CN108875095A - 一种用于智能化矿井设计的bim系统 - Google Patents

一种用于智能化矿井设计的bim系统 Download PDF

Info

Publication number
CN108875095A
CN108875095A CN201710316702.4A CN201710316702A CN108875095A CN 108875095 A CN108875095 A CN 108875095A CN 201710316702 A CN201710316702 A CN 201710316702A CN 108875095 A CN108875095 A CN 108875095A
Authority
CN
China
Prior art keywords
model
profession
bim
professional
integration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710316702.4A
Other languages
English (en)
Inventor
吕琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710316702.4A priority Critical patent/CN108875095A/zh
Publication of CN108875095A publication Critical patent/CN108875095A/zh
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Theoretical Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Architecture (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明公开了一种用于智能化矿井设计的BIM系统,包括采矿专业图纸、矿建专业图纸、机制专业图纸、地质专业图纸、四大件专业图纸、全专业模型整合、性能化分析、碰撞检查、工业负荷分析、BIM模型调整、三维管线综合、成果输出。本发明用于智能化矿井设计的BIM系统,首先绘制各个专业的图纸或建立模型,其次整合全专业模型,再次进行性能化分析、碰撞检查、工业负荷分析,若满足要求即可进行三维管线综合并成果输出,否则,BIM模型调整,重新进行全专业模型整合。因此本发明具有智能程序化,使用方便和功能高效等优点,达到智能化矿井设计的目的。

Description

一种用于智能化矿井设计的BIM系统
技术领域
本发明涉及矿井设计技术领域,具体属于一种用于智能化矿井设计的BIM系统。
背景技术
传统的矿井设计,只有在具体实施时才将各个专业设计成果的整合在一起,现代智能化矿井设计应该结合BIM设计系统的诸多优点,在项目实施前期,建立相应的BIM模型和动画,这样便于早期找出设计缺点和发现安全隐患。
因此本发明解决了智能化设计,使用方便和功能高效等优点,达到智能化矿井设计的目的。
发明内容
本发明的目的是提供一种用于智能化矿井设计的BIM系统,解决了智能化设计,使用方便和功能高效等优点,达到智能化矿井设计的目的。本发明采用的技术方案如下:
一种用于智能化矿井设计的BIM系统,所述的全专业模型整合包括采矿专业图纸、矿建专业图纸、机制专业图纸、地质专业图纸、四大件专业图纸,所述的全专业模型整合后进行性能化分析、碰撞检查、工业负荷分析,若满足要求即可进行三维管线综合并成果输出,否则,BIM模型调整,重新进行全专业模型整合。
进一步,所述的全专业模型整合包括包括采矿专业图纸、矿建专业图纸、机制专业图纸、地质专业图纸、四大件专业图纸。
进一步,所述的全专业模型整合后进行性能化分析、碰撞检查、工业负荷分析,若满足要求即可进行三维管线综合并成果输出,否则,BIM模型调整,重新进行全专业模型整合。
与已有技术相比,本发明的有益效果如下:
本发明提供一种用于智能化矿井设计的BIM系统,解决了智能化设计,使用方便和功能高效等优点,达到智能化矿井设计的目的。
附图说明
图1为用于智能化矿井设计的BIM系统的结构框架图。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
请参阅图1,一种用于智能化矿井设计的BIM系统,包括采矿专业图纸、矿建专业图纸、机制专业图纸、地质专业图纸、四大件专业图纸、全专业模型整合、性能化分析、碰撞检查、工业负荷分析、BIM模型调整、三维管线综合、成果输出。
本发明的工作原理是:首先绘制采矿专业图纸、矿建专业图纸、机制专业图纸、地质专业图纸、四大件专业图纸或建立模型,其次整合全专业模型,再次进行性能化分析、碰撞检查、工业负荷分析,若满足要求即可进行三维管线综合并成果输出,否则,BIM模型调整,重新进行全专业模型整合,最后形成三维管线综合并成果输出。

Claims (1)

1.一种用于智能化矿井设计的BIM系统,包括采矿专业图纸、矿建专业图纸、机制专业图纸、地质专业图纸、四大件专业图纸、全专业模型整合、性能化分析、碰撞检查、工业负荷分析、BIM模型调整、三维管线综合、成果输出,其特征在于:所述的全专业模型整合包括采矿专业图纸、矿建专业图纸、机制专业图纸、地质专业图纸、四大件专业图纸,所述的全专业模型整合后进行性能化分析、碰撞检查、工业负荷分析,若满足要求即可进行三维管线综合并成果输出,否则,BIM模型调整,重新进行全专业模型整合。
CN201710316702.4A 2017-05-08 2017-05-08 一种用于智能化矿井设计的bim系统 Pending CN108875095A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710316702.4A CN108875095A (zh) 2017-05-08 2017-05-08 一种用于智能化矿井设计的bim系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710316702.4A CN108875095A (zh) 2017-05-08 2017-05-08 一种用于智能化矿井设计的bim系统

Publications (1)

Publication Number Publication Date
CN108875095A true CN108875095A (zh) 2018-11-23

Family

ID=64287171

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710316702.4A Pending CN108875095A (zh) 2017-05-08 2017-05-08 一种用于智能化矿井设计的bim系统

Country Status (1)

Country Link
CN (1) CN108875095A (zh)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103093061A (zh) * 2013-02-07 2013-05-08 中铁二十二局集团电气化工程有限公司 一种地铁机电工程综合管线碰撞优化方法
CN103198195A (zh) * 2013-04-16 2013-07-10 上海上安机电设计事务所有限公司 一种基于bim的建筑工程模型碰撞检测方法
CN105808835A (zh) * 2016-03-04 2016-07-27 上海宝冶集团有限公司 基于bim的机电系统管线装配方法
CN105844017A (zh) * 2016-03-24 2016-08-10 中国十七冶集团有限公司 一种用bim技术优化地下管网和景观绿化设计的方法
CN106202723A (zh) * 2016-07-10 2016-12-07 北京工业大学 一种bim地铁施工方法
CN106202825A (zh) * 2016-07-29 2016-12-07 上海宝冶集团有限公司 基于bim的地下综合管廊设计方法
CN106354933A (zh) * 2016-08-29 2017-01-25 中国十七冶集团有限公司 一种基于bim技术的超大型炼钢余热锅炉管道试压方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103093061A (zh) * 2013-02-07 2013-05-08 中铁二十二局集团电气化工程有限公司 一种地铁机电工程综合管线碰撞优化方法
CN103198195A (zh) * 2013-04-16 2013-07-10 上海上安机电设计事务所有限公司 一种基于bim的建筑工程模型碰撞检测方法
CN105808835A (zh) * 2016-03-04 2016-07-27 上海宝冶集团有限公司 基于bim的机电系统管线装配方法
CN105844017A (zh) * 2016-03-24 2016-08-10 中国十七冶集团有限公司 一种用bim技术优化地下管网和景观绿化设计的方法
CN106202723A (zh) * 2016-07-10 2016-12-07 北京工业大学 一种bim地铁施工方法
CN106202825A (zh) * 2016-07-29 2016-12-07 上海宝冶集团有限公司 基于bim的地下综合管廊设计方法
CN106354933A (zh) * 2016-08-29 2017-01-25 中国十七冶集团有限公司 一种基于bim技术的超大型炼钢余热锅炉管道试压方法

Similar Documents

Publication Publication Date Title
Agarwal et al. Oscillation of third-order nonlinear delay differential equations
EP2722926A3 (en) Waveguide-configuration adapters
CN108875095A (zh) 一种用于智能化矿井设计的bim系统
CN204064271U (zh) 一种工程建设规划监督测量机
CN108549775B (zh) 一种智能批量生成人防结构详图中门框墙长度参数的方法
CN205692916U (zh) 一种电芯治具
CN104268270A (zh) 基于MapReduce挖掘海量社交网络数据中三角形的方法
CN103886143A (zh) 一种由节点快速生成构架钢梁施工图的方法
CN204826604U (zh) 超高层建筑用轻型模板
CN205407898U (zh) 一种遮光手机保护壳
CN206859493U (zh) 一种铝格栅安装结构
CN204517070U (zh) 一种可拆卸电缆连接套
Zhou et al. Weighted pseudo-almost periodic solutions of neutral integral and differential equations
CN206154756U (zh) 多功能榨油机
CN202900309U (zh) 一种煤矿复合救生管道
CN204312625U (zh) 双排孔单排l型轻质隔墙板挤压机双层输出轴减速箱
CN104079433A (zh) 一种提高复杂网络结构鲁棒性的方法
CN202624860U (zh) 链条红包
CN204209677U (zh) 纵梁打孔划线器
CN107340746A (zh) 智能化楼宇数据采集分析系统
CN203099129U (zh) 一种螺旋状油气同步输送胶管
CN202560222U (zh) 分体式综掘机机组后稳定装置
CN204385970U (zh) 一种用于连接外墙板的连接结构
CN104123750B (zh) 空间三维弯扭管桁架结构深化设计施工图的表示方法
CN106339552A (zh) 混凝土大坝仓面设计数据结构化实现方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination