CN108876125A - It is a kind of to realize the broadband services workform management system to cooperate online in many ways and method - Google Patents

It is a kind of to realize the broadband services workform management system to cooperate online in many ways and method Download PDF

Info

Publication number
CN108876125A
CN108876125A CN201810563348.XA CN201810563348A CN108876125A CN 108876125 A CN108876125 A CN 108876125A CN 201810563348 A CN201810563348 A CN 201810563348A CN 108876125 A CN108876125 A CN 108876125A
Authority
CN
China
Prior art keywords
subsystem
work order
subtask
resource
processing result
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810563348.XA
Other languages
Chinese (zh)
Inventor
吴凤江
刘悠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Tianyuan Creative Technology Ltd
Original Assignee
Beijing Tianyuan Creative Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Tianyuan Creative Technology Ltd filed Critical Beijing Tianyuan Creative Technology Ltd
Priority to CN201810563348.XA priority Critical patent/CN108876125A/en
Publication of CN108876125A publication Critical patent/CN108876125A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • G06Q50/40

Abstract

The present invention, which provides, a kind of realizes the broadband services workform management system that cooperates online and method in many ways, work order is generated into the target work order that subsystem generates by work order schedule subsystem and carries out task fractionation, target work order is split as construction subtask, resource active subtask and resource quality verify subtask, and the subtask that will construct, resource active subtask and resource quality verify subtask and are respectively allocated to construction subsystem, resource active subsystem and resource quality are verified subsystem and are handled, and the first processing result of corresponding acquisition, second processing result and third processing result, finally according to the first processing result, second processing result and third processing result determine the completion status of target work order.The corresponding multiple subtasks of target work order can be synchronized and be handled by the system and method, improved the overall treatment efficiency of target work order, effectively shortened the processing time of target work order, to be conducive to promote customer experience.

Description

It is a kind of to realize the broadband services workform management system to cooperate online in many ways and method
Technical field
The present invention relates to broadband services administrative skill fields, more particularly, to a kind of width realized and cooperated online in many ways Band business workform management system and method.
Background technique
The application service rapid growth of the rapid development of Internet Construction, Internet user's quantity and various networks.To comply with The trend of Internet high speed development meets urgent need of the people to broadband data service, and each telecom operation commercial city is complete Broadband Data Network is built in face.
With being gradually increased for portfolio, there is a large amount of work order daily and relevant staff is needed to handle.Currently, as visitor When broadband services is handled to business foreground in family, foreground personnel generate corresponding width according to the demand of client in computer system Band business work order, a broadband services work order correspond to the multi-task, and at present the multi-task is used according to fixed flow processing The mode of workflow is handled.
However, the multi-task can not carry out simultaneously, it is difficult to realize when handling broadband services work order by the way of workflow Multiparty collaboration leads to TT processing duration too long, reduces the overall treatment efficiency of work order, influences customer experience.
Summary of the invention
When the present invention handles broadband services work order to overcome by the way of workflow in the prior art, the multi-task without Method carries out simultaneously, it is difficult to realize multiparty collaboration, cause TT processing duration too long the problem of, provide and a kind of realize multi-party online association The broadband services workform management system and method for work.
On the one hand, the present invention provides a kind of broadband services workform management system realized and cooperated online in many ways, including work order It generates subsystem, work order schedule subsystem, construction subsystem, resource active subsystem and resource quality and verifies subsystem, wherein:
The work order generates subsystem and is used to generate target work order according to the broadband services demand and customer information of client;
The work order schedule subsystem is used to determine goal task according to the target work order, the goal task is split Subtask is verified for construction subtask, resource active subtask and resource quality, and the construction subtask, resource active is sub Task and resource quality verify subtask and are respectively allocated to the construction subsystem, resource active subsystem and resource quality verification Subsystem;
The construction subsystem, resource active subsystem and resource quality verify subsystem for respectively to construction Task, resource active subtask and resource quality are verified subtask and are handled, and obtain the first processing result respectively, at second Result and third processing result are managed, so that the work order schedule subsystem is according to first processing result, second processing knot Fruit and third processing result determine the completion status of the target work order.
Preferably, the construction subsystem is specifically used for:
The customer information is obtained from the construction subtask, and client's said target is determined according to the customer information Region;
The construction personnel that the construction subtask is distributed to the target area is handled, and obtains the constructor First processing result of member's feedback.
Preferably, the resource active subsystem is specifically used for:
The first data needed for obtaining resource active in the resource active subtask, and by the first data transmission It is activated to network management;
The first data and corresponding activation result that the network management returns are obtained, the money is determined according to the activation result Activate the corresponding second processing result in subtask in source.
Preferably, the resource quality is verified subsystem and is specifically used for:
The second data needed for obtaining resource inspection are verified in subtask from the resource quality, and second data are passed Network management is transported to, is verified and broadband quality verification so that the network management carries out broadband speeds according to second data;
The second data for obtaining the network management passback and corresponding quality verification are as a result, true according to the quality verification result The fixed resource quality verifies the corresponding third processing result in subtask.
Preferably, the work order schedule subsystem is also used to:
By first data and the second processing result and the target work order associated storage in work order information data In library;
By second data and the third processing result and the target work order associated storage in the work order information In database.
Preferably, the work order schedule subsystem is also used to:
When the second processing result is failure, according to the historical information update in the work order information database The first data in resource active subtask, and updated first data are sent to the resource active subsystem.
Preferably, the work order schedule subsystem is also used to:
When the third processing result is failure, according to the historical information update in the work order information database Resource quality verifies the second data in subtask, and updated second data are sent to the resource quality and verify subsystem System.
On the one hand, the present invention provides a kind of broadband industry that the realization applied to any of the above-described system cooperates online in many ways It works menu manager method, including:
Subsystem is generated using the work order, and target work order is generated according to the broadband services demand and customer information of client;
Goal task is determined according to the target work order using the work order schedule subsystem, the goal task is split Subtask is verified for construction subtask, resource active subtask and resource quality, and the construction subtask, resource active is sub Task and resource quality verify subtask and are respectively allocated to the construction subsystem, resource active subsystem and resource quality verification Subsystem;
Subsystem is verified respectively to construction using the construction subsystem, resource active subsystem and resource quality Task, resource active subtask and resource quality are verified subtask and are handled, and obtain the first processing result respectively, at second Result and third processing result are managed, so that the work order schedule subsystem is according to first processing result, second processing knot Fruit and third processing result determine the completion status of the target work order.
On the one hand, the present invention provides a kind of equipment of broadband services workform management method realized and cooperated online in many ways, packet It includes:
At least one processor;And
At least one processor being connect with the processor communication, wherein:
The memory is stored with the program instruction that can be executed by the processor, and the processor calls described program to refer to Order is able to carry out method described above.
On the one hand, the present invention provides a kind of non-transient computer readable storage medium, and the non-transient computer is readable to deposit Storage media stores computer instruction, and the computer instruction makes the computer execute method described above.
It is provided by the invention it is a kind of realize the broadband services workform management system that cooperates online and method in many ways, pass through work order Work order is generated the target work order that subsystem generates and carries out task fractionation by scheduler subsystem, and target work order is split as construction and is appointed Business, resource active subtask and resource quality verify subtask, and will construction subtask, resource active subtask and resource quality Verification subtask is respectively allocated to construction subsystem, resource active subsystem and resource quality verification subsystem and is handled, and It is corresponding to obtain the first processing result, second processing result and third processing result, finally according to the first processing result, second processing As a result the completion status of target work order is determined with third processing result.The system and method is multiple by splitting into target work order Each subtask is completed by the cooperation of multiple subsystems in subtask, enables the corresponding multiple same steppings in subtask of target work order Row processing, improves the overall treatment efficiency of target work order, the processing time of target work order is effectively shortened, to be conducive to be promoted Customer experience.
Detailed description of the invention
Fig. 1 is a kind of whole knot for realizing the broadband services workform management system to cooperate online in many ways of the embodiment of the present invention Structure schematic diagram;
Fig. 2 is a kind of bulk flow for realizing the broadband services workform management method to cooperate online in many ways of the embodiment of the present invention Journey schematic diagram;
Fig. 3 is a kind of equipment for realizing the broadband services workform management method to cooperate online in many ways of the embodiment of the present invention Structural framing schematic diagram.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiments of the present invention will be described in further detail.Implement below Example is not intended to limit the scope of the invention for illustrating the present invention.
Fig. 1 is a kind of whole knot for realizing the broadband services workform management system to cooperate online in many ways of the embodiment of the present invention Structure schematic diagram, as shown in Figure 1, the present invention provides a kind of broadband services workform management system realized and cooperated online in many ways, including Work order generates subsystem 1, work order schedule subsystem 2, construction subsystem 3, resource active subsystem 4 and resource quality and verifies subsystem System 5, wherein:
Work order generates subsystem 1 and is used to generate target work order according to the broadband services demand and customer information of client;
Specifically, when client handles broadband services to business hall, foreground personnel are by the broadband services demand of client Workform management system is inputted with customer information, the work order in workform management system generates subsystem 1 according to the broadband services of client Demand and customer information generate corresponding target work order.Wherein, customer information includes certificate address information and contact method of client etc. Information can be configured according to demand, be not specifically limited herein.
Work order schedule subsystem 2 is used to determine goal task according to target work order, goal task is split as construction and is appointed Business, resource active subtask and resource quality verify subtask, and will construction subtask, resource active subtask and resource quality It verifies subtask and is respectively allocated to construction subsystem 3, resource active subsystem 4 and resource quality verification subsystem 5;
Specifically, after work order generates the generation target work order of subsystem 1, work order generates subsystem 1 and passes target work order Work order schedule subsystem 2 is given, work order schedule subsystem 2 determines the goal task that target work order is included according to target work order. For broadband services, the goal task for being included mainly includes site operation (installation), Internet resources activation and network money Source quality verification.In view of this, goal task is split as construction subtask, resource active subtask by work order schedule subsystem 2 Subtask is verified with resource quality.
Further, work order schedule subsystem 2 configures construction subtask according to the certificate address information and contact method of client, and Construction subsystem 3 is distributed into construction subtask.Meanwhile work order schedule subsystem 2 is according to the corresponding broadband services of target work order The certificate address information of demand and client parameter needed for obtaining the activation broadband services in resource database;And then work order schedule System 2 is integrated into resource active subtask at multiple instruction, and by multiple instruction according to the parameter combination of acquisition, finally by resource Distribute to resource active subsystem 4 in activation subtask.In addition, work order schedule subsystem 2 determines visitor according to the certificate address information of client The corresponding data of entire link and the parameter obtained from resource database are carried out group by link locating for the corresponding broadband in family It closes, the data after combination are the parameter needed for resource quality is verified, the parameter configuration resource needed for being verified according to resource quality Resource quality verification subtask is finally distributed to resource quality and verifies subsystem 5 by quality verification subtask.
Construct subsystem 3, resource active subsystem 4 and resource quality verify subsystem 5 for respectively to construction subtask, Resource active subtask and resource quality are verified subtask and are handled, and obtain the first processing result, second processing knot respectively Fruit and third processing result, so that work order schedule subsystem 2 is handled according to the first processing result, second processing result and third As a result the completion status of target work order is determined.
Specifically, construction subsystem 3 is behind the construction subtask for receiving the distribution of work order schedule subsystem 2, according to construction Specific configuration information in subtask handles construction subtask, and obtains the first processing result.Resource active subsystem 4 Behind the resource active subtask for receiving the distribution of work order schedule subsystem 2, according to the concrete configuration in resource active subtask Information handles resource active subtask, and obtains second processing result.Resource quality verifies subsystem 5 and is receiving work After the resource quality that single scheduler subsystem 2 is distributed verifies subtask, believed according to the concrete configuration that resource quality is verified in subtask Breath is verified subtask to resource quality and is handled, and obtains third processing result.
Further, construct subsystem 3, resource active subsystem 4 and resource quality verify subsystem 5 respectively will be at first Reason result, second processing result and third processing result feed back to work order schedule subsystem 2, work order schedule subsystem 2 further according to First processing result, second processing result and third processing result determine the completion status of target work order, at first When reason result, second processing result and third processing result are successfully, determine that target work order is completed.
It is provided by the invention a kind of to realize that the broadband services workform management system that cooperates online in many ways, including work order generate son System, work order schedule subsystem, construction subsystem, resource active subsystem and resource quality verify subsystem, pass through work order tune It spends subsystem and work order is generated into the target work order progress task fractionation that subsystem generates, target work order is split as construction and is appointed Business, resource active subtask and resource quality verify subtask, and will construction subtask, resource active subtask and resource quality Verification subtask is respectively allocated to construction subsystem, resource active subsystem and resource quality verification subsystem and is handled, and It is corresponding to obtain the first processing result, second processing result and third processing result, finally according to the first processing result, second processing As a result the completion status of target work order is determined with third processing result.The system is appointed by the way that target work order is split into multiple sons Business completes each subtask by the cooperation of multiple subsystems, the corresponding multiple subtasks of target work order is synchronized and are located Reason improves the overall treatment efficiency of target work order, effectively shortens the processing time of target work order, to be conducive to promote client Experience.
Based on any of the above-described embodiment, a kind of broadband services workform management system realized and cooperated online in many ways is provided, is applied Brigade system 3 is specifically used for:Customer information is obtained from construction subtask, and client's said target area is determined according to customer information Domain;The construction personnel that subtask of constructing is distributed to target area is handled, and obtains the first processing of construction personnel's feedback As a result.
Specifically, construction subsystem 3 is after the construction subtask for receiving the distribution of work order schedule subsystem 2, due to work Single scheduler subsystem 2 is configured with customer information in construction subtask, so construction subsystem 3 can be obtained from construction subtask Customer information is taken, wherein customer information includes certificate address information and contact method of client etc..Construct the living according to client of subsystem 3 Location information determines target area belonging to client, in the query target region pair from pre-set construction personnel's information database The construction personnel answered, and then construction subtask is distributed to the corresponding construction personnel in target area and is handled.For example, construction System 3 can be distributed construction subtask on the work number of construction personnel by way of worksheet processing, and construction personnel logs in construction Construction subtask ready to receive after system 3.
Construction personnel can determine visitor according to the customer information configured in construction subtask after receiving construction subtask The contact method at family, and the exact date constructed is reserved by contact method and client, it is gone to again when reaching the exact date It constructs in the address of client.Construction personnel feeds back to construction subsystem 3 after the completion of construction, by the completion result of construction, i.e., Corresponding first processing result in subtask that will construct feeds back to construction subsystem 3.Finally, construction subsystem 3 is again by the first processing As a result work order schedule subsystem 2 is fed back to.
It is provided by the invention it is a kind of realize the broadband services workform management system that cooperates online in many ways, construction subsystem is from applying Customer information is obtained in brigade task, and client's said target region is determined according to customer information;Construction subtask is distributed to The construction personnel of target area is handled, and obtains the first processing result of construction personnel's feedback, and then the first processing is tied Fruit feeds back to work order schedule subsystem, is conducive to the completion that work order schedule subsystem determines target work order in conjunction with the first processing result State is advantageously implemented the synchronous collaboration of the corresponding multiple subtasks of target work order.
Based on any of the above-described embodiment, a kind of broadband services workform management system realized and cooperated online in many ways, money are provided Source activation subsystem 4 is specifically used for:The first data needed for obtaining resource active in resource active subtask, and first is counted It is activated according to network management is transmitted to;The first data and corresponding activation result that network management returns are obtained, are determined according to activation result The corresponding second processing result in resource active subtask.
Specifically, resource active subsystem 4 receive work order schedule subsystem 2 distribution resource active subtask it Afterwards, parameter needed for being configured with resource active in resource active subtask as work order schedule subsystem 2, the parameter are One data.So resource active subsystem 4 can the first data needed for obtaining resource active in resource active subtask.Its In, the first data include OLT title or IP, OLT PON mouthfuls, ONU SN code, ONU type, ONU title, ONU business broadband, PPPOE account, PPPOE password, SVLAN and CVLAN.
On the basis of the above, resource active subsystem 4 is in the form of issuing activation instruction to network management by above-mentioned first data Network management is transmitted to be activated.Resource active mainly includes ready activation, activation, activation three functional groups of control.Wherein, It is ready for activating, it is desirable to provide for the activation support for meeting new business, the every preparatory function for needing to carry out in terms of activation, Such as service configuration and activation control configuration;For activation, it is desirable to provide business activate automatically in involved in each stage The various functions of activation contain work order and receive, activation control, instruct generation, network element construction, data prediction, data Acquisition and work order seven processes of completion;It is managed for activation, it is desirable to provide to process involved in activation, time limit, service The control function of quality etc..
Network management according to the first data carry out resource active after, by needed for resource active wantonly data and it is corresponding swash Slip-knot fruit returns to resource active subsystem 4, and resource active subsystem 4 determines that resource active subtask is corresponding according to activation result Second processing as a result, when activation result is successfully, then corresponding second processing result is successfully.Finally, resource active Second processing result is fed back to work order schedule subsystem 2 again by system 4.
It is provided by the invention a kind of to realize the broadband services workform management system that cooperates online in many ways, resource active subsystem The first data needed for obtaining resource active in resource active subtask, and first data transmission to network management is activated; Obtain network management passback the first data and corresponding activation result, resource active subtask corresponding the is determined according to activation result Two processing results, and then second processing result is fed back to work order schedule subsystem are conducive to work order schedule subsystem and combine the Two processing results determine the completion status of target work order, are advantageously implemented the same stepping association of the corresponding multiple subtasks of target work order Make.
Based on any of the above-described embodiment, a kind of broadband services workform management system realized and cooperated online in many ways, money are provided Source quality verification subsystem 5 is specifically used for:Obtain resource inspection needed for second data are verified in subtask from resource quality, it will Second data are transmitted to network management, verify and broadband quality verification so that network management carries out broadband speeds according to the second data;It obtains The second data and the corresponding quality verification of network management passback are as a result, determine that resource quality verifies subtask according to quality verification result Corresponding third processing result.
Specifically, resource quality verifies subsystem 5 and verifies son in the resource quality for receiving the distribution of work order schedule subsystem 2 After task, since work order schedule subsystem 2 verifies in subtask the ginseng being configured with needed for resource quality is verified in resource quality Number, which is the second data.So resource quality verifies subsystem 5 can verify acquisition money in subtask from resource quality Second data needed for the quality verification of source.Wherein, the second data include the entire link data and money of link locating for customer broadband First data needed for the activation of source.Finally, resource quality verifies subsystem 5 and second data is transmitted to network management.
Network management carries out broadband speed after receiving resource quality and verifying the second data of subsystem transmission, according to the second data Degree is verified and broadband quality verification.During broadband speeds are verified, broadband is carried out using velocity-measuring system and is tested the speed, when the result that tests the speed When in qualified velocity interval, then it can determine that broadband speeds verify result as qualification.In the quality verification of broadband, by the second number First data needed for link data and resource active in are compared, and when comparison result is consistent, then can determine width Band quality verification result is qualification.Finally, the second data and corresponding kernel of mass needed for network management verifies resource quality come to an end Fruit returns to resource quality and verifies subsystem 5, and wherein quality verification result includes that broadband speeds verify result and broadband kernel of mass Come to an end fruit.Resource quality verifies subsystem 5 and determines resource quality according to broadband speeds verification result and broadband quality verification result The corresponding third processing result in subtask is verified, currently only when broadband speeds verify result and broadband quality verification result is to close When lattice, determine that third processing result is successfully.Finally, third processing result is fed back to work again by resource quality verification subsystem 5 Single scheduler subsystem 2.
It is provided by the invention a kind of to realize that the broadband services workform management system that cooperates online in many ways, resource quality verify son System verifies the second data needed for acquisition resource inspection in subtask from resource quality, and the second data are transmitted to network management, with It is verified and broadband quality verification so that network management carries out broadband speeds according to the second data;Obtain the second data and right of network management passback The quality verification answered as a result, determine that resource quality verifies the corresponding third processing result in subtask according to quality verification result, into And third processing result is fed back into work order schedule subsystem, be conducive to work order schedule subsystem combination third processing result and determine The completion status of target work order is advantageously implemented the same stepping cooperation of the corresponding multiple subtasks of target work order.
Based on any of the above-described embodiment, a kind of broadband services workform management system realized and cooperated online in many ways, work are provided Single scheduler subsystem 2 is also used to:By the first data and second processing result and target work order associated storage in work order information data In library;By the second data and third processing result and target work order associated storage in work order information database.
Specifically, work order schedule subsystem 2 is first needed for the resource active for receiving the passback of resource active subsystem 4 After data and corresponding activation result, the corresponding second processing result in resource active subtask is determined according to activation result.? On the basis of this, work order schedule subsystem 2 is presetting the first data and second processing result with target work order associated storage Work order information database in, be conducive to the subsequent calls target work order and corresponding first data and second processing result.
Work order schedule subsystem 2 receive resource quality verify needed for the resource quality that subsystem 5 returns is verified the After two data and corresponding quality verification result, determine that resource quality verifies subtask corresponding the according to quality verification result Three processing results.On this basis, the second data and third processing result are associated with target work order and deposit by work order schedule subsystem 2 Storage is conducive to the subsequent calls target work order and corresponding second data and third in pre-set work order information database Processing result.
It is provided by the invention a kind of to realize the broadband services workform management system that cooperates online in many ways, work order schedule subsystem By the first data and second processing result and target work order associated storage in work order information database;By the second data and third Processing result and target work order associated storage are conducive to subsequent calls target work order and corresponding in work order information database First data and second processing result and corresponding second data and third processing result, are conducive to system to different target work Single corresponding first data and the second data are learnt, to improve the success rate of target work order completion.
Based on any of the above-described embodiment, a kind of broadband services workform management system realized and cooperated online in many ways, work are provided Single scheduler subsystem 2 is also used to:When second processing result is failure, updated according to the historical information in work order information database The first data in resource active subtask, and updated first data are sent to resource active subsystem 4.
Specifically, after first data needed for obtaining resource active in resource active subtask of resource active subsystem 4, First data transmission to network management is activated, and finally obtains the first data and corresponding activation result that network management returns, if When activation result is failure, then it can determine the corresponding second processing result in resource active subtask for failure.If second processing knot Fruit is failure, then can determine above-mentioned first data and incorrect, need to modify.In view of this, resource active subsystem 4 will First data and corresponding second processing result feed back to work order schedule subsystem 2.Work order schedule subsystem 2 knows second processing It as a result is that same type is inquired from work order information database according to the type of target work order and completion status is successfully after failure History trouble ticket, obtain corresponding first data of the history trouble ticket, and work as according to the corresponding first data update of the history trouble ticket The first data in the resource active subtask of preceding target work order, and updated first data are sent to resource active subsystem System 4, resource active subsystem 4 again activates updated first data transmission to network management, so that network management passback swashs Slip-knot fruit is that successfully, and then may make that the corresponding second processing result in resource active subtask is successfully.
It is provided by the invention it is a kind of realize the broadband services workform management system that cooperates online in many ways, when second processing result When for failure, work order schedule subsystem updates the in resource active subtask according to the historical information in work order information database One data, and updated first data are sent to resource active subsystem, it can be according to the historical data in history trouble ticket Corresponding first data of target work order are corrected, it is advantageously ensured that resource active subtask successfully completes, and then it is advantageously ensured that mesh Mark work order successfully completes.
Based on any of the above-described embodiment, a kind of broadband services workform management system realized and cooperated online in many ways, work are provided Single scheduler subsystem 2 is also used to:When third processing result is failure, updated according to the historical information in work order information database Resource quality verifies the second data in subtask, and updated second data are sent to resource quality and verify subsystem 5.
Specifically, resource quality is verified subsystem 5 and is verified in subtask needed for obtaining resource quality verification from resource quality The second data after, the second data be transmitted to network management carry out broadband speeds and verify and broadband quality verification, and finally obtain net Second data of pipe passback and corresponding quality verification can determine resource quality as a result, if when quality verification result is failure Verifying the corresponding third processing result in subtask is failure.If third processing result is failure, it can determine above-mentioned second data And it is incorrect, it needs to modify.Second data and corresponding third are handled in view of this, resource quality verifies subsystem 5 As a result work order schedule subsystem 2 is fed back to.After work order schedule subsystem 2 knows third processing result for failure, according to target work It is successful history trouble ticket that single type inquires same type and completion status from work order information database, obtains the history work Single corresponding second data, and verified according to the resource quality that corresponding second data of the history trouble ticket update current goal work order The second data in subtask, and updated second data are sent to resource quality and verify subsystem 5, resource quality is verified Updated second data are transmitted to network management again and carry out broadband speeds verification and broadband quality verification by subsystem 5, so that net The quality verification result of pipe passback be successfully, and then may make the resource quality corresponding third processing result in verification subtask at Function.
It is provided by the invention it is a kind of realize the broadband services workform management system that cooperates online in many ways, when third processing result When to fail, work order schedule subsystem updates resource quality according to the historical information in work order information database and verifies in subtask The second data, and by updated second data be sent to resource quality verify subsystem, can be according in history trouble ticket Historical data corrects corresponding second data of target work order, successfully completes it is advantageously ensured that resource quality verifies subtask, in turn It is advantageously ensured that target work order successfully completes.
Fig. 2 is a kind of bulk flow for realizing the broadband services workform management method to cooperate online in many ways of the embodiment of the present invention Journey schematic diagram, as shown in Fig. 2, the present embodiment provides a kind of broadband services workform management method realized and cooperated online in many ways, it should Method is applied to the system in any of the above-described embodiment, including:
S1 generates subsystem using work order and generates target work order according to the broadband services demand and customer information of client;
Specifically, when client handles broadband services to business hall, foreground personnel are by the broadband services demand of client Workform management system is inputted with customer information, the work order in workform management system generates subsystem according to the broadband services need of client Customer information of summing generates corresponding target work order.Wherein, customer information includes the letter such as certificate address information and contact method of client Breath, can be configured according to demand, be not specifically limited herein.
S2 determines goal task according to target work order using work order schedule subsystem, and goal task is split as construction Task, resource active subtask and resource quality verify subtask, and will construction subtask, resource active subtask and resource matter Amount verifies subtask and is respectively allocated to construction subsystem, resource active subsystem and resource quality verification subsystem;
Specifically, after work order generates subsystem generation target work order, work order generates subsystem and transmits target work order Work order schedule subsystem is given, work order schedule subsystem determines the goal task that target work order is included according to target work order.For For broadband services, the goal task for being included mainly includes site operation (installation), Internet resources activation and Internet resources matter Amount is verified.In view of this, goal task is split as construction subtask, resource active subtask and resource by work order schedule subsystem Quality verification subtask.
Further, work order schedule subsystem configures construction subtask according to the certificate address information and contact method of client, and Construction subsystem is distributed into construction subtask.Meanwhile work order schedule subsystem is according to the corresponding broadband services need of target work order The certificate address information of summation client parameter needed for obtaining the activation broadband services in resource database;And then work order schedule subsystem System is integrated into resource active subtask at multiple instruction, and by multiple instruction according to the parameter combination of acquisition, finally swashs resource Distribute to resource active subsystem in subtask living.In addition, work order schedule subsystem determines client couple according to the certificate address information of client The corresponding data of entire link and the parameter obtained from resource database are combined, group by link locating for the broadband answered Data after conjunction are the parameter needed for resource quality is verified, the parameter configuration resource quality core needed for being verified according to resource quality Subtask is looked into, resource quality is finally distributed into resource quality verification subtask and verifies subsystem.
S3, using construction subsystem, resource active subsystem and resource quality verify subsystem respectively to construction subtask, Resource active subtask and resource quality are verified subtask and are handled, and obtain the first processing result, second processing knot respectively Fruit and third processing result, so that work order schedule subsystem is according to first processing result, second processing result and third Processing result determines the completion status of target work order.
Specifically, construction subsystem is behind the construction subtask for receiving the distribution of work order schedule subsystem, according to construction Specific configuration information in task handles construction subtask, and obtains the first processing result.Resource active subsystem exists Behind the resource active subtask for receiving the distribution of work order schedule subsystem, according to the specific configuration information in resource active subtask Resource active subtask is handled, and obtains second processing result.Resource quality verifies subsystem and is receiving work order tune After spending the resource quality verification subtask of subsystem distribution, the specific configuration information in subtask is verified to money according to resource quality Source quality verification subtask is handled, and obtains third processing result.
Further, subsystem, resource active subsystem and resource quality verification subsystem are constructed respectively by the first processing As a result, second processing result and third processing result feed back to work order schedule subsystem, and work order schedule subsystem is further according to first Processing result, second processing result and third processing result determine the completion status of target work order, and if only if the first processing knot When fruit, second processing result and third processing result are successfully, determine that target work order is completed.
It is provided by the invention it is a kind of realize the broadband services workform management method that cooperates online in many ways, pass through work order schedule Work order is generated the target work order that subsystem generates and carries out task fractionation by system, and target work order is split as construction subtask, money Subtask is activated in source and resource quality verifies subtask, and construction subtask, resource active subtask and resource quality are verified Subtask is respectively allocated to construction subsystem, resource active subsystem and resource quality verification subsystem and is handled, and corresponding The first processing result, second processing result and third processing result are obtained, finally according to the first processing result, second processing result The completion status of target work order is determined with third processing result.This method by the way that target work order is split into multiple subtasks, by Each subtask is completed in multiple subsystem cooperations, and the corresponding multiple subtasks of target work order are synchronized and are handled, are mentioned The overall treatment efficiency of high target work order, effectively shortens the processing time of target work order, to be conducive to promote customer experience.
The knot of the equipment for the broadband services workform management method that the realization that Fig. 3 shows the embodiment of the present application cooperates online in many ways Structure block diagram.Referring to Fig. 3, the equipment for the broadband services workform management method that the realization cooperates online in many ways, including:Processor (processor) 31, memory (memory) 32 and bus 33;Wherein, the processor 31 and memory 32 pass through described total Line 33 completes mutual communication;The processor 31 is used to call the program instruction in the memory 32, above-mentioned to execute Method provided by each method embodiment, for example including:Using work order generate subsystem according to the broadband services demand of client and Customer information generates target work order;Goal task is determined according to target work order using work order schedule subsystem, goal task is torn open It is divided into construction subtask, resource active subtask and resource quality and verifies subtask, and will construction subtask, resource active times Business and resource quality verify subtask and are respectively allocated to construction subsystem, resource active subsystem and resource quality verification subsystem System;Subsystem is verified respectively to construction subtask, resource active using construction subsystem, resource active subsystem and resource quality Subtask and resource quality are verified subtask and are handled, and obtain the first processing result, second processing result and third respectively Processing result, so that work order schedule subsystem is determined according to the first processing result, second processing result and third processing result The completion status of target work order.
The present embodiment discloses a kind of computer program product, and the computer program product includes being stored in non-transient calculating Computer program on machine readable storage medium storing program for executing, the computer program include program instruction, when described program instruction is calculated When machine executes, computer is able to carry out method provided by above-mentioned each method embodiment, for example including:Subsystem is generated using work order System generates target work order according to the broadband services demand and customer information of client;Using work order schedule subsystem according to target work order It determines goal task, goal task is split as construction subtask, resource active subtask and resource quality and verifies subtask, and Construction subtask, resource active subtask and resource quality are verified into subtask and are respectively allocated to construction subsystem, resource active Subsystem and resource quality verify subsystem;Subsystem is verified using construction subsystem, resource active subsystem and resource quality Subtask is verified to construction subtask, resource active subtask and resource quality respectively to handle, and is obtained at first respectively Manage result, second processing result and third processing result so that work order schedule subsystem according to the first processing result, second at Reason result and third processing result determine the completion status of target work order.
The present embodiment provides a kind of non-transient computer readable storage medium, the non-transient computer readable storage medium Computer instruction is stored, the computer instruction makes the computer execute method provided by above-mentioned each method embodiment, example Such as include:Subsystem is generated using work order, and target work order is generated according to the broadband services demand and customer information of client;Utilize work Single scheduler subsystem determines goal task according to target work order, goal task is split as construction subtask, resource active is appointed Business and resource quality verify subtask, and construction subtask, resource active subtask and resource quality are verified subtask difference It distributes to construction subsystem, resource active subsystem and resource quality and verifies subsystem;Utilize construction subsystem, resource active System and resource quality verify subsystem respectively to construction subtask, resource active subtask and resource quality verify subtask into Row processing, and the first processing result, second processing result and third processing result are obtained respectively, so that work order schedule subsystem The completion status of target work order is determined according to the first processing result, second processing result and third processing result.
Those of ordinary skill in the art will appreciate that:Realize that all or part of the steps of above method embodiment can pass through The relevant hardware of program instruction is completed, and program above-mentioned can be stored in a computer readable storage medium, the program When being executed, step including the steps of the foregoing method embodiments is executed;And storage medium above-mentioned includes:ROM, RAM, magnetic disk or light The various media that can store program code such as disk.
The embodiments such as the equipment of broadband services workform management method that realization described above cooperates online in many ways are only It is schematical, wherein the unit as illustrated by the separation member may or may not be physically separated, work It may or may not be physical unit for the component that unit is shown, it can it is in one place, or can also divide On cloth to multiple network units.Some or all of the modules therein can be selected to realize the present embodiment according to the actual needs The purpose of scheme.Those of ordinary skill in the art are without paying creative labor, it can understand and implement.
Through the above description of the embodiments, those skilled in the art can be understood that each embodiment can It realizes by means of software and necessary general hardware platform, naturally it is also possible to pass through hardware.Based on this understanding, on Stating technical solution, substantially the part that contributes to existing technology can be embodied in the form of software products in other words, should Computer software product may be stored in a computer readable storage medium, such as ROM/RAM, magnetic disk, CD, including several fingers It enables and using so that a computer equipment (can be personal computer, server or the network equipment etc.) executes each implementation Method described in certain parts of example or embodiment.
Finally, the present processes are only preferable embodiment, it is not intended to limit the scope of the present invention.It is all Within the spirit and principles in the present invention, any modification, equivalent replacement, improvement and so on should be included in protection of the invention Within the scope of.

Claims (10)

1. a kind of realize the broadband services workform management system to cooperate online in many ways, which is characterized in that generate subsystem including work order System, work order schedule subsystem, construction subsystem, resource active subsystem and resource quality verify subsystem, wherein:
The work order generates subsystem and is used to generate target work order according to the broadband services demand and customer information of client;
The work order schedule subsystem is used to determine goal task according to the target work order, the goal task is split as applying Brigade task, resource active subtask and resource quality verify subtask, and by the construction subtask, resource active subtask Subtask, which is verified, with resource quality is respectively allocated to the construction subsystem, resource active subsystem and resource quality verification subsystem System;
The construction subsystem, resource active subsystem and resource quality verify subsystem for appointing respectively to construction Business, resource active subtask and resource quality are verified subtask and are handled, and obtain the first processing result, second processing respectively As a result with third processing result so that the work order schedule subsystem is according to first processing result, second processing result The completion status of the target work order is determined with third processing result.
2. system according to claim 1, which is characterized in that the construction subsystem is specifically used for:
The customer information is obtained from the construction subtask, and client's said target area is determined according to the customer information Domain;
The construction personnel that the construction subtask is distributed to the target area is handled, and it is anti-to obtain the construction personnel First processing result of feedback.
3. system according to claim 1, which is characterized in that the resource active subsystem is specifically used for:
The first data needed for obtaining resource active in the resource active subtask, and by the first data transmission to net Pipe is activated;
The first data and corresponding activation result that the network management returns are obtained, determine that the resource swashs according to the activation result The corresponding second processing result in work subtask.
4. system according to claim 1, which is characterized in that the resource quality is verified subsystem and is specifically used for:
The second data needed for obtaining resource inspection are verified in subtask from the resource quality, and second data are transmitted to Network management is verified and broadband quality verification so that the network management carries out broadband speeds according to second data;
The second data for obtaining the network management passback and corresponding quality verification are as a result, determine institute according to the quality verification result It states resource quality and verifies the corresponding third processing result in subtask.
5. system according to claim 1, which is characterized in that the work order schedule subsystem is also used to:
By first data and the second processing result and the target work order associated storage in work order information database;
By second data and the third processing result and the target work order associated storage in the work order information data In library.
6. system according to claim 5, which is characterized in that the work order schedule subsystem is also used to:
When the second processing result is failure, the resource is updated according to the historical information in the work order information database The first data in subtask are activated, and updated first data are sent to the resource active subsystem.
7. system according to claim 5, which is characterized in that the work order schedule subsystem is also used to:
When the third processing result is failure, the resource is updated according to the historical information in the work order information database The second data in quality verification subtask, and updated second data are sent to the resource quality and verify subsystem.
8. a kind of broadband services workform management side that the realization applied to any system of claim 1-7 cooperates online in many ways Method, which is characterized in that including:
Subsystem is generated using the work order, and target work order is generated according to the broadband services demand and customer information of client;
Goal task is determined according to the target work order using the work order schedule subsystem, the goal task is split as applying Brigade task, resource active subtask and resource quality verify subtask, and by the construction subtask, resource active subtask Subtask, which is verified, with resource quality is respectively allocated to the construction subsystem, resource active subsystem and resource quality verification subsystem System;
Subsystem is verified using the construction subsystem, resource active subsystem and resource quality respectively to appoint construction Business, resource active subtask and resource quality are verified subtask and are handled, and obtain the first processing result, second processing respectively As a result with third processing result so that the work order schedule subsystem is according to first processing result, second processing result The completion status of the target work order is determined with third processing result.
9. a kind of equipment for realizing the broadband services workform management method to cooperate online in many ways, which is characterized in that including:
At least one processor;And
At least one processor being connect with the processor communication, wherein:
The memory is stored with the program instruction that can be executed by the processor, and the processor calls described program to instruct energy Enough execute method according to claim 8.
10. a kind of non-transient computer readable storage medium, which is characterized in that the non-transient computer readable storage medium is deposited Computer instruction is stored up, the computer instruction makes the computer execute method according to claim 8.
CN201810563348.XA 2018-06-04 2018-06-04 It is a kind of to realize the broadband services workform management system to cooperate online in many ways and method Pending CN108876125A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810563348.XA CN108876125A (en) 2018-06-04 2018-06-04 It is a kind of to realize the broadband services workform management system to cooperate online in many ways and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810563348.XA CN108876125A (en) 2018-06-04 2018-06-04 It is a kind of to realize the broadband services workform management system to cooperate online in many ways and method

Publications (1)

Publication Number Publication Date
CN108876125A true CN108876125A (en) 2018-11-23

Family

ID=64336617

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810563348.XA Pending CN108876125A (en) 2018-06-04 2018-06-04 It is a kind of to realize the broadband services workform management system to cooperate online in many ways and method

Country Status (1)

Country Link
CN (1) CN108876125A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111061578A (en) * 2019-12-17 2020-04-24 科大国创软件股份有限公司 Automatic network activation system based on double-track guarantee production mechanism

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102546221A (en) * 2010-12-08 2012-07-04 中国电信股份有限公司 Service configuration method and system for optical network unit
WO2013052331A1 (en) * 2011-10-03 2013-04-11 Comsonics, Inc. Wireless diagnostic system
CN102291264B (en) * 2011-09-03 2013-07-10 四川公用信息产业有限责任公司 Broadband service guarantee support system
CN105868926A (en) * 2016-04-28 2016-08-17 国网福建省电力有限公司 Management platform for achieving task decomposition and automated distribution and performance assessment of power supply station
CN106792630A (en) * 2016-11-11 2017-05-31 大唐软件技术股份有限公司 It is a kind of to realize moving the method and system that network service is opened

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102546221A (en) * 2010-12-08 2012-07-04 中国电信股份有限公司 Service configuration method and system for optical network unit
CN102291264B (en) * 2011-09-03 2013-07-10 四川公用信息产业有限责任公司 Broadband service guarantee support system
WO2013052331A1 (en) * 2011-10-03 2013-04-11 Comsonics, Inc. Wireless diagnostic system
CN105868926A (en) * 2016-04-28 2016-08-17 国网福建省电力有限公司 Management platform for achieving task decomposition and automated distribution and performance assessment of power supply station
CN106792630A (en) * 2016-11-11 2017-05-31 大唐软件技术股份有限公司 It is a kind of to realize moving the method and system that network service is opened

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
甘路: ""基于EPON模式服务开通系统的设计与开发"", 《中国优秀硕士学位论文全文数据库(硕士)》 *
赵民等编著: "《基于流程的知识工程与创新》", 31 January 2016 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111061578A (en) * 2019-12-17 2020-04-24 科大国创软件股份有限公司 Automatic network activation system based on double-track guarantee production mechanism
CN111061578B (en) * 2019-12-17 2023-02-14 科大国创软件股份有限公司 Automatic network activation system based on double-track guarantee production mechanism

Similar Documents

Publication Publication Date Title
Niu et al. Load balancing across microservices
CN109740851A (en) Design for Automatic Control Engineering work management method, platform and the system quickly delivered
US11805073B2 (en) Controlling placement of workloads of an application within an application environment
Velasco et al. Solving routing and spectrum allocation related optimization problems: From off-line to in-operation flexgrid network planning
CN106844198B (en) Distributed dispatching automation test platform and method
CN101340331B (en) Method for executing system task by idle terminal in P2P network
CN107959640A (en) Network dispatching method and device
CN104956330A (en) Workload distribution with resource awareness
CN104322011A (en) Connectivity service orchestrator
CN104754013B (en) A kind of network resource control method of cloud computing platform, apparatus and system
CN109740849A (en) Structure design work management method, platform and the system quickly delivered
EP1257956A2 (en) Method and system for skills-based planning and scheduling in a workforce contact center environment
CN111082960B9 (en) Data processing method and device
CN104200557A (en) System and method for realizing intelligent number taking by using handheld equipment
US8630404B2 (en) Iterative scheduling and campaign management
CN109936593A (en) A kind of method and system of message distribution
CN109614110A (en) A kind of method and apparatus that message-oriented middleware concentrates deployment
CN109074287A (en) Infrastructure resources state
CN111311125B (en) Method and device for selecting resource linkage scheme among bank outlets based on genetic algorithm
CN110110520A (en) A kind of the cloud workflow implementing method and system of tolerant invading
CN108876125A (en) It is a kind of to realize the broadband services workform management system to cooperate online in many ways and method
Lam et al. A simulation approach to restructuring call centers
CN109242240A (en) Task based on unit time distribution and timeliness control develops cloud platform
Sakchaikun et al. IT help desk service workflow relationship with process mining
CN112817706B (en) Distributed task scheduling system and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181123