CN108891526A - The mounting tool and installation method of a kind of D type ceiling in corridor - Google Patents

The mounting tool and installation method of a kind of D type ceiling in corridor Download PDF

Info

Publication number
CN108891526A
CN108891526A CN201810646735.XA CN201810646735A CN108891526A CN 108891526 A CN108891526 A CN 108891526A CN 201810646735 A CN201810646735 A CN 201810646735A CN 108891526 A CN108891526 A CN 108891526A
Authority
CN
China
Prior art keywords
corridor
fixing piece
hanging beam
type
tapping screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810646735.XA
Other languages
Chinese (zh)
Inventor
王硕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Merchants Jinling Shipping Nanjing Co ltd
China Merchants Heavy Industry Jiangsu Co Ltd
Original Assignee
China Merchants Heavy Industry Jiangsu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Merchants Heavy Industry Jiangsu Co Ltd filed Critical China Merchants Heavy Industry Jiangsu Co Ltd
Priority to CN201810646735.XA priority Critical patent/CN108891526A/en
Publication of CN108891526A publication Critical patent/CN108891526A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B71/00Designing vessels; Predicting their performance

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

A kind of mounting tool the invention discloses D type ceiling in corridor, the angle steel including enclosing installation connection elasticity h firmware at arm on deck or steel, elastic h fixing piece includes L fixing piece, flexible connector, U-shaped card slot;L fixing piece angle cleat, it is connected above flexible connector with L fixing piece, lower section is connected with U-shaped card slot, U-shaped card slot is connected with unilateral top-type material, tooling further includes corridor hanging beam, corridor hanging beam is fixed on unilateral top-type material by tapping screw one, D type ceiling is fixed on the hanging beam of corridor by tapping screw two, the present invention can simplify construction, cost efficiency.

Description

The mounting tool and installation method of a kind of D type ceiling in corridor
Technical field
The invention belongs to accommodation outfitting technology fields, and in particular to the mounting tool and installation of a kind of D type ceiling in corridor Method.
Background technique
D type ceiling is a kind of current widely used ceiling type, deep to be liked by numerous shipowners owner, but D type ceiling construction is relatively complicated, needs to weld, fixed a large amount of screw rod M8, ears hanging beam, and construction while will also avoid With the interference of other professions, the common installation of D type ceiling needs then to be welded on screw rod M8 first by screw rod M8 and sleeve combination On deck, then elastic lifting tip cutting seat and screw rod M8 are tightened, finally ears hanging beam is stuck on elastic lifting tip cutting seat, ears Hanging beam installs D type ceiling again after the installation is completed, and the spacing of ears hanging beam is 1000-1200mm under normal circumstances, and big Most non-passenger ship project corridor spacing are in 1000mm or so, that is to say, that the plate of D type ceiling is grown in 1000mm or so, then is made It is installed with the installation method of screw rod M8, ears hanging beam, construction is complicated, higher cost.
Summary of the invention
Mounting tool and installation method the purpose of the present invention is to provide a kind of D type ceiling in corridor, to simplify Construction, cost efficiency.
In order to solve the above technical problems, the technical solution adopted by the present invention is that:A kind of erector of D type ceiling in corridor It fills, the angle steel including enclosing installation connection elasticity h firmware at arm on deck or steel, elastic h fixing piece connects comprising L fixing piece, elasticity Fitting, U-shaped card slot;L fixing piece angle cleat, flexible connector top is connected with L fixing piece, lower section is connected with U-shaped card slot, U Type card slot is connected with unilateral top-type material, and tooling further includes corridor hanging beam, and corridor hanging beam is fixed on list by tapping screw one On the top-type material of side, D type ceiling is fixed on the hanging beam of corridor by tapping screw two.
Preferably, wherein corridor hanging beam is " L " type, a length of 10-100mm in one side, a length of 50-150mm in another side, material Matter is the galvanized steel plain sheet of thickness 1.2mm, and unilateral top-type material uses the galvanized steel plain sheet of 1.2mm thickness.
A kind of installation method of the mounting tool of D type ceiling in corridor, includes the following steps:
Step S1:The angle steel of installation connection elasticity h fixing piece at deck or steel wall;
Step S2:Elastic h fixing piece is welded on angle steel;
Step S3:By unilateral top-type material and elasticity h fixing piece spot welding;
Step S4:Corridor hanging beam is fixed on unilateral top-type material by tapping screw one;
Step S5:D type ceiling is fixed on the hanging beam of corridor finally by tapping screw two.
Preferably, tapping screw uses cross recess coiled hair self drilling tapping screw, it is this referring to GB/T15856.12002 Tapping screw is made of drill bit and screw two parts, and first from thread Pilot hole is drilled out when assembly, then tapping internal screw thread, when installation can To realize drilling, tapping, fixation, the disposable completion of locking, and it is easy to disassemble, and material is stainless steel, due to unilateral top-type material It is the galvanized steel plain sheet of thick 1.2mm with corridor hanging beam material, therefore screw length is 3-4mm.
Compared with prior art, mounting means of the invention reduces a large amount of welding, paints patch work, model Interference checking work, while material has been saved, alleviate weight;Installation for D type ceiling in corridor provides a kind of convenience, fast Prompt installation method, and play the effect of cost efficiency.
Detailed description of the invention
Fig. 1 is flow chart of the invention;
Fig. 2 is the scheme of installation of present invention installation D type ceiling;
Fig. 3 is the partial enlarged view of Fig. 2.
Wherein:1, deck;2, D type ceiling;3, steel wall;4, angle steel;5, unilateral top-type material;6-1, tapping screw one; 6-2, tapping screw two;7, corridor hanging beam;8, liner plate;9, elasticity h fixing piece;9-1, L fixing piece;9-2, flexible connector; 9-3, U-shaped card slot.
Specific embodiment
The embodiment of the present invention is described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end Same or similar label indicates same or similar element or element with the same or similar functions.Below with reference to attached The embodiment of figure description is exemplary, and for explaining only the invention, and is not considered as limiting the invention.
In the description of the present invention, unless otherwise specified and limited, it should be noted that term " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be mechanical connection or electrical connection, the connection being also possible to inside two elements can It, can also be indirectly connected through an intermediary to be to be connected directly.It for the ordinary skill in the art, can basis Concrete condition understands the concrete meaning of above-mentioned term.
As shown in Figure 1-3, a kind of installation method of D type ceiling, a kind of mounting tool of D type ceiling in corridor, packet The angle steel 4 of the installation connection elasticity h fixing piece 9 at deck 1 or steel wall 3 is included, elastic h fixing piece 9 includes L fixing piece 9-1, bullet Property connector 9-2, U-shaped card slot 9-3;L fixing piece 9-1 angle cleat 4, be connected above flexible connector 9-2 with L fixing piece 9-1, Lower section is connected with U-shaped card slot 9-3, and U-shaped card slot 9-3 is connected with unilateral top-type material 5, and tooling further includes corridor hanging beam 7, and corridor is hung Drop in beam 7 is fixed on unilateral top-type material 5 by one 6-1 of tapping screw, is fixed to D type ceiling by two 6-2 of tapping screw On corridor hanging beam 7, unilateral top-type material 5 uses the galvanized steel plain sheet of 1.2mm thickness.
Preferably, wherein corridor hanging beam 7 is " L " type, a length of 10-100mm, a length of 50-150mm in another side on one side, Material is the galvanized steel plain sheet of thickness 1.2mm.
A kind of installation method of the mounting tool of D type ceiling in corridor, includes the following steps:
Step S1:The angle steel 4 of installation connection elasticity h fixing piece 9 at deck 1 or steel wall 3;
Step S2:Elastic h fixing piece 9 is welded on angle steel 4;
Step S3:By unilateral top-type material 5 and 9 spot welding of elasticity h fixing piece;
Step S4:Corridor hanging beam 7 is fixed on unilateral top-type material 5 by one 6-1 of tapping screw;
Step S5:D type ceiling 2 is fixed on corridor hanging beam 7 finally by two 6-2 of tapping screw.
Preferably, tapping screw uses cross recess coiled hair self drilling tapping screw, it is this referring to GB/T15856.12002 Tapping screw is made of drill bit and screw two parts, and first from thread Pilot hole is drilled out when assembly, then tapping internal screw thread, when installation can To realize drilling, tapping, fixation, the disposable completion of locking, and it is easy to disassemble, and material is stainless steel, due to unilateral top-type material 5 It is the galvanized steel plain sheet of thick 1.2mm with 7 material of corridor hanging beam, therefore screw length is 3-4mm.
Mounting means of the invention reduces a large amount of welding, paints patch work, and model interference checking works, together Shi Jieyue material, alleviates weight;Installation for D type ceiling in corridor provides a kind of easily and efficiently installation method, and And play the effect of cost efficiency.
In the description of this specification, the description meaning of reference term " one embodiment ", " example " or " some examples " etc. Refer to that particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained at least one reality of the invention It applies in example or example.In the present specification, schematic expression of the above terms are not necessarily referring to identical embodiment or show Example.Moreover, particular features, structures, materials, or characteristics described can be in any one or more of the embodiments or examples It can be combined in any suitable manner.
Although an embodiment of the present invention has been shown and described, it will be understood by those skilled in the art that:Not A variety of change, modification, replacement and modification can be carried out to these embodiments in the case where being detached from the principle of the present invention and objective, this The range of invention is defined by the claims and their equivalents.

Claims (4)

1. a kind of D type ceiling is in the mounting tool in corridor, which is characterized in that be included in deck or steel encloses installation connection bullet at arm Property h firmware angle steel, elastic h fixing piece include L fixing piece, flexible connector, U-shaped card slot;L fixing piece angle cleat, elasticity Connector top is connected with L fixing piece, lower section is connected with U-shaped card slot, and U-shaped card slot is connected with unilateral top-type material, and tooling further includes Corridor hanging beam, corridor hanging beam are fixed on unilateral top-type material by tapping screw one, by tapping screw two by D type smallpox Plate is fixed on the hanging beam of corridor.
2. mounting tool according to claim 1, which is characterized in that wherein corridor hanging beam is " L " type, a length of on one side 10-100mm, a length of 50-150mm in another side, material are the galvanized steel plain sheet of thickness 1.2mm, and unilateral top-type material uses the plating of 1.2mm thickness Zinc steel plate.
3. the installation method of the mounting tool using a kind of D type ceiling as claimed in claim 2 in corridor, which is characterized in that Include the following steps:
Step S1:The angle steel of installation connection elasticity h fixing piece at deck or steel wall;
Step S2:Elastic h fixing piece is welded on angle steel;
Step S3:By unilateral top-type material and elasticity h fixing piece spot welding;
Step S4:Corridor hanging beam is fixed on unilateral top-type material by tapping screw one;
Step S5:D type ceiling is fixed on the hanging beam of corridor finally by tapping screw two.
4. installation method according to claim 3, which is characterized in that tapping screw uses cross recess coiled hair self-drilling self-tapping spiral shell Nail, referring to GB/T15856.12002, this tapping screw is made of drill bit and screw two parts, first from drilling out screw thread when assembly Bottom outlet, then tapping internal screw thread may be implemented when installation that drilling, tapping, fixation, locking is disposable completes, and easy to disassemble, Material is stainless steel, and since unilateral top-type material and corridor hanging beam material are the galvanized steel plain sheet of thick 1.2mm, therefore screw length is 3-4mm。
CN201810646735.XA 2018-06-21 2018-06-21 The mounting tool and installation method of a kind of D type ceiling in corridor Pending CN108891526A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810646735.XA CN108891526A (en) 2018-06-21 2018-06-21 The mounting tool and installation method of a kind of D type ceiling in corridor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810646735.XA CN108891526A (en) 2018-06-21 2018-06-21 The mounting tool and installation method of a kind of D type ceiling in corridor

Publications (1)

Publication Number Publication Date
CN108891526A true CN108891526A (en) 2018-11-27

Family

ID=64345542

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810646735.XA Pending CN108891526A (en) 2018-06-21 2018-06-21 The mounting tool and installation method of a kind of D type ceiling in corridor

Country Status (1)

Country Link
CN (1) CN108891526A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111547185A (en) * 2020-04-24 2020-08-18 上海外高桥造船有限公司 Fixing device of boats and ships

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201597731U (en) * 2009-11-10 2010-10-06 大连船舶重工集团有限公司 B level continues ship cabin interior decoration mode on ship
CN203306198U (en) * 2013-05-07 2013-11-27 江西朝阳机械厂 F-type ceiling
CN203612178U (en) * 2013-11-25 2014-05-28 华南建材(深圳)有限公司 Ceiling of fire-retarding cabin of ship
CN203666934U (en) * 2013-12-27 2014-06-25 福建省马尾造船股份有限公司 Cabin ceiling pendant
CN104210621A (en) * 2014-09-22 2014-12-17 上海外高桥造船海洋工程设计有限公司 Accommodation system of ship
CN205574218U (en) * 2015-12-16 2016-09-14 江西朝阳机械厂 A section bar of borduring
CN207191308U (en) * 2017-07-14 2018-04-06 招商局重工(江苏)有限公司 A kind of hull corridor D type smallpox board fixing structures
CN208979055U (en) * 2018-06-21 2019-06-14 招商局重工(江苏)有限公司 A kind of mounting tool of D type ceiling in corridor

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201597731U (en) * 2009-11-10 2010-10-06 大连船舶重工集团有限公司 B level continues ship cabin interior decoration mode on ship
CN203306198U (en) * 2013-05-07 2013-11-27 江西朝阳机械厂 F-type ceiling
CN203612178U (en) * 2013-11-25 2014-05-28 华南建材(深圳)有限公司 Ceiling of fire-retarding cabin of ship
CN203666934U (en) * 2013-12-27 2014-06-25 福建省马尾造船股份有限公司 Cabin ceiling pendant
CN104210621A (en) * 2014-09-22 2014-12-17 上海外高桥造船海洋工程设计有限公司 Accommodation system of ship
CN205574218U (en) * 2015-12-16 2016-09-14 江西朝阳机械厂 A section bar of borduring
CN207191308U (en) * 2017-07-14 2018-04-06 招商局重工(江苏)有限公司 A kind of hull corridor D type smallpox board fixing structures
CN208979055U (en) * 2018-06-21 2019-06-14 招商局重工(江苏)有限公司 A kind of mounting tool of D type ceiling in corridor

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111547185A (en) * 2020-04-24 2020-08-18 上海外高桥造船有限公司 Fixing device of boats and ships

Similar Documents

Publication Publication Date Title
US8272610B2 (en) Wall mountable holder
CN101748801A (en) Cast-in channel
US10935067B2 (en) Reverse-thread insert anchor for masonry applications
US20060018730A1 (en) Drywall fastener
EP2920476B1 (en) Combination hanger fastener
CN106168245A (en) A kind of multifunctional double-headed stud
CN108891526A (en) The mounting tool and installation method of a kind of D type ceiling in corridor
AU2011318225B2 (en) Screw fastener
CN208979055U (en) A kind of mounting tool of D type ceiling in corridor
US20040156696A1 (en) Fastener for fiberglass and other composite structures
CN205543820U (en) Novel mounting bracket
JP5002298B2 (en) Adhesive anchor bolt
CN202082496U (en) Detachable automobile oil pipe clamp
JP2007315513A (en) Self-boring screw
CN203532453U (en) Tapping expansion screw improved structure
JP2006214577A (en) Self drilling tapping screw for thin steel sheet
CN107339308A (en) A kind of double thread connection can pre-install buckle
CN204610508U (en) A kind of high-strength tensile bolt
CN103470593A (en) Bolt combination installation device and application method
CN210263421U (en) Self-tapping screw for building component
US20080148666A1 (en) Tongue and Groove Board and Fastener Assembly
CN205688696U (en) A kind of stair railing
JP2008063806A (en) Rain gutter hanger
CN210564376U (en) Converter, combination converter and combination drilling tool
CN210621949U (en) Building templates mounting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20221229

Address after: 226116 No. 1, Xin'anjiang Road, Binjiang Street, Haimen District, Nantong, Jiangsu

Applicant after: CHINA MERCHANTS HEAVY INDUSTRY (JIANGSU) Co.,Ltd.

Applicant after: China Merchants Jinling shipping (Nanjing) Co.,Ltd.

Address before: 226100 Xin'anjiang Road, Binjiang Street, Haimen City, Nantong City, Jiangsu Province

Applicant before: CHINA MERCHANTS HEAVY INDUSTRY (JIANGSU) Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181127