CN108867373A CN201810864074.8A CN201810864074A CN108867373A CN 108867373 A CN108867373 A CN 108867373A CN 201810864074 A CN201810864074 A CN 201810864074A CN 108867373 A CN108867373 A CN 108867373A
Authority
CN
China
Prior art keywords
template
plate
baffle
comb teeth
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810864074.8A
Other languages
Chinese (zh)
Other versions
CN108867373B (en
Inventor
陈庆丰
陈宗辉
周小毛
胡伟
杨碧波
蔡岳龙
唐国庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
6th Engineering Co Ltd of MBEC
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd MBEC
6th Engineering Co Ltd of MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd MBEC, 6th Engineering Co Ltd of MBEC filed Critical China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority to CN201810864074.8A priority Critical patent/CN108867373B/en
Publication of CN108867373A publication Critical patent/CN108867373A/en
Application granted granted Critical
Publication of CN108867373B publication Critical patent/CN108867373B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

The invention discloses a kind of reinforced concrete bridge deck plate template system and construction method, which includes end template, flank template and comb teeth template;Flank template includes the fixed plate being connected with end template and multiple baffles in fixed plate;Baffle is along fixed plate length direction successively arranged for interval;Comb teeth template includes top plate and the multiple tooth plates for being fixed on top plate lower surface vertically, and tooth plate is plugged on framework of steel reinforcement vertically and is located on the inside of baffle and is held in baffle, and each tooth plate is along top plate length direction successively arranged for interval.Baffle and tooth plate provided by the invention are plugged between the reinforcing bar of framework of steel reinforcement, tooth plate is located on the inside of baffle and is held in baffle, on the one hand, baffle forms the extruding to comb teeth template in casting concrete, prevents comb teeth template toward outer displacement, avoid the dislocation between flank template and comb teeth template, it ensure that the verticality of comb teeth template, on the other hand, upper layer and lower layer do not use bolt, project amount is reduced, production efficiency is improved.

Description

A kind of reinforced concrete bridge deck plate template system and construction method
Technical field
The present invention relates to bridge formwork production and installing areas, and in particular to a kind of reinforced concrete bridge deck plate template body System and construction method.
Background technique
Floorings are usually that pouring concrete makes again by building template, conventional by the way of split type side template, this Usually there is drawback in the split type side template of kind:1, since template is divided into upper layer and lower layer, production type is single, takes up a large area; 2, when assembled, upper layer and lower layer are easy to produce dislocation, to influence formwork sides flatness;3, upper layer and lower layer are bolted, Project amount is larger, one of horizontal joint easy to form;4, when installing, lower template is first installed, after framework of steel reinforcement enters mould, then is installed Upper former, upper and lower level template are drilled bolt by the connecting plates of two sides, when dismounting, upper former are first removed, due to lower layer's mould Plate is close to bridge deck concrete surface, and when dismounting is relatively difficult, by tapping lower template when prefabricated boards can only being waited to lift by crane The edge of a wing could remove, increase by a submantle layer punching block using conventional two-piece side punching block not only more, but also increase upper layer and lower layer mould The connecting plate of plate, adjustment upper layer and lower layer mold plate verticality also need to spend it is some artificial, it is uneconomical.Therefore, if to meet a variety of The floorings of type make simultaneously, and the quantity and model of template are just very more, therefore conventional two-piece template be not applicable in.
Summary of the invention
In view of the deficiencies in the prior art, the purpose of the present invention is to provide one kind to avoid upper layer and lower layer dislocation, life Produce high-efficient reinforced concrete bridge deck plate template system.
To achieve the above objectives, the technical solution adopted by the present invention is that:A kind of reinforced concrete bridge deck plate template system, It includes:
End template is used to carry framework of steel reinforcement;
Multiple flank templates, the flank template include the fixed plate being connected with the end template and be set to the fixed plate On multiple baffles;The baffle is along the fixed plate length direction successively arranged for interval;
Multiple comb teeth templates, the comb teeth template include top plate and are fixed on multiple teeth of the top plate lower surface vertically Plate, the tooth plate is for being plugged on the framework of steel reinforcement vertically and being located on the inside of the baffle and be held in the baffle, each institute Tooth plate is stated along the top plate length direction successively arranged for interval.
Further, the template system further includes multiple exterior sheathings, the exterior sheathing include connecting plate, stiffening plate and The first gusset that both ends are connected with the end face of the connecting plate and the stiffening plate respectively, the connecting plate is far from the stiffening plate End face by the second link of boards in the side of the top plate lower surface far from the tooth plate.
Further, first gusset is equipped at intervals with multiple along top plate length direction.
Further, second gusset is equipped at intervals with multiple along top plate length direction.
Further, second gusset is with a thickness of 10mm, and distance is 400mm between adjacent two second gusset.
Further, the top plate lower surface is also vertically fixed two third gussets, and the two third gussets are located at institute Top plate two sides are stated, and each tooth plate is between the two third gussets.
Further, the connecting hole for the adjacent two comb teeth template connection is offered on the third gusset.
Further, hole for hoist is offered on the top plate.
Further, the fixed plate is fixed with the bed die crab bolt.
The present invention also provides a kind of construction methods of reinforced concrete bridge deck plate template system, include the following steps:
Along the edge of the end template, the flank template is mounted on the end template surrounding;
The framework of steel reinforcement is lifted to the end template, make the baffle be plugged in the framework of steel reinforcement reinforcing bar it Between;
Along the edge of the framework of steel reinforcement, the comb teeth template is plugged in the framework of steel reinforcement surrounding, is located at tooth plate On the inside of the baffle and it is held in the baffle, the two neighboring comb teeth template is connected and fixed by bolt and screw;
Casting concrete forms floorings.
Compared with the prior art, the advantages of the present invention are as follows:
(1) template system provided by the invention, end template, flank template and comb teeth template are all calibrated bolck, integral assembling It uses, when installation, baffle and tooth plate are all to be plugged between the reinforcing bar of framework of steel reinforcement, and tooth plate is located at baffle inside and supports In baffle, baffle forms the extruding to comb teeth template in casting concrete, prevents comb teeth template toward outer displacement, avoids flank Dislocation between template and comb teeth template ensure that the verticality of comb teeth template.
(2) flank template and comb teeth template of the present invention are to realize that is, tooth plate is located at gear by the effect of tooth plate and baffle On the inside of plate and it is held in baffle, stress between the two does not need to be fixedly connected by bolt, greatly reduces and use bolt The project amount of connection, improves production efficiency, avoids appearance such as conventional two-piece mode bring horizontal joint.
Detailed description of the invention
Fig. 1 is end template structural schematic diagram provided in an embodiment of the present invention;
Fig. 2 is flank template main view provided in an embodiment of the present invention;
Fig. 3 is the top view of Fig. 2;
Fig. 4 is comb teeth template main view provided in an embodiment of the present invention;
Fig. 5 is Fig. 4 top view;
Fig. 6 is Fig. 4 left view;
Fig. 7 is floorings provided in an embodiment of the present invention and framework of steel reinforcement structural schematic diagram.
In figure:1, end template;10, first positioning hole;2, flank template;20, fixed plate;200, second location hole;21, it keeps off Plate;3, comb teeth template;30, top plate;300, hole for hoist;31, tooth plate;32, third gusset;320, connecting hole;4, exterior sheathing;40, Connecting plate;41, stiffening plate;42, the first gusset;43, the second gusset;5, framework of steel reinforcement;6, floorings;60, exposed steel bar.
Specific embodiment
Invention is further described in detail with reference to the accompanying drawings and embodiments.
Referring to FIG. 1 to FIG. 4, the embodiment of the present invention provides a kind of reinforced concrete bridge deck plate template system, packet Include end template 1, multiple flank templates 2 and the multiple comb teeth templates 3 for carrying framework of steel reinforcement 5 (shown in Figure 7);Referring to figure Shown in 2 and Fig. 3, flank template 2 includes the fixed plate 20 being connected with end template 1 and multiple baffles 21 in fixed plate 20; Baffle 21 is along 20 length direction of fixed plate successively arranged for interval;Shown in Figure 4, comb teeth template 3 is solid including top plate 30 and vertically Multiple tooth plates 31 of 30 lower surface of top plate are scheduled on, in use, tooth plate 31 is plugged in vertically on framework of steel reinforcement 5, and tooth plate 31 In the inside of baffle 21 and it is held in baffle 21, each tooth plate 31 is along 30 length direction of top plate successively arranged for interval.
Template system provided by the invention, end template 1, flank template 2 and comb teeth template 3 are all calibrated bolck, integral assembling It uses, when installation, baffle 21 and tooth plate 31 are all to be plugged between the reinforcing bar of framework of steel reinforcement 5, and tooth plate 31 is located at baffle 21 Inside is simultaneously held in baffle 21, and baffle 21 forms the extruding to comb teeth template 3 in casting concrete, prevents comb teeth template 3 past Outer displacement avoids the dislocation between flank template 2 and comb teeth template 3, ensure that the verticality of comb teeth template 3.
Flank template 2 and comb teeth template 3 of the present invention are realized by the effect of tooth plate 31 and baffle 21, i.e. tooth plate 31 In 21 inside of baffle and it is held in baffle 21, stress between the two is not needed to be fixedly connected by bolt, be substantially reduced The project amount being connected with, improves production efficiency, avoids appearance such as conventional two-piece mode bring horizontal joint.
The present invention uses comb teeth template 3, only the tooth plate 31 of comb teeth template 3 need to be abutted baffle 21 when worker installs, can be with Accomplish integral installation and remove, greatly improves work efficiency.
In the present embodiment, comb teeth template 3 is deformed when removing and handling in order to prevent, and top plate 30 uses 20mm thick steel plate; Baffle 21 uses 10mm thick steel plate in the present embodiment.
Referring to figs. 5 and 6 shown in, in order to improve the number of turnover of comb teeth template 3, prevent in use because hit, Beat deformation, template system further includes multiple exterior sheathings 4, exterior sheathing 4 include connecting plate 40, stiffening plate 41 and both ends respectively with The first gusset 42 that connecting plate 40 is connected with the end face of stiffening plate 41, connecting plate 40 pass through the second muscle far from the end face of stiffening plate 41 Plate 43 is connected to side of 30 lower surface of top plate far from tooth plate 31.In the present embodiment, connecting plate 40, stiffening plate 41 and the first gusset 42 are welded into body structure, then with comb teeth template 3 by being welded into body structure.
In the present embodiment, end template 1, flank template 2, comb teeth template 3 and 4 surface of exterior sheathing are painted with anti-corrosion material, For example it paints.
It is shown in Figure 5, the first gusset 42 be equipped at intervals with along top plate length direction it is multiple, in the present embodiment, the first gusset 42 with a thickness of 6mm, and distance is 100mm between adjacent two first gusset 42.
Second gusset 43 is equipped at intervals with multiple along top plate length direction, and the second gusset 43 is with a thickness of 10mm, and adjacent two second Distance is 400mm between gusset 43, and 43 width of the second gusset is greater than 21 thickness of baffle, and baffle 21 is allow to be inserted in tooth plate 31 and connect Between fishplate bar 40.
Shown in Figure 5,30 lower surface of top plate is also vertically fixed two third gussets 32, and two third gussets 32 are located at 30 two sides of top plate, and each tooth plate 31 is located between two third gussets 32.Second gusset 43 and third gusset 32 are using identical Gusset, and the distance between the second gusset 43 of close third gusset 32 and the third gusset 32 are 400mm.
It is shown in Figure 6, the connecting hole 320 for the connection of adjacent two comb teeth template 3 is offered on third gusset 32, it is adjacent Two comb teeth templates 3 connect installation and removal conveniently by being arranged in the bolt of connecting hole 320.
It is shown in Figure 5, hole for hoist 300 is offered on top plate 30, hole for hoist 300 respectively sets one on 30 both sides of top plate, side Just the lifting operation of comb teeth template 3, is transported through using door machine, greatly reduces labor intensity of workers.
Referring to first positioning hole 10 shown in Fig. 1 and Fig. 3, is offered on end template 1, offers in fixed plate 20 and determine with first The matched second location hole 200 in position hole 10, fixed plate 20 and end template 1 are by being threaded through first positioning hole 10 and second location hole 200 bolt is fixed.
Shown in Figure 7, the present invention also provides the construction methods of reinforced concrete bridge deck plate template system, including such as Lower step:
S1:Second location hole 200 in the fixed plate 20 of flank template 2 is directed at the first positioning hole 10 on end template 1, It is fixed with bolt, along the edge of end template 1, flank template 2 is mounted on 1 surrounding of end template;
S2:By in the lifting to end template 1 of framework of steel reinforcement 5, it is plugged in baffle 21 between the reinforcing bar of framework of steel reinforcement 5;
S3:Along the edge of framework of steel reinforcement 5, comb teeth template 3 is plugged in 5 surrounding of framework of steel reinforcement, tooth plate 31 is made to be located at baffle 21 insides are simultaneously held in baffle 21, when comb teeth 3 grafting of template, one section are reserved on framework of steel reinforcement 5 and is used as exposed steel bar 60, phase Adjacent two comb teeth templates 3 are located next to, and the connecting hole 320 of two neighboring comb teeth template 3 are passed through by bolt, and connected admittedly with screw It is fixed;
S4:Casting concrete forms floorings 6;
S5:Comb teeth template 3 is removed, flank template 2 is removed.
The present invention is not limited to the above-described embodiments, for those skilled in the art, is not departing from Under the premise of the principle of the invention, several improvements and modifications can also be made, these improvements and modifications are also considered as protection of the invention Within the scope of.The content being not described in detail in this specification belongs to the prior art well known to professional and technical personnel in the field.

Claims (10)

1. a kind of reinforced concrete bridge deck plate template system, which is characterized in that it includes:
End template (1) is used to carry framework of steel reinforcement (5);
Multiple flank templates (2), the flank template (2) include the fixed plate (20) being connected with the end template (1) and are set to Multiple baffles (21) on the fixed plate (20);The baffle (21) is successively spaced cloth along the fixed plate (20) length direction It sets;
Multiple comb teeth templates (3), the comb teeth template (3) include top plate (30) and are fixed on the top plate (30) lower surface vertically Multiple tooth plates (31), the tooth plate (31) for be plugged on the framework of steel reinforcement (5) vertically and be located at the baffle (21) Inside is simultaneously held in the baffle (21), and each tooth plate (31) is along the top plate (30) length direction successively arranged for interval.
2. reinforced concrete bridge deck plate template system as described in claim 1, it is characterised in that:The template system also wraps Include multiple exterior sheathings (4), the exterior sheathing (4) include connecting plate (40), stiffening plate (41) and both ends respectively with the connection The first gusset (42) that plate (40) is connected with the end face of the stiffening plate (41), the connecting plate (40) is far from the stiffening plate (41) end face is connected to side of the top plate (30) lower surface far from the tooth plate (31) by the second gusset (43).
3. reinforced concrete bridge deck plate template system as claimed in claim 2, it is characterised in that:First gusset (42) It is equipped at intervals with along top plate length direction multiple.
4. reinforced concrete bridge deck plate template system as claimed in claim 2, it is characterised in that:Second gusset (43) It is equipped at intervals with along top plate length direction multiple.
5. reinforced concrete bridge deck plate template system as claimed in claim 4, it is characterised in that:Second gusset (43) With a thickness of 10mm, distance is 400mm between adjacent two second gusset (43).
6. reinforced concrete bridge deck plate template system as described in claim 1, it is characterised in that:Top plate (30) following table Face is also vertically fixed two third gussets (32), and the two third gussets (32) are located at the top plate (30) two sides, and each institute Tooth plate (31) are stated between the two third gussets (32).
7. reinforced concrete bridge deck plate template system as claimed in claim 6, it is characterised in that:The third gusset (32) On offer connecting hole (320) for the adjacent two comb teeth templates (3) connection.
8. reinforced concrete bridge deck plate template system as described in claim 1, it is characterised in that:It is opened on the top plate (30) Equipped with hole for hoist (300).
9. reinforced concrete bridge deck plate template system as described in claim 1, it is characterised in that:The fixed plate (20) with End template (1) bolt is fixed.
10. a kind of construction method of reinforced concrete bridge deck plate template system as described in any one of claim 1 to 9, special Sign is, includes the following steps:
Along the edge of the end template (1), the flank template (2) is mounted on the end template (1) surrounding;
By in the framework of steel reinforcement (5) lifting to the end template (1), the baffle (21) is made to be plugged in the framework of steel reinforcement (5) between reinforcing bar;
Along the edge of the framework of steel reinforcement (5), the comb teeth template (3) is plugged in the framework of steel reinforcement (5) surrounding, makes tooth plate (31) it is located on the inside of the baffle (21) and is held in the baffle (21), the two neighboring comb teeth template (3) passes through bolt It is connected and fixed with screw;
Casting concrete is formed floorings (6).
CN201810864074.8A 2018-08-01 2018-08-01 Template system for reinforced concrete bridge deck and construction method Active CN108867373B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810864074.8A CN108867373B (en) 2018-08-01 2018-08-01 Template system for reinforced concrete bridge deck and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810864074.8A CN108867373B (en) 2018-08-01 2018-08-01 Template system for reinforced concrete bridge deck and construction method

Publications (2)

Publication Number Publication Date
CN108867373A true CN108867373A (en) 2018-11-23
CN108867373B CN108867373B (en) 2024-02-27

Family

ID=64307290

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810864074.8A Active CN108867373B (en) 2018-08-01 2018-08-01 Template system for reinforced concrete bridge deck and construction method

Country Status (1)

Country Link
CN (1) CN108867373B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158473A (en) * 2019-05-07 2019-08-23 中交一公局桥隧工程有限公司 Processing unit (plant) and processing method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0913405A (en) * 1995-06-30 1997-01-14 Koken Sangyo Kk Retaining wall construction method and formwork for executing the method
CN103711083A (en) * 2014-01-03 2014-04-09 中铁大桥局集团第四工程有限公司 Double-layer comb-shaped pattern plate system and installation method thereof
CN104153296A (en) * 2014-07-29 2014-11-19 中建四局第五建筑工程有限公司 Method for increasing bridge deck pavement flatness and comb-shaped form board used by same
CN204826618U (en) * 2015-07-06 2015-12-02 中国建筑第八工程局有限公司 After water board template structure
CN205223857U (en) * 2015-10-13 2016-05-11 中国十七冶集团有限公司 Edge of a wing broach template of prefabricated T roof beam or case roof beam
CN208803372U (en) * 2018-08-01 2019-04-30 中铁大桥局集团第六工程有限公司 A kind of reinforced concrete bridge deck plate template system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0913405A (en) * 1995-06-30 1997-01-14 Koken Sangyo Kk Retaining wall construction method and formwork for executing the method
CN103711083A (en) * 2014-01-03 2014-04-09 中铁大桥局集团第四工程有限公司 Double-layer comb-shaped pattern plate system and installation method thereof
CN104153296A (en) * 2014-07-29 2014-11-19 中建四局第五建筑工程有限公司 Method for increasing bridge deck pavement flatness and comb-shaped form board used by same
CN204826618U (en) * 2015-07-06 2015-12-02 中国建筑第八工程局有限公司 After water board template structure
CN205223857U (en) * 2015-10-13 2016-05-11 中国十七冶集团有限公司 Edge of a wing broach template of prefabricated T roof beam or case roof beam
CN208803372U (en) * 2018-08-01 2019-04-30 中铁大桥局集团第六工程有限公司 A kind of reinforced concrete bridge deck plate template system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158473A (en) * 2019-05-07 2019-08-23 中交一公局桥隧工程有限公司 Processing unit (plant) and processing method

Also Published As

Publication number Publication date
CN108867373B (en) 2024-02-27

Similar Documents

Publication Publication Date Title
CN109707090B (en) Pre-buried dislocation preventing structure under laminated plate reinforced band plate and construction method
CN102704672A (en) Installation construction method for large all-steel formwork at internal corner of shear wall
CN101481935B (en) Prestressed reinforcement concrete double T plate, tire shuttering thereof and production method
CN206748695U (en) The prefabricated edges of boards mould of zigzag
CN208803372U (en) A kind of reinforced concrete bridge deck plate template system
CN111730738A (en) Prefabricated box girder diaphragm plate connecting structure and construction method thereof
CN108867373A (en) A kind of reinforced concrete bridge deck plate template system and construction method
CN111608314A (en) Bidirectional laminated slab concrete structure and integral joint construction method thereof
CN209190965U (en) A kind of adjustable prefabricated board die
CN215519942U (en) Assembly template applied to super high-rise dual-core barrel structure
CN206690311U (en) Mold for tie with reinforcing bar
CN212266159U (en) Prefabricated case roof beam body preformed hole template
CN213173791U (en) Assembled landing stage pile cap
CN208323723U (en) A kind of pin-connected panel prefabricated panel mold
CN209195006U (en) Tool-type reinforcing template for assembled composite beam and prefabricated post joint
CN111706005A (en) Integrated reinforcing steel bar formwork-free cast-in-place concrete beam
CN207812625U (en) Special-shaped gutter template integrated apparatus
CN111691598A (en) A prefabricated even roof beam of high-efficient processing and node structure for superimposed shear wall
CN218346800U (en) Pool large formwork mounting device
CN218668499U (en) Wall soft mold system with angle steel and clamping piece as connecting pieces
CN205024908U (en) Constructional device that whole combination of steel bar truss floor board, hoist and mount are taken one's place
CN106223543B (en) A kind of light steel construction column of cross quick access formula and its installation method
CN212866869U (en) Reinforced composite cement-based U-shaped beam shell
CN210316546U (en) Novel assembled post-cast section reinforcing device
CN218111142U (en) Aluminum detachable prefabricated wall formwork

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant