CN108879676A CN201810994277.9A CN201810994277A CN108879676A CN 108879676 A CN108879676 A CN 108879676A CN 201810994277 A CN201810994277 A CN 201810994277A CN 108879676 A CN108879676 A CN 108879676A
Authority
CN
China
Prior art keywords
electricity
sale
load
control system
management system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810994277.9A
Other languages
Chinese (zh)
Other versions
CN108879676B (en
Inventor
李华印
于槐林
尧军
邢馥麟
石大鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinzhi Energy System Control Co Ltd
Original Assignee
Xinzhi Energy System Control Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinzhi Energy System Control Co Ltd filed Critical Xinzhi Energy System Control Co Ltd
Priority to CN201810994277.9A priority Critical patent/CN108879676B/en
Publication of CN108879676A publication Critical patent/CN108879676A/en
Application granted granted Critical
Publication of CN108879676B publication Critical patent/CN108879676B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/008Circuit arrangements for ac mains or ac distribution networks involving trading of energy or energy transmission rights

Abstract

The invention discloses a kind of sale of electricity control systems, including:Sale of electricity deviation control system, for obtaining the bid rules, long association's electricity and load prediction electricity of user, and receive the practical electricity consumption for the user that power demand side's management system is sent, sale of electricity bias contribution is obtained according to bid rules, long association's electricity, load prediction electricity and practical electricity consumption, sale of electricity bias contribution not within a preset range when, sale of electricity bias contribution is sent to power grid central control system;Power demand side's management system, for monitoring the status information of generating equipment, energy storage device and load and the practical electricity consumption of user;And the state of at least one in generating equipment, energy storage device and load is adjusted according to control instruction;Power grid central control system sends corresponding control instruction to power demand side's management system for the status information according to sale of electricity bias contribution and generating equipment, energy storage device and load.Sale of electricity control system disclosed by the invention, can balance sale of electricity deviation.

Description

A kind of sale of electricity control system
Technical field
The present invention relates to power technology, espespecially a kind of sale of electricity control system.
Background technique
Currently, domestic have registered large quantities of sale of electricity companies, with the continuous expansion of power market transaction scale, sale of electricity policy And trading rules is perfect, market competition is more and more fierce, and sale of electricity deviation bring cost of verification and evaluation how to be avoided to become sale of electricity One of company's important process, and in current technology, there are no effective solution schemes for this problem.
Summary of the invention
In order to solve the above-mentioned technical problems, the present invention provides a kind of sale of electricity control systems, can balance sale of electricity deviation.
In order to reach the object of the invention, the present invention provides a kind of sale of electricity control systems to include:Sale of electricity deviation control system, Power demand side's management system and power grid central control system, wherein:
Sale of electricity deviation control system, for obtaining the bid rules, long association's electricity and load prediction electricity of user, Yi Jijie The practical electricity consumption for receiving the user that the power demand side's management system is sent, according to bid rules, long association's electricity, described Load prediction electricity and the practical electricity consumption obtain sale of electricity bias contribution, the sale of electricity bias contribution not within a preset range When, the sale of electricity bias contribution is sent to the power grid central control system;
The power demand side's management system, for monitoring status information and the user of generating equipment, energy storage device and load Practical electricity consumption;The status information is sent to the power grid central control system;And it is controlled according to the power grid center The state of at least one in control instruction adjustment generating equipment, energy storage device and the load that system processed is sent;
The power grid central control system, for according to the sale of electricity bias contribution and the generating equipment, energy storage device With the status information of load, corresponding control instruction is sent to the power demand side's management system.
Sale of electricity control system provided in an embodiment of the present invention controls system by sale of electricity deviation by being based on demand side management System obtains sale of electricity bias contribution, demand side management system according to bid rules, long association's electricity, load prediction electricity and practical electricity consumption System monitoring generating equipment, the status information of energy storage device and load, power grid central control system is according to sale of electricity deviation control system Generating equipment, the status information of energy storage device and load of sale of electricity bias contribution and the power demand side's management system acquisition provided, It generates corresponding control instruction and is sent to power demand side's management system, power demand side's management system is set according to control instruction adjustment power generation The state of at least one in standby, energy storage device and load, to realize the adjustment to sale of electricity deviation, thus realize the management of electricity, Balance sale of electricity deviation.On this basis, sale of electricity company can also effectively be reduced because of the cost of verification and evaluation that sale of electricity deviation is come.
Other features and advantages of the present invention will be illustrated in the following description, also, partly becomes from specification It obtains it is clear that understand through the implementation of the invention.The objectives and other advantages of the invention can be by specification, right Specifically noted structure is achieved and obtained in claim and attached drawing.
Detailed description of the invention
Attached drawing is used to provide to further understand technical solution of the present invention, and constitutes part of specification, with this The embodiment of application technical solution for explaining the present invention together, does not constitute the limitation to technical solution of the present invention.
Fig. 1 is the structural schematic diagram for the sale of electricity control system that the embodiment of the present invention one provides;
Fig. 2 is the structural schematic diagram of sale of electricity control system provided by Embodiment 2 of the present invention;
Fig. 3 is the electric system topological diagram of sale of electricity control system provided in an embodiment of the present invention.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction with attached drawing to the present invention Embodiment be described in detail.It should be noted that in the absence of conflict, in the embodiment and embodiment in the application Feature can mutual any combination.
Step shown in the flowchart of the accompanying drawings can be in a computer system such as a set of computer executable instructions It executes.Also, although logical order is shown in flow charts, and it in some cases, can be to be different from herein suitable Sequence executes shown or described step.
Sale of electricity control system provided in an embodiment of the present invention based on demand side management, passes through demand side management, Ke Yiguan Manage the excision or investment of load;The excision or investment of generating equipment can also be managed, or to increase or decrease generating equipment defeated Power out;Energy storage device charge or discharge can also be managed, realize the management of electricity, balance sale of electricity deviation, effective reduce is sold Electric company is because of the cost of verification and evaluation that sale of electricity deviation is come.
Fig. 1 is the structural schematic diagram for the sale of electricity control system that the embodiment of the present invention one provides, as shown in Figure 1, the present invention is real The sale of electricity control system of example offer is provided, including:Sale of electricity deviation control system 11, power demand side's management system 12 and the control of power grid center System 13.Wherein, every two system in sale of electricity deviation control system 11, power demand side's management system 12 and power grid central control system 13 It is interconnected between system.
Sale of electricity deviation control system 11, for obtaining the bid rules of user, length assists electricity and load prediction electricity, and The practical electricity consumption for receiving the user that power demand side's management system 12 is sent, according to bid rules, long association electricity, load prediction electricity With practical electricity consumption obtain sale of electricity bias contribution, sale of electricity bias contribution not within a preset range when, sale of electricity bias contribution is sent out Give power grid central control system 13.
Wherein, depending on preset range can examine deviation range according to practical sale of electricity, for example ± 2% can be taken as.
Specifically, sale of electricity deviation control system 11 connects with power demand side's management system 12 and power grid central control system 13 respectively It connects, the practical electricity consumption of user can be obtained from power demand side's management system 12;Its basis is obtained from power demand side's management system 12 The practical electricity consumption taken, and the bid rules, long association's electricity and the load prediction electricity that obtain from own system, determine and sell Electric bias contribution, and the sale of electricity bias contribution determined is sent to power grid central control system 13.
It should be noted that long association's electricity is the fixation electricity that the user that sale of electricity company and power plant consult is used for a long time, Bid rules are the electricity that sale of electricity company obtains according to the electricity service condition competitve bid of user in preset time, the electricity of bidding Amount is a variable electricity, can be adjusted according to long association's electricity and load prediction electricity.Wherein, which can be with It is one month, i.e., bid rules are monthly ahead bidding electricity;The preset time can also be with one day, i.e., bid rules are that day degree is bidded electricity Amount.
Optionally, deviation management system can be also used for:In the bid rules, long association's electricity and load prediction for obtaining user Before electricity, bid rules are adjusted according to long association's electricity and load prediction electricity.For example, if long association's electricity is 80, load prediction Electricity is 100, then bid rules are 20;If long association's electricity is 80, load prediction electricity is 110, then bid rules are 30.
Optionally, when bid rules are monthly ahead bidding electricity, sale of electricity deviation control system 11 can be using January as interval Sale of electricity bias contribution is obtained, a sale of electricity bias contribution can be monthly calculated.When bid rules are day degree bid rules, sale of electricity Deviation control system 11 can calculate a sale of electricity bias contribution with one day for interval acquiring sale of electricity bias contribution daily.
Power demand side's management system 12, for monitoring status information and the user of generating equipment, energy storage device and load Practical electricity consumption;Status information is sent to power grid central control system 13;And it is sent according to power grid central control system 13 Control instruction adjustment generating equipment, the state of at least one in energy storage device and load.
Specifically, power demand side's management system 12 connects with sale of electricity deviation control system 11 and power grid central control system 13 respectively It connects, the practical electricity consumption of the user of monitoring can be sent to sale of electricity deviation control system 11;It can also be by the hair of monitoring The status information of electric equipment, energy storage device and load is sent to power grid central control system 13;It can also receive power grid center The control instruction that control system 13 is sent, to adjust the state of at least one in generating equipment, energy storage device and load.
It should be noted that the status information of generating equipment can be starting state or closed state for generating equipment; The status information of energy storage device can be discharge condition or charged state for energy storage device;The status information of load can be negative Lotus is excision state or investment state.Wherein, generating equipment can be wind power plant, fuel gas generation equipment or photovoltaic hair The equipment that electric equipment etc. can produce electric energy, such as generator.Energy storage device can be used to store the equipment complex of electric energy for one, It can be divided into middle pressure energy storage device and low pressure energy storage device, can also be divided into electric energy storage device and cold and hot energy storage device.Load It can be user's controller switching equipment and electrical equipment, load can be divided into first order load, two stage loads, three stage loads, specific Realization principle and classification are same as the prior art, and the present embodiment is herein without repeating.
Power grid central control system 13, for the shape according to sale of electricity bias contribution and generating equipment, energy storage device and load State information sends corresponding control instruction to power demand side's management system 12.
Specifically, the sale of electricity bias contribution that power grid central control system 13 is provided according to sale of electricity deviation control system 11, knot Generating equipment, the status information of energy storage device and load that power demand side's management system 12 acquires are closed, corresponding control instruction is generated And the control instruction is sent to power demand side's management system 12, which is used to indicate adjustment generating equipment, energy storage device With the state of at least one in load, to realize adjustment to sale of electricity deviation.
It should be noted that power grid central control system 13 can know that sale of electricity electricity ratio is practical according to sale of electricity bias contribution Electricity consumption or prediction electricity are few or more, are how to adjust with determination in conjunction with the status information of generating equipment, energy storage device and load The state of at least one in electric equipment, energy storage device and load of haircuting, for example, being excision or investment load, or starting Or generating equipment is closed, or instruction energy storage device is to be charged or discharged.
Sale of electricity control system provided in an embodiment of the present invention controls system by sale of electricity deviation by being based on demand side management System obtains sale of electricity bias contribution, demand side management system according to bid rules, long association's electricity, load prediction electricity and practical electricity consumption System monitoring generating equipment, the status information of energy storage device and load, power grid central control system is according to sale of electricity deviation control system Generating equipment, the status information of energy storage device and load of sale of electricity bias contribution and the power demand side's management system acquisition provided, It generates corresponding control instruction and is sent to power demand side's management system, power demand side's management system is set according to control instruction adjustment power generation The state of at least one in standby, energy storage device and load, to realize the adjustment to sale of electricity deviation, thus realize the management of electricity, Balance sale of electricity deviation.On this basis, sale of electricity company can also effectively be reduced because of the cost of verification and evaluation that sale of electricity deviation is come.
Further, in the above-described embodiments, sale of electricity deviation control system 11 is according to bid rules, long association electricity, load It predicts that electricity and practical electricity consumption obtain sale of electricity bias contribution, may include:
It is poor that the sum of bid rules and long association's electricity are made with load prediction electricity, obtains sale of electricity bias contribution;Alternatively, by real It is poor that border electricity consumption and load prediction electricity are made, and obtains sale of electricity bias contribution.
Specifically, the sum of the bid rules that can be counted sale of electricity deviation control system 11 in the present embodiment and long association's electricity As sale of electricity transaction electricity A, the load prediction electricity C that sale of electricity transaction electricity A and sale of electricity deviation control system 11 can be counted Difference obtain as sale of electricity bias contribution, the reality that sale of electricity can also be traded electricity A and power demand side's management system 12 monitor The difference of electricity consumption B is as sale of electricity bias contribution.
Further, in the above-described embodiments, power grid central control system 13 according to sale of electricity bias contribution and generating equipment, The status information of energy storage device and load sends corresponding control instruction to power demand side's management system 12, may include:
When the difference that sale of electricity bias contribution is the sum of load prediction electricity or practical electricity consumption and bid rules and long association's electricity Value be greater than zero, and its difference not within a preset range when, power grid central control system 13 transmission comprise at least one of the following mode Or any combination thereof control instruction to power demand side's management system 12:
The load governor that mode one, disconnection are connected with load;
Mode two, starting generating equipment, or promote generating equipment output power;
Mode three, energy storage device electric discharge.
Specifically, when load prediction electricity C is greater than sale of electricity transaction electricity A and when outside preset range, or practical electricity consumption It measures B and is greater than sale of electricity transaction electricity A and when outside preset range, excision load, starting generating equipment can be passed through or promote power generation Any or combinations thereof mode in equipment output power, instruction energy storage device electric discharge, with adjust generating equipment, energy storage device and The state of at least one in load makes practical electricity consumption B and sale of electricity trade electricity A always to realize the adjustment to sale of electricity deviation It is maintained at and exempts from examination in core deviation range.
Further, in the above-described embodiments, power grid central control system 13 according to sale of electricity bias contribution and generating equipment, The status information of energy storage device and load sends corresponding control instruction to power demand side's management system 12, may include:
When the difference that sale of electricity bias contribution is the sum of load prediction electricity or practical electricity consumption and bid rules and long association's electricity Value less than zero, and its difference not within a preset range when, power grid central control system 13 transmission comprise at least one of the following mode Or any combination thereof control instruction to power demand side's management system 12:
The load governor that mode one, closure are connected with load;
Mode two closes generating equipment, or reduces generating equipment output power;
Mode three, energy storage device charging.
Specifically, when load prediction electricity C is less than sale of electricity transaction electricity A and when outside preset range, or practical electricity consumption It measures B and is less than sale of electricity transaction electricity A and when outside preset range, investment load can be passed through, close generating equipment or reduce power generation Any or combinations thereof mode in equipment output power, instruction energy storage device charging, with adjust generating equipment, energy storage device and The state of at least one in load makes practical electricity consumption B and sale of electricity trade electricity A always to realize the adjustment to sale of electricity deviation It is maintained at and exempts from examination in core deviation range.
Further, in the above-described embodiments, as shown in Figure 1, sale of electricity deviation control system 11 may include:Bidding management System, long association's power management system, load prediction system and deviation management system.Wherein, bidding management system, long association's electricity pipe Reason system and load prediction system are connect with deviation management system respectively.
Bidding management system, for distributing corresponding bid rules for different user.
Specifically, bidding management system can be sale of electricity corporate agent user electricity, bid rules are distributed (such as the moon for user Spend bid rules or day degree bid rules) system.Optionally, bidding management system is the corresponding electricity of bidding of different user distribution It measures, may include:Bidding management system is that user's distribution is bidded accordingly according to the long association's electricity and load prediction electricity of user Electricity.That is, the bid rules are length association's electricity and load prediction electricity according to user and change at any time.
Long association's power management system, for distributing corresponding long association's electricity for different user.
Specifically, long association's power management system can be sale of electricity corporate agent user electricity, long association's electricity is distributed for user System.Optionally, long association's power management system is the corresponding long association's electricity of different user distribution, may include:Long association's electricity Management system is the corresponding long association's electricity of user's distribution according to the electricity that sale of electricity administrator inputs.
Load prediction system, for distributing corresponding load prediction electricity for different user.
Specifically, load prediction system can be sale of electricity corporate agent user electricity, electricity is predicted for user's distribution load System.Optionally, load prediction system is that different user distributes corresponding load prediction electricity, may include:Load prediction System is that user distributes corresponding load prediction electricity according to the electricity consumption information of load.That is, the load prediction electricity is root Change at any time according to the electricity consumption information of load.
Deviation management system, for being obtained respectively from bidding management system, long association's power management system and load prediction system The corresponding bid rules of each user, long association's electricity and load prediction electricity are taken, and receives power demand side's management system 12 and sends out The practical electricity consumption of the correspondence user sent obtains phase according to bid rules, long association's electricity, load prediction electricity and practical electricity consumption Using the sale of electricity bias contribution at family, sale of electricity bias contribution not within a preset range when, sale of electricity bias contribution is sent to power grid Central control system 13.
In the present embodiment, deviation management system assists power management system and load prediction with bidding management system, length respectively It is competing accordingly to obtain each user from bidding management system, long association's power management system and load prediction system for system connection Valence electricity, long association's electricity and load prediction electricity.Deviation management system can also respectively with power demand side's management system 12 and power grid Central control system 13 connects, and the practical electricity consumption of user is obtained from power demand side's management system 12, and, the sale of electricity that will acquire is inclined Poor result is sent to power grid central control system 13.
Further, in the above-described embodiments, as shown in Figure 1, power demand side's management system 12 may include:First data are adopted Collecting system, power supply/energy storage controller (Microres Controller, abbreviation MC) and load governor (Load Controller, abbreviation LC).Wherein, the first data collection system is connect with MC and LC respectively.
First data collection system, for the status information from MC acquisition generating equipment and energy storage device, and from LC The status information of load is acquired, and the status information of acquisition is sent to power grid central control system 13.
Specifically, the input terminal of the first data collection system can be connect with MC and LC respectively, output end can be with power grid Central control system 13 is connected.First data collection system can monitor the generating equipment/energy storage device state connecting with MC Information, and, the status information for the load connecting with LC is monitored, and the status information of monitoring is sent to power grid center control system System 13.
In the present embodiment, the first data collection system can also and sale of electricity deviation control system 11 connect, specifically and sale of electricity Deviation management system connection in deviation control system 11.First data collection system is also used to monitor the practical electricity consumption of user Amount, and the practical electricity consumption of monitoring is sent to sale of electricity deviation control system 11.
Optionally, the practical electricity consumption of the first data collection system monitoring user includes:Total use of load is acquired from LC Electricity using the total electricity consumption as the practical electricity consumption of user, and is sent to sale of electricity deviation control system 11.
It should be noted that the first data collection system may include energy storage/generation monitoring system and load governor prison Examining system, energy storage/generation monitoring system can be constituted by electrically acquiring equipment in real time, can be used for monitoring the hair connecting with MC Electric equipment/energy storage device status information, and the status information of monitoring is sent to power grid central control system 13.Load control system Device monitoring system can be constituted by electrically acquiring equipment in real time, can be used for monitoring the status information for the load connecting with LC, And the status information of monitoring is sent to power grid central control system 13;Load governor monitoring system can be also used for monitoring with The total electricity consumption of the load of LC connection, and the status information that the total electricity consumption is sent to monitoring as practical electricity consumption is sent to Sale of electricity deviation control system 11.
Optionally, energy storage/generation monitoring system can also monitor the electrical ginseng of generating equipment/energy storage device connecting with MC Number, and it is sent to the preservation of power grid central control system 13.Load governor monitoring system can also monitor the load connecting with LC Electric parameter, and be sent to power grid central control system 13 preservation.
Optionally, the first data collection system can also include electric parameter acquisition system, the electric parameter acquisition system It can be by intelligence instrument, protective relaying device, programmable logic controller (PLC) (Programmable Logic Controller, letter Claim PLC), the intelligent acquisitions equipment such as mutual inductor constitute, be used to acquire the electric simulation amount and digital quantity in each circuit of power grid, concurrently Give the preservation of power grid central control system 13.
MC, for being connect respectively with generating equipment and energy storage device;It is also used to send when power grid central control system 13 When control instruction instruction adjustment generating equipment and/or the state of energy storage device, the shape of generating equipment and/or energy storage device is mutually coped with State is adjusted.
Specifically, MC input terminal is connect with power grid central control system 13, MC output end and generating equipment and energy storage device Connection.MC can receive the control instruction of the transmission of power grid central control system 13, and control command can be coped with mutually based on the received Generating equipment and/or the state of energy storage device are adjusted.
LC, for being connect with load;The control instruction instruction adjustment for being also used to send when power grid central control system 13 is negative When the state of lotus, the state for mutually coping with load is adjusted.
Specifically, LC input terminal is connect with power grid central control system 13, LC output end is connect with load.LC can connect The control instruction that power grid central control system 13 is sent is received, control command should mutually can carry out the state of load based on the received Adjustment.
It should be noted that generating equipment/energy storage device status information can also include that generating equipment/energy storage device is disconnected The location information of road device, such as the location information of power supply/energy storage controller (Microres Controller, abbreviation MC).Load Status information can also include load breaker location information, such as load governor (Load Controller, abbreviation LC) Location information.Power grid central control system 13 can know control according to the status information of generating equipment, energy storage device and load Generating equipment processed, the state and generating equipment of energy storage device and load, energy storage device and load breaker location information, To determine generating equipment, the state of energy storage device and load of adjustment where.
Further, in the above-described embodiments, as shown in Figure 1, power demand side's management system 12 can also include:Second data Acquisition system.
Second data collection system, for acquiring the electricity consumption information of generating equipment, energy storage device and load, and by electricity consumption Amount information is sent to sale of electricity deviation control system 11.
Specifically, the second data collection system can be connect with MC and LC respectively, it is connect for being acquired from MC with the MC Generating equipment and/or energy storage device electricity consumption information, from LC acquisition and the electricity consumption information of the LC load connecting. Wherein, electricity consumption information can be it is not limited to include electricity consumption time and electric power.
Sale of electricity deviation control system 11 is also used in the bid rules, long association's electricity and load prediction electricity for obtaining user Before, electricity is predicted according to electricity consumption information Load adjustment.
In the present embodiment, load prediction electricity can change at any time according to the electricity consumption information of load, thus realization pair The continuous adjustment of load prediction electricity, realizes the management of electricity, further to balance sale of electricity deviation.
Sale of electricity control system provided in an embodiment of the present invention, including power grid central control system, power demand side's management system and Sale of electricity deviation control system, hierarchical structure top are power grid central control system, and middle layer is power demand side's management system, and bottom is Sale of electricity deviation control system, context can be sent to bottom sale of electricity deviation control system, bottom by power demand side's management system Layer data may return to top layer power grid central control system again, form a closed-loop system.Meanwhile first data collection system And/or second data collection system can be connect respectively with MC and LC, monitor the generating equipment, the reality of energy storage device that connect with MC When information, and the real time information of load that monitoring is connect with LC can be with timely learning generating equipment, energy storage device and load Operating condition, more efficient performance generating equipment, the utilization rate of energy storage device and load.
Further, in the above-described embodiments, LC can be switch, wherein the electricity in power supply and load can be set in LC Between source interface.When the state of the control instruction Load adjustment sent according to power grid central control system 13, LC is accordingly disconnected Or closure.
In the present embodiment, MC be can be set between power supply and energy storage device/generating equipment power interface, when in power grid It, can basis in the control instruction instruction adjustment generating equipment and energy storage device for entreating control system 13 to send when at least one state Control instruction controls being opened or closed for generating equipment accordingly, perhaps promotes or reduces generating equipment output power or refer to Show energy storage device charge or discharge.LC can be set between power supply and the power interface of load, when power grid central control system When the state of the 13 control instruction instruction Load adjustments sent, the disconnection of load can be controlled accordingly according to control instruction or closed It closes.
Further, in the above-described embodiments, as shown in Figure 1, power grid central control system 13 may include:Database is set Standby and processor.Wherein, database facility is connected with processor.
Database facility, for receiving and storing the generating equipment of the transmission of power demand side's management system 12, energy storage device and negative The sale of electricity bias contribution that the status information and sale of electricity deviation control system 11 of lotus are sent.
Specifically, database facility can be connected with power demand side's management system 12 and sale of electricity deviation control system 11 respectively, Generating equipment, the status information of energy storage device and load and the sale of electricity deviation control system that power demand side's management system 12 is sent The 11 sale of electricity bias contributions sent are stored in database facility.
Processor sends phase for the status information according to sale of electricity bias contribution and generating equipment, energy storage device and load Answer control instruction to power demand side's management system 12.
Specifically, processor obtained from database facility generate control instruction sale of electricity bias contribution and generating equipment, The status information of energy storage device and load, and the control instruction of generation is sent to power demand side's management system 12.
Further, in the above-described embodiments, power demand side's management system 12 can be multiple, respectively one by one with different geographical It is corresponding;What one power demand side's management system 12 was monitored is the shape of the generating equipment of corresponding region, energy storage device and load The practical electricity consumption of the user of state information and corresponding region.
In the present embodiment, different geographical can be controlled simultaneously by multiple power demand side's management systems 12, finally make sale of electricity inclined Difference control is in core range of exempting from examination.Specifically, Fig. 2 is the structural schematic diagram of sale of electricity control system provided by Embodiment 2 of the present invention, As shown in Fig. 2, on the basis of the above embodiments, sale of electricity control system provided in an embodiment of the present invention can also include network pipe Reason system 14.Wherein, Network Management System 14 connects with multiple power demand side's management systems 12 and power grid central control system 13 respectively It connects.
Status information is sent to power grid central control system 13 by power demand side's management system 12, may include:Each is needed Ask side management system 12 that the status information of the generating equipment of corresponding region, energy storage device, load is passed through network management System 14 is sent to power grid central control system 13.
Power grid central control system 13 sends corresponding control instruction to power demand side's management system 12, may include:In power grid The control instruction of corresponding region is sent to the corresponding demand side pipe in the region by Network Management System 14 by centre control system 13 Reason system 12.
Specifically, as shown in Fig. 2, Network Management System 14 can be by system end communication alternative device, multiple network management lists Member, multistage network communication bus and user terminal communication bus are constituted.Wherein, multiple network management units respectively with different demands side Management system 12 corresponds, each network management unit may include user terminal communication alternative device and communication manager.Its Each module connection relationship is:Looped network is connected by network communication bus between a plurality of clients communication alternative device, system end is logical News converter one end is connect with network communication bus, and the other end with power grid central control system 13 for connecting;User's end communication One end of converter, communication manager and user terminal communication bus is sequentially connected, the other end of user terminal communication bus be used for Power demand side's management system 12 is connected.
In the present embodiment, when power demand side's management system 12 is multiple, each power demand side's management system 12 may include One the first data collection system, at least one power supply/energy storage controller (Microres Controller, abbreviation MC) and extremely A few load governor (Load Controller, abbreviation LC).Each first data collection system can acquire a ground The information such as generating equipment, the status information of energy storage device, load in domain.One MC can connect a generating equipment or energy storage is set Standby, a LC can connect a load, and the quantity of MC and LC can be respectively according to it in each power demand side's management system 12 The quantity of generating equipment/energy storage device and load in the region of place and change.Each first data collection system can be with Network Management System 14 connects, specifically, first data collection system can be connected to one by user terminal communication bus A network management unit.The connection of the first data collection system, MC and the LC that include in each power demand side's management system 12 are closed System and realization function are same as the previously described embodiments, and the present embodiment is herein without repeating.
It should be noted that in the present embodiment first number acquisition according to system by acquisition include generating equipment, energy storage device, The information such as the status information of load are sent to corresponding network management unit in Network Management System 14, pass through the network management list Member is sent to power grid central control system 13.The control instruction of corresponding region is passed through network pipe by power grid central control system 13 Reason system 14 is sent to the region corresponding MC and/or LC.
Optionally, each power demand side's management system 12 can also include second data collection system, each the Two data collection systems can acquire the generating equipment of a region, the electricity consumption information of energy storage device and load, and will acquisition Information be sent to sale of electricity deviation control system 11.Wherein, the connection relationship of the second data collection system and realize function with it is upper It is identical to state embodiment, the present embodiment is herein without repeating.
Sale of electricity control system provided in an embodiment of the present invention, including power grid central control system, Network Management System, demand Side management system, sale of electricity deviation control system, hierarchical structure top are power grid central control system, and middle layer is Network Management Department System, lower layer are power demand side's management system, and bottom is sale of electricity deviation control system, context can by Network Management System and Power demand side's management system is sent to bottom sale of electricity deviation control system, and bottom data may return to the control of top layer power grid center again System forms a closed-loop system.
Fig. 3 is the electric system topological diagram of sale of electricity control system provided in an embodiment of the present invention, power train in the present embodiment System is that on-load switch, power generation/energy storage device controller, transformer, energy storage device, generating equipment, load equipment etc. are used bus The complication system connected.As shown in figure 3, independent user 1, user 2, user n are connected with external electrical network respectively, connect Point pcc is user power consumption stoichiometric point, connects in user under pcc and presses bus.Under middle pressure bus connect transformer TR1, TR2 ... TRn perhaps connects pressure electric equipment 3# in medium-voltage equipment such as load 7# or connection.It is female that low pressure is connected under transformer Line, connected load 1# and load n# etc. under low-voltage bus bar, or connection low pressure generating equipment 1#, generating equipment n# and energy storage are set Standby 1# etc..On-load switch is LC, and LC is connected one by one with each load, while the switch between load and low-voltage bus bar is connected, with Control load is switched in or out.Power generation/energy storage device controller is MC, is connected one by one with each power generation/energy storage device, simultaneously It is connected with power generation/switch between energy storage device and low-voltage bus bar, control power generation/energy storage device is switched in or out.Demand-side Data collection system in management system acquires each switching signal and information about power, and there are also pcc information about power, and by acquisition Information is transferred to the network management unit in Network Management System, is then communicated to power grid central control system.Wherein, data are adopted Collecting system may include the first data collection system and/or the second data collection system.
For example, it is sale of electricity transaction electricity A that sale of electricity bias system, which counts long association the sum of electricity and bid rules, and Obtain load prediction electricity C;Data collection system counts practical electricity consumption B, is exactly the sum of the electricity of all PCC1 to PCCn. When load prediction electricity C be greater than A and examine range outside when, or practical electricity consumption B be greater than A and examination range outside when, root Arbitrary load in customer charge 1# to load n# can be cut off according to control instruction to combine, it is preferential to cut off three stage loads, i.e., it is corresponding disconnected Open on-load switch LC1 to LCn relevant to load;And/or generating equipment 1# can be opened to generating equipment according to control instruction Any generating equipment combination in n#, or generating equipment output power can be promoted according to control instruction;And/or energy storage device 1# Electric discharge.When load prediction electricity C be less than A and examine range outside when, or practical electricity consumption B be less than A and examining range outside When, arbitrary load in customer charge 1# to load n# can be put into according to control instruction and combined, i.e., respective closed is related to load On-load switch LC1 to LCn;And/or it is closed arbitrarily to generate electricity in generating equipment 1# to generating equipment n# according to control instruction and be set Standby combination, or generating equipment output power can be reduced according to control instruction;And/or energy storage device 1# charging.It is real to continue monitoring Border electricity consumption B, sale of electricity transaction electricity A and load prediction electricity C, the sale of electricity bias contribution obtained according to its positive and negative deviation continue to adjust It is whole, until sale of electricity bias contribution is in examination range.
It will appreciated by the skilled person that whole or certain steps, system, dress in method disclosed hereinabove Functional module/unit in setting may be implemented as software, firmware, hardware and its combination appropriate.In hardware embodiment, Division between the functional module/unit referred in the above description not necessarily corresponds to the division of physical assemblies;For example, one Physical assemblies can have multiple functions or a function or step and can be executed by several physical assemblies cooperations.Certain groups Part or all components may be implemented as by processor, such as the software that digital signal processor or microprocessor execute, or by It is embodied as hardware, or is implemented as integrated circuit, such as specific integrated circuit.Such software can be distributed in computer-readable On medium, computer-readable medium may include computer storage medium (or non-transitory medium) and communication media (or temporarily Property medium).As known to a person of ordinary skill in the art, term computer storage medium is included in for storing information (such as Computer readable instructions, data structure, program module or other data) any method or technique in the volatibility implemented and non- Volatibility, removable and nonremovable medium.Computer storage medium include but is not limited to RAM, ROM, EEPROM, flash memory or its His memory technology, CD-ROM, digital versatile disc (DVD) or other optical disc storages, magnetic holder, tape, disk storage or other Magnetic memory apparatus or any other medium that can be used for storing desired information and can be accessed by a computer.This Outside, known to a person of ordinary skill in the art to be, communication media generally comprises computer readable instructions, data structure, program mould Other data in the modulated data signal of block or such as carrier wave or other transmission mechanisms etc, and may include any information Delivery media.

Claims (11)

1. a kind of sale of electricity control system, which is characterized in that including:Sale of electricity deviation control system, power demand side's management system and power grid Central control system, wherein:
Sale of electricity deviation control system, for obtaining the bid rules, long association's electricity and load prediction electricity of user, and reception institute The practical electricity consumption for stating the user of power demand side's management system transmission, according to the bid rules, long the association electricity, the load Predict electricity and practical electricity consumption acquisition sale of electricity bias contribution, the sale of electricity bias contribution not within a preset range when, The sale of electricity bias contribution is sent to the power grid central control system;
The power demand side's management system, for monitoring the status information of generating equipment, energy storage device and load and the reality of user Border electricity consumption;The status information is sent to the power grid central control system;And it is controlled according to the power grid center and is The state of at least one in control instruction adjustment generating equipment, energy storage device and the load that system is sent;
The power grid central control system is used for according to the sale of electricity bias contribution and the generating equipment, energy storage device and bears The status information of lotus sends corresponding control instruction to the power demand side's management system.
2. system according to claim 1, which is characterized in that the sale of electricity deviation control system is bidded electricity according to Amount, long association's electricity, the load prediction electricity and the practical electricity consumption obtain sale of electricity bias contribution, including:
It is poor that the sum of the bid rules and long association's electricity are made with the load prediction electricity, obtains the sale of electricity deviation knot Fruit;
Alternatively,
It is poor that the practical electricity consumption and the load prediction electricity are made, and obtains the sale of electricity bias contribution.
3. system according to claim 1, which is characterized in that the power grid central control system is according to the sale of electricity deviation As a result with the status information of the generating equipment, energy storage device and load, corresponding control instruction is sent to the demand side management System, including:
When the sale of electricity bias contribution is the load prediction electricity or the practical electricity consumption and bid rules and described The difference of the sum of long association's electricity is greater than zero, and its difference not within a preset range when, the power grid central control system sends packet The control instruction of following at least one mode or any combination thereof is included to the power demand side's management system:
The load governor that mode one, disconnection are connected with load;
Mode two, starting generating equipment, or promote generating equipment output power;
Mode three, energy storage device electric discharge;
Or;
When the sale of electricity bias contribution is the load prediction electricity or the practical electricity consumption and bid rules and described The difference of the sum of long association's electricity less than zero, and its difference not within a preset range when, the power grid central control system sends packet The control instruction of following at least one mode or any combination thereof is included to the power demand side's management system:
The load governor that mode one, closure are connected with load;
Mode two closes generating equipment, or reduces generating equipment output power;
Mode three, energy storage device charging.
4. system according to claim 1, which is characterized in that the power demand side's management system be it is multiple, it is respectively and different Region corresponds;What one power demand side's management system was monitored is generating equipment, the energy storage device of corresponding region With the practical electricity consumption of the user of the status information and corresponding region of load;
The sale of electricity control system further includes:Network Management System;
The status information is sent to the power grid central control system by the power demand side's management system, including:Each is needed Ask side management system that the status information of the generating equipment of corresponding region, energy storage device, load is passed through the network pipe Reason system is sent to power grid central control system;
The power grid central control system sends corresponding control instruction to the power demand side's management system, including:In the power grid Entreat control system that the control instruction of corresponding region is sent to the corresponding demand side pipe in the region by the Network Management System Reason system.
5. system according to claim 1-4, which is characterized in that the sale of electricity deviation control system includes:It is competing Valence management system, long association's power management system, load prediction system and deviation management system, wherein:
The bidding management system, for distributing the corresponding bid rules for different user;
Long association's power management system, for distributing corresponding long association's electricity for different user;
The load prediction system, for distributing the corresponding load prediction electricity for different user;
The deviation management system, for respectively from the bidding management system, long association's power management system and described negative Lotus forecasting system obtains each user bid rules, long association's electricity and the load prediction electricity accordingly, with And the practical electricity consumption for the correspondence user that the power demand side's management system is sent is received, according to the bid rules, the long association Electricity, the load prediction electricity and the practical electricity consumption obtain the sale of electricity bias contribution of relative users, inclined in the sale of electricity Poor result not within a preset range when, the sale of electricity bias contribution is sent to the power grid central control system.
6. system according to claim 5, which is characterized in that the deviation management system is also used to:Obtaining user's Before bid rules, long association's electricity and load prediction electricity, institute is adjusted according to long association's electricity and the load prediction electricity State bid rules.
7. system according to claim 1-4, which is characterized in that the power demand side's management system includes:First Data collection system, power supply/energy storage controller MC and load governor LC, wherein:
First data collection system, for the status information from MC acquisition generating equipment and energy storage device, Yi Jicong The status information of load is acquired in the LC, and the status information of acquisition is sent to the power grid central control system;
The MC, for being connect respectively with the generating equipment and the energy storage device;It is also used to control when the power grid center When the control instruction instruction that system is sent adjusts the state of the generating equipment and/or energy storage device, mutually cope with generating equipment and/ Or the state of energy storage device is adjusted;
The LC, for being connect with the load;It is also used to the control instruction instruction when the power grid central control system is sent When adjusting the state of the load, the state for mutually coping with load is adjusted.
8. system according to claim 7, which is characterized in that the power demand side's management system further includes:Second data are adopted Collecting system;
Second data collection system, for acquiring the electricity consumption of the generating equipment, the energy storage device and the load Information, and the electricity consumption information is sent to the sale of electricity deviation control system;
The sale of electricity deviation control system, be also used to the bid rules, long association's electricity and load prediction electricity for obtaining user it Before, the load prediction electricity is adjusted according to the electricity consumption information.
9. system according to claim 7, which is characterized in that the LC is switch, wherein:
The LC is arranged between power supply and the power interface of load;When the control sent according to the power grid central control system When instruction adjusts the state of the load, the LC is accordingly opened or closed.
10. system according to claim 1-4, which is characterized in that the power grid central control system includes:Number According to library facilities and processor, wherein:
The database facility, for receive and store generating equipment, energy storage device that the power demand side's management system sends and The sale of electricity bias contribution that the status information of load and the sale of electricity deviation control system are sent;
The processor, for the status information according to the sale of electricity bias contribution and generating equipment, energy storage device and load, hair Send corresponding control instruction to the power demand side's management system.
11. system according to claim 1-4, which is characterized in that the bid rules include monthly ahead bidding electricity Amount or day degree bid rules;
When the bid rules are monthly ahead bidding electricity, the sale of electricity deviation control system is sold using January as described in interval acquiring Electric bias contribution;
When the bid rules are day degree bid rules, the sale of electricity deviation control system was to sell described in interval acquiring with one day Electric bias contribution.
CN201810994277.9A 2018-08-29 2018-08-29 Electricity selling control system Active CN108879676B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810994277.9A CN108879676B (en) 2018-08-29 2018-08-29 Electricity selling control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810994277.9A CN108879676B (en) 2018-08-29 2018-08-29 Electricity selling control system

Publications (2)

Publication Number Publication Date
CN108879676A true CN108879676A (en) 2018-11-23
CN108879676B CN108879676B (en) 2020-10-09

Family

ID=64322157

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810994277.9A Active CN108879676B (en) 2018-08-29 2018-08-29 Electricity selling control system

Country Status (1)

Country Link
CN (1) CN108879676B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113902230A (en) * 2021-12-10 2022-01-07 四川瑞康智慧能源有限公司 Electric quantity deviation control method, system, storage medium and electronic equipment

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004274981A (en) * 2003-01-15 2004-09-30 Sumitomo Electric Ind Ltd Secondary battery control method, power supply system, and communication unit
CN204883824U (en) * 2015-08-20 2015-12-16 中国南方电网有限责任公司电网技术研究中心 Two -way measurement power consumption management system
CN105515039A (en) * 2015-11-30 2016-04-20 华南理工大学 Central control system and method suitable for user-side microgrid
CN105790309A (en) * 2016-04-26 2016-07-20 贵州电网有限责任公司 Method of utilizing distributed energy and temporary additional electricity price to optimize control cooperatively
CN107527145A (en) * 2017-08-22 2017-12-29 广东电网有限责任公司 User side marketization electricity clearing computational methods and device based on deviation examination
CN206908304U (en) * 2017-05-08 2018-01-19 惠州博磊达新能源科技有限公司 A kind of intelligent micro-grid energy-storage system
CN108280693A (en) * 2018-02-06 2018-07-13 广东电力交易中心有限责任公司 A kind of power generation side marketization electricity settlement method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004274981A (en) * 2003-01-15 2004-09-30 Sumitomo Electric Ind Ltd Secondary battery control method, power supply system, and communication unit
CN204883824U (en) * 2015-08-20 2015-12-16 中国南方电网有限责任公司电网技术研究中心 Two -way measurement power consumption management system
CN105515039A (en) * 2015-11-30 2016-04-20 华南理工大学 Central control system and method suitable for user-side microgrid
CN105790309A (en) * 2016-04-26 2016-07-20 贵州电网有限责任公司 Method of utilizing distributed energy and temporary additional electricity price to optimize control cooperatively
CN206908304U (en) * 2017-05-08 2018-01-19 惠州博磊达新能源科技有限公司 A kind of intelligent micro-grid energy-storage system
CN107527145A (en) * 2017-08-22 2017-12-29 广东电网有限责任公司 User side marketization electricity clearing computational methods and device based on deviation examination
CN108280693A (en) * 2018-02-06 2018-07-13 广东电力交易中心有限责任公司 A kind of power generation side marketization electricity settlement method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113902230A (en) * 2021-12-10 2022-01-07 四川瑞康智慧能源有限公司 Electric quantity deviation control method, system, storage medium and electronic equipment

Also Published As

Publication number Publication date
CN108879676B (en) 2020-10-09

Similar Documents

Publication Publication Date Title
Prinsloo et al. Customer domain supply and load coordination: A case for smart villages and transactive control in rural off-grid microgrids
CA2731433C (en) Systems and methods for demand response and distributed energy resource management
Galiana et al. Scheduling and pricing of coupled energy and primary, secondary, and tertiary reserves
Rahimi et al. Overview of demand response under the smart grid and market paradigms
EP2485189A1 (en) Energy management system and power feed control device
Rider et al. Application of a nonlinear reactive power pricing model for competitive electric markets
El-Batawy et al. Integration of prosumers with battery storage and electric vehicles via transactive energy
Reddy Optimizing energy and demand response programs using multi-objective optimization
Orozco et al. Intra-day scheduling of a local energy community coordinated with day-ahead multistage decisions
Weckx et al. Optimal real-time pricing for unbalanced distribution grids with network constraints
Ferrero et al. Dynamic economic dispatch in deregulated systems
Usman et al. A novel two-stage TSO–DSO coordination approach for managing congestion and voltages
Nair et al. A hierarchical local electricity market for a der-rich grid edge
Alizadeh et al. A novel TSO-DSO ancillary service procurement coordination approach for congestion management
Srikantha et al. Intelligent signal processing and coordination for the adaptive smart grid: An overview of data-driven grid management
CN109066661A (en) A kind of sale of electricity Deviation Control Method and sale of electricity control system
CN108879676A (en) A kind of sale of electricity control system
Ghahramani et al. Application of load shifting programs in next day operation of distribution networks
Merino et al. Fostering DER integration in the electricity markets
Tan et al. Bi-level electricity market design with boundary equivalence of interior security constraints
Talari et al. Sequential clearing of network-aware local energy and flexibility markets in community-based grids
Sharma Operation of distribution systems with PEVs and smart loads
Wei et al. Graphvpp: Enabling optimal bidding strategy of virtual power plants in graph computing frameworks
Kapoor et al. Voltage Regulation in Distribution System using Demand Response
Shi et al. A bidding Optimization Framework of District Energy Systems under Market Environment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant