the invention.It is of the present invention Usually has usually intellectual in technical field, without departing from the spirit and scope of the present invention, when various modifications may be made and moisten Decorations.Therefore, the scope of protection of the present invention is defined by those of the claims.

Claims (5)

1. a kind of light rail beam wind information collection and method for early warning, which is characterized in that include the following steps:
Step 1:Beam wind information collecting device is arranged in Light rail, obtains the beam wind information of its position, including beam wind is strong Degree and wind direction information, and one current signal/numerical signal conversion equipment is transmitted in the form of current signal;
Step 2:Current signal/numerical signal conversion equipment receives aforementioned currents signal, and converts phase for aforementioned beam wind intensity The beam wind strength values signal answered;
Step 3:The reference threshold of dynamic generation beam wind calamity source, i.e., according to aforementioned beam wind information collecting device position History beam wind disaster a situation arises data and current beam wind strength values signal compare, and determination is currently located wiring region Beam wind disaster reference threshold;
Step 4:The i.e. beam wind strength information of beam wind strength values signal for judging that aforementioned beam wind information collecting device currently acquires is It is no to exceed reference threshold section produced, if it exceeds then start early warning program, otherwise repeatedly abovementioned steps;
Step 5:After early warning starting, the spatial coordinated information where beam wind information collecting device is obtained, to impacted line Road area carries out Geographic mapping;
Step 6:After positioning successfully, starting control vehicle mode controls the speed in the travelled train in this section of wiring region;
Step 7:Judge whether train speed is controlled, terminates the early warning and beam wind of this early warning is strong if being controlled It spends the estimated reference threshold of information and is stored in historical data base, otherwise return to abovementioned steps and reenter early warning program.
2. light rail beam wind information collection according to claim 1 and method for early warning, which is characterized in that control described in step 6 Under vehicle mode, the speed in the travelled train in this section of wiring region is controlled, specially:According to different grades of beam wind disaster area Between, control makes the speed of train be down to preset section;
(1) instantaneous wind speed is 14.0-17.0m/s, then control makes the speed of train operation within 30km/h, is 1 grade of blue Early warning;
(2) instantaneous wind speed is 17.0-20.0m/s, then control makes train running speed within 25km/h, is that 2 grades of yellow is pre- It is alert;
(3) instantaneous wind speed is 20.0-24.0m/s, then control makes train running speed within 20km/h, is 3 grades orange pre- It is alert;
(4) instantaneous wind speed is greater than 24.0m/s, then control makes suspension of service, is 4 grades of red early warning.
3. light rail beam wind information collection according to claim 1 and method for early warning, which is characterized in that moved described in step 3 State generates the reference threshold of beam wind calamity source, specially:
Based on aforementioned history beam wind disaster a situation arises data, beam wind strength information-beam wind calamity is obtained using clustering algorithm The grade interval distribution of evil reference threshold;Sentenced with the beam wind strength information that beam wind information collecting device position is current It is disconnected, determine the grade interval belonging to it;It is referred to using the beam wind disaster of the grade interval belonging to it as current beam wind intensity feelings The reference threshold of condition judgement.
4. a kind of light rail beam wind information collection and early warning system, which is characterized in that including:It is distributed in the beam wind information of Light rail Acquisition device, current signal/numerical signal conversion equipment, the reference threshold device, pre- for dynamic generation beam wind calamity source Determination device, positioning device, control vehicle device, storage device and the control device of alert program starting.
5. light rail beam wind information collection according to claim 4 and early warning system, which is characterized in that the beam wind information is adopted Acquisition means are made of beam wind air velocity transducer and beam wind wind transducer.
CN201810705547.XA 2018-07-02 2018-07-02 A kind of light rail train beam wind information collection and method for early warning and system Withdrawn CN108909774A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810705547.XA CN108909774A (en) 2018-07-02 2018-07-02 A kind of light rail train beam wind information collection and method for early warning and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810705547.XA CN108909774A (en) 2018-07-02 2018-07-02 A kind of light rail train beam wind information collection and method for early warning and system

Publications (1)

Publication Number Publication Date
CN108909774A true CN108909774A (en) 2018-11-30

Family

ID=64421232

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810705547.XA Withdrawn CN108909774A (en) 2018-07-02 2018-07-02 A kind of light rail train beam wind information collection and method for early warning and system

Country Status (1)

Country Link
CN (1) CN108909774A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110726850A (en) * 2019-10-08 2020-01-24 南京信息工程大学 Railway crosswind early warning system based on wind direction decomposition and crosswind strength calculation method
CN114895061A (en) * 2022-05-09 2022-08-12 南京理工大学 Crosswind early warning method and system for high-speed train

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007269055A (en) * 2006-03-30 2007-10-18 Railway Technical Res Inst Simple side wind monitoring method and side wind monitoring device in railroad line
JP2009162657A (en) * 2008-01-08 2009-07-23 Railway Technical Res Inst Strong wind monitoring method and strong wind monitoring device
CN103978996A (en) * 2014-05-15 2014-08-13 南京理工大学 High speed railway environmental information collection, assessment and early warning device and method
CN104724143A (en) * 2015-03-13 2015-06-24 南京理工大学 High speed railway crosswind information collection and early warning method and system
CN106250611A (en) * 2016-07-28 2016-12-21 中国路桥工程有限责任公司 System for monitoring gale meteorological disasters in railway wind section
CN207489255U (en) * 2017-10-25 2018-06-12 云南省交通科学研究院 Crossing beam wind monitoring and warning system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007269055A (en) * 2006-03-30 2007-10-18 Railway Technical Res Inst Simple side wind monitoring method and side wind monitoring device in railroad line
JP2009162657A (en) * 2008-01-08 2009-07-23 Railway Technical Res Inst Strong wind monitoring method and strong wind monitoring device
CN103978996A (en) * 2014-05-15 2014-08-13 南京理工大学 High speed railway environmental information collection, assessment and early warning device and method
CN104724143A (en) * 2015-03-13 2015-06-24 南京理工大学 High speed railway crosswind information collection and early warning method and system
CN106250611A (en) * 2016-07-28 2016-12-21 中国路桥工程有限责任公司 System for monitoring gale meteorological disasters in railway wind section
CN207489255U (en) * 2017-10-25 2018-06-12 云南省交通科学研究院 Crossing beam wind monitoring and warning system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110726850A (en) * 2019-10-08 2020-01-24 南京信息工程大学 Railway crosswind early warning system based on wind direction decomposition and crosswind strength calculation method
CN114895061A (en) * 2022-05-09 2022-08-12 南京理工大学 Crosswind early warning method and system for high-speed train
CN114895061B (en) * 2022-05-09 2024-05-24 南京理工大学 Crosswind early warning method and system for high-speed train

Similar Documents

Publication Publication Date Title
CN104709313B (en) High-speed railway rainfall information gathers and method for early warning and system
CN104715597B (en) High speed rail earthquake data information acquisition and method for early warning and system
CN1331701C (en) Automatic train stop system
CN108932819A (en) A kind of subway seismic data information collection and method for early warning and system
CN104724143B (en) High-speed railway beam wind information gathering and method for early warning and system
AU2012227260B9 (en) Method and device for generating proximity warnings
CN104554299B (en) Train automatic Pilot method based on ATP/TD loop wire standards
CN105346566A (en) Pre-warning system for high-speed train operation approaching and achieving method of pre-warning system
KR20100083051A (en) System and method to control a train with a rfid
CN104742939B (en) Temperature information collection and early warning method and system for high speed railway
CN105387963A (en) Highway slope pressure detection and early warning device
CN108909774A (en) A kind of light rail train beam wind information collection and method for early warning and system
CN106594645A (en) Solar street lamp and outdoor alarm method
Song et al. A train-centric communication-based new movement authority proposal for ETCS-2
CN106448263A (en) A vehicle driving safety management system and method
CN103323813A (en) Positioning system and positioning method of mine locomotive beacon
CN104742940B (en) High-speed railway lightning information gathers and method for early warning and system
CN113223279A (en) Intelligent mine hazard source dynamic identification and mutual inductance early warning management and control platform
CN103337169A (en) A road tunnel traffic intelligent wireless early warning apparatus based on a doppler automatic detector
CN103802863A (en) High-speed railway vehicle tailgating-prevention alarming method and device
CN102815323A (en) Wireless network based automatic management system for mine locomotive
CN101973290A (en) Estimation system of railway operating environment of high-speed train
CN215728815U (en) Active security radar system for subway
CN101890970B (en) Indicating system for running and positioning subway and evacuating personnel
CN108001486A (en) Car team is close to early warning system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20181130

WW01 Invention patent application withdrawn after publication