CN108877162A - Transmission line of electricity monitoring and pre-alarming method and transmission line of electricity networking early warning system - Google Patents

Transmission line of electricity monitoring and pre-alarming method and transmission line of electricity networking early warning system Download PDF

Info

Publication number
CN108877162A
CN108877162A CN201810856870.7A CN201810856870A CN108877162A CN 108877162 A CN108877162 A CN 108877162A CN 201810856870 A CN201810856870 A CN 201810856870A CN 108877162 A CN108877162 A CN 108877162A
Authority
CN
China
Prior art keywords
information
electricity
transmission line
monitoring
server
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810856870.7A
Other languages
Chinese (zh)
Inventor
吕刚
刘华麟
杨立
唐华东
陈亮
邓文军
李道豫
代志强
王春
李毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guizhou Electric Power Engineering Co Ltd
Guiyang Bureau Extra High Voltage Power Transmission Co
Original Assignee
PowerChina Guizhou Electric Power Engineering Co Ltd
Guiyang Bureau Extra High Voltage Power Transmission Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guizhou Electric Power Engineering Co Ltd, Guiyang Bureau Extra High Voltage Power Transmission Co filed Critical PowerChina Guizhou Electric Power Engineering Co Ltd
Priority to CN201810856870.7A priority Critical patent/CN108877162A/en
Publication of CN108877162A publication Critical patent/CN108877162A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/18Status alarms
    • G08B21/185Electrical failure alarms
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/18Status alarms
    • G08B21/182Level alarms, e.g. alarms responsive to variables exceeding a threshold

Landscapes

  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Telephonic Communication Services (AREA)
  • Alarm Systems (AREA)

Abstract

The present invention provides a kind of transmission line of electricity monitoring and pre-alarming method and transmission line of electricity networking early warning systems, are related to transmission line of electricity monitoring technical field.The method is applied to transmission line of electricity networking early warning system, monitor the essential information of sensing module real-time monitoring transmission line of electricity, management server is sent to by network communication server, management server compares the running state information for generating transmission line of electricity according to essential information and pre-stored essential information, and running state information is sent to partitioned server, partitioned server generates warning information according to running state information, and warning information is sent to corresponding user terminal, realizes real-time early warning.Meanwhile management server can also send video image acquisition instruction and make to monitor the video image information that sensing module obtains the abnormal transmission line of electricity of appearance, to be judged in more detail according to actual conditions of the video image information to transmission line of electricity.

Description

Transmission line of electricity monitoring and pre-alarming method and transmission line of electricity networking early warning system
Technical field
The present invention relates to transmission line of electricity monitoring technical fields, in particular to a kind of transmission line of electricity monitoring and pre-alarming method And transmission line of electricity networking early warning system.
Background technique
Transmission line of electricity is the important component of national grid, usually all can be across number since the span of transmission line of electricity is big It hundred kilometers, is very easy to be influenced by various environment and lead to power supply trouble.Therefore, it is necessary to the operation shapes periodically to transmission line of electricity State is monitored, and generally reaches this requirement using artificial line walking mode at present, but electric power line longitudinal is big across degree, distribution It is with a varied topography;Line status parameter is many kinds of, and many links are not easy artificial discovery, cannot grasp line status in time.Therefore A kind of automatic, accurate, real-time monitoring mode is needed, to realize the round-the-clock on-line monitoring and pipe of transmission line status Reason.
Summary of the invention
In view of this, the embodiment of the present invention is designed to provide a kind of transmission line of electricity monitoring and pre-alarming method and transmission line of electricity Network early warning system, with improve the monitoring of existing transmission line of electricity be unable to satisfy real-time monitoring, it is across Geography monitor the problems such as.
The technical solution adopted by the present invention is as follows:
The embodiment of the invention provides a kind of transmission line of electricity monitoring and pre-alarming method, the transmission line of electricity monitoring and pre-alarming method is answered For transmission line of electricity networking early warning system, the transmission line of electricity networking early warning system includes monitoring sensing module, network communication clothes Business device, management server, partitioned server and user terminal, the method includes:Sensing module is monitored according to preset monitoring Mode, monitoring obtain the essential information of transmission line of electricity in corresponding jurisdiction;Wherein, the essential information includes transmission line of electricity Line information, real-time windage yaw information, icing or snowberg information and overhead line structures information;The network communication server is by the prison The essential information for surveying the transmission line of electricity obtained is sent to the management server;The management server is to received multiple transmissions of electricity The essential information of route is analyzed and processed the running state information for generating transmission line of electricity, and by the running state information of generation and The essential information of the corresponding transmission line of electricity of the running state information is sent to partitioned server;The partitioned server is according to connecing The running state information of receipts and the essential information of transmission line of electricity generate warning information, and the warning information of generation is sent to user Terminal.
Further, the method also includes:Management server obtains the air pressure in region locating for transmission line of electricity, temperature, drop Snowfall and/or rainfall;When the air pressure be greater than the first preset pressure value, the temperature be lower than the first preset temperature value, work as drop Snowfall and/or rainfall are in the first preset range, generate the first monitoring pattern, the first monitoring pattern is every the first preset time A data monitoring is carried out to obtain;When the snowfall and/or rainfall are in the second preset range, the second monitoring mould is generated Formula, the second monitoring pattern carry out a data monitoring every the second preset time and obtain.
Further, the method includes:Management server sends first monitoring pattern or the second monitoring pattern To network communication server;First monitoring pattern or the second monitoring pattern are sent to monitoring perception by the network communication server Module, the monitoring sensing module are monitored transmission line of electricity according to the monitoring pattern.
Further, the management server is analyzed and processed generation to the essential information of received multiple transmission lines of electricity The step of running state information of transmission line of electricity includes:Management server is by the line information of received multiple transmission lines of electricity, reality When windage yaw information, icing or snowberg information and overhead line structures information and pre-stored line information, real-time windage yaw information, icing or Generation running state information is compared in snowberg information and overhead line structures information;Management server is by the running state information of generation It is sent to partitioned server;Information generates warning information to the partitioned server according to the operation state, and by the early warning Information is sent to the user terminal.
Further, the partitioned server includes the step of information generates warning information according to the operation state:When There is exception in the line information, when real-time windage yaw information, icing or snowberg information and overhead line structures information do not occur abnormal, Generate first order warning information;When abnormal, line information, route occur in the real-time windage yaw information or icing or snowberg information When shaft tower information does not occur abnormal, second level warning information is generated;When the overhead line structures information occurs abnormal, third is generated Grade warning information.
Further, the method also includes:The warning information of generation is sent to management server by partitioned server;Pipe Reason server stores the warning information.
Further, the method also includes:Warning information generates video image acquisition to management server based on the received Instruction;And the video image acquisition instruction is sent to network communication server;The network communication server is by the view Frequency image acquisition instruction is sent to monitoring sensing module;The monitoring sensing module is obtained according to the video image acquisition instruction The video image of transmission line of electricity, and the video image that will acquire is sent to the management server by network communication server.
The present invention also provides a kind of transmission line of electricity networking early warning system, the transmission line of electricity networking early warning system includes prison Survey sensing module, network communication server, management server, partitioned server and user terminal, the monitoring sensing module It is electrically connected with the network communication server, the monitoring sensing module and the network communication server are set to power transmission line Road, the network communication server are connect with management server communication, the partitioned server and the management server communication Connection, the user terminal and the partitioned server communicate to connect, and the monitoring sensing module is used for according to preset monitoring Mode, monitoring obtain the essential information of transmission line of electricity in corresponding jurisdiction;Wherein, the essential information includes transmission line of electricity Line information, real-time windage yaw information, icing or snowberg information and overhead line structures information;The network communication server is used for institute The essential information for stating the transmission line of electricity that monitoring obtains is sent to the management server;The management server is used for received The essential information of multiple transmission lines of electricity is analyzed and processed the running state information for generating transmission line of electricity, and by the operation shape of generation State information and the essential information of the corresponding transmission line of electricity of the running state information are sent to partitioned server;The differentiated services Device generates warning information for running state information based on the received and the essential information of transmission line of electricity, and the early warning of generation is believed Breath is sent to the user terminal.
Further, the management server is used to believe the line information of received multiple transmission lines of electricity, real-time windage yaw Breath, icing or snowberg information and overhead line structures information and pre-stored line information, real-time windage yaw information, icing or snowberg information And generation running state information is compared in overhead line structures information;The management service is also used to the running state information that will be generated It is sent to partitioned server;The partitioned server generates warning information for information according to the operation state, and will be described Warning information is sent to the user terminal.
Further, the partitioned server be used for when the line information occur it is abnormal, real-time windage yaw information, icing or When snowberg information and overhead line structures information do not occur abnormal, first order warning information is generated;The partitioned server is also used to When exception occur in the real-time windage yaw information or icing or snowberg information, line information, overhead line structures information do not occur exception When, generate second level warning information;The partitioned server is also used to when the overhead line structures information occurs abnormal, generates the Three-level warning information.
Compared with the prior art, the invention has the advantages that:
The present invention provides a kind of transmission line of electricity monitoring and pre-alarming method and transmission line of electricity networking early warning system, the method packets Monitoring sensing module is included according to preset monitoring pattern, monitoring obtains the essential information of transmission line of electricity in corresponding jurisdiction;Its In, the essential information includes line information, real-time windage yaw information, icing or the snowberg information and overhead line structures letter of transmission line of electricity Breath;The essential information for the transmission line of electricity that the monitoring obtains is sent to the management server by the network communication server; The management server is analyzed and processed the operation shape for generating transmission line of electricity to the essential information of received multiple transmission lines of electricity State information, and the essential information of the running state information of generation and the corresponding transmission line of electricity of the running state information is sent to Partitioned server;Running state information and the essential information of transmission line of electricity generate early warning letter to the partitioned server based on the received Breath, and the warning information of generation is sent to the user terminal.By obtaining the essential information of transmission line of electricity in real time, by entire route Essential information be sent to management server, route essential information is compared the management server, the differentiated services Device generates warning information according to running state information, and transmission line of electricity monitoring and pre-alarming method provided by the invention can be effectively to defeated Electric line realizes full landform, round-the-clock monitoring, carries out early warning to the risk being likely to occur.
To enable the above objects, features and advantages of the present invention to be clearer and more comprehensible, preferred embodiment is cited below particularly, and cooperate Appended attached drawing, is described in detail below.
Detailed description of the invention
It, below will be to use required in embodiment in order to illustrate more clearly of the technical solution of embodiment of the present invention Attached drawing be briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not to be seen as It is the restriction to range, it for those of ordinary skill in the art, without creative efforts, can be with root Other relevant attached drawings are obtained according to these attached drawings.
Fig. 1 shows a kind of schematic diagram of transmission line of electricity networking early warning system provided by the present invention.
Fig. 2 shows the flow charts of transmission line of electricity monitoring and pre-alarming method.
Fig. 3 shows step S101~step S103 flow chart.
Fig. 4 shows the sub-step flow chart of step S30.
Fig. 5 shows the flow chart of transmission line of electricity monitoring and pre-alarming method.
Icon:10- transmission line of electricity networking early warning system;110- monitors sensing module;120- network communication server;130- Management server;140- partitioned server;150- user terminal.
Specific embodiment
Below in conjunction with attached drawing in the embodiment of the present invention, technical solution in the embodiment of the present invention carries out clear, complete Ground description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Usually exist The component of the embodiment of the present invention described and illustrated in attached drawing can be arranged and be designed with a variety of different configurations herein.Cause This, is not intended to limit claimed invention to the detailed description of the embodiment of the present invention provided in the accompanying drawings below Range, but it is merely representative of selected embodiment of the invention.Based on the embodiment of the present invention, those skilled in the art are not doing Every other embodiment obtained under the premise of creative work out, shall fall within the protection scope of the present invention.
It should be noted that:Similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
In the description of the present invention, it is also necessary to explanation, herein, such as first and second or the like relationship art Language is only used to distinguish one entity or operation from another entity or operation, without necessarily requiring or implying this There are any actual relationship or orders between a little entities or operation.The terms "include", "comprise" or its it is any its He is intended to non-exclusive inclusion by variant, so that the process, method, article or equipment including a series of elements is not Only include those elements, but also including other elements that are not explicitly listed, or further include for this process, method, Article or the intrinsic element of equipment.In the absence of more restrictions, being wanted by what sentence "including a ..." limited Element, it is not excluded that there is also other identical elements in the process, method, article or apparatus that includes the element.For For those skilled in the art, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
With reference to the accompanying drawing, it elaborates to some embodiments of the present invention.In the absence of conflict, following Feature in embodiment and embodiment can be combined with each other.
Fig. 1 is please referred to, is a kind of structural schematic diagram of transmission line of electricity networking early warning system 10 provided in an embodiment of the present invention, A kind of transmission line of electricity networking early warning system 10 provided in an embodiment of the present invention can be used for realizing transmission line of electricity monitoring and pre-alarming method.It should Transmission line of electricity networking early warning system 10 includes multiple subject tables, multiple sensing network platforms, a management platform, multiple services Platform and multiple user platforms.
In the present embodiment, subject table can be each transmission line of electricity, including electric power line pole tower and transmission line of electricity bar Power transmission line and other accessories between tower.Monitoring sensing module 110, i.e. monitoring sensing module are installed in the subject table 110 correspondences are installed on transmission line of electricity, and the monitoring sensing module 110 is used to acquire the basic parameter of corresponding transmission line of electricity, such as Essential information, video image information of transmission line of electricity of the transmission line of electricity etc..
Network communication server 120 is installed on the sensing network platform, the network communication server 120 correspondence is installed on On transmission line of electricity, which connects one to one with monitoring sensing module 110.Preferably, the network is logical Telecommunications services device 120 can be gateway, for monitoring sensing module 110 and the bridge communicated to connect between platform be managed, for that will supervise It surveys essential information, the video image information of transmission line of electricity of transmission line of electricity etc. that sensing module 110 acquires and is transferred to management platform In.
It include at least one management server 130 on the management platform, correspondence is equipped in each management server 130 The management system of one power transmission network.Also i other words, the corresponding management server 130 of a network system, such as southwestern power grid or Person's south electric network etc., southwestern power grid or south electric network respectively correspond a management server 130, and multiple management servers 130 by the same management platform management.It should be understood that the management platform be it is multiple when, can respectively to be set to management Management server 130 on platform is managed.It should be noted that the lower corresponding multiple nets of management of a management server 130 The network communication server 120, more common practice are that the management server 130 of a network system manages corresponding multiple nets The network communication server 120, i other words, the network communication server 120 of multiple transmission lines of electricity under a certain network system will acquire The essential information etc. of transmission line of electricity be sent in the corresponding management server 130 of the network system.
In the present embodiment, which can manage platform, such as the electricity of various regions for the regional power grid under network system Net branch company, the service platform be it is multiple, a partitioned server 140, the partitioned server are installed on each service platform 140, for receiving the data of the transmission of management server 130, and after handling the data, are sent to multiple user platforms And/or subject table.
The user platform is user terminal 150, which can be, but be not limited to, mobile phone, tablet computer, electricity The intelligent electronic devices such as sub- wrist-watch, the user terminal 150 can also be to be installed on each monitoring station of transmission line of electricity or power grid branch company The user terminal 150 of each services sites.Each user platform is corresponding with a subject table.
In actual use, monitoring sensing module 110 and network have been installed in the subject table (transmission line of electricity) The communication server 120, and it is pre- to be also mounted with that corresponding receivable partitioned server 140 is sent on user platform (such as mobile phone) The application program of alert information.In addition, the management server 130 has also been configured the partitioned server 140 that can be in communication with each other, I other words the management server 130 with the same communications protocols or interface can be in communication with each other with partitioned server 140.
A kind of transmission line of electricity monitoring and pre-alarming method is present embodiments provided, referring to Fig. 2, Fig. 2 shows the present embodiment to mention The flow chart of the transmission line of electricity monitoring and pre-alarming method of confession.Transmission line of electricity monitoring and pre-alarming method includes step S10~step S90.
Step S10:Sensing module 110 is monitored according to preset monitoring pattern, monitoring obtains transmission of electricity in corresponding jurisdiction The essential information of route.
The essential information includes line information, real-time windage yaw information, icing or the snowberg information and route of transmission line of electricity Shaft tower information.Line information includes the electric current, voltage and power at transmission line of electricity both ends etc..Real-time windage yaw information refers to two routes What the transmission line of electricity between shaft tower deviateed its upright position under the action of the forces of the wind refers to rain apart from size, icing or snowberg information Snowy day gas, the case where ice or snow are covered on transmission line of electricity, generally, pulling force, insulator by measuring transmission pressure incline The data such as angle are to characterize the icing or snowberg information of transmission line of electricity.
It is described to refer to according to preset monitoring pattern, it is instructed according to monitoring pattern, obtains the essential information for needing to monitor.Example Such as, comprising the essential information for needing to obtain in monitoring pattern instruction, the monitoring sensing module 110 refers to according to the monitoring pattern The essential information for including in order goes the essential information of monitoring perception transmission line of electricity.Alternatively, including prison in the monitoring pattern instruction Survey mode, monitoring obtain the frequency of data, time point etc., and the monitoring sensing module 110 is supervised according to monitoring pattern instruction Survey perception.
In this present embodiment, before step S10, the method also includes step S101~step S103, please refer to figure 3。
Step S101:Air pressure, temperature, snowfall and/or the rainfall of the acquisition of management server 130 transmission line of electricity region The data such as amount.
The band of position that management server 130 is installed according to corresponding monitoring sensing module 110 obtains transmission line of electricity The weather condition in locating region.Specifically, the management server 130 can obtain weather feelings from the server of meteorological department Condition can also be and be input to management server 130 after staff inquires weather condition on time.The weather condition includes gas The data such as pressure, temperature, snowfall and/or rainfall.
Step S102:Management server 130 generates preset monitoring mould according to the weather condition of transmission line of electricity region Formula instruction, and monitoring pattern instruction is sent to network communication server 120.
Management server 130 generates preset monitoring pattern according to weather condition and instructs, each weather condition corresponding one The preset monitoring pattern instruction of kind, for example, corresponding to different monitoring moulds according to the difference of the data such as wind speed, precipitation, temperature Formula instruction, different monitoring patterns may include the frequency that different monitoring data obtain, and time point obtains data type Type etc..When the air pressure be greater than the first preset pressure value, the temperature be lower than the first preset temperature value, when snowfall and/ Or rainfall is in the first preset range, generates the first monitoring pattern, the first monitoring pattern carries out one every the first preset time Secondary data monitoring obtains;When the snowfall and/or rainfall are in the second preset range, the second monitoring pattern is generated, the Two monitoring patterns carry out a data monitoring every the second preset time and obtain.The management server 130 is by the monitoring of generation Mode instruction is sent to network communication server 120.Refer to it should be noted that generating different monitoring patterns according to weather condition It enables, the monitoring pattern instruction of generation is sent to corresponding network communication server 120.
Step S103:Monitoring pattern instruction is sent to monitoring sensing module 110, institute by the network communication server 120 Monitoring sensing module 110 is stated to be monitored transmission line of electricity according to monitoring pattern instruction.
Network communication server 120 is correspondingly connected with monitoring sensing module 110, and the network communication server 120 will connect The monitoring pattern instruction of receipts is sent to monitoring sensing module 110, and monitoring sensing module 110 is according to monitoring pattern instruction starting to defeated Electric line is monitored perception.The monitoring pattern instruction includes first the second monitoring pattern of monitoring pattern.
Step S20:The essential information for the transmission line of electricity that the monitoring obtains is sent to described by network communication server 120 Management server 130.
Network communication server 120 is electrically connected with the monitoring sensing module 110, network communication server 120 also with institute State the communication connection of management server 130.When monitoring sensing module 110 monitoring perceives the essential information of transmission line of electricity, prison It surveys sensing module 110 and the essential information for the transmission line of electricity that monitoring perceives is sent to network communication server 120, the network The essential information for monitoring the transmission line of electricity that the monitoring of sensing module 110 perceives is sent to management server by the communication server 120 130。
Step S30:It is defeated that management server 130 is analyzed and processed generation to the essential information of received multiple transmission lines of electricity The running state information of electric line, and by the running state information of generation and the corresponding transmission line of electricity of the running state information Essential information is sent to partitioned server 140.
Management server 130 receives the essential information for the transmission line of electricity that network communication server 120 is sent.In the present embodiment In, the corresponding multiple network communication servers 120 of a management server 130, so the management server 130 receives multiple nets The essential information for the transmission line of electricity that the network communication server 120 is sent, for example, the basic letter of the transmission line of electricity in multiple and different regions Breath, the transmission line of electricity in multiple and different regions form the power transmission network in the region.
The essential information that management server 130 receives the transmission line of electricity that multiple network communication servers 120 are sent is divided Analysis processing, generates running state information, and the running state information of generation is sent to partitioned server 140.
In this present embodiment, step S30 includes following sub-step:S301~S302 please refers to Fig. 4.
Step S301:Management server 130 is by the essential information of received multiple transmission lines of electricity and pre-stored basic letter Generation running state information is compared in breath.
Management server 130 believes the line information of received multiple transmission lines of electricity, real-time windage yaw information, icing or snowberg Breath and overhead line structures information and pre-stored line information, real-time windage yaw information, icing or snowberg information and overhead line structures information Generation running state information is compared.Pre-stored line information, real-time windage yaw information, icing or snowberg information and route lever Tower information includes a preset conventional numberical range, when received line information, real-time windage yaw information, icing or snowberg Information and overhead line structures information and pre-stored line information, real-time windage yaw information, icing or snowberg information and overhead line structures are believed When breath is mismatched with preset numberical range, exception information is generated.The running state information includes of multiple essential informations With situation, for example, the running state information of the essential information of some region of transmission line of electricity is:Line information, real-time windage yaw letter Breath, icing or snowberg information and overhead line structures information are normal.Alternatively, line information is abnormal, real-time windage yaw information, icing or cover It avenges information and overhead line structures information is normal.
Step S302:The running state information of generation is sent to partitioned server 140 by management server 130.
Management server 130 and multiple partitioned servers 140 communicate to connect, and the management server 130 can be a certain The running state information of generation is sent to correspondence by the management server 130 of regional power grid branch company, the management server 130 Management server 130.It is the number for obtaining the monitoring monitoring of sensing module 110 of all transmission lines of electricity of first area According to being sent to the corresponding partitioned server 140 in first area after being compared.
Step S40:Information generates warning information to partitioned server 140 according to the operation state, and the early warning is believed Breath is sent to the user terminal 150.
Partitioned server 140 is believed according to the early warning that the running state information that management server 130 is sent generates corresponding level Breath, and the warning information of corresponding level is sent to the user terminal 150.When the running state information is that all routes are basic When information is no abnormal, partitioned server 140 generates the normal route operation information of route, and the route operation information is sent out It send to user terminal 150.Route operation information is also sent to management server 130 simultaneously, the management server 130 is by line The operation information on road is stored.
When partial information occurs abnormal, information generates warning information to partitioned server 140 according to the operation state.In In the present embodiment, generating warning information includes following several situations:
When exception occurs in the line information, real-time windage yaw information, icing or snowberg information and overhead line structures information are not When occurring abnormal, first order warning information is generated.
Line information includes the electric current, voltage and power at transmission line of electricity both ends etc., when line information appearance exception, and is transmitted electricity When other operation datas of route do not occur abnormal, then first order warning information is generated.The failure of route may transmit electricity at this time There is burr etc. during power transmission in route, causes energy loss.
When exception occur in the real-time windage yaw information or icing or snowberg information, line information, overhead line structures information are not When occurring abnormal, second level warning information is generated.
When real-time windage yaw information or icing or snowberg information occur abnormal, then illustrate route due to weather or other shapes There is exception in condition, and exception and icing occurs in real-time windage yaw information or snowberg information exception occurs and easily causes line fault, raw At second level warning information.
When the overhead line structures information occurs abnormal, third level warning information is generated.
Overhead line structures information includes the elevation information of overhead line structures, horizontal information, tilt angle information etc., when overhead line structures are believed When breath occurs abnormal, line fault is easily caused, power transmission is influenced.In this present embodiment, when the appearance of overhead line structures information is different Chang Shi generates third level warning information.
After the partitioned server 140 generates warning information, the warning information is sent to the user terminal 150.Institute Stating user terminal 150 can be the mobile phone, tablet computer or other intelligent terminals of specific staff.For example, maintenance should The staff of transmission line of electricity.The user terminal 150, which can also be, is installed on each monitoring station of transmission line of electricity or power grid branch company The user terminal 150 of each services sites.
In this present embodiment, the method also includes step S50~step S90.Please refer to Fig. 5.
Step S50:The warning information of generation is sent to management server 130 by partitioned server 140.
After the partitioned server 140 generates warning information, the warning information is sent to pipe by partitioned server 140 Manage server 130.
Step S60:Management server 130 stores the warning information.
Management server 130 receives the warning information that the partitioned server 140 is sent, generally, partitioned server 140 The warning information of transmission includes the region of the transmission line of electricity of abnormal conditions occur, number etc..The management server 130 will occur The information such as warning information, the exception information of the transmission line of electricity of abnormal conditions are stored.
Step S70:Warning information generates video image acquisition instruction to management server 130 based on the received;And it will be described Video image acquisition instruction is sent to network communication server 120.
When the management server 130 receives the warning information that the partitioned server 140 is sent, the management clothes Device 130 be engaged according to warning information generation video image acquisition instruction.Preferably, according to the corresponding power transmission line of warning information Road generates video image acquisition instruction, to obtain the video image information for the transmission line of electricity for abnormal conditions occur.The management Server 130 is sent to the network communication server 120 for video image acquisition instruction is generated.It needs to illustrate still, institute It states management server 130 video image acquisition instruction is sent to network corresponding with the transmission line of electricity for abnormal conditions occur and lead to Telecommunications services device 120.
Step S80:The video image acquisition instruction is sent to monitoring sensing module by the network communication server 120 110。
The video image acquisition instruction that management server 130 is sent is sent to corresponding prison by network communication server 120 Survey sensing module 110.
Step S90:The monitoring sensing module 110 obtains the video of transmission line of electricity according to the video image acquisition instruction Image, and the video image that will acquire is sent to the management server 130 by network communication server 120.
Sensing module 110 is monitored according to the video image acquisition instruction, obtains the video image information of transmission line of electricity.Example Such as, monitoring sensing module 110 shoots the still image or dynamic video of transmission line of electricity, and the video image information that will acquire is logical It crosses network communication server 120 and is sent to management server 130.So that the management server 130 is according to video image information Judge the actual conditions of transmission line of electricity.
The working principle of the invention:The present invention provides a kind of transmission line of electricity monitoring and pre-alarming method and transmission line of electricity networking are pre- Alert system 10, the transmission line of electricity monitoring and pre-alarming method are applied to transmission line of electricity networking early warning system 10, and the method is logical The essential information of monitoring 110 real-time monitoring transmission line of electricity of sensing module is crossed, and management is sent to by network communication server 120 Life is compared according to the essential information and pre-stored essential information of transmission line of electricity in server 130, the management server 130 Partitioned server 140, the partitioned server are sent at the running state information of transmission line of electricity, and by running state information 140 generate warning information according to running state information, and warning information is sent to counterpart staff or other user's ends Real-time early warning is realized at end 150.Meanwhile the management server 130 can also send video image acquisition instruction and perceive monitoring Module 110 obtains the video image information for abnormal transmission line of electricity occur, with the reality according to video image information to transmission line of electricity Border situation carries out more accurate clearly judgement.
In conclusion the present invention provides a kind of transmission line of electricity monitoring and pre-alarming method and transmission line of electricity networking early warning system, The method includes monitoring sensing modules according to preset monitoring pattern, and monitoring obtains the base of transmission line of electricity in corresponding jurisdiction This information;Wherein, the essential information include transmission line of electricity line information, real-time windage yaw information, icing or snowberg information and Overhead line structures information;The essential information for the transmission line of electricity that the monitoring obtains is sent to the pipe by the network communication server Manage server;The management server is analyzed and processed generation transmission line of electricity to the essential information of received multiple transmission lines of electricity Running state information, and by the running state information of generation and the basic letter of the corresponding transmission line of electricity of the running state information Breath is sent to partitioned server;Running state information and the essential information of transmission line of electricity are raw based on the received for the partitioned server It is sent to the user terminal at warning information, and by the warning information of generation.It, will by obtaining the essential information of transmission line of electricity in real time The essential information of entire route is sent to management server, and route essential information is compared the management server, described Partitioned server generates warning information according to running state information, and transmission line of electricity monitoring and pre-alarming method provided by the invention can have Full landform, round-the-clock monitoring are realized to transmission line of electricity in effect ground, carry out early warning to the risk being likely to occur.
In several embodiments provided herein, it should be understood that disclosed device and method can also pass through Other modes are realized.The apparatus embodiments described above are merely exemplary, for example, flow chart and block diagram in attached drawing Show the device of multiple embodiments according to the present invention, the architectural framework in the cards of method and computer program product, Function and operation.In this regard, each box in flowchart or block diagram can represent the one of a module, section or code Part, a part of the module, section or code, which includes that one or more is for implementing the specified logical function, to be held Row instruction.It should also be noted that function marked in the box can also be to be different from some implementations as replacement The sequence marked in attached drawing occurs.For example, two continuous boxes can actually be basically executed in parallel, they are sometimes It can execute in the opposite order, this depends on the function involved.It is also noted that every in block diagram and or flow chart The combination of box in a box and block diagram and or flow chart can use the dedicated base for executing defined function or movement It realizes, or can realize using a combination of dedicated hardware and computer instructions in the system of hardware.
In addition, each functional module in each embodiment of the present invention can integrate one independent portion of formation together Point, it is also possible to modules individualism, an independent part can also be integrated to form with two or more modules.
It, can be with if the function is realized and when sold or used as an independent product in the form of software function module It is stored in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially in other words The part of the part that contributes to existing technology or the technical solution can be embodied in the form of software products, the meter Calculation machine software product is stored in a storage medium, including some instructions are used so that a computer equipment (can be a People's computer, server or network equipment etc.) it performs all or part of the steps of the method described in the various embodiments of the present invention. And storage medium above-mentioned includes:USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), arbitrary access are deposited The various media that can store program code such as reservoir (RAM, Random Access Memory), magnetic or disk.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including the element.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.It should be noted that:Similar label and letter exist Similar terms are indicated in following attached drawing, therefore, once being defined in a certain Xiang Yi attached drawing, are then not required in subsequent attached drawing It is further defined and explained.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any Those familiar with the art in the technical scope disclosed by the present invention, can easily think of the change or the replacement, and should all contain Lid is within protection scope of the present invention.Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (10)

1. a kind of transmission line of electricity monitoring and pre-alarming method, which is characterized in that the transmission line of electricity monitoring and pre-alarming method is applied to transmission of electricity Route networking early warning system, the transmission line of electricity networking early warning system include monitoring sensing module, network communication server, management Server, partitioned server and user terminal, the method includes:
Sensing module is monitored according to preset monitoring pattern, monitoring obtains the essential information of transmission line of electricity in corresponding jurisdiction; Wherein, the essential information includes line information, real-time windage yaw information, icing or the snowberg information and overhead line structures of transmission line of electricity Information;
The essential information for the transmission line of electricity that the monitoring obtains is sent to the management server by the network communication server;
The management server is analyzed and processed the fortune for generating transmission line of electricity to the essential information of received multiple transmission lines of electricity Row status information, and the running state information of generation and the essential information of the corresponding transmission line of electricity of the running state information are sent out It send to partitioned server;
Running state information and the essential information of transmission line of electricity generate warning information to the partitioned server based on the received, and will The warning information of generation is sent to the user terminal.
2. transmission line of electricity monitoring and pre-alarming method as described in claim 1, which is characterized in that the method also includes:
Management server obtains air pressure, temperature, snowfall and/or the rainfall in region locating for transmission line of electricity;When the air pressure is big It is lower than the first preset temperature value in the first preset pressure value, the temperature, when snowfall and/or rainfall are in the first default model It encloses, generates the first monitoring pattern, the first monitoring pattern carries out a data monitoring every the first preset time and obtains;When the drop When snowfall and/or rainfall are in the second preset range, the second monitoring pattern is generated, the second monitoring pattern is when second is default Between carry out data monitoring and obtain.
3. transmission line of electricity monitoring and pre-alarming method as claimed in claim 2, which is characterized in that the method also includes:
First monitoring pattern or the second monitoring pattern are sent to network communication server by management server;
First monitoring pattern or the second monitoring pattern are sent to monitoring sensing module, the monitoring by the network communication server Sensing module is monitored transmission line of electricity according to the monitoring pattern.
4. transmission line of electricity monitoring and pre-alarming method as described in claim 1, which is characterized in that the management server is to received The essential information of multiple transmission lines of electricity be analyzed and processed generate transmission line of electricity running state information the step of include:
Management server is by the line information of received multiple transmission lines of electricity, real-time windage yaw information, icing or snowberg information and line Line pole tower information is compared with pre-stored line information, real-time windage yaw information, icing or snowberg information and overhead line structures information To generation running state information;
The running state information of generation is sent to partitioned server by management server;
Information generates warning information to the partitioned server according to the operation state, and the warning information is sent to user Terminal.
5. transmission line of electricity monitoring and pre-alarming method as described in claim 1, which is characterized in that the partitioned server is according to Running state information generate warning information the step of include:
When exception occurs in the line information, real-time windage yaw information, icing or snowberg information and overhead line structures information do not occur When abnormal, first order warning information is generated;
When exception occur in the real-time windage yaw information or icing or snowberg information, line information, overhead line structures information do not occur When abnormal, second level warning information is generated;
When the overhead line structures information occurs abnormal, third level warning information is generated.
6. transmission line of electricity monitoring and pre-alarming method as described in claim 1, which is characterized in that the method also includes:
The warning information of generation is sent to management server by partitioned server;
Management server stores the warning information.
7. transmission line of electricity monitoring and pre-alarming method as described in claim 1, which is characterized in that the method also includes:
Warning information generates video image acquisition instruction to management server based on the received;And by the video image acquisition instruction It is sent to network communication server;
The video image acquisition instruction is sent to monitoring sensing module by the network communication server;
The monitoring sensing module obtains the video image of transmission line of electricity according to the video image acquisition instruction, and will acquire Video image is sent to the management server by network communication server.
The early warning system 8. a kind of transmission line of electricity is networked, which is characterized in that the transmission line of electricity networking early warning system includes monitoring sense Know module, network communication server, management server, partitioned server and user terminal, the monitoring sensing module and institute Network communication server electrical connection is stated, the monitoring sensing module and the network communication server are set to transmission line of electricity, institute Network communication server to be stated to connect with management server communication, the partitioned server is connect with the management server communication, The user terminal and the partitioned server communicate to connect,
The monitoring sensing module is used for according to preset monitoring pattern, and monitoring obtains the base of transmission line of electricity in corresponding jurisdiction This information;Wherein, the essential information include transmission line of electricity line information, real-time windage yaw information, icing or snowberg information and Overhead line structures information;
The network communication server is used to the essential information for the transmission line of electricity that the monitoring obtains being sent to the management and take Business device;
The management server is for being analyzed and processed generation transmission line of electricity to the essential information of received multiple transmission lines of electricity Running state information, and by the running state information of generation and the basic letter of the corresponding transmission line of electricity of the running state information Breath is sent to partitioned server;
The partitioned server generates warning information for running state information based on the received and the essential information of transmission line of electricity, And the warning information of generation is sent to the user terminal.
The early warning system 9. transmission line of electricity as claimed in claim 8 is networked, which is characterized in that the management server will be for that will connect Line information, real-time windage yaw information, icing or the snowberg information and overhead line structures information of the multiple transmission lines of electricity received and pre-stored Line information, real-time windage yaw information, icing or snowberg information and overhead line structures information generation running state information is compared;
The management service is also used to the running state information of generation being sent to partitioned server;
The partitioned server generates warning information for information according to the operation state, and the warning information is sent to User terminal.
The early warning system 10. transmission line of electricity as claimed in claim 8 is networked, which is characterized in that the partitioned server is for working as There is exception in the line information, when real-time windage yaw information, icing or snowberg information and overhead line structures information do not occur abnormal, Generate first order warning information;
The partitioned server is also used to abnormal, route letter occur when the real-time windage yaw information or icing or snowberg information When breath, overhead line structures information do not occur abnormal, second level warning information is generated;
The partitioned server is also used to generate third level warning information when the overhead line structures information occurs abnormal.
CN201810856870.7A 2018-08-01 2018-08-01 Transmission line of electricity monitoring and pre-alarming method and transmission line of electricity networking early warning system Pending CN108877162A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810856870.7A CN108877162A (en) 2018-08-01 2018-08-01 Transmission line of electricity monitoring and pre-alarming method and transmission line of electricity networking early warning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810856870.7A CN108877162A (en) 2018-08-01 2018-08-01 Transmission line of electricity monitoring and pre-alarming method and transmission line of electricity networking early warning system

Publications (1)

Publication Number Publication Date
CN108877162A true CN108877162A (en) 2018-11-23

Family

ID=64306334

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810856870.7A Pending CN108877162A (en) 2018-08-01 2018-08-01 Transmission line of electricity monitoring and pre-alarming method and transmission line of electricity networking early warning system

Country Status (1)

Country Link
CN (1) CN108877162A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109581215A (en) * 2019-01-16 2019-04-05 广西电网有限责任公司电力科学研究院 A kind of high-voltage circuitbreaker intelligent checking system with compbined test function
CN112291303A (en) * 2020-09-30 2021-01-29 长春工程学院 Multidirectional distance dynamic monitoring and early warning method based on edge calculation
CN112822652A (en) * 2020-12-29 2021-05-18 国家电网有限公司 Power transmission line multi-state perception early warning system
CN112909905A (en) * 2021-04-08 2021-06-04 国网河北省电力有限公司沧州供电分公司 VSC-HVDC-based offshore shore power transmission line full-line quick-acting protection device and method
CN113472065A (en) * 2021-05-18 2021-10-01 广东电网有限责任公司广州供电局 Power transmission line state monitoring method, device, equipment and storage medium
CN113936440A (en) * 2021-10-27 2022-01-14 北京国网富达科技发展有限责任公司 Transmission line operating condition monitoring system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103175571A (en) * 2011-12-22 2013-06-26 中国科学院沈阳自动化研究所 Power transmission line intelligent monitoring system based on network of things
CN106710164A (en) * 2017-03-06 2017-05-24 国电南瑞科技股份有限公司 Power distribution network fault early warning method aiming at multiple factors
CN107069975A (en) * 2017-06-20 2017-08-18 国网山东省电力公司诸城市供电公司 A kind of distributed transmission facility status data reponse system and its method
CN107247203A (en) * 2017-07-10 2017-10-13 佛山杰致信息科技有限公司 A kind of transformer fault detection method and device
KR20180075348A (en) * 2016-12-26 2018-07-04 전광현 Current monitoring board and control method thereof
US20180211518A1 (en) * 2017-01-23 2018-07-26 Florida Power And Light Company Open neutral detection

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103175571A (en) * 2011-12-22 2013-06-26 中国科学院沈阳自动化研究所 Power transmission line intelligent monitoring system based on network of things
KR20180075348A (en) * 2016-12-26 2018-07-04 전광현 Current monitoring board and control method thereof
US20180211518A1 (en) * 2017-01-23 2018-07-26 Florida Power And Light Company Open neutral detection
CN106710164A (en) * 2017-03-06 2017-05-24 国电南瑞科技股份有限公司 Power distribution network fault early warning method aiming at multiple factors
CN107069975A (en) * 2017-06-20 2017-08-18 国网山东省电力公司诸城市供电公司 A kind of distributed transmission facility status data reponse system and its method
CN107247203A (en) * 2017-07-10 2017-10-13 佛山杰致信息科技有限公司 A kind of transformer fault detection method and device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
战杰: "《输电线路状态监测诊断技术》", 30 April 2014 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109581215A (en) * 2019-01-16 2019-04-05 广西电网有限责任公司电力科学研究院 A kind of high-voltage circuitbreaker intelligent checking system with compbined test function
CN112291303A (en) * 2020-09-30 2021-01-29 长春工程学院 Multidirectional distance dynamic monitoring and early warning method based on edge calculation
CN112822652A (en) * 2020-12-29 2021-05-18 国家电网有限公司 Power transmission line multi-state perception early warning system
CN112909905A (en) * 2021-04-08 2021-06-04 国网河北省电力有限公司沧州供电分公司 VSC-HVDC-based offshore shore power transmission line full-line quick-acting protection device and method
CN113472065A (en) * 2021-05-18 2021-10-01 广东电网有限责任公司广州供电局 Power transmission line state monitoring method, device, equipment and storage medium
CN113936440A (en) * 2021-10-27 2022-01-14 北京国网富达科技发展有限责任公司 Transmission line operating condition monitoring system

Similar Documents

Publication Publication Date Title
CN108877162A (en) Transmission line of electricity monitoring and pre-alarming method and transmission line of electricity networking early warning system
US20230205947A1 (en) Multi-layer cyber-physical systems simulation platform
CN106066192B (en) A kind of low-voltage platform area fault diagnosis system
CN103151771B (en) Power transmission network operation monitoring system and method
CN103837796B (en) The transmission line malfunction visualization report method of a kind of sing on web and GIS and system
CN107656175B (en) Power grid fault positioning method and positioning device
CN109193632B (en) A kind of intelligent low-voltage platform area power circuit automated topology system
CN103715767B (en) Intelligent grid information integerated and display platform
CN104297574A (en) Substation power frequency electromagnetic environment monitoring system
CN109902948A (en) A kind of power transmission line monitoring system and method based on big data
CN105118106A (en) Electric power inspection handheld terminal, inspection circuit obtaining method and circuit inspection method
CN204807122U (en) Image analysis and humiture safety monitoring device in cubical switchboard cabinet
CN103150598B (en) Processing system and method for sudden failure of power transmission network
CN110460373A (en) A kind of electric power optical cable failure fast positioning method and system
CN105790794A (en) Transformer area line online identification system
CN112886468B (en) Power transmission line region fault positioning method and device based on inspection data
CN109713789A (en) A kind of transformer and distribution station intelligence real-time graded alarm method based on BIM technology
CN106846168A (en) The processing unit and system of transmission line of electricity scissors crossing
CN105375631A (en) Underground cable monitoring system for power grid
CN115062198A (en) Visual power grid planning layout platform
CN210327647U (en) Intelligent Micro terminal of changing on spot
CN102571194A (en) Method for real-timely monitoring optical cable resources, device and system adopting same
CN110492612B (en) Electric power system monitoring system based on Internet of things
CN104808260A (en) Power gird radar early warning method based on GIS
CN109446747A (en) A kind of three-dimensional valve tower method for automatic modeling based on CIM model and CAD

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181123