CN108867771A - A kind of building vacuum drainage system - Google Patents
A kind of building vacuum drainage system Download PDFInfo
- Publication number
- CN108867771A CN108867771A CN201810829177.0A CN201810829177A CN108867771A CN 108867771 A CN108867771 A CN 108867771A CN 201810829177 A CN201810829177 A CN 201810829177A CN 108867771 A CN108867771 A CN 108867771A
- Authority
- CN
- China
- Prior art keywords
- vacuum
- pipe
- valve
- tube
- triple valve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03C—DOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
- E03C1/00—Domestic plumbing installations for fresh water or waste water; Sinks
- E03C1/01—Domestic plumbing installations for fresh water or waste water; Sinks for combinations of baths, showers, sinks, wash-basins, closets, urinals, or the like
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03C—DOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
- E03C1/00—Domestic plumbing installations for fresh water or waste water; Sinks
- E03C1/12—Plumbing installations for waste water; Basins or fountains connected thereto; Sinks
- E03C1/122—Pipe-line systems for waste water in building
- E03C1/1222—Arrangements of devices in domestic waste water pipe-line systems
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03C—DOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
- E03C1/00—Domestic plumbing installations for fresh water or waste water; Sinks
- E03C1/12—Plumbing installations for waste water; Basins or fountains connected thereto; Sinks
- E03C1/28—Odour seals
- E03C1/29—Odour seals having housing containing dividing wall, e.g. tubular
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03D—WATER-CLOSETS OR URINALS WITH FLUSHING DEVICES; FLUSHING VALVES THEREFOR
- E03D11/00—Other component parts of water-closets, e.g. noise-reducing means in the flushing system, flushing pipes mounted in the bowl, seals for the bowl outlet, devices preventing overflow of the bowl contents; devices forming a water seal in the bowl after flushing, devices eliminating obstructions in the bowl outlet or preventing backflow of water and excrements from the waterpipe
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03D—WATER-CLOSETS OR URINALS WITH FLUSHING DEVICES; FLUSHING VALVES THEREFOR
- E03D9/00—Sanitary or other accessories for lavatories ; Devices for cleaning or disinfecting the toilet room or the toilet bowl; Devices for eliminating smells
Landscapes
- Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Public Health (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Water Supply & Treatment (AREA)
- Environmental & Geological Engineering (AREA)
- Epidemiology (AREA)
- Structural Engineering (AREA)
- Sanitary Device For Flush Toilet (AREA)
- Sewage (AREA)
Abstract
The invention discloses a kind of building vacuum drainage systems, including toilet bowl sewage draining module, hand basin blowdown module, the first triple valve and the second triple valve, first sewage outlet pipe one end of toilet bowl sewage draining module is connected with the water outlet pipe of the first vacuum valve, and the first sewage outlet pipe other end is connected with the third end pipe of the first triple valve;The 4th vacuum tube is connected between the check-valves of first triple valve and the first vacuum plant;It is connected between the third end pipe of second triple valve and the water outlet pipe of third vacuum valve by the second sewage outlet pipe, is connected between the check-valves of the second triple valve and the second vacuum plant by the 7th vacuum tube;The second end pipe on first triple valve and the second triple valve is connected with air accumulator by pipeline, it is divided into the first chamber, the second chamber and third chamber by two blocks of filtrate plates in air accumulator, the first chamber, the second chamber and third chamber lower end, which respectively correspond, is connected with the first lobe pump, pulverizer and the second lobe pump;This drainage arrangement is convenient, can be widely used to promote.
Description
【Technical field】
The present invention relates to the technical fields of the technical field of drainage system, especially architectural drainage system.
【Background technique】
Places, the pumping equipment such as building building, subway and hospital are a very necessary devices at present, are typically now adopted
Sewage discharge is carried out with gravity form, there are many flaws in this way:Draining water channel, there are spaces to be connected to the external world, meeting in this way
Generate the external world that very big stink distributes;Gravity drainage needs to carry out water channel gradient setting, and water channel is needed using Large Diameter Pipeline, to the greatest extent
Pipe is in this way, the problems such as water channel still can generate blocking;Against the above deficiency, it is necessary to it is next to design a kind of building vacuum drainage system
It solves the above problems.
【Summary of the invention】
The object of the invention is to solve the problems of the prior art, a kind of building vacuum drainage system is proposed, can make
Pipeline is not flexibly that pipe diameter is small, and water consumption is few, and permeability is good, and stink is not easy to be dispersed into the external world.
To achieve the above object, it the invention proposes a kind of building vacuum drainage system, including toilet bowl sewage draining module, washes one's hands
Basin blowdown module, the first triple valve, the second triple valve, air accumulator, the first lobe pump, pulverizer and the second lobe pump, the horse
Bucket blowdown module first sewage outlet pipe one end be connected with the water outlet pipe of the first vacuum valve, the first sewage outlet pipe other end and
The third end pipe of first triple valve is connected;The 4th vacuum is connected between the check-valves of first triple valve and the first vacuum plant
Pipe;It is connected between the third end pipe of second triple valve and the water outlet pipe of third vacuum valve by the second sewage outlet pipe, the
It is connected between the check-valves of two triple valves and the second vacuum plant by the 7th vacuum tube;First triple valve and the second threeway
The second end pipe on valve is connected with air accumulator by pipeline, and the first end pipe on the first triple valve and the second triple valve is selected
It is clogging, one of connect other toilet bowl sewage draining modules (100) and connect other (200) three kinds of modes of hand basin blowdown module, air accumulator
Inside pass through two blocks of filtrate plates and be divided into the first chamber, the second chamber and third chamber, the first chamber, the second chamber and third chamber lower end respectively correspond
It is connected with the first lobe pump, pulverizer and the second lobe pump.
Preferably, the toilet bowl sewage draining module includes the first vacuum valve, the first vacuum plant, the first collecting box, first
Deodorization apparatus, hand push button and closestool, first collecting box upper end are provided with the first deodorization apparatus, the water inlet of the first vacuum valve
Adapter tube is connect with the first collecting box by the first sewage inlet pipe, is passed through between the vacuum hole of the first vacuum valve and the first vacuum plant
First vacuum tube connects, and the second vacuum tube on the first vacuum plant is connected with the vacuum hole of the second vacuum valve, the first vacuum
Third vacuum tube on device is connected with the respiratory siphon of the first deodorization apparatus, vacuum control pipe one end on the first vacuum plant
It is connected with hand push button;Second vacuum valve is arranged in water pipe, and water pipe one end is connected with the water inlet of closestool, horse
It is connected with the first sewage pipe between bucket water outlet and the first collecting box import, is provided with the first vacuum non-return in the middle part of the first sewage pipe
Valve, toilet bowl sewage draining module (100) quantity are at least 1.
Preferably, the hand basin blowdown module includes third vacuum valve, the second collecting box, the second vacuum plant,
Two deodorization apparatus, vacuum monitoring pipe, hand basin and the second vacuum control check valve, second collecting box upper end are provided with the second deodorization
Device is connected with the 5th vacuum tube between the vacuum hole of third vacuum valve and the second vacuum plant, and on the second vacuum plant
Six vacuum tube one end are connected with the respiratory siphon of the second deodorization apparatus, vacuum monitoring pipe and the second collecting box of the second vacuum plant
Upper end is connected, and is connected with the second sewage inlet pipe between the water inlet adapter tube of third vacuum valve and the second collecting box;The hand basin
Discharge outlet and the second collecting box water inlet between be connected with the second sewage pipe, be provided with the second vacuum in the middle part of the second sewage pipe
The quantity of check-valves, the hand basin blowdown module (200) is at least 1.
Preferably, being arranged between the water inlet pipe mouth and effluent pipe mouth of the logical front and back of the cross of first vacuum valve soft
Pipe, the logical water inlet pipe mouth outer end of cross, which is connected with into water, to be taken over, and the logical effluent pipe mouth outer end of cross is connected with water outlet pipe;It is described
It is equipped with upper diaphragm pressing plate and lower diaphragm plate pressing plate in cross is logical, the interior sliding raised line of lower diaphragm plate pressing plate is long in the sliding of upper diaphragm pressing plate
Sliding in notch, outer sliding raised line lead to the sliding of the guiding rib slot on inner sidewall in cross, the top board of upper diaphragm pressing plate lower end and
The lower platen of lower diaphragm plate pressing plate upper end is staggered to form cartoon mouth, and hose is threaded through in cartoon mouth;The logical connection upper casing suitable for reading of cross
Body one end is provided with upper press cover, and the first spring is provided between upper press cover and lower platen;The logical lower mouth of cross connects lower case one
End is provided with lower cover, and second spring is provided between lower cover and top board, sealing is provided between upper press cover and upper housing
Diaphragm is provided with sealing diaphragm between lower cover and lower case;The cross, which leads on side wall, offers vacuum hole;Described first is true
Empty valve, the second vacuum valve are identical with the structure of third vacuum valve.
Preferably, being provided with oil sealing and sealing in the lower chamber of the connecting tube lower end of first deodorization apparatus lower part
Ball, ball sealer are located at below oil sealing;The blow vent that first collecting box upper end opens up is located at the underface of oil sealing, blow vent
Diameter is less than the diameter of ball sealer;Upper end of connecting tube is inserted with snorkel, passes through support between snorkel lateral wall and outer housing
Link of boards;The setting of breathing diaphragm compresses it fixation by upper cover in outer housing upper end, and breathing diaphragm lower end is connected with deodorization
Block, deodorization block are located at snorkel upper end, and deodorization block is cylindrical and diameter is greater than snorkel diameter of bore;Upper cover upper end is provided with
Respiratory siphon;The blow vent that second collecting box upper end opens up is located at the underface of the oil sealing of the second deodorization apparatus;Described first
Deodorization apparatus is identical with the structure of the second deodorization apparatus.
Preferably, soft straight tube is provided in the three-way straight pipe of first triple valve, first retaining ring of soft straight tube one end
It is set on three-way straight pipe one end, card muscle, card muscle and three-way straight pipe inside is provided on the preceding straight tube side wall of the soft straight tube other end
Wall forms interference fit, and soft straight tube one end is additionally provided with the second retaining ring, and the length of preceding straight tube is longer than the middle straight tube in the middle part of soft straight tube
Degree length, the wall thickness of preceding straight tube are 1-1.5mm, and the height of card muscle is 0.5-1mm, the lateral wall of preceding straight tube and the inside of three-way straight pipe
There are the gaps of 0.5mm between wall;The three-way straight pipe side wall is provided with threeway inclined tube, threeway inclined tube and three-way straight pipe inner cavity phase
Connection, the aperture of three-way straight pipe side wall setting are equipped with check-valves, and the length of the preceding straight tube covers threeway inclined tube inner section;Institute
It states three-way straight pipe both ends and threeway inclined tube one end and the first end pipe, the second end pipe and third end pipe is connected separately with by cutting ferrule, the
O-ring seal is provided between two end pipe one end and three-way straight pipe one end;First triple valve and the second threeway valve arrangement are complete
It is exactly the same.
Beneficial effects of the present invention:The present invention by the way that device is provided with toilet bowl sewage draining module and hand basin blowdown module,
It can be convenient and closestool and hand basin dirt are collected, the filtrate plate inside air accumulator can be very good dirt carrying out solid-liquid
Separation, pulverizer can preferably be crushed dirt, and the first lobe pump and the second lobe pump are powerful to the offer of system really
Suction power, facilitate the discharge of dirt;The first deodorization apparatus and are respectively arranged on first collecting box and the second collecting box
Two deodorization apparatus can be very good placement foul smell and be dispersed into public place;This drainage is easy to use, and arrangement is convenient, can be with
It is widely popularized and is used.
Feature and advantage of the invention will be described in detail by embodiment combination attached drawing.
【Detailed description of the invention】
Fig. 1 is a kind of overall structure diagram of building vacuum drainage system of the present invention;
Fig. 2 is a kind of toilet bowl sewage draining modular structure schematic diagram of building vacuum drainage system of the present invention;
Fig. 3 is a kind of hand basin blowdown modular structure schematic diagram of building vacuum drainage system of the present invention;
Fig. 4 is a kind of first vacuum valve diagrammatic cross-section of building vacuum drainage system of the present invention;
Fig. 5 is that a kind of cross of building vacuum drainage system of the present invention leads to schematic perspective view;
Fig. 6 is that a kind of cross of building vacuum drainage system of the present invention leads to diagrammatic cross-section;
Fig. 7 is that a kind of upper diaphragm pressing plate of building vacuum drainage system of the present invention and lower diaphragm plate pressing plate assembling structure are illustrated
Figure;
Fig. 8 is a kind of first deodorization apparatus diagrammatic cross-section of building vacuum drainage system of the present invention;
Fig. 9 is a kind of first triple valve diagrammatic cross-section of building vacuum drainage system of the present invention;
Figure 10 is a kind of first triple valve section part A enlarged diagram of building vacuum drainage system of the present invention;
Figure 11 is a kind of first triple valve section part B enlarged diagram of building vacuum drainage system of the present invention;
Figure 12 is a kind of soft straight tube schematic perspective view of building vacuum drainage system of the present invention.
In figure:100- toilet bowl sewage draining module, 200- hand basin blowdown module, the first vacuum valve of 1-, 101- cross be logical, 102-
Water inlet pipe mouth, 103- effluent pipe mouth, 104- be suitable for reading, mouth, 106- guiding rib slot, 107- vacuum hole, 2- hose, 3- water inlet under 105-
Under adapter tube, 4- water outlet pipe, 5- upper housing, 6- lower case, 7- upper diaphragm pressing plate, 701- sliding long nick, 702- top board, 8-
Raised line is slided outside diaphragm pressing plate, 801-, raised line, 803- lower platen, the first spring of 9-, 10- upper press cover, 11- the is slided in 802-
Two springs, 12- lower cover, 13- sealing diaphragm, 14- cartoon mouth, the first sewage inlet pipe of 15-, the first sewage of 16- outlet pipe, 17- the
One vacuum plant, the first vacuum tube of 18-, the second vacuum tube of 19-, the first collecting box of 20-, 201- blow vent, 21- third vacuum
Pipe, the first deodorization apparatus of 22-, 221- connecting tube, 222- lower chamber, 223- oil sealing, 224- ball sealer, 225- snorkel, 226-
Outer housing, 227- bearing rib, 228- breathe diaphragm, 229- upper cover, 2210- deodorization block, 2211- respiratory siphon, 23- vacuum control
Pipe, 24- hand push button, the 4th vacuum tube of 25-, the second vacuum valve of 26-, 27- water pipe, 28- closestool, the first sewage pipe of 29-,
The first vacuum control check valve of 30-, 31- third vacuum valve, the second sewage inlet pipe of 32-, the second collecting box of 33-, the second sewage of 34- go out
Pipe, the second vacuum plant of 35-, the 5th vacuum tube of 36-, the second deodorization apparatus of 37-, the 6th vacuum tube of 38-, 39- vacuum monitoring pipe,
The 7th vacuum tube of 40-, 41- hand basin, the second sewage pipe of 42-, the second vacuum control check valve of 43-, the first triple valve of 44-, 441- tri-
Straight tube, the second retaining ring of 4433-, 4434- before logical straight tube, 442- threeway inclined tube, the soft straight tube of 443-, the first retaining ring of 4431-, 4432-
Straight tube, the first end pipe of 444-, the second end pipe of 445-, 446-O type sealing ring, 447- check-valves, 448- third in card muscle, 4435-
End pipe, 449- aperture, the second triple valve of 45-, 46- air accumulator, the first chamber of 461-, the second chamber of 462-, 463- third chamber, 464- filter
Liquid plate, the first lobe pump of 47-, 48- pulverizer, the second lobe pump of 49-.
【Specific embodiment】
- Figure 12 refering to fig. 1, a kind of building vacuum drainage system of the present invention, including toilet bowl sewage draining module 100, hand basin row
Dirty module 200, the first triple valve 44, the second triple valve 45, air accumulator 46, the first lobe pump 47, pulverizer 48 and the second cam
Pump 49,16 one end of the first sewage outlet pipe of the toilet bowl sewage draining module 100 is connected with the water outlet pipe 4 of the first vacuum valve 1, the
One sewage outlet pipe, 16 other end is connected with the third end pipe 448 of the first triple valve 44;The check-valves 447 of first triple valve 44 with
The 4th vacuum tube 25 is connected between first vacuum plant 17;The third end pipe 448 and third vacuum of second triple valve 45
It is connected between the water outlet pipe 4 of valve 31 by the second sewage outlet pipe 34, the check-valves 447 and the second vacuum holding of the second triple valve 45
It sets and is connected between 35 by the 7th vacuum tube 40;The second end pipe 445 on first triple valve 44 and the second triple valve 45 is
Be connected with air accumulator 46 by pipeline, the first end pipe 444 on the first triple valve 44 and the second triple valve 45 select it is clogging,
It connects other toilet bowl sewage draining modules 100 and connects one of other hand basin blowdown 200 3 kinds of modes of module, pass through two pieces in air accumulator 46
Filtrate plate 464 is divided into the first chamber 461, the second chamber 462 and third chamber 463, the first chamber 461, the second chamber 462 and third chamber 463
Lower end has been connected respectively the first lobe pump 47, pulverizer 48 and the second lobe pump 49;The toilet bowl sewage draining module 100 includes
First vacuum valve 1, the first vacuum plant 17, the first collecting box 20, the first deodorization apparatus 22, hand push button 24 and closestool 28, institute
It states 20 upper end of the first collecting box and is provided with the first deodorization apparatus 22, the water inlet adapter tube 3 of the first vacuum valve 1 and the first collecting box 20 are logical
The connection of the first sewage inlet pipe 15 is crossed, passes through the first vacuum tube between the vacuum hole 107 of the first vacuum valve 1 and the first vacuum plant 17
18 connect, and the second vacuum tube 19 on the first vacuum plant 17 is connected with the vacuum hole 107 of the second vacuum valve 26, the first vacuum
Third vacuum tube 21 on device 17 is connected with the respiratory siphon 2211 of the first deodorization apparatus 22, true on the first vacuum plant 17
Sky control 23 one end of pipe is connected with hand push button 24;Second vacuum valve 26 is arranged in water pipe 27,27 one end of water pipe
It is connected with the water inlet of closestool 28, is connected with the first sewage pipe 29 between 20 import of 28 water outlet of closestool and the first collecting box,
The first vacuum control check valve 30 is provided in the middle part of first sewage pipe 29;The hand basin blowdown module 200 include third vacuum valve 31,
Second collecting box 33, the second vacuum plant 35, the second deodorization apparatus 37, vacuum monitoring pipe 39, hand basin 41 and the second vacuum are stopped
Valve 43 is returned, 33 upper end of the second collecting box is provided with the second deodorization apparatus 37, the vacuum hole 107 of third vacuum valve 31 and second
The 5th vacuum tube 36 is connected between vacuum plant 35,38 one end of the 6th vacuum tube on the second vacuum plant 35 and the second deodorization
The respiratory siphon 2211 of device 37 is connected, and the vacuum monitoring pipe 39 of the second vacuum plant 35 is connected with 33 upper end of the second collecting box
It connects, the second sewage inlet pipe 32 is connected between the water inlet adapter tube 3 of third vacuum valve 31 and the second collecting box 33;The hand basin 41
Discharge outlet and the second collecting box 33 water inlet between be connected with the second sewage pipe 42, is provided in the middle part of the second sewage pipe 42
Two vacuum control check valves 43;It is covered between the water inlet pipe mouth 102 and effluent pipe mouth 103 of logical 101 front and back of the cross of first vacuum valve 1
Equipped with hose 2,102 outer end of water inlet pipe mouth of cross logical 101 is connected with into water adapter tube 3, and cross leads to outside 101 effluent pipe mouth 103
End is connected with water outlet pipe 4;Be equipped with upper diaphragm pressing plate 7 and lower diaphragm plate pressing plate 8 in the cross logical 101, lower diaphragm plate pressing plate 8 it is interior
Sliding raised line 802 slides in the sliding long nick 701 of upper diaphragm pressing plate 7, and outer sliding raised line 801 leads to 101 inner sidewalls in cross
On guiding rib slot 106 slide, the lower platen 803 of the top board 702 of 7 lower end of upper diaphragm pressing plate and 8 upper end of lower diaphragm plate pressing plate is handed over
Mistake forms cartoon mouth 14, and hose 2 is threaded through in cartoon mouth 14;104 connection suitable for reading, 5 one end of upper housing of cross logical 101 is provided with
Upper press cover 10 is provided with the first spring 9 between upper press cover 10 and lower platen 803;The lower mouth 105 of cross logical 101 connects lower case 6
One end is provided with lower cover 12, and second spring 11, upper press cover 10 and upper housing 5 are provided between lower cover 12 and top board 702
Between be provided with sealing diaphragm 13, be provided between lower cover 12 and lower case 6 sealing diaphragm 13;The cross leads to 101 side walls
On offer vacuum hole 107;First vacuum valve 1, the second vacuum valve 26 are identical with the structure of third vacuum valve 31;Institute
It states in the lower chamber 222 of 221 lower end of connecting tube of 22 lower part of the first deodorization apparatus and is provided with oil sealing 223 and ball sealer 224, seal
Ball 224 is located at 223 lower section of oil sealing;The blow vent 201 that first collecting box, 20 upper end opens up is located at the underface of oil sealing 223,
The diameter of blow vent 201 is less than the diameter of ball sealer 224;221 upper end of connecting tube is inserted with snorkel 225,225 outside of snorkel
It is connected between wall and outer housing 226 by bearing rib 227;Breathing diaphragm 228, which is arranged, passes through upper cover in 226 upper end of outer housing
229 compress it fixation, and breathing 228 lower end of diaphragm is connected with deodorization block 2210, and deodorization block 2210 is located at 225 upper end of snorkel,
Deodorization block 2210 is cylindrical and diameter is greater than 225 diameter of bore of snorkel;229 upper end of upper cover is provided with respiratory siphon 2211;Institute
State the underface that the blow vent 201 that 33 upper end of the second collecting box opens up is located at the oil sealing 223 of the second deodorization apparatus 37;Described first
Deodorization apparatus 22 is identical with the structure of the second deodorization apparatus 37;Setting in the three-way straight pipe 441 of first triple valve 44
There is soft straight tube 443, first retaining ring 4431 of soft 443 one end of straight tube is set on 441 one end of three-way straight pipe, and soft straight tube 443 is another
Card muscle 4434 is provided on 4432 side wall of preceding straight tube at end, card muscle 4434 and 441 inner sidewall of three-way straight pipe, which are formed, to be interference fitted, soft
443 one end of straight tube is additionally provided with the second retaining ring 4433, and the length of preceding straight tube 4432 is longer than the middle straight tube 4435 at soft 443 middle part of straight tube
Degree length, the wall thickness of preceding straight tube 4432 are 1-1.5mm, and the height of card muscle 4434 is 0.5-1mm, the lateral wall and three of preceding straight tube 4432
There are the gaps of 0.5mm between the inner sidewall of logical straight tube 441;441 side wall of three-way straight pipe is provided with threeway inclined tube 442, and three
Logical inclined tube 442 is connected with 441 inner cavity of three-way straight pipe, and the aperture 449 of 441 side wall of three-way straight pipe setting is equipped with check-valves 447,
The length of the preceding straight tube 4432 covers 442 inner section of threeway inclined tube;441 both ends of three-way straight pipe and threeway inclined tube 442 1
End is connected separately with the first end pipe 444, the second end pipe 445 and third end pipe 448,445 one end of the second end pipe and three by cutting ferrule
O-ring seal 446 is provided between logical 441 one end of straight tube;First triple valve 44 and the complete phase of 45 structure of the second triple valve
Together, toilet bowl sewage draining module (100) quantity is at least 1, and the quantity of the hand basin blowdown module (200) is at least 1.
The course of work of the present invention:
A kind of building vacuum drainage system of the present invention during the work time, for toilet bowl sewage draining, when user presses manually
Button 24, the first vacuum plant 17 vacuumize the first vacuum tube 18, the second vacuum tube 19, so that hose 2 is by original
Pressing plate 702 gradually expands out in the case where the first spring 9 and second spring 11 are acted in compressive state with lower platen 803, so that soft
Pipe 2 is opened, and the first lobe pump 47 and the second lobe pump 49 aspirate the dirt of the first collecting box 20, and dirt is dirty by first
Water inlet pipe 15, the first sewage outlet pipe 16, the first triple valve 44 are drawn into air accumulator 46, and pulverizer 48 carries out larger particles dirt
It crushes, is finally discharged;Meanwhile tap water cleans closestool 28 by the second vacuum valve 26 in water pipe 27, clearly
Waste liquid after washing is discharged into the first collecting box 20 by the first sewage pipe 29, and hose 2 is opened, the first lobe pump 47 and second
Lobe pump 49 aspirates the dirt of the first collecting box 20;The first vacuum plant 17 take out to third vacuum tube 21 true simultaneously
Sky makes deodorization block 2210 leave 225 upper surface of snorkel, and extraneous air enters ventilation by the gap of bearing rib 227
In pipe 225, the first collecting box 20 supplement vacuum is entered finally into, if the collection of the first collecting box 20 has been expired, dirt enters logical
Port 201 floats ball sealer 224 to block oil sealing 223, to prevent dirt excessive.For hand basin blowdown, hand basin 41
Sewage be discharged into the second collecting box 33 by the second sewage pipe 42, air pressure inside rises so that vacuum monitors 39 air pressure liter of pipe
Height, the work of the second vacuum plant 35 vacuumize the 5th vacuum tube 36, and third vacuum valve 31 is opened, 47 He of the first lobe pump
Second lobe pump 49 aspirates the dirt of the second collecting box 33, and dirt passes through the second sewage inlet pipe 32, the second sewage outlet pipe
34 and second triple valve 45 enter air accumulator 46, pulverizer 48 crushes larger particles dirt, is finally discharged.
Meanwhile second vacuum plant 35 the 6th vacuum tube 38 is vacuumized so that deodorization block 2210 leaves snorkel
225 upper surfaces, extraneous air are entered in snorkel 225 by the gap of bearing rib 227, enter finally into the second collection
Case 33 supplements vacuum, if the second collecting box 33 collection when having expired, dirt enters blow vent 201, and that ball sealer 224 is floated is stifled
Firmly oil sealing 223, to prevent dirt excessive.
The present invention can be convenient by the way that device is provided with toilet bowl sewage draining module 100 and hand basin blowdown module 200 to horse
Bucket 28 and 41 dirt of hand basin are collected, and the filtrate plate 464 inside air accumulator 46 can be very good dirt carrying out solid-liquid point
From pulverizer 48 can preferably be crushed dirt, and the first lobe pump 47 and the second lobe pump 49 provide system really
Powerful suction power facilitates the discharge of dirt;The first deodorization is respectively arranged on first collecting box 20 and the second collecting box 33
Device 23 and the second deodorization apparatus 37 can be very good placement foul smell and be dispersed into public place;This drainage is easy to use, cloth
It sets conveniently, can be widely popularized and be used.
Above-described embodiment is the description of the invention, is not limitation of the invention, after any pair of simple transformation of the present invention
Scheme all belong to the scope of protection of the present invention.
Claims (6)
1. a kind of building vacuum drainage system, it is characterised in that:Including toilet bowl sewage draining module (100), hand basin blowdown module
(200), the first triple valve (44), the second triple valve (45), air accumulator (46), the first lobe pump (47), pulverizer (48) and
Two lobe pumps (49), the water outlet of first sewage outlet pipe (16) one end and the first vacuum valve (1) of the toilet bowl sewage draining module (100)
Adapter tube (4) is connected, and first sewage outlet pipe (16) other end is connected with the third end pipe (448) of the first triple valve (44);The
The 4th vacuum tube (25) is connected between the check-valves (447) and the first vacuum plant (17) of one triple valve (44);Described second
Pass through the second sewage outlet pipe between the third end pipe (448) of triple valve (45) and the water outlet pipe (4) of third vacuum valve (31)
(34) it connects, passes through the 7th vacuum tube (40) between the check-valves (447) and the second vacuum plant (35) of the second triple valve (45)
Connection;The second end pipe (445) on first triple valve (44) and the second triple valve (45) passes through pipe with air accumulator (46)
Road is connected, the first end pipe (444) on the first triple valve (44) and the second triple valve (45) select it is clogging, connect other closestools
It blowdown module (100) and one of connects other (200) three kinds of modes of hand basin blowdown module, passes through two pieces of filtrates in air accumulator (46)
Plate (464) is divided into the first chamber (461), the second chamber (462) and third chamber (463), the first chamber (461), the second chamber (462) and
Three chambers (463) lower end has been connected respectively the first lobe pump (47), pulverizer (48) and the second lobe pump (49).
2. a kind of building vacuum drainage system as described in claim 1, it is characterised in that:The toilet bowl sewage draining module (100)
Including the first vacuum valve (1), the first vacuum plant (17), the first collecting box (20), the first deodorization apparatus (22), hand push button
(24) be provided with the first deodorization apparatus (22) with closestool (28), the first collecting box (20) upper end, the first vacuum valve (1) into
Water is taken over (3) and is connect with the first collecting box (20) by the first sewage inlet pipe (15), the vacuum hole (107) of the first vacuum valve (1)
It is connect between the first vacuum plant (17) by the first vacuum tube (18), the second vacuum tube on the first vacuum plant (17)
(19) be connected with the vacuum hole (107) of the second vacuum valve (26), the third vacuum tube (21) on the first vacuum plant (17) with
The respiratory siphon (2211) of first deodorization apparatus (22) is connected, and vacuum control pipe (23) one end on the first vacuum plant (17) connects
It is connected to hand push button (24);Second vacuum valve (26) is arranged on water pipe (27), water pipe (27) one end and closestool
(28) water inlet is connected, and is connected with the first sewage pipe between closestool (28) water outlet and the first collecting box (20) import
(29), it is provided with the first vacuum control check valve (30) in the middle part of the first sewage pipe (29), toilet bowl sewage draining module (100) quantity is at least
It is 1.
3. a kind of building vacuum drainage system as described in claim 1, it is characterised in that:The hand basin blowdown module
It (200) include third vacuum valve (31), the second collecting box (33), the second vacuum plant (35), the second deodorization apparatus (37), vacuum
Monitoring pipe (39), hand basin (41) and the second vacuum control check valve (43), it is anti-that the second collecting box (33) upper end is provided with second
Smelly device (37) is connected with the 5th vacuum tube between the vacuum hole (107) and the second vacuum plant (35) of third vacuum valve (31)
(36), respiratory siphon (2211) phase of the 6th vacuum tube (38) one end on the second vacuum plant (35) and the second deodorization apparatus (37)
The vacuum monitoring pipe (39) of connection, the second vacuum plant (35) is connected with the second collecting box (33) upper end, third vacuum valve
(31) the second sewage inlet pipe (32) are connected between water inlet adapter tube (3) and the second collecting box (33);The hand basin (41)
It is connected between discharge outlet and the water inlet of the second collecting box (33) the second sewage pipe (42), setting in the middle part of the second sewage pipe (42)
Have the second vacuum control check valve (43), the quantity of the hand basin blowdown module (200) is at least 1.
4. a kind of building vacuum drainage system as described in claim 1, it is characterised in that:The ten of first vacuum valve (1)
Word, which leads between water inlet pipe mouth (102) and effluent pipe mouth (103) before and after (101), to be arranged with hose (2), cross logical (101) into
Hose nozzle (102) outer end is connected with into water and takes over (3), and effluent pipe mouth (103) outer end that cross leads to (101) is connected with water outlet pipe
(4);The cross, which leads to, is equipped with upper diaphragm pressing plate (7) and lower diaphragm plate pressing plate (8) in (101), the interior sliding of lower diaphragm plate pressing plate (8) is convex
Item (802) sliding in the sliding long nick (701) of upper diaphragm pressing plate (7), outer sliding raised line (801) are led in (101) in cross
Guiding rib slot (106) sliding on side wall, top board (702) and lower diaphragm plate pressing plate (8) upper end of upper diaphragm pressing plate (7) lower end
Lower platen (803) is staggered to form cartoon mouth (14), and hose (2) is threaded through in cartoon mouth (14);Cross leads to the suitable for reading of (101)
(104) connection upper housing (5) one end is provided with upper press cover (10), is provided with first between upper press cover (10) and lower platen (803)
Spring (9);Cross lead to (101) lower mouth (105) connection lower case (6) one end be provided with lower cover (12), lower cover (12) with
It is provided between top board (702) second spring (11), is provided with sealing diaphragm between upper press cover (10) and upper housing (5)
(13), sealing diaphragm (13) is provided between lower cover (12) and lower case (6);The cross, which leads on (101) side wall, to be offered
Vacuum hole (107);First vacuum valve (1), the second vacuum valve (26) are identical with the structure of third vacuum valve (31).
5. a kind of building vacuum drainage system as described in claim 1, it is characterised in that:Under first deodorization apparatus (22)
Oil sealing (223) and ball sealer (224), ball sealer (224) position are provided in the lower chamber (222) of connecting tube (221) lower end in portion
Below oil sealing (223);The blow vent (201) that first collecting box (20) upper end opens up is located at the underface of oil sealing (223),
The diameter of blow vent (201) is less than the diameter of ball sealer (224);Connecting tube (221) upper end is inserted with snorkel (225), ventilation
It is connect between pipe (225) lateral wall and outer housing (226) by bearing rib (227);Diaphragm (228) are breathed to be arranged in outer housing
(226) upper end compresses it fixation by upper cover (229), and breathing diaphragm (228) lower end is connected with deodorization block (2210), deodorization block
(2210) it is located at snorkel (225) upper end, deodorization block (2210) is cylindrical and diameter is greater than snorkel (225) diameter of bore;
Upper cover (229) upper end is provided with respiratory siphon (2211);The blow vent (201) that second collecting box (33) upper end opens up is located at the
The underface of the oil sealing (223) of two deodorization apparatus (37);The knot of first deodorization apparatus (22) and the second deodorization apparatus (37)
Structure is identical.
6. a kind of building vacuum drainage system as described in claim 1, it is characterised in that:The three of first triple valve (44)
It is provided with soft straight tube (443) in logical straight tube (441), first retaining ring (4431) of soft straight tube (443) one end is set in three-way straight pipe
(441) it on one end, is provided with card muscle (4434) on preceding straight tube (4432) side wall of soft straight tube (443) other end, card muscle (4434)
It is formed and is interference fitted with three-way straight pipe (441) inner sidewall, soft straight tube (443) one end is additionally provided with the second retaining ring (4433), preceding straight
The length for managing (4432) is longer than middle straight tube (4435) length in the middle part of soft straight tube (443), and the wall thickness of preceding straight tube (4432) is 1-
1.5mm, the height of card muscle (4434) are 0.5-1mm, the inner sidewalls of the lateral wall of preceding straight tube (4432) and three-way straight pipe (441) it
Between there are the gaps of 0.5mm;Three-way straight pipe (441) side wall is provided with threeway inclined tube (442), threeway inclined tube (442) and three
Logical straight tube (441) inner cavity is connected, and the aperture (449) of three-way straight pipe (441) side wall setting is equipped with check-valves (447), described
The length of preceding straight tube (4432) covers threeway inclined tube (442) inner section;Three-way straight pipe (441) both ends and threeway inclined tube
(442) one end is connected separately with the first end pipe (444), the second end pipe (445) and third end pipe (448), second end by cutting ferrule
O-ring seal (446) are provided between pipe (445) one end and three-way straight pipe (441) one end;First triple valve (44) and the
Two triple valves (45) structure is identical.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810829177.0A CN108867771B (en) | 2018-07-25 | 2018-07-25 | Building vacuum drainage system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810829177.0A CN108867771B (en) | 2018-07-25 | 2018-07-25 | Building vacuum drainage system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108867771A true CN108867771A (en) | 2018-11-23 |
CN108867771B CN108867771B (en) | 2023-07-07 |
Family
ID=64305283
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810829177.0A Active CN108867771B (en) | 2018-07-25 | 2018-07-25 | Building vacuum drainage system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108867771B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110409589A (en) * | 2019-07-31 | 2019-11-05 | 艾迪机器(杭州)有限公司 | A kind of anti-stifled jetting stream vacuum drainage system of no pumping plant |
CN111608242A (en) * | 2020-04-16 | 2020-09-01 | 杭州智笙生物技术有限公司 | Intelligent control method of single vacuum closed sewage collecting and releasing system |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004300894A (en) * | 2003-04-01 | 2004-10-28 | Taisei Setsubi Kk | Drainage collecting system |
DE102007004832A1 (en) * | 2007-01-31 | 2008-08-14 | Airbus Deutschland Gmbh | Drainage device with odor trap for a vacuum toilet drainage system |
CN201512837U (en) * | 2009-09-14 | 2010-06-23 | 杨俊� | Automatic water-saving gas return sewage system |
-
2018
- 2018-07-25 CN CN201810829177.0A patent/CN108867771B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004300894A (en) * | 2003-04-01 | 2004-10-28 | Taisei Setsubi Kk | Drainage collecting system |
DE102007004832A1 (en) * | 2007-01-31 | 2008-08-14 | Airbus Deutschland Gmbh | Drainage device with odor trap for a vacuum toilet drainage system |
CN201512837U (en) * | 2009-09-14 | 2010-06-23 | 杨俊� | Automatic water-saving gas return sewage system |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110409589A (en) * | 2019-07-31 | 2019-11-05 | 艾迪机器(杭州)有限公司 | A kind of anti-stifled jetting stream vacuum drainage system of no pumping plant |
CN110409589B (en) * | 2019-07-31 | 2024-03-26 | 艾迪机器(杭州)有限公司 | Non-pump station anti-blocking jet flow vacuum drainage system |
CN111608242A (en) * | 2020-04-16 | 2020-09-01 | 杭州智笙生物技术有限公司 | Intelligent control method of single vacuum closed sewage collecting and releasing system |
CN111608242B (en) * | 2020-04-16 | 2021-04-27 | 杭州智笙生物技术有限公司 | Intelligent control method of single vacuum closed sewage collecting and releasing system |
Also Published As
Publication number | Publication date |
---|---|
CN108867771B (en) | 2023-07-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108797719A (en) | A kind of recycling of building kitchen garbage and vacuum sewage system | |
CN108867771A (en) | A kind of building vacuum drainage system | |
CN208916874U (en) | A kind of kitchen garbage solid water oil eliminator | |
CN211856549U (en) | Water sample pretreatment detector and water sampling system using same | |
CN209397668U (en) | A kind of building vacuum drainage system | |
CN208917931U (en) | A kind of recycling of building kitchen garbage and vacuum sewage system | |
CN208917940U (en) | A kind of building kitchen garbage pulverizing vacuum collection device | |
CN211856548U (en) | Water quality monitoring water sampling system | |
CN211058984U (en) | Vacuum pump filter equipment | |
CN208917945U (en) | A kind of building vacuum closestool | |
CN108797725A (en) | A kind of building kitchen garbage pulverizing vacuum collection device | |
CN209457114U (en) | A kind of high pressure blowdown integrated apparatus | |
CN214329153U (en) | Vacuum collection and discharge device | |
CN108824577A (en) | A kind of building vacuum closestool | |
CN208917932U (en) | A kind of fully mechanical micro-control air valve damping vacuum interface collection device | |
CN211302180U (en) | Movable sludge suction device for sewage tank | |
CN210142030U (en) | Gas-liquid loop of membrane type liquid-based specimen pelleter | |
CN218058539U (en) | Reclaimed water primary treatment reverse osmosis device | |
CN206128211U (en) | Pipeline dredging device | |
CN203836284U (en) | Water tank drainage solenoid valve | |
CN205933422U (en) | Job site groundwater mining and cyclic utilization system | |
CN216839817U (en) | Washing unit that prefabricated pump station of integration was used | |
CN105036496B (en) | A kind of sewage disposal device with Treatment of Sludge | |
CN217838542U (en) | Sewage treatment arranges mud device for municipal works | |
CN213233753U (en) | Integrated sewage lifting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: No. 603-2, Kangxin Road, Tangqi Town, Yuhang District, Hangzhou City, Zhejiang Province 310000 Applicant after: HOULIDE MACHINE (HANGZHOU) Co.,Ltd. Address before: Room 502c-3, building 2, No.3, Taiji Road, economic development zone, Yuhang District, Hangzhou City, Zhejiang Province 310000 Applicant before: HOULIDE MACHINE (HANGZHOU) Co.,Ltd. |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |