CN108867957A - A kind of curtain wall construction method - Google Patents
A kind of curtain wall construction method Download PDFInfo
- Publication number
- CN108867957A CN108867957A CN201810641397.0A CN201810641397A CN108867957A CN 108867957 A CN108867957 A CN 108867957A CN 201810641397 A CN201810641397 A CN 201810641397A CN 108867957 A CN108867957 A CN 108867957A
- Authority
- CN
- China
- Prior art keywords
- curtain wall
- inside casing
- glass unit
- card
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/162—Handles to carry construction blocks
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/167—Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
The invention discloses a kind of curtain wall construction methods, are related to technical field of building construction, if solving in construction at present by high-intensitive wind load, it is difficult to the problem of lifting glass unit.Its key points of the technical solution are that including the following steps:S1, surveying and locating:Bullet sets master control line, external locus of control and external control line;Connecting plate in S2, installation:The inside casing unit for glass unit placement is made in steel latticework, builds scaffold;S3, lifting glass curtain wall:Glass unit is lifted on to be assemblied into glass curtain wall at corresponding inside casing unit, and there is mutually matched clamping structure between the glass unit and inside casing unit;S4, the outer limit plate of installation:Aluminium sheet is made and is cooperated with interior connecting plate to grip the outer limit plate of glass curtain wall;S5, installation curtain wall attachment;S6, maintenance curtain wall.Even having reached the construction of super high-rise building, it can avoid the influence of eminence wind load, glass unit accurately and be quickly mounted on its fixed bit, to reduce the purpose of difficulty of construction.
Description
Technical field
The present invention relates to technical field of building construction, more specifically, being related to a kind of curtain wall construction method.
Background technique
Building curtain wall is the building external envelope structure for melting Building technology, building function, the art of architecture and being integrated, and is at this stage
The advanced exterior decoration form of building, the main target of Curtain Wall Design are to create one to realize building reason by decorative art
It reads, illustrates architecture semiotic, conveys epoch information and feature, while having both the building coat of certain functionality, safety.It is large-scale
Gracefulness, harmony, the smoothness of building are the inevitable requirements in the public and city, and the appreciative value of curtain wall exactly realizes above-mentioned requirements most
Good carrier.
With the development of society, the complexity of the heavy constructions such as overlength, super-high structure is increasing, the difficulty of construction of curtain wall
Also higher and higher therewith, it often causes to do over again during actual construction, leads to the problems such as construction period long, quality control difficulty.
Especially when engineering is super high-rise building, frequently by the displacement of Wind effects building vibration, less convenient for aloft installation hanging
Glass unit under state.
Summary of the invention
The object of the present invention is to provide a kind of curtain wall construction methods can avoid eminence wind for the construction of super high-rise building
Glass unit accurately and is quickly mounted on its fixed bit by the influence of load, to reduce difficulty of construction.
Above-mentioned technical purpose of the invention technical scheme is that:A kind of curtain wall construction method, packet
Include following steps:
S1, surveying and locating:Built-in fitting on the outside of cleaning building building, sets up basis of reference axis using curtain wall tolerance, using whole station
Instrument checks the relationship between benchmark dotted line by prism, and bullet sets master control line, external locus of control and external control line;
Connecting plate in S2, installation:The inside casing unit for glass unit placement is made in steel latticework, builds scaffold, according in S1
The dotted line of label since building building corner position install inside casing unit to be assemblied into interior connecting plate;
S3, lifting glass curtain wall:Using cantilever mounted/activity telpher by glass unit be lifted at corresponding inside casing unit with
It is assemblied into glass curtain wall, and there is mutually matched clamping structure between the glass unit and inside casing unit;
S4, the outer limit plate of installation:Aluminium sheet is made on scaffold and is cooperated with interior connecting plate to grip the outer of glass curtain wall
Limit plate, and there is the running clearance rotated for glass unit between the part outer limit plate and interior connecting plate;
S5, installation curtain wall attachment:Sun shades, and the sun shades position are vertically installed on two neighboring outer limit plate in the S4
Stitching portion between two neighboring inside casing unit;
S6, maintenance curtain wall:Segmented-erection is safe guarding shed, cleans curtain wall, and examine the firmness of the connection between each component of curtain wall.
By using above-mentioned technical proposal, in the method for construction curtain wall, in installation inside casing unit, inside casing list outside building building
Member is disposed for glass unit, and by the tentatively fixed glass unit of clamping structure, avoid glass unit influenced by wind load and
It loosens, recycles outer limit plate and the conjunction of interior connecting plate matched to grip glass unit, consequently facilitating accurately and quickly by glass
Unit is mounted on its fixed bit, reduces difficulty of construction;And setting running clearance, so as to segment glass unit rotational, thus conduct
Window uses;Remaining step in construction method is followed again, realizes the installation of curtain wall entirety.
The further setting of the present invention is, along the external control line of label in building building outside screw installation after the S1
There is connector, the outer limit plate in the S4 has several inserting columns, and the inside casing unit in the S2 has for connector insertion
The first jack and for inserting column insertion the second jack;After installing outer limit plate in the S4, to the steel lattice of inside casing unit
High pressure injects concrete in structure.
By using above-mentioned technical proposal, inside casing unit is enclosed by steel latticework welding, and steel latticework is that inside is hollow
Rectangular steel pipe, using the cooperation of the cooperation of connector and the first jack and inserting column and the second jack, so as in building building
Outer quickly location and installation inside casing unit, and the limit plate outside quick location and installation on inside casing unit;Concrete is reinjected, is passed through
Concrete condensation package inserting column and connector, to increase being connected firmly between building building, interconnecting piece and outer limit plate
Degree.
The further setting of the present invention is, a card beam is installed on the glass unit in the S3, is manufactured in the S2
When inside casing unit, the card slot that indent hangs for card beam, and the clamping structure master are provided on the upside of the inside casing unit
It to be formed with card beam and card slot.
By using above-mentioned technical proposal, as clamping structure in such a way that card beam is embedded to card slot, structure is simple, and
Cooperate required precision low, manufacture easy to process.
The further setting of the present invention is, the second magnetic block is embedded in the card beam, be embedded in the card slot with
The first attracting magnetic block of second magnetic block.
By using above-mentioned technical proposal, attracting the first magnetic block and the second magnetic block are set, increased at clamping structure
Connectivity robustness using attracting magnetism, match convenient for quickly positioning and when glass unit is lifted on inside casing unit
It closes, reduces difficulty of construction.
The further setting of the present invention is that the bottom of the card slot, which has to be open, is less than the turn trough of internal diameter, and the card
The end of beam has the shaft in indentation turn trough so as to glass unit rotation.
By using above-mentioned technical proposal, turn trough and turn trough are set, the arc track contacted by the two realizes rotation glass
The purpose of glass unit avoids the glass unit as window from needing additionally mounted rotational structure, to increase making for clamping structure
With function, and convenient for the cooperation between clamping structure, avoid damaging card slot or card beam because of collision when installation.
The further setting of the present invention is, slow in installing elasticity outside interior connecting plate in the S2 in assembly after connecting plate
Punching.
By using above-mentioned technical proposal, because glass unit is lifted on outside building building, the influence vulnerable to wind load is shaken,
Especially when glass unit and the installation of interior connecting plate cooperate, shaking glass unit will lead to glass unit and collide to interior connection
Plate, is arranged elastic ring punching, and glass unit fragmentation when avoiding collision improves security performance when glass unit installation.
The further setting of the present invention is, the outer limit plate in the S4 has several third jacks, in the S5
Sun shades have the card column of insertion third jack;And in the S5 install sun shades the specific steps are first by the card of sun shades
Column is inserted into the third jack in outer limit plate, is slidably installed snap-gauge then at outer limit plate backwards to the side of sunshading board, the snap-gauge
The notch of card hole is slid into the card hole for clamping card column and for card column.
By using above-mentioned technical proposal, using the cooperation of card column and third jack, so that sun shades are quickly located in
Installation place on outer limit plate, and connect and fix card column using snap-gauge, i.e., cooperated by the card hole on snap-gauge with card column, notch
It is arranged and, so as to the dismounting of sun shades, later period maintenance is facilitated to replace to limit the loosening of sun shades convenient for the deformation of card hole.
The further setting of the present invention is, when the S3 lifts glass unit, in the next building of glass unit installation place
Fork truck is arranged at layer, and the cushion of support glass unit is provided at the lifting of fork truck.
By using above-mentioned technical proposal, fork truck is set and supports cushion, cantilever mounted/work of cooperation lifting glass unit
Dynamic telpher, avoids glass unit from being shaken by Wind effects, while generation glass unit in hoisting process being avoided surprisingly to take off
The accident fallen.
In conclusion the invention has the advantages that:In the method for construction curtain wall, inside casing is installed outside building in building
Unit, inside casing unit are disposed for glass unit, and by the tentatively fixed glass unit of clamping structure, avoid glass unit wind-engaging lotus
The influence of load and loosen, recycle outer limit plate and the conjunction of interior connecting plate matched to grip glass unit, consequently facilitating accurate and fastly
Glass unit is mounted on its fixed bit by speed, reduces difficulty of construction, then follow remaining step in construction method, realizes curtain wall
Whole installation.
Detailed description of the invention
Fig. 1 is process flow chart of the invention;
Fig. 2 is the schematic diagram of curtain wall in the present invention;
Fig. 3 is the cross-sectional view being located at A line place in Fig. 2;
Fig. 4 is the cross-sectional view being located at B line place in Fig. 2;
Fig. 5 is the exploded view at curtain wall attachment place of the present invention.
In figure, 1, building building;11, internal thread hole;2, connector;21, threaded post;22, positioning column;3, inside casing unit;3a,
Upper side frame;31, the first jack;32, card slot;321, turn trough;322, step surface;33, the first magnetic block;34, funnel is infused;35,
Two jacks;4, elastic buffer piece;5, glass unit;51, card beam;511, shaft;512, supporting beam;52, the second magnetic block;6, outer
Limit plate;6a, running clearance;61, inserting column;62, it perforates;63, third jack;7, sun shades;71, card column;711, card ball;8, block
Plate;81, card hole;82, notch.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
As depicted in figs. 1 and 2, a kind of curtain wall construction method is in the present embodiment building height about 157 for engineering
Rice, totally 37 layers of super high-rise building, include the following steps:
S1, surveying and locating.
<1>All built-in fittings left when firstly, constructing before 1 outside of cleaning building building;
<2>Secondly, establishing a benchmark of this engineering according to construction organization drawing, errorless premise is confirmed in the axis of this engineering
Under, using curtain wall tolerance, set up basis of reference axis in place, crosscheck it is errorless after, be asserted auxiliary base axis
Line;
<3>Then, datum axis and sideline are measured by prism using total station, press in-while-in-while circulation measurement side
Method, measures each support dot center line position, and general calibration simultaneously positions each centreline space away from measurement and calibration bottom datum-plane
Line, fixed each vertical line for supporting dot center's line;
<4>It is parallel to the peripheral master control line of this floor finally, being set in every floor in building building 1 with line of ink marker bullet using theodolite, is matched
It closes theodolite and divides external locus of control and external control line on the basis of master control line, to be formed multiple for the corresponding installation of glass unit 5
And along the fixed bit of external control line distribution;
<5>It is located in each fixed bit on the outside of building building 1 and makes a call to the internal thread hole 11 of four inclinations upward, interior spiral shell using drill bit
Pit 11 is close to the vertex of fixed bit, and screw thread installs a connector 2 at each internal thread hole 11(It is shown in Figure 4),
Connector 2 includes threaded post 21 and the positioning column 22 reversed with threaded post 21 in insertion internal thread hole 11.
Connecting plate in S2, installation.
<1>Firstly, production constitute in connecting plate multiple inside casing units 3, as shown in connection with fig. 3, the size of inside casing unit 3 according to
The fixed bit obtained according to S1, inside casing unit 3 are enclosed by steel latticework welding and form a rectangle frame, and steel latticework is that inside is hollow
Rectangular steel pipe has upper side frame 3a, lower frame, left frame and left frame.The side in the fitting building of inside casing unit 3 building 1 opens up
There is the first jack 31 being inserted into for positioning column 22, inside casing unit 3 has at rectangle frame center interior backwards to the side in building building 1
The recessed recess portion being embedded for glass unit 5, it is ensured that glass unit 5 and inside casing unit 3 are coplanar.The recess portion centre of upper side frame 3a is also
With a card slot 32, card slot 32 includes the step surface 322 for being located at a turn trough 321 of bottom and being connected with turn trough 321, is turned
Opening between slot 321 and step surface 322 is less than the internal diameter of turn trough 321, and the inner wall of turn trough 321 is also embedded with the first magnetic block
33.A note funnel 34 is also provided at the top surface of upper side frame 3a.Upper side frame 3a and lower frame are located at backwards to the side in building building 1
The second jack 35 is offered outside recess portion;
<2>Secondly, building scaffold at 3 institute's floor to be mounted of inside casing unit, have 0.1 between scaffold and building building 1
The distance of rice, the load-bearing of scaffold are at least 0.4 ton;
<3>Finally, installing the inside casing unit 3 of the floor since at the corner position in building building 1, and each inside casing unit 3 is corresponding
Its fixed bit defined in S1 is inserted into the first jack 31 by positioning column 22, so that inside casing unit 3 is hung on building building
Outside 1, then the gap between positioning column 22 and jack is fully welded, and in building building 1 between two neighboring inside casing unit 3
Side is further fixed using welding manner, to be assembled into interior connecting plate;
<4>Meanwhile in assembly after connecting plate, elastic buffer piece 4, elasticity are laid with backwards to the side in building building 1 with interior connecting plate
Ring punching is to be made of sponge to be bonded the ring bodies of 3 side of inside casing unit, and fix through glue rifle adhesion.
S3, lifting glass curtain wall.
<1>Firstly, production and the matched glass unit 5 of inside casing unit 3, and in the top centre gluing of glass unit 5
There is a card beam 51, as shown in connection with fig. 3, the card slot 32 in card beam 51 and inside casing unit 3 cooperatively forms clamping structure, and card beam 51 is wrapped
It includes positioned at end the shaft 511 to be caught in turn trough 321 and is connected to the supporting beam 512 of step surface 322, shaft 511 is most
Big width is greater than the thickness of supporting beam 512 and the opening of turn trough 321, and when installation, card beam 51 is pressed into card slot 32, and is turned
Second magnetic block 52 attracting with the first magnetic block 33 is embedded in axis 511;
<2>Secondly, the wind load situation according to each floor, selects in 25 layers of floor or less place's laying activity telphers, and pushing up
Cantilever mounted is installed at building, is used to lifting glass unit 5, while arranging fork at the next floor of 5 installation place of glass unit
Vehicle goes up and down at the lifting of fork truck at 0.1 meter of gap between scaffold and building building 1, and is equipped with a buffering at lifting
Pad supports glass unit 5 when for cooperating movable telpher/cantilever mounted hanged glass unit 5(It is not shown in figure);
<3>Finally, checking ensures that the glass unit 5 for building 1 side of building is entrenched in the recess portion in inside casing unit 3, and across
The side glass unit 5 bundlees a rope, and glass unit 5 is avoided to loosen.
S4, the outer limit plate 6 of installation.
<1>Firstly, production cooperates with interior connecting plate to grip the outer limit plate 6 of glass unit 5, glass is specifically clamped
Shaft 511 on unit 5, and the contact surface between shaft 511 is arc surface.Outer limit plate 6 is by the aluminium with a thickness of 20 centimetres
Plate is made, and length is equal to the width of building 1 side of building, and outer limit plate 6 is mounted on the connection of neighbouring two inside casing units 3
Place, can cover gap lateral between inside casing unit 3, wherein have between the outer limit plate 6 in part and interior connecting plate for glass list
The running clearance 6a of 5 rotation of member, in conjunction with shown in Fig. 3 and Fig. 5, so that shaft 511 turns between interior connecting plate and outer limit plate 6
It is dynamic.Outer 6 side of limit plate has the inserting column 61 of the second jack 35 in insertion inside casing unit 3, so as to which outer limit plate 6 is tentatively fixed
Position is on interior connecting plate.There is perforation 62, perforation 62 positioned at the seam crossing of the two neighboring inside casing unit 3 in left and right on outer limit plate 6
Rectangular in cross-section, and perforation 62 is parallel to the setting of 61 place end face of inserting column, perforation 62 offers third backwards to the side of inserting column 61
Jack 63;
<2>Then, stand outer limit plate 6 is hung on interior connecting plate using inserting column 61 on scaffold, then by inserting column 61 with
Between second jack 35 and the gap between outer limit plate 6 and interior connecting plate is welded, at especially the second jack 35 into
Row is fully welded;Finally, injecting concrete from 34 mesohigh of note funnel of inside casing unit 3, package 61 He of inserting column is condensed by concrete
The positioning column 22 of connector 2, to increase the firmness of the connection between building building 1, interconnecting piece 2 and outer limit plate 6.
S5, installation curtain wall attachment.
<1>Firstly, making curtain wall attachment, the curtain wall attachment in this engineering is mainly sun shades 7, and sun shades 7 are by metal metal plate
Golden part is made, and with a thickness of 0.02 meter or 0.01 meter, length is depending on the distance of neighbouring two outer limit plates 6, sun shades 7
Both ends there is the card column 71 of insertion third jack 63, the maximum width of card column 71 is located at the card ball 711 of 71 end of card column, and
Maximum width is equal to the diameter of card ball 711.
<2>Then, sun shades 7 are installed, third jack 63 are inserted into using the card column 71 of sun shades 7, in wearing for outer limit plate 6
A snap-gauge 8 is assigned at hole 62, snap-gauge 8 is made of spring steel, opens up that there are two symmetrical above and below and be caught in for card column 71 on snap-gauge 8
Card hole 81, and the notch 82 for reversely all having connection 8 side wall of snap-gauge of two card holes 81, the seat of notch 82 is specifically in card hole
81 upper/lower, and elastic deformation can occur for the bore of notch 82, so that the card column 71 of upper and lower two sides slides into from notch 82
At card hole 81, or changed by 82 bore of notch and expand card hole 81, so that card ball 711 passes through card hole 81.Concrete operations are, first
In assigning the sun shades 7 positioned at downside on outer limit plate 6, the snap-gauge 8 cooperated with sun shades 7 is assigned in the outer limit plate 6,
Finally in assigning the sun shades 7 for cooperating and being located at upside with snap-gauge 8 on the limit plate, so that two sun shades 7 are fixed on together
On one outer limit plate 6.It is stuck between the card ball 711 and outer limit plate 6 of card column 71 by snap-gauge 8, so that sun shades 7 are quick
The splicing for being fixedly mounted between neighbouring two outer limit plates 6, while being also located between the two neighboring inside casing unit 3 in left and right
Place is also used to cover the gap of stitching portion between the two neighboring inside casing unit 3 in left and right, and in addition to shielding light is shone with a thickness of 0.02
The sun shades 7 of rice can be also used for limitation glass unit 5 and loosen.
S6, maintenance curtain wall.
<1>Firstly, cleaning curtain wall, every layer of curtain wall is installed by the method for the above S2 to S5, and curtain wall is installed and is taken under
Sequence supreme, by Bian Zhizhong, after installing one layer of curtain wall, it is safe guarding shed to stand on segmented-erection on scaffold, and safety is anti-
Protecting includes the elastic string for bundling curtain wall in canopy, recycles two magnetic wipings to be located at curtain wall two sides and is cleaned;
<2>Then, elastic string is removed after curtain cleaning, stirs each component of curtain wall, and sample and carry out destructive testing, measures each structure
The limit of part bonding strength, to examine the firmness of the connection between each component of curtain wall.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art
Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this
All by the protection of Patent Law in the scope of the claims of invention.
Claims (8)
1. a kind of curtain wall construction method, which is characterized in that include the following steps:
S1, surveying and locating:Built-in fitting on the outside of cleaning building building (1), sets up basis of reference axis using curtain wall tolerance, using complete
Instrument stand by the relationship between prism review benchmark dotted line, and bullet sets master control line, external locus of control and external control line;
Connecting plate in S2, installation:The inside casing unit (3) for glass unit (5) placement is made in steel latticework, builds scaffold, according to
Inside casing unit (3) are installed according to the dotted line marked in S1 to be assemblied into interior connecting plate since the corner position for building building (1);
S3, lifting glass curtain wall:Glass unit (5) is lifted on corresponding inside casing unit using cantilever mounted/activity telpher
(3) it sentences and is assemblied into glass curtain wall, and there is mutually matched clamping knot between the glass unit (5) and inside casing unit (3)
Structure;
S4, the outer limit plate (6) of installation:Aluminium sheet is made on scaffold and is cooperated with interior connecting plate to grip glass curtain wall
Outer limit plate (6), and between the rotation rotated for glass unit (5) between the part outer limit plate (6) and interior connecting plate
Gap (6a);
S5, installation curtain wall attachment:It is vertically installed sun shades (7) on two neighboring outer limit plate (6) in the S4, and the screening
Stitching portion of the positive (7) between two neighboring inside casing unit (3);
S6, maintenance curtain wall:Segmented-erection is safe guarding shed, cleans curtain wall, and examine the firmness of the connection between each component of curtain wall.
2. a kind of curtain wall construction method according to claim 1, which is characterized in that along the external control of label after the S1
Line is equipped with connector (2) in building building (1) outside screw, and the outer limit plate (6) in the S4 has several inserting columns (61), and
Inside casing unit (3) in the S2 there is the first jack (31) be inserted into for connector (2) and be inserted into for inserting column (61) the
Two jacks (35);After installing outer limit plate (6) in the S4, into the steel latticework of inside casing unit (3), high pressure injects concrete.
3. a kind of curtain wall construction method according to claim 1, which is characterized in that the glass unit (5) in the S3
One card beam of upper installation (51) is provided with indent on the upside of the inside casing unit (3) when manufacturing inside casing unit (3) in the S2
For the card slot (32) that card beam (51) is hung, and the clamping structure mainly forms with card beam (51) and card slot (32).
4. a kind of curtain wall construction method according to claim 3, which is characterized in that be embedded with second in the card beam (51)
Magnetic block (52), the card slot (32) is interior to be embedded with first magnetic block (33) attracting with the second magnetic block (52).
5. a kind of curtain wall construction method according to claim 3, which is characterized in that the bottom of the card slot (32), which has, opens
Mouth is less than the turn trough (321) of internal diameter, and the end of the card beam (51) has in indentation turn trough (321) so as to glass unit (5)
The shaft (511) of rotation.
6. a kind of curtain wall construction method according to claim 1, which is characterized in that in the S2 in assembly after connecting plate,
In installation elastic buffer piece (4) outside interior connecting plate.
7. a kind of curtain wall construction method according to claim 1, which is characterized in that outer limit plate (6) tool in the S4
There are several third jacks (63), the sun shades (7) in the S5 have the card column (71) of insertion third jack (63);And the S5
Middle installation sun shades (7) the specific steps are it is slotting to be first inserted into the third in outer limit plate (6) for the card columns (71) of sun shades (7)
Hole (63) is slidably installed snap-gauge (8) then at outer limit plate (6) backwards to the side of sunshading board, and the snap-gauge (8), which has, clamps card column
(71) card hole (81) and the notch (82) for card column (71) slide-in card hole (81).
8. a kind of curtain wall construction method according to claim 1, which is characterized in that when S3 lifting glass unit (5),
Fork truck is arranged at the next floor of glass unit (5) installation place, and the slow of support glass unit (5) is provided at the lifting of fork truck
Punching pad.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810641397.0A CN108867957B (en) | 2018-06-21 | 2018-06-21 | Curtain wall construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810641397.0A CN108867957B (en) | 2018-06-21 | 2018-06-21 | Curtain wall construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108867957A true CN108867957A (en) | 2018-11-23 |
CN108867957B CN108867957B (en) | 2020-03-31 |
Family
ID=64340138
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810641397.0A Active CN108867957B (en) | 2018-06-21 | 2018-06-21 | Curtain wall construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108867957B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112431336A (en) * | 2020-11-09 | 2021-03-02 | 罗显容 | Installation method of spliced building curtain wall |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE20206969U1 (en) * | 2002-05-02 | 2002-08-08 | Schueco Int Kg | connecting device |
CN201080778Y (en) * | 2007-06-21 | 2008-07-02 | 李虎 | Detachable and assembled architecture sun shading device |
CN202611023U (en) * | 2012-02-21 | 2012-12-19 | 沈阳远大铝业工程有限公司 | Connecting structure of glass curtain wall and backing plate |
CN102979314A (en) * | 2012-12-19 | 2013-03-20 | 中国江苏国际经济技术合作公司 | Construction method for curved surface point supported type glass curtain wall |
CN205189591U (en) * | 2015-12-10 | 2016-04-27 | 中国建筑西南设计研究院有限公司 | Wholly get in touch formula anticreep projecting top -hung window system |
CN106013555A (en) * | 2016-06-30 | 2016-10-12 | 上海玻机智能幕墙股份有限公司 | Movable integrated curtain wall auxiliary frame with pre-positioning function |
-
2018
- 2018-06-21 CN CN201810641397.0A patent/CN108867957B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE20206969U1 (en) * | 2002-05-02 | 2002-08-08 | Schueco Int Kg | connecting device |
CN201080778Y (en) * | 2007-06-21 | 2008-07-02 | 李虎 | Detachable and assembled architecture sun shading device |
CN202611023U (en) * | 2012-02-21 | 2012-12-19 | 沈阳远大铝业工程有限公司 | Connecting structure of glass curtain wall and backing plate |
CN102979314A (en) * | 2012-12-19 | 2013-03-20 | 中国江苏国际经济技术合作公司 | Construction method for curved surface point supported type glass curtain wall |
CN205189591U (en) * | 2015-12-10 | 2016-04-27 | 中国建筑西南设计研究院有限公司 | Wholly get in touch formula anticreep projecting top -hung window system |
CN106013555A (en) * | 2016-06-30 | 2016-10-12 | 上海玻机智能幕墙股份有限公司 | Movable integrated curtain wall auxiliary frame with pre-positioning function |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112431336A (en) * | 2020-11-09 | 2021-03-02 | 罗显容 | Installation method of spliced building curtain wall |
Also Published As
Publication number | Publication date |
---|---|
CN108867957B (en) | 2020-03-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205333290U (en) | Gas bullet model | |
KR101854769B1 (en) | Maintenance apparatus for Brick wall and maintenance method of brick wall using the same | |
CN108867957A (en) | A kind of curtain wall construction method | |
CN209556931U (en) | A kind of drill bit of engineering geological drilling | |
CN107747367A (en) | A kind of autoclaved lightweight sand aerated concrete(AAC)Sheet material construction method | |
CN207497288U (en) | A kind of shield duct piece bracket system | |
CN103510716A (en) | Installation and construction method of concrete prefabricated wall panel and lifting shifting device | |
CN113585079B (en) | Method for quickly installing steel structure stand column | |
CN107227829B (en) | A kind of quick levelling hanging structure of metope | |
CN206448727U (en) | A kind of metal door and window is with built-in center pillar corner brace | |
CN105672129B (en) | A kind of distribution method of horizontal drawing cable bridge main rope and double-deck cable saddle used | |
CN201326380Y (en) | Drill cushion block suitable for component with circular surface | |
CN101476374B (en) | Reinforcement apparatus for stair step plate, step plate with the same and its production method | |
CN207738282U (en) | A kind of elevator decorative ceiling | |
CN208473747U (en) | A kind of production tree group allocation and transportation support frame | |
CN209703358U (en) | Frame section bar, road signs for road signs | |
CN109371995A (en) | The manufacturing method in circular steel tubing string cofferdam | |
CN216840416U (en) | Door frame leveling device | |
CN109736434A (en) | Big specification purlin installation method and construction technology on a kind of long-span deformed roofing | |
CN115182597B (en) | Human-shaped double-inclined-span steel column butt joint construction method | |
CN112227417B (en) | Construction method for bracket on pipe joint | |
CN208561404U (en) | The outer cover plate supporting support of staircase | |
CN215889038U (en) | Clamping groove type pipe wrapping structure | |
CN208062698U (en) | A kind of Simple assembled chute | |
CN219753027U (en) | Assembled bracket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |