CN108872664A - Intelligent electric meter - Google Patents

Intelligent electric meter Download PDF

Info

Publication number
CN108872664A
CN108872664A CN201810865280.0A CN201810865280A CN108872664A CN 108872664 A CN108872664 A CN 108872664A CN 201810865280 A CN201810865280 A CN 201810865280A CN 108872664 A CN108872664 A CN 108872664A
Authority
CN
China
Prior art keywords
data
variable
class
intelligent electric
security module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810865280.0A
Other languages
Chinese (zh)
Other versions
CN108872664B (en
Inventor
杨祎巍
林伟斌
匡晓云
崔超
李舟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China South Power Grid International Co ltd
China Southern Power Grid Co Ltd
Original Assignee
China South Power Grid International Co ltd
China Southern Power Grid Co Ltd
Power Grid Technology Research Center of China Southern Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China South Power Grid International Co ltd, China Southern Power Grid Co Ltd, Power Grid Technology Research Center of China Southern Power Grid Co Ltd filed Critical China South Power Grid International Co ltd
Priority to CN201810865280.0A priority Critical patent/CN108872664B/en
Publication of CN108872664A publication Critical patent/CN108872664A/en
Application granted granted Critical
Publication of CN108872664B publication Critical patent/CN108872664B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R11/00Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
    • G01R11/02Constructional details
    • G01R11/24Arrangements for avoiding or indicating fraudulent use

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Selective Calling Equipment (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

The application discloses a smart electric meter, which comprises a meter for metering electric quantity; a communication module for transmitting data; the main controller is connected with the communication module and used for receiving the data sent by the main station through the communication module and judging whether the data are metering sensitive data or not, if so, the data are forwarded to the safety module, and otherwise, corresponding operation is executed according to the data; and the safety module is respectively connected with the main controller and the meter and is used for executing corresponding safety operation on the metering value of the meter according to metering-class sensitive data. This application will measure the sensitive data of class and directly handle by security module, security module and counter lug connection, can directly carry out safe operation to the metering value of counter, that is to say, do not do by the master controller to the processing of metering value, but do by very safe security module, have avoided receiving the risk of maliciously falsifying when the master controller is handled, have improved the security of ammeter, have protected user's interests better.

Description

A kind of intelligent electric meter
Technical field
This application involves Automated electronic product technical fields, more particularly to a kind of intelligent electric meter.
Background technique
Intelligent electric meter is the terminal of smart grid, it other than having the function of measuring of traditional ammeter basic electricity consumption, Also there are two-way a variety of rates metering, user terminal control and a variety of intelligentized functions such as anti-electricity-theft.
The structure of common intelligent electric meter is as shown in Figure 1, including main controller, communication module, meter, security module, showing Show device and controllable switch.Main controller executes corresponding operation under the control of main website, such as reads the variable of meter, control Controllable switch closure come realize power-off etc., during executing corresponding operation security module for main controller provide encrypt or The service such as decryption.But the intelligent electric meter of this structure still remains biggish risk, when hackers are attacked and control master control After device, security module can not find that the data that main controller is sent for pseudo- data, cannot play the role of protecting data safety, example Such as, after main controller obtains variable, hacker is by the data tampering and is sent to security module and carries out the safe handling such as encrypting, finally Main website is sent to by communication module by main controller, it can be seen that during entire data processing, security module is not Play the role of protecting the authenticity of data, main website can not also find that data are distorted in main controller processing;For another example, intelligence It after energy ammeter receives cut-offing instruction, is usually parsed, and instruction legitimate verification is carried out by security module, is instructed by main controller Cut-offing instruction can just be executed by being verified rear main controller, and after main controller is maliciously controlled, main controller can skip verifying ring The case where section directly sends power-off signal to controllable switch, and malice is caused to power off.As it can be seen that the safety of current intelligent electric meter compared with Low, the interests of user are subject to encroach on.
Therefore, how a kind of scheme can solve above-mentioned technical problem is provided, is that those skilled in the art needs at present It solves the problems, such as.
Summary of the invention
The purpose of the application is to provide a kind of intelligent electric meter, avoids the wind maliciously distorted in main controller processing Danger, improves the safety of ammeter, preferably protects the interests of user.
In order to solve the above technical problems, this application provides a kind of intelligent electric meters, including:
For measuring the meter of electricity;
It is used for transmission the communication module of data;
The main controller being connect with the communication module, for receiving the data that main website is sent by the communication module, and Judge whether the data are metering class sensitive data, if so, being forwarded to security module, otherwise execute phase according to the data The operation answered;
It connect, be used for according to the metering class sensitive data to the metering with the main controller and the meter respectively The variable of device executes the security module of corresponding safety operation.
Preferably, which further includes:
The controllable switch being connect with the security module;
Then the main controller is also used to judge whether the data are verifying class sensitive data, if so, being forwarded to safety Otherwise module executes corresponding operation according to the data;
Then the security module is also used to verify the legitimacy of the verifying class sensitive data, and sensitive in the verifying class After data are by verifying, the controllable switch closure is controlled to give the controllable switch pair according to the verifying class sensitive data The customer power supply or the control controllable switch answered disconnect so that user corresponding with controllable switch power-off.
Preferably, the metering class sensitive data includes metering electricity class data;
Then the security module is specifically used for obtaining the metering of the meter according to the metering electricity class data Value carries out safe handling to the variable, the variable after safe handling is sent to the main controller, so as to described Main controller reports to the main website.
Preferably, the metering class sensitive data further includes charging class data;
Then the security module is specifically used for obtaining the variable of the meter according to the charging class data, Charging is completed according to default electricity price and the variable.
Preferably, which further includes:
It is connect with the main controller, for showing the display of the variable;
Then the main controller is also used to show after the variable reduction after safe handling by the display Show.
Preferably, the process for carrying out safe handling to the variable is specially:
The variable is encrypted and/or is calculated message authentication code and/or signature.
Preferably, the process of the legitimacy of the verifying verifying class sensitive data is specially:
By decryption and/or signature authentication and/or verifying message authentication code, the legitimacy of the verifying class data is verified.
Preferably, the controllable switch is relay.
Preferably, the display is liquid crystal display.
This application provides a kind of intelligent electric meters, including the meter for measuring electricity;It is used for transmission the communication of data Module;Whether the main controller connecting with communication module for receiving the data that main website is sent by communication module, and judges data To measure class sensitive data, if so, being forwarded to security module, corresponding operation otherwise is executed according to data;Respectively with master control Device connects with meter, the safety for executing corresponding safety operation to the variable of meter according to metering class sensitive data Module.
The application is directly handled class sensitive data is measured by security module, and security module is directly connected to meter, Can variable directly to meter carry out safety operation, that is to say, that the processing to variable be not done by main controller, and It is to be done by very safe security module, avoids the risk maliciously distorted in main controller processing, improve ammeter Safety, preferably protect the interests of user.
Detailed description of the invention
It in order to more clearly explain the technical solutions in the embodiments of the present application, below will be to institute in the prior art and embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the application Example, for those of ordinary skill in the art, without creative efforts, can also obtain according to these attached drawings Obtain other attached drawings.
Fig. 1 is the structural schematic diagram of intelligent electric meter in the prior art;
Fig. 2 is a kind of structural schematic diagram of intelligent electric meter provided herein;
Fig. 3 is the structural schematic diagram of another intelligent electric meter provided herein.
Specific embodiment
The core of the application is to provide a kind of intelligent electric meter, avoids the wind maliciously distorted in main controller processing Danger, improves the safety of ammeter, preferably protects the interests of user.
To keep the purposes, technical schemes and advantages of the embodiment of the present application clearer, below in conjunction with the embodiment of the present application In attached drawing, the technical scheme in the embodiment of the application is clearly and completely described, it is clear that described embodiment is Some embodiments of the present application, instead of all the embodiments.Based on the embodiment in the application, those of ordinary skill in the art Every other embodiment obtained without making creative work, shall fall in the protection scope of this application.
Referring to FIG. 2, Fig. 2 is a kind of structural schematic diagram of intelligent electric meter provided herein, including:
For measuring the meter 1 of electricity;
It is used for transmission the communication module 2 of data;
The main controller 3 connecting with communication module 2 for receiving the data that main website is sent by communication module 2, and judges number According to whether being metering class sensitive data, if so, being forwarded to security module 4, corresponding operation otherwise is executed according to data;
It is connect respectively with main controller 3 and meter 1, for being held according to metering class sensitive data to the variable of meter 1 The security module 4 of the corresponding safety operation of row.
Specifically, in order to solve the problems, such as to propose in background technique, the application improves the structure of intelligent electric meter, by Belong to the important and key message of user in the variable of meter 1, cannot exist and the risks such as be tampered, and main controller 3 is ratio Be easier to the attack by hacker, if reading variable by main controller 3,3 end variable of main controller under attack just In the presence of the risk distorted, security module 4 will not find that data are tampered with main website by " bypass ", security module 4;Therefore, originally Meter 1 is connect by application with security module 4, and variable is obtained by security module 4, is provided with attack protection in security module 4 Software, will not maliciously be controlled, also there is no the risks that are tampered of variable obtained, therefore, by security module 4 Processing variable can guarantee the reliability and integrality of variable, and ammeter could be safer.In addition, the data sent when main website When not being metering class sensitive data, that is, when will not relate to the important and key message of user, directly made accordingly by main controller 3 Response, can share out the work and help one another in this way with security module 4, reduce respective data processing pressure.
It should be noted that variable here can be the electricity consumption of the corresponding user of intelligent electric meter, metering here Class sensitive data is sent by main website, is a kind of instruction for variable, such as report variable and charging.Here communication mould Block 2 can be wireless communication module, such as Wi-Fi (Wireless-Fidelity, Wireless Fidelity) network, or wired Communication module, the application is it is not limited here.
In addition, SPI (Serial Peripheral can be passed through when security module 4 is connect with the equal hardware of meter 1 Interface, Serial Peripheral Interface (SPI)) and UART (Universal Asynchronous Receiver/Transmitter, it is logical With asynchronous receiving-transmitting transmitter) etc. interfaces, can also be by other interfaces, the application is it is not limited here.The application not only can be used In intelligent electric meter, it can also be used to which other need the industrial control equipment using safety chip.
This application provides a kind of intelligent electric meters, including the meter for measuring electricity;It is used for transmission the communication of data Module;Whether the main controller connecting with communication module for receiving the data that main website is sent by communication module, and judges data To measure class sensitive data, if so, being forwarded to security module, corresponding operation otherwise is executed according to data;Respectively with master control Device connects with meter, the safety for executing corresponding safety operation to the variable of meter according to metering class sensitive data Module.
The application is directly handled class sensitive data is measured by security module, and security module is directly connected to meter, Can variable directly to meter carry out safety operation, that is to say, that the processing to variable be not done by main controller, and It is to be done by very safe security module, avoids the risk maliciously distorted in main controller processing, improve ammeter Safety, preferably protect the interests of user.
On the basis of the above embodiments:
Embodiment as one preferred, the intelligent electric meter further include:
The controllable switch 5 being connect with security module 4;
Then main controller 3 is also used to judge whether data are verifying class sensitive data, if so, it is forwarded to security module 4, it is no Then corresponding operation is executed according to data;
Then security module 4 is also used to the legitimacy of authentication class sensitive data, and in verifying class sensitive data by testing It, can to give the corresponding customer power supply of controllable switch 5 or control according to verifying class sensitive data control controllable switch 5 closure after card Switch 5 is controlled to disconnect so that user corresponding with controllable switch 5 powers off.
Specifically, in order to further increase the safety of ammeter, the verifying class sensitive data that the application sends main website is still It is handled, the instruction that verifying class sensitive data here can act for control controllable switch 5, such as is closed by security module 4 It closes controllable switch 5 or disconnects controllable switch 5, for this kind of data, security module 4 needs to verify its true and false, is determining the number After for true (legal), security module 4 sends control signal to controllable switch 5 connected to it.Referring to FIG. 3, specific next It says, when verifying class sensitive data is closure controllable switch 5, security module 4 sends closure to controllable switch 5 connected to it Signal is controlled, after controllable switch 5 is closed, the ammeter of user is connect with power supply grid, and power supply grid can be to customer power supply, when testing Demonstrate,proving class sensitive data is when disconnecting controllable switch 5, and security module 4 sends the control disconnected to controllable switch 5 connected to it and believes Number, after controllable switch 5 disconnects, the ammeter and power supply grid of user is disconnected, and powers off user.
In addition, other than above-mentioned metering class sensitive data and verifying class sensitive data, it can also be as needed to main website Other data for being related to important information sent are performed corresponding processing by security module 4, and the application does not do special limit herein It is fixed.
Embodiment as one preferred, metering class sensitive data include metering electricity class data;
Then security module 4 be specifically used for according to metering electricity class data, obtain meter 1 variable, to variable into Variable after safe handling is sent to main controller 3 by row safe handling, so that main controller 3 reports to main website.
Specifically, metering electricity class data here are to report variable, i.e. master request ammeter in first embodiment Main controller 3 return user electricity consumption (variable), the electricity consumption of user is measured by meter 1.Therefore, security module 4 after the metering electricity class data for receiving the forwarding of main controller 3, obtain variable and encrypt etc. to variable and improve data Then the safe handling of safety is reported to main website via main controller 3.
Embodiment as one preferred, metering class sensitive data further includes charging class data;
Then security module 4 is specifically used for obtaining the variable of meter 1 according to charging class data, according to default electricity price and Variable completes charging.
Specifically, in order to further increase the safety of ammeter, metering class sensitive data further includes charging class data, i.e., main Station requires ammeter to complete the charging to the electricity consumption of user, and the number such as electricity price can specifically, in security module 4 be stored in advance After obtaining variable according to, security module 4, the electricity charge of user are calculated according to variable and electricity price, in addition, if in security module 4 Further comprising user is the amount of money for paying the electricity charge, and security module 4 can also deduct the corresponding amount of money according to the electricity charge of calculating, thus Complete billing function.
In addition, metering class sensitive data may be other, this Shen other than metering electricity class data and charging class data Please it is not limited here.
Embodiment as one preferred, the intelligent electric meter further include:
It is connect with main controller 3, for showing the display of variable;
Then main controller is also used to show after the variable reduction after safe handling by display.
Specifically, in order to improve the intelligence of ammeter, when user wants to know electricity consumption, user can be made by main website Ammeter display variable being obtained, such as user sends electricity display request to main website, main website controls ammeter progress electricity and shows, because This, the intelligent electric meter of the application further includes display, and display can be attached with main controller 3, and main controller 3 receives safety Variable after 4 safe handling of module restores the variable after safe handling, such as whether verifying MAC value is consistent, after consistent The MAC value for removing the calculating of security module 4 restores the variable after safe handling, to facilitate display to show.
It should be noted that display here can be liquid crystal display, or LED display or other displays Device, the application is it is not limited here.
Embodiment as one preferred, the process for carrying out safe handling to variable are specially:
Message authentication code and/or signature are encrypted and/or calculated to variable.
Specifically, to variable carry out safe handling when, can using encryption, calculate message authentication code (MAC value) and The modes such as signature are signed as in the way of key progress authentication, the mode for carrying out safe handling to variable can be But it is not limited to above-mentioned several ways.
The process of embodiment as one preferred, the legitimacy of authentication class sensitive data is specially:
Pass through decryption and/or signature authentication and/or verifying message authentication code, the legitimacy of authentication class data.
Specifically, it when 4 authentication class sensitive data of security module, can be decrypted by the password of setting, if can With decryption, then illustrates that verifying class sensitive data is legal, can also be tested by the verifying of signature authentication and message authentication code to determine The legitimacy of class sensitive data is demonstrate,proved, certainly, verification mode can also be other, and the application is it is not limited here.
Embodiment as one preferred, controllable switch 5 are relay.
Specifically, it is contemplated that the cost of ammeter, controllable switch 5 can be the common lower relay of price, certainly It can be other controllable switches 5, as long as can be realized the application, the application is it is not limited here.
Embodiment as one preferred, display are liquid crystal display.
Specifically, display can be liquid crystal display, or LED display or other displays, the application exist This is without limitation.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other The difference of embodiment, the same or similar parts in each embodiment may refer to each other.
It should also be noted that, in the present specification, relational terms such as first and second and the like be used merely to by One entity or operation are distinguished with another entity or operation, without necessarily requiring or implying these entities or operation Between there are any actual relationship or orders.Moreover, the terms "include", "comprise" or its any other variant meaning Covering non-exclusive inclusion, so that the process, method, article or equipment for including a series of elements not only includes that A little elements, but also including other elements that are not explicitly listed, or further include for this process, method, article or The intrinsic element of equipment.In the absence of more restrictions, being wanted by what sentence " including one " limited Element, it is not excluded that there is also other identical elements in the process, method, article or apparatus that includes the element.
The foregoing description of the disclosed embodiments makes professional and technical personnel in the field can be realized or use the application. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the application.Therefore, the application It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.

Claims (9)

1. a kind of intelligent electric meter, which is characterized in that including:
For measuring the meter of electricity;
It is used for transmission the communication module of data;
The main controller connecting with the communication module for receiving the data that main website is sent by the communication module, and judges Whether the data are metering class sensitive data, if so, being forwarded to security module, are otherwise executed according to the data corresponding Operation;
Connect respectively with the main controller and the meter, for according to the metering class sensitive data to the meter Variable executes the security module of corresponding safety operation.
2. intelligent electric meter according to claim 1, which is characterized in that the intelligent electric meter further includes:
The controllable switch being connect with the security module;
Then the main controller is also used to judge whether the data are verifying class sensitive data, if so, it is forwarded to security module, Otherwise corresponding operation is executed according to the data;
Then the security module is also used to verify the legitimacy of the verifying class sensitive data, and in the verifying class sensitive data After verifying, it is corresponding to give the controllable switch that the controllable switch closure is controlled according to the verifying class sensitive data Customer power supply or the control controllable switch disconnect so that user corresponding with controllable switch power-off.
3. intelligent electric meter according to claim 1, which is characterized in that the metering class sensitive data includes metering electricity class Data;
Then the security module is specifically used for obtaining the variable of the meter according to the metering electricity class data, Safe handling is carried out to the variable, the variable after safe handling is sent to the main controller, so as to the master Control device reports to the main website.
4. intelligent electric meter according to claim 1, which is characterized in that the metering class sensitive data further includes charging class number According to;
Then the security module is specifically used for obtaining the variable of the meter according to the charging class data, according to Default electricity price and the variable complete charging.
5. intelligent electric meter according to claim 3, which is characterized in that the intelligent electric meter further includes:
It is connect with the main controller, for showing the display of the variable;
Then the main controller is also used to show after the variable reduction after safe handling by the display.
6. intelligent electric meter according to claim 3, which is characterized in that the mistake for carrying out safe handling to the variable Journey is specially:
The variable is encrypted and/or is calculated message authentication code and/or signature.
7. intelligent electric meter according to claim 2, which is characterized in that the verifying is described to verify the legal of class sensitive data The process of property is specially:
By decryption and/or signature authentication and/or verifying message authentication code, the legitimacy of the verifying class data is verified.
8. intelligent electric meter according to claim 2, which is characterized in that the controllable switch is relay.
9. intelligent electric meter according to claim 5, which is characterized in that the display is liquid crystal display.
CN201810865280.0A 2018-08-01 2018-08-01 Intelligent ammeter Active CN108872664B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810865280.0A CN108872664B (en) 2018-08-01 2018-08-01 Intelligent ammeter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810865280.0A CN108872664B (en) 2018-08-01 2018-08-01 Intelligent ammeter

Publications (2)

Publication Number Publication Date
CN108872664A true CN108872664A (en) 2018-11-23
CN108872664B CN108872664B (en) 2024-09-06

Family

ID=64307198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810865280.0A Active CN108872664B (en) 2018-08-01 2018-08-01 Intelligent ammeter

Country Status (1)

Country Link
CN (1) CN108872664B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110535858A (en) * 2019-08-29 2019-12-03 广东电网有限责任公司 A kind of intelligent electric meter Verification System and method
CN111583622A (en) * 2020-04-28 2020-08-25 南方电网数字电网研究院有限公司 Metering information distribution processing system and method of double-core intelligent ammeter management unit

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101540738A (en) * 2008-12-31 2009-09-23 北京飞天诚信科技有限公司 Information security middleware and use method
KR20110100597A (en) * 2010-03-04 2011-09-14 양인석 Smart metering device
JP2012058852A (en) * 2010-09-06 2012-03-22 Toshiba Corp Data management device, power consumption amount calculation system and program
CN103348696A (en) * 2010-12-22 2013-10-09 纳格拉影像股份有限公司 Safety facility metering monitoring module
CN204131804U (en) * 2014-10-28 2015-01-28 中国科学院信息工程研究所 A kind of visible intelligent light fixture based on wireless security suspension member technology
CN206003100U (en) * 2016-06-24 2017-03-08 中国南方电网有限责任公司电网技术研究中心 Metering safety device
CN206075060U (en) * 2016-08-30 2017-04-05 苏州安控物联网科技有限公司 Intelligent electric meter control device
CN106921686A (en) * 2015-12-24 2017-07-04 中兴通讯股份有限公司 Manage the methods, devices and systems of continuous data
CN107786550A (en) * 2017-10-17 2018-03-09 中电长城(长沙)信息技术有限公司 A kind of safety communicating method of self-service device, safe communication system and self-service device
CN208588767U (en) * 2018-08-01 2019-03-08 南方电网科学研究院有限责任公司 Intelligent electric meter

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101540738A (en) * 2008-12-31 2009-09-23 北京飞天诚信科技有限公司 Information security middleware and use method
KR20110100597A (en) * 2010-03-04 2011-09-14 양인석 Smart metering device
JP2012058852A (en) * 2010-09-06 2012-03-22 Toshiba Corp Data management device, power consumption amount calculation system and program
CN103348696A (en) * 2010-12-22 2013-10-09 纳格拉影像股份有限公司 Safety facility metering monitoring module
CN204131804U (en) * 2014-10-28 2015-01-28 中国科学院信息工程研究所 A kind of visible intelligent light fixture based on wireless security suspension member technology
CN106921686A (en) * 2015-12-24 2017-07-04 中兴通讯股份有限公司 Manage the methods, devices and systems of continuous data
CN206003100U (en) * 2016-06-24 2017-03-08 中国南方电网有限责任公司电网技术研究中心 Metering safety device
CN206075060U (en) * 2016-08-30 2017-04-05 苏州安控物联网科技有限公司 Intelligent electric meter control device
CN107786550A (en) * 2017-10-17 2018-03-09 中电长城(长沙)信息技术有限公司 A kind of safety communicating method of self-service device, safe communication system and self-service device
CN208588767U (en) * 2018-08-01 2019-03-08 南方电网科学研究院有限责任公司 Intelligent electric meter

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李志强 等: "基于大数据的智能电表入侵检测方法", 电力科学与技术学报, vol. 31, no. 1, 31 January 2016 (2016-01-31), pages 121 - 126 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110535858A (en) * 2019-08-29 2019-12-03 广东电网有限责任公司 A kind of intelligent electric meter Verification System and method
CN111583622A (en) * 2020-04-28 2020-08-25 南方电网数字电网研究院有限公司 Metering information distribution processing system and method of double-core intelligent ammeter management unit
CN111583622B (en) * 2020-04-28 2021-01-22 南方电网数字电网研究院有限公司 Metering information distribution processing system and method of double-core intelligent ammeter management unit

Also Published As

Publication number Publication date
CN108872664B (en) 2024-09-06

Similar Documents

Publication Publication Date Title
US9384658B2 (en) System and method to enforce utility meter security
CN102983886B (en) The security architecture of main storage is used in the design of safety element
CN103348696B (en) Detachable metering monitoring device
CN103903141A (en) O2O safety payment method, system and POS terminal
US20110296169A1 (en) Facilitating secure communication between utility devices
US9688155B2 (en) Authentication and pairing of a mobile device to an external power source
CN102868675B (en) Metering system having improved security
KR101310156B1 (en) Apparatus for smart metering
EP2469237B1 (en) Power meter arrangement
CN112217795B (en) Method and device for managing communication security of intelligent electric meter
CN103323045A (en) Method to detect tampering of data
CN104348610A (en) Method and system for securely transmitting transaction sensitive data based on cloud POS
CN103903140A (en) O2O safety payment method, system and safety payment background
CN108872664A (en) Intelligent electric meter
KR101023709B1 (en) Encryption system for remote meter reading and key exchange method thereof
CN106465044A (en) Wireless power transfer with improved device identification and signaling link security
CN208588767U (en) Intelligent electric meter
CN206003100U (en) Metering safety device
KR101691540B1 (en) System for reading electric power amount
CN105959249B (en) The management method and system of electronic equipment
CN104135458A (en) Establishment of communication connection between mobile equipment and secure carrier
CN103716328B (en) Operation request processing method and system
RU152425U1 (en) ELECTRICITY METER AND ELECTRICITY METERING SYSTEM
KR101135841B1 (en) A security system and method thereof using automatic meter reading protocol
KR20140072992A (en) Subscriber Identification Module for Electronic metering energy in SmartGrid, and System and Method of Electronic measuring using thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210706

Address after: 510663 3 building, 3, 4, 5 and J1 building, 11 building, No. 11, Ke Xiang Road, Luogang District Science City, Guangzhou, Guangdong.

Applicant after: China South Power Grid International Co.,Ltd.

Applicant after: CHINA SOUTHERN POWER GRID Co.,Ltd.

Address before: 510663 3 building, 3, 4, 5 and J1 building, 11 building, No. 11, Ke Xiang Road, Luogang District Science City, Guangzhou, Guangdong.

Applicant before: China South Power Grid International Co.,Ltd.

Applicant before: CHINA SOUTHERN POWER GRID Co.,Ltd.

Applicant before: POWER GRID TECHNOLOGY RESEARCH CENTER. CHINA SOUTHERN POWER GRID

GR01 Patent grant
GR01 Patent grant