CN108894486A - One kind is for aerial platform in well cabinet frame and preparation method thereof - Google Patents
One kind is for aerial platform in well cabinet frame and preparation method thereof Download PDFInfo
- Publication number
- CN108894486A CN108894486A CN201810586057.2A CN201810586057A CN108894486A CN 108894486 A CN108894486 A CN 108894486A CN 201810586057 A CN201810586057 A CN 201810586057A CN 108894486 A CN108894486 A CN 108894486A
- Authority
- CN
- China
- Prior art keywords
- cabinet frame
- well cabinet
- fixedly connected
- round bar
- brace
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Furniture Connections (AREA)
Abstract
The present invention provides one kind for aerial platform in well cabinet frame and preparation method thereof, wherein for aerial platform in well cabinet frame, for being set in well cabinet frame, including:Two main reinforcements disposed in parallel, main ribs include first part, second part and Part III, described first part one end is fixedly connected with the Part III, the other end is fixedly connected with the end of the second part, and, the first part is vertical with the second part, and the Part III is used for the cross bar being arranged on well cabinet frame;More direct rod shape dowels are fixedly connected between two main ribs;Two direct rod shape braces, bearing diagonal is in two main ribs respectively.Provided by the present invention for aerial platform in well cabinet frame and preparation method thereof, aerial platform in well cabinet frame is used, construction speed can be improved and reduces construction labour, improves engineering construction benefit.
Description
Technical field
The present invention relates to field of engineering building, especially a kind of for aerial platform and its production in well cabinet frame
Method.
Background technique
In construction, workshop colored steel installation is especially common, sees Fig. 1, is generally coupled using well cabinet frame 4,
Construction personnel station construction operation on the cross bar 401 of well cabinet frame 4.
Currently, this kind of form of construction work low efficiency, and it is dangerous.
Summary of the invention
The technical problem to be solved in the present invention is to provide one kind to be used for aerial platform and preparation method thereof in well cabinet frame,
Construction efficiency is improved, safety is enhanced.
The present invention provides one kind for aerial platform in well cabinet frame, for being set in well cabinet frame, including:
Two main reinforcements disposed in parallel, main ribs include first part, second part and Part III, the first part and
The second part is direct rod shape, and the Part III is hook solid, and described first part one end and the Part III are solid
Fixed connection, the other end are fixedly connected with the end of the second part, also, the first part and the second part hang down
Directly, the Part III is used for the cross bar being arranged on well cabinet frame;
More direct rod shape dowels are fixedly connected between two main ribs, the both ends of each dowel respectively with
Two main ribs are fixedly connected;
Two direct rod shape braces, one end of each brace are fixedly connected with the first part, the other end and institute
It states second part to be fixedly connected, bearing diagonal is in two main ribs respectively.
Further, the first part, the second part, the dowel and the brace are round bar,
The Part III is bent by round bar.
Further, the first part, the second part, the dowel and the brace be diameter 8 ~
The round bar of 15mm, the Part III are bent by the round bar of 8 ~ 15mm of diameter.
Further, the first part, the second part, the dowel and the brace are diameter 10mm
Round bar, the Part III bends by the round bar of diameter 10mm.
Further, it is welded to connect between the first part and the second part, the first part and described
It is welded to connect between three parts, is welded to connect between the dowel and main ribs, between the brace and main ribs
It is welded to connect.
The present invention also provides a kind of production methods for aerial platform in well cabinet frame, include the following steps:
A:First part, second part and Part III are made respectively, by one end of the first part and the Part III
It is fixedly connected, the other end is fixedly connected with the end of the second part, obtains main reinforcement, wherein the first part and described
Second part is direct rod shape, and the first part is vertical with the second part, and the Part III is hook solid, and described the
Three parts are used for the cross bar being arranged on well cabinet frame;
B:More direct rod shape dowels are made, and are fixed between the main ribs for being connected to two laid parallels respectively, are made
The both ends of each dowel are fixedly connected with two main ribs respectively;
C:Make two braces, one end of each brace be fixedly connected with the first part, the other end with
The second part is fixedly connected, and makes two brace difference bearing diagonals in two main ribs.
Further, the first part, the second part, the dowel and the brace are round bar,
The Part III is bent by round bar.
Further, the first part, the second part, the dowel and the brace be diameter 8 ~
The round bar of 15mm, the Part III are bent by the round bar of 8 ~ 15mm of diameter.
Further, the first part, the second part, the dowel and the brace are diameter 10mm
Round bar, the Part III bends by the round bar of diameter 10mm.
Further, it is welded to connect between the first part and the second part, the first part and described
It is welded to connect between three parts, is welded to connect between the dowel and main ribs, between the brace and main ribs
It is welded to connect.
Provided by the present invention for aerial platform in well cabinet frame and preparation method thereof, uses high-altitude in well cabinet frame and make
Industry device can be improved construction speed and reduce construction labour, improves engineering construction benefit.
Advantage specific manifestation is as follows:
Production, easy for construction, strong operability.
Easily operated, raising construction efficiency.
It can be recycled, save construction cost.
Detailed description of the invention
Fig. 1 is the schematic perspective view of well cabinet frame;
Schematic perspective view of Fig. 2 present invention for aerial platform in well cabinet frame;
Fig. 3 is schematic diagram of the present invention for aerial platform use state in well cabinet frame.
In figure, 1. main reinforcements, 101. first parts, 102. second parts, 103. Part III, 2. dowels, 3. braces,
4. well cabinet frame, 401. cross bars.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings and specific examples, so that those skilled in the art can be with
It more fully understands the present invention and can be practiced, but illustrated embodiment is not as a limitation of the invention.
One kind is for aerial platform in well cabinet frame, as shown in Fig. 1 ~ 3, for being set in well cabinet frame 4, including:
Two main reinforcements 1 disposed in parallel, main ribs 1 include first part 101, second part 102 and Part III 103, institute
Stating first part 101 and the second part 102 is direct rod shape, and the Part III 103 is hook solid, the first part
101 one end are fixedly connected with the Part III 103, and the other end is fixedly connected with the end of the second part 102, also,
The first part 101 is vertical with the second part 102, and the Part III 103 is used for the cross bar being arranged on well cabinet frame 4
On 401;
More direct rod shape dowels 2 are fixedly connected between two main ribs 1, the both ends difference of each dowel 2
It is fixedly connected with two main ribs 1;
Two direct rod shape braces 3, one end of each brace 3 are fixedly connected with the first part 101, the other end
It is fixedly connected with the second part 102, bearing diagonal is in two main ribs 1 respectively.
In one optional embodiment of the present embodiment, the first part 101, the second part 102, the dowel
2 and the brace 3 be round bar, the Part III 103 is bent by round bar.
In one optional embodiment of the present embodiment, the first part 101, the second part 102, the dowel
2 and the brace 3 be 8 ~ 15mm of diameter round bar, the Part III 103 by 8 ~ 15mm of diameter round bar bend
It forms.Preferably, the first part 101, the second part 102, the dowel 2 and the brace 3 are diameter
The round bar of 10mm, the Part III 102 are bent by the round bar of diameter 10mm.
In one optional embodiment of the present embodiment, the company of welding between the first part 101 and the second part 102
It connects, is welded to connect between the first part 101 and the Part III 103, welded between the dowel 2 and main ribs 1
It connects, is welded to connect between the brace 3 and main ribs 1 in succession.
The present invention also provides a kind of production methods for aerial platform in well cabinet frame, include the following steps:
A:Make first part 101, second part 102 and Part III 103 respectively, by one end of the first part 101 with
The Part III 103 is fixedly connected, and the other end is fixedly connected with the end of the second part 102, obtains main reinforcement 1, wherein
The first part 101 and the second part 102 are direct rod shape, and the first part 101 hangs down with the second part 102
Directly, the Part III 103 is hook solid, and the Part III 103 is used for the cross bar 401 being arranged on well cabinet frame 4;
B:More direct rod shape dowels 2 are made, and is fixed is connected between the main ribs 1 of two laid parallels respectively,
It is fixedly connected with the both ends of each dowel 2 with two main ribs 1 respectively;
C:Two braces 3 are made, one end of each brace 3 is fixedly connected with the first part 101, it is another
End is fixedly connected with the second part 102, and two braces 3 is made to distinguish bearing diagonal in two main ribs 1.
In one optional embodiment of the present embodiment, the first part 101, the second part 102, the dowel
2 and the brace 3 be round bar, the Part III 103 is bent by round bar.
In one optional embodiment of the present embodiment, the first part 101, the second part 102, the dowel
2 and the brace 3 be 8 ~ 15mm of diameter round bar, the Part III 103 by 8 ~ 15mm of diameter round bar bend
It forms.Preferably, the first part 101, the second part 102, the dowel 2 and the brace 3 are diameter
The round bar of 10mm, the Part III 102 are bent by the round bar of diameter 10mm.
In one optional embodiment of the present embodiment, the company of welding between the first part 101 and the second part 102
It connects, is welded to connect between the first part 101 and the Part III 103, welded between the dowel 2 and main ribs 1
It connects, is welded to connect between the brace 3 and main ribs 1 in succession.
The present apparatus has obtained good application in Baosteel Desheng Stainless Steel Co., Ltd.'s items technology innovation project, mentions well
High colored steel installs high altitude operation personnel construction efficiency problem.Use of the invention, direct construction personnel is directly by high altitude operation
Device is hung on well cabinet frame 4, and then operating personnel station is constructed on device, simple and convenient.
The scope of protection of the present invention is not limited to this.Those skilled in the art are made equivalent on the basis of the present invention
Substitution or transformation, it is within the scope of the present invention.Protection scope of the present invention is subject to claims.
Claims (10)
1. one kind is for aerial platform in well cabinet frame, for being set in well cabinet frame, which is characterized in that including:
Two main reinforcements disposed in parallel, main ribs include first part, second part and Part III, the first part and
The second part is direct rod shape, and the Part III is hook solid, and described first part one end and the Part III are solid
Fixed connection, the other end are fixedly connected with the end of the second part, also, the first part and the second part hang down
Directly, the Part III is used for the cross bar being arranged on well cabinet frame;
More direct rod shape dowels are fixedly connected between two main ribs, the both ends of each dowel respectively with
Two main ribs are fixedly connected;
Two direct rod shape braces, one end of each brace are fixedly connected with the first part, the other end and institute
It states second part to be fixedly connected, bearing diagonal is in two main ribs respectively.
2. as described in claim 1 for aerial platform in well cabinet frame, which is characterized in that the first part, described
Second part, the dowel and the brace are round bar, and the Part III is bent by round bar.
3. as described in claim 1 for aerial platform in well cabinet frame, which is characterized in that the first part, described
Second part, the dowel and the brace are the round bar of 8 ~ 15mm of diameter, the Part III by diameter 8 ~
The round bar of 15mm is bent.
4. as claimed in claim 3 for aerial platform in well cabinet frame, which is characterized in that the first part, described
Second part, the dowel and the brace are the round bar of diameter 10mm, and the Part III is by diameter 10mm's
Round bar is bent.
5. as described in claim 1 for aerial platform in well cabinet frame, which is characterized in that the first part and described
Be welded to connect between second part, be welded to connect between the first part and the Part III, the dowel with it is described
It is welded to connect between main reinforcement, is welded to connect between the brace and main ribs.
6. a kind of production method for aerial platform in well cabinet frame, which is characterized in that include the following steps:
A:First part, second part and Part III are made respectively, by one end of the first part and the Part III
It is fixedly connected, the other end is fixedly connected with the end of the second part, obtains main reinforcement, wherein the first part and described
Second part is direct rod shape, and the first part is vertical with the second part, and the Part III is hook solid, and described the
Three parts are used for the cross bar being arranged on well cabinet frame;
B:More direct rod shape dowels are made, and are fixed between the main ribs for being connected to two laid parallels respectively, are made
The both ends of each dowel are fixedly connected with two main ribs respectively;
C:Make two braces, one end of each brace be fixedly connected with the first part, the other end with
The second part is fixedly connected, and makes two brace difference bearing diagonals in two main ribs.
7. the production method for aerial platform in well cabinet frame as claimed in claim 6, which is characterized in that described first
Partially, the second part, the dowel and the brace are round bar, the Part III by round bar bend and
At.
8. the production method for aerial platform in well cabinet frame as claimed in claim 6, which is characterized in that described first
Partially, the second part, the dowel and the brace are the round bar of 8 ~ 15mm of diameter, the Part III by
The round bar of 8 ~ 15mm of diameter is bent.
9. the production method for aerial platform in well cabinet frame as claimed in claim 8, which is characterized in that described first
Partially, the second part, the dowel and the brace are the round bar of diameter 10mm, and the Part III is by straight
The round bar of diameter 10mm is bent.
10. the production method for aerial platform in well cabinet frame as claimed in claim 6, which is characterized in that described the
It is welded to connect between a part of and described second part, is welded to connect between the first part and the Part III, it is described
It is welded to connect between dowel and main ribs, is welded to connect between the brace and main ribs.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810586057.2A CN108894486A (en) | 2018-06-08 | 2018-06-08 | One kind is for aerial platform in well cabinet frame and preparation method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810586057.2A CN108894486A (en) | 2018-06-08 | 2018-06-08 | One kind is for aerial platform in well cabinet frame and preparation method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108894486A true CN108894486A (en) | 2018-11-27 |
Family
ID=64344460
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810586057.2A Pending CN108894486A (en) | 2018-06-08 | 2018-06-08 | One kind is for aerial platform in well cabinet frame and preparation method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108894486A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201786007U (en) * | 2010-06-22 | 2011-04-06 | 浙江中南建设集团钢结构有限公司 | Aerial operation hanging basket |
CN202787928U (en) * | 2012-06-26 | 2013-03-13 | 中建钢构有限公司 | Construction device for steel plate wall |
CN203905428U (en) * | 2014-05-20 | 2014-10-29 | 广西建工集团第二建筑工程有限责任公司 | Simple high-altitude single-person operating hanging basket |
CN206873896U (en) * | 2017-05-26 | 2018-01-12 | 海洋石油工程股份有限公司 | Cage for the construction of oil gas storage tank outer wall pipe support |
CN207363235U (en) * | 2017-09-04 | 2018-05-15 | 中国建筑第二工程局有限公司 | Steel-made moving formula Hanging Basket |
-
2018
- 2018-06-08 CN CN201810586057.2A patent/CN108894486A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201786007U (en) * | 2010-06-22 | 2011-04-06 | 浙江中南建设集团钢结构有限公司 | Aerial operation hanging basket |
CN202787928U (en) * | 2012-06-26 | 2013-03-13 | 中建钢构有限公司 | Construction device for steel plate wall |
CN203905428U (en) * | 2014-05-20 | 2014-10-29 | 广西建工集团第二建筑工程有限责任公司 | Simple high-altitude single-person operating hanging basket |
CN206873896U (en) * | 2017-05-26 | 2018-01-12 | 海洋石油工程股份有限公司 | Cage for the construction of oil gas storage tank outer wall pipe support |
CN207363235U (en) * | 2017-09-04 | 2018-05-15 | 中国建筑第二工程局有限公司 | Steel-made moving formula Hanging Basket |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204040435U (en) | High-altitude steel structure welding Hanging Basket | |
CN204024005U (en) | Assembly type suspension platform | |
CN204552054U (en) | A kind of telescopic work high above the ground hanger bracket | |
CN204752026U (en) | Tower crane escape way | |
CN108894486A (en) | One kind is for aerial platform in well cabinet frame and preparation method thereof | |
CN205531248U (en) | Construction scaffolding component | |
CN205857670U (en) | A kind of external wall construction hanging basket is encorbelmented device | |
CN208310154U (en) | A kind of construction scaffold | |
CN206784886U (en) | A kind of hanging basket | |
CN205894636U (en) | A cage device for steel structure high altitude welding jobs | |
CN205348817U (en) | Safety belt pendant | |
CN205840303U (en) | A kind of button bar adaptor | |
CN209568702U (en) | Aluminum alloy pattern plate support system | |
CN208815876U (en) | A kind of fixed device of detachable suspended scaffold upright rod load | |
CN210164201U (en) | Roofing transformation engineering protection outrigger | |
CN207749810U (en) | A kind of Novel moveable scaffold | |
CN204456811U (en) | A kind of Portable scaffold | |
CN207160532U (en) | Scaffolding scope of operation guard rail | |
CN209723570U (en) | Steel column docking installation operation platform | |
CN206034886U (en) | Steel sheet net installing support | |
CN205314607U (en) | Auxiliary bracket | |
CN201704037U (en) | Adjustable hanging basket suspension mechanism | |
CN209353741U (en) | A kind of rack overhead welding ease of Use platform | |
CN206438756U (en) | A kind of guard bar structure and scaffold for scaffold | |
CN205271293U (en) | Support of preparation air pipe angle steel flange |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181127 |
|
RJ01 | Rejection of invention patent application after publication |