CN108889775A - Guard rail U-steel roll mill and milling method - Google Patents

Guard rail U-steel roll mill and milling method Download PDF

Info

Publication number
CN108889775A
CN108889775A CN201810661660.2A CN201810661660A CN108889775A CN 108889775 A CN108889775 A CN 108889775A CN 201810661660 A CN201810661660 A CN 201810661660A CN 108889775 A CN108889775 A CN 108889775A
Authority
CN
China
Prior art keywords
guard rail
steel
groove profile
roll
section region
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810661660.2A
Other languages
Chinese (zh)
Inventor
王代文
杜健
邓长富
沈飞
贾济海
李光跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pangang Group Panzhihua Steel and Vanadium Co Ltd
Original Assignee
Pangang Group Panzhihua Steel and Vanadium Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pangang Group Panzhihua Steel and Vanadium Co Ltd filed Critical Pangang Group Panzhihua Steel and Vanadium Co Ltd
Priority to CN201810661660.2A priority Critical patent/CN108889775A/en
Publication of CN108889775A publication Critical patent/CN108889775A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B1/00Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
    • B21B1/08Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling structural sections, i.e. work of special cross-section, e.g. angle steel
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape

Abstract

The present invention relates to U-steel technical field, especially a kind of guard rail U-steel roll mill and milling method.Guard rail U-steel roll mill, including topping roll, bottom roll, topping roll, bottom roll are correspondingly arranged at intermediate formation roll hole up and down, roll hole is constituted by sequentially connected first guard rail groove profile steel rolling section region, linkage section region, the second guard rail with groove profile steel rolling section region, and the first guard rail groove profile steel rolling section region, the second guard rail are symmetrical set with groove profile steel rolling section region using linkage section region as axis.A guard rail U-steel can only be once rolled out in the past, using roll mill and milling method of the invention, two guard rail U-steels can be once rolled out, production efficiency is improved, and, roll hole is to be symmetrical set, that is to say becomes symmetry rolling for guard rail U-steel asymmetry, is convenient for mill operation, reduces production difficulty, the quality of guard rail U-steel is improved, is conducive to promote.

Description

Guard rail U-steel roll mill and milling method
Technical field
The present invention relates to U-steel technical field, especially a kind of guard rail U-steel roll mill and milling method.
Background technique
Guard rail is the important component of fixed railway frog track switch with U-steel, it is arranged in railway frog two sides, is control vehicle The traffic direction of wheel prevents wheel from impacting in gap in the frog or climbing up actual point of frog, guarantees train operating safety Important equipment.Guard rail is asymmetric compound section fashioned iron with U-steel, as shown in Figure 1, its substance is 32.89kg/m, passes through shield Rail is produced with U-steel roll mill, since guard rail is asymmetric compound section fashioned iron in production with U-steel, is easy Existing crack, so that the Section Steel Production difficulty is big, and production efficiency is also low.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of guard rails that can reduce production difficulty, improve production efficiency With U-steel roll mill.
The present invention solves guard rail U-steel roll mill used by its technical problem, including topping roll, bottom roll, above rolls Roller, bottom roll are correspondingly arranged at intermediate formation roll hole up and down, and roll hole is by sequentially connected first guard rail groove profile steel rolling section Region, linkage section region, the second guard rail are constituted with groove profile steel rolling section region, and the first guard rail groove profile steel rolling section region, Second guard rail is symmetrical set with groove profile steel rolling section region using linkage section region as axis.
Further, there are two the lug bosses being oppositely arranged up and down for the setting of linkage section region.
Further, the width of lug boss is 10-30mm, the distance between two lug bosses are 10-20mm.
Further, the top of lug boss is connected by arc transition.
Further, the first guard rail groove profile steel rolling section region and linkage section region connection pass through arc transition Connection, linkage section region is connect with the second guard rail with groove profile steel rolling section region connection by arc transition.
The present invention another will solve the problems, such as to be to provide a kind of shield that can reduce production difficulty, improve production efficiency Rail U-steel milling method.
Guard rail provided by the invention U-steel milling method, includes the following steps:
A, steel billet is made by guard rail U-steel roll mill, steel billet is divided into the first guard rail U-steel section, linkage section, the Two guard rails U-steel section;
B, it is cut by cutter device along linkage section and steel billet is divided into two parts, include that the first guard rail is with U-steel section It is the second guard rail groove profile steel body that first guard rail groove profile steel body, which includes the second guard rail U-steel section,;
C, the first guard rail groove profile steel body, the second guard rail are polished with groove profile steel body respectively, to obtain two shields Rail U-steel.
The beneficial effects of the invention are as follows:Roll hole is by sequentially connected first guard rail groove profile steel rolling section region, connection Section region, the second guard rail are constituted with groove profile steel rolling section region, and the first guard rail groove profile steel rolling section region, the second guard rail are used Groove profile steel rolling section region is symmetrical set using linkage section region as axis, and the first guard rail is with groove profile steel rolling section region and second Guard rail with the shape in groove profile steel rolling section region as the shape of guard rail U-steel, the steel billet rolled out by roll hole, Steel billet is cut into two parts, respectively the first guard rail groove profile steel body, the second guard rail groove profile steel body, by first along linkage section Guard rail groove profile steel body, the second guard rail are polished with groove profile steel body, to obtain two guard rail U-steels.As it can be seen that in the past A guard rail U-steel can only be once rolled out, using roll mill and milling method of the invention, can once roll out two Root guard rail U-steel, improves production efficiency, moreover, roll hole is to be symmetrical set, that is to say guard rail U-steel Asymmetry becomes symmetry rolling, is convenient for mill operation, reduces production difficulty, improve the quality of guard rail U-steel, benefit In popularization.
Detailed description of the invention
Fig. 1 is the section structure diagram of guard rail U-steel;
Fig. 2 is the structural schematic diagram of guard rail U-steel roll mill;
Components, position and number in figure:Topping roll 1, bottom roll 2, roll hole 3, the first guard rail groove profile steel rolling section Region 31, linkage section region 32, the second guard rail groove profile steel rolling section region 33, lug boss 4, guard rail U-steel 5.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings.
As shown in Fig. 2, guard rail of the present invention U-steel roll mill, including topping roll 1, bottom roll 2, topping roll 1, bottom roll About 2 be correspondingly arranged at it is intermediate form roll hole 3, roll hole 3 by sequentially connected first guard rail groove profile steel rolling section region 31, Linkage section region 32, the second guard rail are constituted with groove profile steel rolling section region 33, and the first guard rail groove profile steel rolling section region 31, Second guard rail is symmetrical set with groove profile steel rolling section region 33 with linkage section region 32 for axis, and the first guard rail is rolled with U-steel Section region 31 processed and the second guard rail are with the shape in groove profile steel rolling section region 32 as the shape of guard rail U-steel 5.
Specifically, the shape in linkage section region 32 is axisymmetric shape, for the ease of rolling, loss is reduced, for another example Fig. 2 institute Show, there are two the lug bosses 4 being oppositely arranged up and down for the setting of linkage section region 32.By being obtained in a large number of experiments and practice, each The width of lug boss 4 is 10-30mm, and the distance between two lug bosses 4 are 10-20mm.Meanwhile the top of lug boss 4 passes through Arc transition connection, convenient for rolling.Similarly, the first guard rail groove profile steel rolling section region 31 and 32 connection of linkage section region It is connected by arc transition, linkage section region 32 and the second guard rail pass through circular arc mistake with 33 connection of groove profile steel rolling section region Cross connection.
Guard rail provided by the invention U-steel milling method, includes the following steps:
A, steel billet is made by above-mentioned guard rail U-steel roll mill, steel billet is divided into the first guard rail U-steel section, connects Connect section, the second guard rail U-steel section;
B, it is cut by cutter device along linkage section and steel billet is divided into two parts, include that the first guard rail is with U-steel section It is the second guard rail groove profile steel body that first guard rail groove profile steel body, which includes the second guard rail U-steel section,;
C, the first guard rail groove profile steel body, the second guard rail are polished with groove profile steel body respectively, to obtain two shields Rail U-steel 5.
In conclusion the steel billet rolled out by roll hole 3, is cut into two parts along linkage section for steel billet, respectively the One guard rail groove profile steel body, the second guard rail groove profile steel body, by the first guard rail groove profile steel body, the second guard rail with groove profile steel body into Row polishing, to obtain two guard rail U-steels 5.As it can be seen that can only once roll out a guard rail U-steel 5 in the past, adopt With roll mill and milling method of the invention, two guard rail U-steels 5 can be once rolled out, production efficiency is improved, and And roll hole 3 is to be symmetrical set, that is to say becomes symmetry rolling for 5 asymmetry of guard rail U-steel, convenient for rolling behaviour Make, reduce production difficulty, improve the quality of guard rail U-steel 5, is conducive to promote.

Claims (6)

1. guard rail U-steel roll mill, including topping roll (1), bottom roll (2), topping roll (1), bottom roll (2) correspond to up and down It is located at intermediate formation roll hole (3), it is characterised in that:Roll hole (3) is by sequentially connected first guard rail groove profile steel rolling section Region (31), linkage section region (32), the second guard rail are constituted with groove profile steel rolling section region (33), and the first guard rail U-steel Rolling section region (31), the second guard rail groove profile steel rolling section region (33) are that axis bilateral symmetry is set with linkage section region (32) It sets.
2. guard rail as described in claim 1 U-steel roll mill, it is characterised in that:There are two linkage section region (32) settings The lug boss (4) being oppositely arranged up and down.
3. guard rail as claimed in claim 2 U-steel roll mill, it is characterised in that:The width of lug boss (4) is 10- 30mm, the distance between two lug bosses (4) are 10-20mm.
4. guard rail as claimed in claim 2 U-steel roll mill, it is characterised in that:Lug boss passes through circular arc at the top of (4) Transition connection.
5. guard rail as described in claim 1 U-steel roll mill, it is characterised in that:First guard rail groove profile steel rolling section area Domain (31) is connect with linkage section region (32) connection by arc transition, linkage section region (32) and the second guard rail groove profile Steel rolling section region (33) connection is connected by arc transition.
6. guard rail U-steel milling method, it is characterised in that:Include the following steps:
A, steel billet is made by such as any one guard rail of claim 1-5 U-steel roll mill, steel billet is divided into the first guard rail use U-steel section, linkage section, the second guard rail U-steel section;
B, it is cut by cutter device along linkage section and steel billet is divided into two parts, include the first guard rail U-steel section be first It is the second guard rail groove profile steel body that guard rail groove profile steel body, which includes the second guard rail U-steel section,;
C, the first guard rail groove profile steel body, the second guard rail are polished respectively with groove profile steel body, is used to obtain two guard rails U-steel (5).
CN201810661660.2A 2018-06-25 2018-06-25 Guard rail U-steel roll mill and milling method Pending CN108889775A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810661660.2A CN108889775A (en) 2018-06-25 2018-06-25 Guard rail U-steel roll mill and milling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810661660.2A CN108889775A (en) 2018-06-25 2018-06-25 Guard rail U-steel roll mill and milling method

Publications (1)

Publication Number Publication Date
CN108889775A true CN108889775A (en) 2018-11-27

Family

ID=64346239

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810661660.2A Pending CN108889775A (en) 2018-06-25 2018-06-25 Guard rail U-steel roll mill and milling method

Country Status (1)

Country Link
CN (1) CN108889775A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04172114A (en) * 1990-11-02 1992-06-19 Sumitomo Metal Ind Ltd Device and method for edger mill rolling of wide flange shape
CN103316919A (en) * 2013-07-08 2013-09-25 莱芜钢铁集团有限公司 Mill roll assembly, rolling mill and method for rolling forklift portal frame profile steel
CN103350114A (en) * 2013-07-19 2013-10-16 莱芜钢铁集团有限公司 Double-pass roller for machining track shape steel and rolling method
CN103357663A (en) * 2013-07-19 2013-10-23 莱芜钢铁集团有限公司 F-shaped steel mill roll double-hole type and rolling method
CN203343170U (en) * 2013-07-08 2013-12-18 莱芜钢铁集团有限公司 Mill roll component and rolling mill for rolling forklift portal frame profile steel
CN105344710A (en) * 2015-12-10 2016-02-24 山东钢铁股份有限公司 Rolling mill and rolling method for H-shaped steel
CN106734206A (en) * 2016-12-02 2017-05-31 山东钢铁股份有限公司 C-type steel diplopore rolls axial symmetry pass and milling method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04172114A (en) * 1990-11-02 1992-06-19 Sumitomo Metal Ind Ltd Device and method for edger mill rolling of wide flange shape
CN103316919A (en) * 2013-07-08 2013-09-25 莱芜钢铁集团有限公司 Mill roll assembly, rolling mill and method for rolling forklift portal frame profile steel
CN203343170U (en) * 2013-07-08 2013-12-18 莱芜钢铁集团有限公司 Mill roll component and rolling mill for rolling forklift portal frame profile steel
CN103350114A (en) * 2013-07-19 2013-10-16 莱芜钢铁集团有限公司 Double-pass roller for machining track shape steel and rolling method
CN103357663A (en) * 2013-07-19 2013-10-23 莱芜钢铁集团有限公司 F-shaped steel mill roll double-hole type and rolling method
CN105344710A (en) * 2015-12-10 2016-02-24 山东钢铁股份有限公司 Rolling mill and rolling method for H-shaped steel
CN106734206A (en) * 2016-12-02 2017-05-31 山东钢铁股份有限公司 C-type steel diplopore rolls axial symmetry pass and milling method

Similar Documents

Publication Publication Date Title
CN103669119A (en) Manganese steel fork core steel rail split type frog
CN108889775A (en) Guard rail U-steel roll mill and milling method
CN105665444A (en) Universal hole-shaped structure used for improving rolling symmetry quality of steel rail
CN110453849A (en) A kind of longitudinal direction thickens I-steel
CN210766200U (en) Groove rail with surfacing structure for rhombic crossed turnout
CN208815354U (en) A kind of 400 kilometers of movable-point crossing wing rails of speed per hour
CN208830066U (en) A kind of groove profile rail double slip swich
CN210287979U (en) Anti-jumping and adjustable fixed combined frog
CN206457407U (en) A kind of new ultra-thin glass cutting facility
CN203668763U (en) Manganese steel fork core and steel rail spliced type frog
CN203741653U (en) Double-throat fixing type acute frog
CN100537896C (en) Novel central body of frog
CN103669121B (en) A kind of double-throat fixed type acute frog
CN208279949U (en) A kind of railway switch slope climbing type tongue
CN103357664B (en) F shaped roll pass and milling method
CN107503249B (en) Railway switch and its core rail reinforced type withdrawing fork
CN110144768B (en) Anti-jump and adjustable fixed type combined frog
CN203741651U (en) Fixed acute frog wing rail
CN1233900C (en) Fixed railroad frog wing rail made of composite parts
CN108978361A (en) A kind of 400 kilometers of movable-point crossing wing rails of speed per hour and processing method
CN110486045A (en) Arch bridge type tunnel lining trolley
CN216585939U (en) Switch point rail close-fitting regulator
CN217550755U (en) Guiding groove assembly suitable for multi-line segmentation
CN203370830U (en) Heat preservation cover device for hot-rolled slabs
CN218643080U (en) Combined crossing frog

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181127